A method for analyzing a blank zone of a control range of a drainage bore based on three-dimensional space
Patent Information
- Application Number
- CN202211171258.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2022-08-09
- Filing Date
- 2022-09-23
- Publication Date
- 2026-10-16
- Estimated Expiration
- 2042-09-23
AI Technical Summary
[0004]本发明的目的在于提供一种基于三维空间的抽采钻孔控制范围空白带分析方法,用以解决现有技术利用人工分析时不能准确反应空白带空间状态、无法准确判定空白带的位置及大小等准确信息
[0010]Its beneficial effects are as follows: When constructing a three-dimensional coal seam using the location information of the coal-encountering and coal-terminating points in a borehole, if the borehole control range is insufficient or there are blank areas, a blank zone exists within the constructed three-dimensional coal seam. To accurately and intuitively determine the information of the blank zone, the blank control range of a single borehole can be accurately determined by using the coal segment formed between the coal-encountering and coal-terminating points in a single borehole, as well as the borehole extraction radius. That is, the sum of the three-dimensional extraction range models of all coal segments is used as the borehole control range, enabling accurate construction of the borehole control range. Based on the constructed three-dimensional coal seam and the borehole control range, the blank zone within the constructed three-dimensional coal seam can be accurately and intuitively obtained. Compared with traditional analysis using manual planar diagrams, this method can present the analysis results in a more three-dimensional, intuitive, and accurate manner; it provides a data foundation for blank zone analysis using various automated systems; and it enables precise positioning of borehole blank zones and automatic calculation of coal volume.