Integrated construction device for dumping, filling and pouring
Through the integrated construction device of throwing and pouring, the combination of slip pipes and grouting pipes can achieve uniform laying and anti-shrinkage capacity improvement of throwing stones, solving the problems of low construction efficiency and difficult to control the quality of throwing stones in the existing technology, and achieving efficient protection of marine structures.
Patent Information
- Application Number
- CN202310012092.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-05
- Publication Date
- 2025-08-15
- Estimated Expiration
- 2043-01-05
AI Technical Summary
In the existing stone throwing construction, it is difficult to lay stone evenly, the construction efficiency is low, the stone throwing stacking capacity has weak anti-shrinkage ability, and the quality of the throwing filling is difficult to control.
The integrated construction device of throwing and pouring is adopted, combining the slip pipe and grouting pipe, the stone throwing drop point is adjusted through the jet head of the grouting pipe, and the slurry is pumped to the grouting pipe in combination with the pumping system to achieve uniform accumulation of throwing stone and anti-shrinking ability.
The construction efficiency of stone throwing is improved, the scope of single construction is increased, the frequency of sliding pipe position adjustment is reduced, and the anti-shrinkage ability and protection time of stone throwing piles is improved.