A line fire prevention method, device, system and storage medium

By employing high-precision voltage and zero-sequence transformers to identify fault phases and close grounding switches, the method and device address the inefficacy of existing arc extinguishing coils, effectively preventing forest fires and ensuring power supply safety.

CN115347546BActive Publication Date: 2024-12-03STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202210825889.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-14
Publication Date
2024-12-03
Estimated Expiration
2042-07-14

AI Technical Summary

Technical Problem

Existing arc extinguishing coils in power distribution lines are ineffective in compensating capacitive currents below 50mA, leading to fault arcs that can ignite forest fires in mountainous areas with high tree density.

Method used

A method and device that quickly identifies the fault phase and closes a grounding switch to transfer capacitive current to ground, utilizing high-precision voltage transformers and a zero-sequence voltage transformer to determine the fault phase and generate a grounding switch closing instruction, ensuring the current is routed to the ground to extinguish arcs.

Benefits of technology

The solution effectively extinguishes fault arcs by transferring current to ground, preventing forest fires and ensuring power supply safety by quickly identifying and responding to single-phase grounding faults.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115347546B_ABST
    Figure CN115347546B_ABST
Patent Text Reader

Abstract

The present invention discloses a line forest fire prevention method, device, system and storage medium. The method obtains the bus voltage monitored in real time by a fault phase selection device, and when the bus voltage is abnormal, starts a fault phase selection program to determine the fault phase; generates a grounding switch closing instruction based on the fault phase, and closes the grounding switch corresponding to the fault based on the grounding switch closing instruction, so as to transfer the current of the grounding fault point corresponding to the fault to the grounding switch into the ground, so as to achieve the effect of automatic extinguishing of the arc at the fault point, and prevent forest fires from occurring in the target area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid line safety monitoring, and in particular to a line wildfire prevention method, device, system and storage medium. Background Art

[0002] my country's distribution lines (35kV, 10kV lines) mainly adopt the operation mode of neutral point ungrounded or grounded through arc suppression coil. With the above operation mode, the line can continue to operate when a single-phase grounding fault occurs, which effectively improves the power supply reliability of the distribution line. However, for distribution lines set in mountainous areas, due to the large number of trees in the mountainous areas, if a single-phase to ground discharge fault occurs in the distribution line, it will cause forest fires, increasing the risk of forest fires ignited by lines in forest areas.

[0003] The key to preventing forest fires caused by single-phase discharge faults in distribution lines is to prevent the generation of fault arcs. Under certain voltage conditions, the size of the fault arc is determined by the size of the capacitive current flowing through the single-phase grounding fault point, and the capacitive current is determined by the system capacity. The capacitive current of the mountain distribution system generally ranges from 1A to 100A. Tests have shown that when the current flowing through the single-phase grounding fault point of the distribution line exceeds 50mA, there is a possibility of arc generation and igniting tree branches. The arc extinguishing coils commonly used at present are difficult to compensate the capacitive current to below 50mA, so they cannot completely eliminate the fault arc and prevent forest fires. Summary of the invention

[0004] The technical problem to be solved by the present invention is that the arc extinguishing coil used in the prior art is difficult to compensate the capacitive current to below 50mA, and it is impossible to eliminate the fault arc to prevent forest fires. Therefore, the present invention provides a line forest fire prevention method, device, system and storage medium, so that when a single-phase grounding fault occurs in the distribution line, the fault phase is quickly identified through a fault phase selection device, and the grounding switch of the bus fault phase is closed, so that the capacitive current flowing through the fault point is transferred to the station and enters the ground through the grounding switch. In the case of high-resistance grounding, since the impedance of the fault point is much higher than the inland grid of the distribution system, most of the capacitive current will enter the ground through the station, and the residual current flowing through the fault point is almost zero, so as to achieve the purpose of automatic extinguishing of the arc at the fault point, thereby preventing the occurrence of forest fires.

[0005] The present invention is achieved through the following technical solutions:

[0006] A line fire prevention method, comprising:

[0007] Obtain the bus voltage of the target area monitored in real time by the fault phase selection device. When the bus voltage is abnormal, start the fault phase selection program to determine the fault phase;

[0008] A grounding switch closing instruction is generated based on the fault phase, and a grounding switch corresponding to the fault is closed based on the grounding switch closing instruction to transfer the current of the grounding fault point corresponding to the fault to the ground of the grounding switch.

[0009] Furthermore, after obtaining the bus voltage of the target area monitored in real time by the fault phase selection device, the line fire prevention method further includes:

[0010] After obtaining the bus three-phase voltage of the target area monitored in real time by the fault phase selection device, a vector sum calculation is performed on the monitored bus three-phase voltage, and the calculated zero-sequence voltage is compared with the zero-sequence voltage monitored by the zero-sequence voltage transformer in the fault phase selection device;

[0011] When the calculated zero-sequence voltage is inconsistent with the zero-sequence voltage monitored by the zero-sequence voltage transformer, the zero-sequence voltage monitored by the zero-sequence voltage transformer is compared with the maximum zero-sequence voltage during normal operation of the distribution system. When the monitored zero-sequence voltage is greater than the preset multiple of the maximum zero-sequence voltage during normal operation of the distribution system, it is determined that the bus voltage in the target area is abnormal.

[0012] Furthermore, when the bus voltage is abnormal, the fault phase selection program is started to determine the fault phase, including:

[0013] When the bus voltage is abnormal, the fault phase is determined according to the capacitance and current compensation status of the distribution system;

[0014] When the capacitance current compensation state of the power distribution system is no compensation or under compensation, the next phase of the highest voltage phase among the three-phase voltage is determined as the fault phase;

[0015] When the capacitance current compensation state of the power distribution system is an over-compensation state, the previous phase of the highest voltage phase among the three-phase voltage is determined as the fault phase.

[0016] Further, generating a grounding switch closing instruction based on the faulty phase includes:

[0017] The zero-sequence voltage monitored by the zero-sequence voltage transformer is obtained, and the trigger quantity calculation formula is called in combination with the transformation ratio of the zero-sequence voltage transformer to calculate the trigger quantity;

[0018] Determine the minimum threshold of the trigger amount according to the risk level of the target area, and compare the calculated trigger amount with the minimum threshold of the trigger amount. When the calculated trigger amount is greater than the minimum threshold of the trigger amount, determine the sensitivity of the grounding switch according to the risk level of the target area, and the risk level of the monitoring area is proportional to the sensitivity of the grounding switch;

[0019] The corresponding switch closing command is generated based on the sensitivity of the grounding switch and the fault phase.

[0020] Furthermore, the trigger amount calculation formula is specifically:

[0021]

[0022] In the formula, δ represents the triggering amount, ΔU0 represents the zero-sequence voltage increment, and k0 represents the transformation ratio of the zero-sequence voltage transformer.

[0023] Furthermore, the action time of the grounding switch is less than 30 ms.

[0024] A line mountain fire prevention device, comprising:

[0025] The fault phase identification module is used to obtain the bus voltage of the target area monitored in real time by the fault phase selection device. When the bus voltage is abnormal, the fault phase selection program is started to determine the fault phase;

[0026] The grounding switch closing processing module is used to generate a grounding switch closing instruction based on the fault phase, and close the grounding switch corresponding to the fault based on the grounding switch closing instruction to transfer the current of the single-phase grounding fault point corresponding to the fault to the grounding switch.

[0027] Furthermore, the fault phase identification module includes:

[0028] The zero-sequence voltage determination unit is used to perform vector sum calculation on the monitored three-phase bus voltage after obtaining the bus three-phase voltage of the target area monitored in real time by the fault phase selection device, and compare the calculated zero-sequence voltage with the zero-sequence voltage monitored by the zero-sequence voltage transformer;

[0029] A bus voltage abnormality determination unit is used to compare the zero-sequence voltage monitored by the zero-sequence voltage transformer with the maximum zero-sequence voltage during normal operation of the distribution system when the calculated zero-sequence voltage is inconsistent with the zero-sequence voltage monitored by the zero-sequence voltage transformer, and determine that the bus voltage of the target area is abnormal when the monitored zero-sequence voltage is greater than a preset multiple of the maximum zero-sequence voltage during normal operation of the distribution system;

[0030] A bus voltage abnormality processing unit, used to determine the fault phase according to the capacitance current compensation state of the power distribution system when the bus voltage is abnormal;

[0031] A first fault phase determination unit is used to determine the next phase of the highest voltage phase among the three-phase voltages as the fault phase when the capacitance current compensation state of the power distribution system is a non-compensation state or an under-compensation state;

[0032] The second fault phase determination unit is used to determine the previous phase of the highest voltage phase among the three-phase voltage as the fault phase when the capacitance current compensation state of the power distribution system is an over-compensation state.

[0033] Furthermore, the grounding switch closing processing module includes:

[0034] A trigger quantity calculation unit is used to obtain the zero-sequence voltage monitored by the zero-sequence voltage transformer, and call the trigger quantity calculation formula in combination with the transformation ratio of the zero-sequence voltage transformer to calculate the trigger quantity;

[0035] A grounding switch sensitivity determination unit, used to determine a minimum threshold of a trigger quantity according to a risk level of a target area, and compare the calculated trigger quantity with the minimum threshold of the trigger quantity; when the calculated trigger quantity is greater than the minimum threshold of the trigger quantity, the sensitivity of the grounding switch is determined according to the risk level of the target area, and the risk level of the monitoring area is proportional to the sensitivity of the grounding switch;

[0036] The switch closing instruction generating unit is used to generate a corresponding switch closing instruction based on the sensitivity of the grounding switch and the fault phase.

[0037] A line forest fire prevention system, characterized in that it comprises the above-mentioned line forest fire prevention device, a fault phase selection device and a grounding switch;

[0038] The fault phase selection device is used to monitor the bus voltage of the target area in real time and send it to the line fire prevention device;

[0039] The line fire prevention device judges the received bus voltage, determines the fault phase according to the abnormal bus voltage, and generates a switch closing instruction;

[0040] The grounding switch is closed based on the received switch closing instruction, and the current of the single-phase grounding fault point corresponding to the fault is transferred to the grounding switch into the ground.

[0041] Furthermore, the fault phase selection device includes three voltage transformers, namely a first voltage transformer, a second voltage transformer and a third voltage transformer. The first voltage transformer, the second voltage transformer and the third voltage transformer are respectively installed on corresponding bus phase lines to monitor the bus three-phase voltage on the distribution line in real time.

[0042] Furthermore, the fault phase selection device also includes a zero-sequence voltage transformer, and the zero-sequence voltage transformer monitors the zero-sequence voltage on the bus in real time.

[0043] Further, the voltage measurement error of the first voltage transformer, the second voltage transformer, the third voltage transformer and the zero-sequence voltage transformer is less than 0.01%;

[0044] The transformation ratio is:

[0045]

[0046] Wherein, k represents the transformation ratio of the first voltage transformer, the second voltage transformer, the third voltage transformer or the zero-sequence voltage transformer, and U0 represents the bus voltage of the distribution line, in kV.

[0047] The present invention provides a line forest fire prevention method, device, system and storage medium. The method obtains the bus voltage of the target area monitored in real time by a fault phase selection device. When the bus voltage is abnormal, a fault phase selection program is started to determine the fault phase; a grounding switch closing instruction is generated based on the fault phase, and the grounding switch corresponding to the fault is closed based on the grounding switch closing instruction, so as to transfer the current of the grounding fault point corresponding to the fault to the grounding switch into the ground, so as to achieve the effect of automatic extinguishing of the arc at the fault point, thereby preventing forest fires from occurring in the target area. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0049] Figure 1 The present invention is a flow chart of a line mountain fire prevention method.

[0050] Figure 2 for Figure 1 A specific flow chart of step S10 in FIG.

[0051] Figure 3 for Figure 1 A specific flow chart of step S20 in FIG.

[0052] Figure 4 A schematic structural diagram of a line mountain fire prevention device according to the present invention.

[0053] Figure 5 The present invention is a schematic structural diagram of a line mountain fire prevention system. DETAILED DESCRIPTION

[0054] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0055] The present invention provides a line fire prevention method, which can be applied to different electronic devices, including but not limited to various personal computers, notebook computers, smart phones and tablet computers.

[0056] Example 1

[0057] In one embodiment, if Figure 1 As shown, the present invention provides a line mountain fire prevention method, comprising:

[0058] S10: Obtain the bus voltage of the target area monitored in real time by the fault phase selection device. When the bus voltage is abnormal, start the fault phase selection program to determine the fault phase.

[0059] Among them, the target area refers to the area that requires wildfire prevention and control.

[0060] Specifically, the fault phase selection device includes three high-precision voltage transformers, namely, a first voltage transformer, a second voltage transformer, and a third voltage transformer, which are respectively installed on corresponding bus phase lines and are used to monitor the bus three-phase voltage on the distribution line in real time. Since the zero-sequence voltage calculated based on the vector sum of the bus three-phase voltage may not be accurate, in order to improve the accuracy of the zero-sequence voltage, the fault phase selection device of this embodiment also includes a zero-sequence voltage transformer, which monitors the zero-sequence voltage on the bus in real time.

[0061] The voltage measurement accuracy of the first voltage transformer, the second voltage transformer, the third voltage transformer and the zero-sequence voltage transformer is less than 0.01%;

[0062] The transformation ratio is:

[0063]

[0064] Wherein, k represents the transformation ratio of the first voltage transformer, the second voltage transformer, the third voltage transformer or the zero-sequence voltage transformer, and U0 represents the bus voltage of the distribution line, in kV.

[0065] When the bus voltage on the distribution line is 10kV, the transformation ratio of the voltage transformer is 100:1; when it is 35kV, the transformation ratio of the voltage transformer is 350:1.

[0066] S20: Generate a grounding switch closing instruction based on the fault phase, and close the grounding switch corresponding to the fault based on the grounding switch closing instruction to transfer the current of the grounding fault point corresponding to the fault to the ground of the grounding switch.

[0067] Furthermore, in order to protect the power supply safety and prevent the occurrence of fire, the grounding switch used in this embodiment is a switch that can quickly complete the start-up and closing, and its action time needs to be less than 30ms.

[0068] Furthermore, if Figure 2 As shown, in step S10, after obtaining the bus voltage of the target area monitored in real time by the fault phase selection device, a line fire prevention method further includes:

[0069] S11: After obtaining the bus three-phase voltage of the target area monitored in real time by the fault phase selection device, a vector sum calculation is performed on the monitored bus three-phase voltage, and the calculated zero-sequence voltage is compared with the zero-sequence voltage monitored by the zero-sequence voltage transformer in the fault phase selection device.

[0070] S12: When the calculated zero-sequence voltage is inconsistent with the zero-sequence voltage monitored by the zero-sequence voltage transformer, the zero-sequence voltage monitored by the zero-sequence voltage transformer is compared with the maximum zero-sequence voltage during normal operation of the distribution system. When the monitored zero-sequence voltage is greater than a preset multiple of the maximum zero-sequence voltage during normal operation of the distribution system, it is determined that the bus voltage in the target area is abnormal.

[0071] Furthermore, if Figure 2 As shown, in step S10, when the bus voltage is abnormal, the fault phase selection program is started to determine the fault phase, which specifically includes the following steps:

[0072] S13: When the bus voltage is abnormal, the fault phase is determined according to the capacitance current compensation state of the distribution system.

[0073] S14: When the capacitance current compensation state of the power distribution system is a non-compensation state or an under-compensation state, the next phase of the highest voltage phase among the three-phase voltage is determined as the fault phase.

[0074] S15: When the capacitance current compensation state of the power distribution system is an over-compensation state, the previous phase of the highest voltage phase among the three-phase voltage is determined as the fault phase.

[0075] Furthermore, if Figure 3 As shown, in step S20, generating a grounding switch closing instruction based on the faulty phase specifically includes the following steps:

[0076] S21: Obtain the zero-sequence voltage monitored by the zero-sequence voltage transformer, and call the trigger quantity calculation formula in combination with the transformation ratio of the zero-sequence voltage transformer to calculate the trigger quantity.

[0077] S22: Determine the minimum threshold of the trigger quantity according to the risk level of the target area, and compare the calculated trigger quantity with the minimum threshold of the trigger quantity. When the calculated trigger quantity is greater than the minimum threshold of the trigger quantity, determine the sensitivity of the grounding switch according to the risk level of the target area. The risk level of the monitoring area is proportional to the sensitivity of the grounding switch.

[0078] Specifically, according to the risk level of the target area, a pre-stored mapping table of risk level and trigger quantity is queried to determine the minimum threshold of the trigger quantity corresponding to the target area. After obtaining the minimum threshold of the trigger quantity, the calculated trigger quantity is compared with the minimum threshold of the trigger quantity. When the calculated trigger quantity is greater than the minimum threshold of the trigger quantity, the sensitivity of the switch is determined according to the risk level of the target area. The higher the risk level of the area, the more dangerous it is. The grounding switch needs to be set more sensitively, and the corresponding minimum threshold of the trigger quantity is set smaller; the lower the risk level of the area, the less dangerous it is. The grounding switch does not need to be set too sensitive accordingly, and the corresponding minimum threshold of the trigger quantity can be set larger. The sensitivity of the grounding switch can be flexibly set according to the risk level of different areas to better meet actual requirements and save resources.

[0079] For ease of understanding, this embodiment sets a mapping table between risk levels and trigger amounts as shown in Table 2. This mapping table is only for illustrative purposes and does not limit the mapping table between risk levels and trigger amounts in this embodiment.

[0080] Risk Level Minimum trigger threshold High-risk areas 0.35 Medium-risk areas 0.6 Low risk areas 2

[0081] Table 2

[0082] S23: Generate a corresponding switch closing command based on the sensitivity of the grounding switch and the fault phase.

[0083] Specifically, the risk level is proportional to the sensitivity of the grounding switch and inversely proportional to the trigger amount. The higher the risk level, the higher the sensitivity of the grounding switch and the lower the trigger amount. That is, the lower the trigger amount in the monitored risk area, the more sensitive the grounding switch. When the busbar zero-sequence voltage change in a high-risk area exceeds the corresponding minimum threshold of the trigger amount, it means that there is a risk of fire in the area, and it is necessary to immediately start the corresponding grounding switch to close the circuit, and transfer the current of the grounding fault point corresponding to the fault to the grounding switch to ensure power supply safety; while low-risk areas do not need to be so sensitive. When the busbar zero-sequence voltage in the area changes significantly, that is, it exceeds the corresponding minimum threshold of the trigger amount, it is judged that there is a risk of fire in the area, and it is necessary to start the corresponding grounding switch to close the circuit, and transfer the current of the grounding fault point corresponding to the fault to the grounding switch to ensure power supply safety. In this embodiment, it is only necessary to start the grounding switch to close the circuit, so as to ensure the safety of the corresponding phase line, and it is not necessary to determine the specific fault point.

[0084] Furthermore, the trigger quantity calculation formula is specifically as follows:

[0085]

[0086] In the formula, δ represents the triggering amount, ΔU0 represents the zero-sequence voltage increment, and k0 represents the transformation ratio of the zero-sequence voltage transformer.

[0087] The present invention provides a line forest fire prevention method, which obtains the bus voltage of the target area monitored in real time by a fault phase selection device, and determines whether the bus voltage is abnormal through the zero-sequence voltage. When the bus voltage is abnormal, the fault phase selection program is started, and the fault phase is determined according to the operating state of the distribution system. When the operating state of the distribution system is an uncompensated or under-compensated state, the next phase of the highest voltage phase in the three-phase voltage is determined as the fault phase. When the operating state of the distribution system is an over-compensated state, the previous phase of the highest voltage phase in the three-phase voltage is determined as the fault phase. After determining the fault phase, a grounding switch closing instruction is generated based on the risk level of the fault phase and the monitoring area, so as to quickly close the grounding switch corresponding to the fault based on the grounding switch closing instruction, so as to transfer the current of the grounding fault point corresponding to the fault to the grounding switch into the ground, so as to achieve the effect of automatic extinguishing of the arc at the fault point, thereby preventing forest fires from occurring in the target area.

[0088] Example 2

[0089] This embodiment provides a mountain fire prevention device, which corresponds one-to-one to a line mountain fire prevention method in the above embodiment. Figure 4 As shown, the forest fire prevention device includes a fault phase identification module 10 and a grounding switch closing processing module 20. Each functional module is described in detail as follows:

[0090] The fault phase identification module 10 is used to obtain the bus voltage of the target area monitored in real time by the fault phase selection device. When the bus voltage is abnormal, the fault phase selection program is started to determine the fault phase.

[0091] The grounding switch closing processing module 20 is used to generate a grounding switch closing instruction based on the fault phase, and close the grounding switch corresponding to the fault based on the grounding switch closing instruction to transfer the current of the single-phase grounding fault point corresponding to the fault to the grounding switch.

[0092] Furthermore, the fault phase identification module includes a zero-sequence voltage determination unit, a bus voltage abnormality determination unit, a bus voltage abnormality processing unit, a first fault phase determination unit and a second fault phase determination unit.

[0093] The zero-sequence voltage determination unit is used to perform vector sum calculation on the monitored three-phase bus voltage after obtaining the bus three-phase voltage of the target area monitored in real time by the fault phase selection device, and compare the calculated zero-sequence voltage with the zero-sequence voltage monitored by the zero-sequence voltage transformer.

[0094] The bus voltage abnormality determination unit is used to compare the zero-sequence voltage monitored by the zero-sequence voltage transformer with the maximum zero-sequence voltage during normal operation of the distribution system when the calculated zero-sequence voltage is inconsistent with the zero-sequence voltage monitored by the zero-sequence voltage transformer. When the monitored zero-sequence voltage is greater than a preset multiple of the maximum zero-sequence voltage during normal operation of the distribution system, it is determined that the bus voltage in the target area is abnormal.

[0095] The bus voltage abnormality processing unit is used to determine the fault phase according to the capacitance current compensation state of the distribution system when the bus voltage is abnormal.

[0096] The first fault phase determination unit is used to determine the next phase of the highest voltage phase in the three-phase voltage as the fault phase when the capacitance current compensation state of the power distribution system is no compensation or under compensation.

[0097] The second fault phase determination unit is used to determine the previous phase of the highest voltage phase among the three-phase voltage as the fault phase when the capacitance current compensation state of the power distribution system is an over-compensation state.

[0098] Furthermore, the grounding switch closing processing module includes a trigger quantity calculation unit, a grounding switch sensitivity determination unit and a switch closing instruction generation unit.

[0099] The trigger quantity calculation unit is used to obtain the zero-sequence voltage monitored by the zero-sequence voltage transformer, and call the trigger quantity calculation formula in combination with the transformation ratio of the zero-sequence voltage transformer to calculate the trigger quantity.

[0100] The grounding switch sensitivity determination unit is used to determine the minimum threshold of the trigger quantity according to the risk level of the target area, and compare the calculated trigger quantity with the minimum threshold of the trigger quantity. When the calculated trigger quantity is greater than the minimum threshold of the trigger quantity, the sensitivity of the grounding switch is determined according to the risk level of the target area. The risk level of the monitoring area is proportional to the sensitivity of the grounding switch.

[0101] The switch closing instruction generating unit is used to generate a corresponding switch closing instruction based on the sensitivity of the grounding switch and the fault phase.

[0102] For the specific definition of a forest fire prevention device, please refer to the definition of a line forest fire prevention method above, which will not be repeated here. Each module in the above-mentioned forest fire prevention device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0103] Example 3

[0104] This embodiment provides a mountain fire prevention system, such as Figure 5As shown, the forest fire prevention system includes the line forest fire prevention device, the fault phase selection device and the grounding switch in the above embodiment; wherein,

[0105] Fault phase selection device, used to monitor the bus voltage in the target area in real time and send it to the line fire prevention device;

[0106] The line fire prevention device judges the received bus voltage, determines the fault phase according to the abnormal bus voltage, and generates a switch closing command;

[0107] The grounding switch is closed based on the received switch closing command, and the current of the single-phase grounding fault point corresponding to the fault is transferred to the grounding switch into the ground.

[0108] Furthermore, the fault phase selection device includes three voltage transformers, namely a first voltage transformer, a second voltage transformer and a third voltage transformer. The first voltage transformer, the second voltage transformer and the third voltage transformer are respectively installed on corresponding bus phase lines to monitor the bus three-phase voltage on the distribution line in real time.

[0109] Furthermore, the fault phase selection device also includes a zero-sequence voltage transformer, which monitors the zero-sequence voltage on the bus in real time.

[0110] Furthermore, the voltage measurement errors of the first voltage transformer, the second voltage transformer, the third voltage transformer and the zero-sequence voltage transformer are less than 0.01%.

[0111] The transformation ratio is:

[0112]

[0113] Wherein, k represents the transformation ratio of the first voltage transformer, the second voltage transformer, the third voltage transformer or the zero-sequence voltage transformer, and U0 represents the bus voltage of the distribution line, in kV.

[0114] Example 4

[0115] This embodiment provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of a line fire prevention method in the above embodiment are implemented, such as Figure 1 Steps S10-S20 shown, or Figures 2 to 3 To avoid repetition, the steps shown in are not described here. Alternatively, when the processor executes the computer program, the functions of each module / unit in the embodiment of a line fire prevention device are realized, for example Figure 4 The functions of the modules 10 to 20 are shown in Figure 1. To avoid repetition, they will not be described here.

[0116] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0117] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0118] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A line fire prevention method, characterized in that: include: Obtain the bus voltage of the target area monitored in real time by the fault phase selection device. When the bus voltage is abnormal, start the fault phase selection program to determine the fault phase; generating a grounding switch closing instruction based on the fault phase, and closing the grounding switch corresponding to the fault based on the grounding switch closing instruction, so as to transfer the current of the grounding fault point corresponding to the fault to the ground of the grounding switch; After obtaining the bus voltage of the target area monitored in real time by the fault phase selection device, the line fire prevention method further includes: After obtaining the bus three-phase voltage of the target area monitored in real time by the fault phase selection device, a vector sum calculation is performed on the monitored bus three-phase voltage, and the calculated zero-sequence voltage is compared with the zero-sequence voltage monitored by the zero-sequence voltage transformer in the fault phase selection device; When the calculated zero-sequence voltage is inconsistent with the zero-sequence voltage monitored by the zero-sequence voltage transformer, the zero-sequence voltage monitored by the zero-sequence voltage transformer is compared with the maximum zero-sequence voltage when the distribution system is operating normally. When the monitored zero-sequence voltage is greater than the preset multiple of the maximum zero-sequence voltage when the distribution system is operating normally, it is determined that the bus voltage in the target area is abnormal. When the bus voltage is abnormal, the fault phase selection program is started to determine the fault phase, including: When the bus voltage is abnormal, the fault phase is determined according to the capacitance and current compensation status of the distribution system; When the capacitance current compensation state of the power distribution system is no compensation or under compensation, the next phase of the highest voltage phase among the three-phase voltage is determined as the fault phase; When the capacitance current compensation state of the power distribution system is in an over-compensation state, the phase above the phase with the highest voltage among the three-phase voltage is determined as the fault phase; The generating a grounding switch closing instruction based on the fault phase comprises: The zero-sequence voltage monitored by the zero-sequence voltage transformer is obtained, and the trigger quantity calculation formula is called in combination with the transformation ratio of the zero-sequence voltage transformer to calculate the trigger quantity; Determine the minimum threshold of the trigger amount according to the risk level of the target area, and compare the calculated trigger amount with the minimum threshold of the trigger amount. When the calculated trigger amount is greater than the minimum threshold of the trigger amount, determine the sensitivity of the grounding switch according to the risk level of the target area, and the risk level of the monitoring area is proportional to the sensitivity of the grounding switch; The corresponding switch closing command is generated based on the sensitivity of the grounding switch and the fault phase.

2. A line fire prevention method according to claim 1, characterized in that: The trigger amount calculation formula is specifically: In the formula, δ represents the triggering amount, ΔU0 represents the zero-sequence voltage increment, and k0 represents the transformation ratio of the zero-sequence voltage transformer.

3. A line fire prevention method according to claim 1, characterized in that: The operating time of the grounding switch is less than 30ms.

4. A line fire prevention device, characterized in that: include: The fault phase identification module is used to obtain the bus voltage of the target area monitored in real time by the fault phase selection device. When the bus voltage is abnormal, the fault phase selection program is started to determine the fault phase; A grounding switch closing processing module, configured to generate a grounding switch closing instruction based on the fault phase, and close the grounding switch corresponding to the fault based on the grounding switch closing instruction, so as to transfer the current of the single-phase grounding fault point corresponding to the fault to the grounding switch; The fault phase identification module comprises: The zero-sequence voltage determination unit is used to perform vector sum calculation on the monitored three-phase bus voltage after obtaining the bus three-phase voltage of the target area monitored in real time by the fault phase selection device, and compare the calculated zero-sequence voltage with the zero-sequence voltage monitored by the zero-sequence voltage transformer; A bus voltage abnormality determination unit is used to compare the zero-sequence voltage monitored by the zero-sequence voltage transformer with the maximum zero-sequence voltage during normal operation of the distribution system when the calculated zero-sequence voltage is inconsistent with the zero-sequence voltage monitored by the zero-sequence voltage transformer, and determine that the bus voltage of the target area is abnormal when the monitored zero-sequence voltage is greater than a preset multiple of the maximum zero-sequence voltage during normal operation of the distribution system; A bus voltage abnormality processing unit, used to determine the fault phase according to the capacitance current compensation state of the power distribution system when the bus voltage is abnormal; A first fault phase determination unit is used to determine the next phase of the highest voltage phase among the three-phase voltages as the fault phase when the capacitance current compensation state of the power distribution system is a non-compensation state or an under-compensation state; A second fault phase determination unit is used to determine the previous phase of the highest voltage phase among the three-phase voltages as the fault phase when the capacitance current compensation state of the power distribution system is an over-compensation state; The grounding switch closing processing module comprises: A trigger quantity calculation unit is used to obtain the zero-sequence voltage monitored by the zero-sequence voltage transformer, and call the trigger quantity calculation formula in combination with the transformation ratio of the zero-sequence voltage transformer to calculate the trigger quantity; A grounding switch sensitivity determination unit, used to determine a minimum threshold of a trigger quantity according to a risk level of a target area, and compare the calculated trigger quantity with the minimum threshold of the trigger quantity; when the calculated trigger quantity is greater than the minimum threshold of the trigger quantity, the sensitivity of the grounding switch is determined according to the risk level of the target area, and the risk level of the monitoring area is proportional to the sensitivity of the grounding switch; The switch closing instruction generating unit is used to generate a corresponding switch closing instruction based on the sensitivity of the grounding switch and the fault phase.

5. A line mountain fire prevention system, comprising the line mountain fire prevention device according to claim 4, characterized in that: It also includes a fault phase selection device and a grounding switch; The fault phase selection device is used to monitor the bus voltage of the target area in real time and send it to the line fire prevention device; The line fire prevention device judges the received bus voltage, determines the fault phase according to the abnormal bus voltage, and generates a switch closing instruction; The grounding switch is closed based on the received switch closing instruction, and the current of the single-phase grounding fault point corresponding to the fault is transferred to the grounding switch into the ground.

6. A line mountain fire prevention system according to claim 5, characterized in that: The fault phase selection device includes three voltage transformers, namely a first voltage transformer, a second voltage transformer and a third voltage transformer. The first voltage transformer, the second voltage transformer and the third voltage transformer are respectively installed on corresponding bus phase lines to monitor the bus three-phase voltage on the distribution line in real time.

7. A line mountain fire prevention system according to claim 6, characterized in that: The fault phase selection device also includes a zero-sequence voltage transformer, which monitors the zero-sequence voltage on the bus in real time.

8. A line mountain fire prevention system according to claim 6 or 7, characterized in that: The voltage measurement error of the first voltage transformer, the second voltage transformer, the third voltage transformer and the zero-sequence voltage transformer is less than 0.01%; The transformation ratio is: Wherein, k represents the transformation ratio of the first voltage transformer, the second voltage transformer, the third voltage transformer or the zero-sequence voltage transformer, and U0 represents the bus voltage of the distribution line, in kV.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, a line wildfire prevention method as claimed in any one of claims 1 to 3 is implemented.

Citation Information

Patent Citations

  • Phase sequence voltage amplitude comparison-based failure phase selection method and device

    CN102818973A

  • Fast judgment method and system for power supply system distribution network single phase grounding fault line

    CN107966633A

  • Phase selection method and phase selection device used in case of power distribution network single-phase earth fault

    CN109633366A