Spray jet pressure control method
By introducing temporary grout storage containers and waste grout discharge pipes into jet grouting piles, the problem of unstable grout pressure control in jet grouting technology has been solved, achieving stable control and grout penetration of upward inclined jet grouting, expanding the application scope of jet grouting technology, and improving construction quality and control accuracy.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- 叶晓明
- Filing Date
- 2022-06-25
- Publication Date
- 2026-06-30
AI Technical Summary
Existing jet grouting technology cannot effectively control grout pressure in upward-sloping jet grouting pile construction, leading to grout outflow. Therefore, it cannot be applied to projects that require upward-sloping reinforcement, such as tunnel excavation.
A temporary grout storage container is introduced through a grout outlet pipe with a grout stop plug, and the grout is allowed to permeate into the soil surrounding the jet grouting body by adjusting the pressure control height L. Excess grout is then discharged into a waste grout container through a waste grout discharge pipe to achieve pressure stabilization control.
It has achieved stable control of upward tilting jet grouting and slurry penetration, expanded the application scope of jet grouting technology, improved construction quality and control accuracy, and reduced implementation costs.