Method and device for entrusting and collecting multi-specialty construction drawings of coal preparation plant

By invoking standard drafting configurations and automating the drafting process in the coal preparation plant construction drawing commissioning process, the problem of long drafting cycles and low efficiency caused by inconsistent drafting standards has been solved, achieving efficient and accurate construction drawing generation.

CN116244789BActive Publication Date: 2026-05-08CCTEG BEIJING HUAYU ENG
View PDF 2 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
CCTEG BEIJING HUAYU ENG
Filing Date
2022-12-20
Publication Date
2026-05-08

AI Technical Summary

Technical Problem

In the process of commissioning the submission of construction drawings for coal preparation plants, the design contents of various disciplines are closely related, resulting in long submission cycles, low efficiency and high error rates. This is mainly due to inconsistent drawing standards and mismatched data transmission.

Method used

By acquiring the construction drawing design task, calling the reference library and referencing the standard drafting configuration for drawing, generating reference files for each specialty, checking and summarizing them, generating the target reference drawings, and using the program to drive the standardized process, unify symbols and rules, and realize automated data classification and the establishment of reference relationships.

Benefits of technology

It shortened the data submission cycle, improved data submission efficiency, reduced the error rate, and decreased the workload of repetitive drawing and the risk of errors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116244789B_ABST
    Figure CN116244789B_ABST
Patent Text Reader

Abstract

The present disclosure relates to the technical field of building information model design, and particularly relates to a method and device for outsourcing of multi-specialty construction drawings of a coal preparation plant. The method for outsourcing of multi-specialty construction drawings of the coal preparation plant comprises the following steps: obtaining a construction drawing outsourcing design task; calling a reference drawing standard configuration of an outsourcing drawing library according to the construction drawing outsourcing design task to draw and obtain an outsourcing file corresponding to at least one specialty; and if the outsourcing file corresponding to the at least one specialty meets checking conditions, generating a target outsourcing drawing corresponding to the construction drawing outsourcing design task according to the outsourcing file corresponding to the at least one specialty. The present disclosure can shorten the outsourcing period, improve the outsourcing efficiency, and reduce the error rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This disclosure relates to the field of building information modeling design technology, and in particular to a method and apparatus for commissioning and providing information on multi-disciplinary construction drawings for coal preparation plants. Background Technology

[0002] The construction drawing design of coal preparation plant projects is currently mainly carried out in an assembly line manner. The design content of various disciplines is highly interconnected, requiring mutual submission of construction drawing data. However, in the current coal preparation plant construction drawing data submission process, upstream disciplines can only submit corresponding data to downstream disciplines after the upstream disciplines have completed their designs, resulting in a lengthy data submission cycle. Furthermore, due to inconsistent data submission standards across disciplines, downstream disciplines incur significant workloads in areas such as deletion, style adjustments, and verification of design scales, leading to low data submission efficiency and a high error rate. Summary of the Invention

[0003] This disclosure provides a method and apparatus for commissioning the submission of multi-disciplinary construction drawings for coal preparation plants. The main purpose is to shorten the submission cycle, improve the submission efficiency, and reduce the error rate.

[0004] According to one aspect of this disclosure, a method for commissioning and providing multi-disciplinary construction drawings for coal preparation plants is provided, including:

[0005] Obtain a construction drawing design commission;

[0006] Based on the construction drawing commission design task, the data library is called to reference the standard drafting configuration for drawing, and at least one data file corresponding to a professional is obtained;

[0007] If the information submission documents corresponding to at least one specialty meet the inspection conditions, then the target information submission drawings corresponding to the construction drawing commissioning design task are generated based on the information submission documents corresponding to at least one specialty.

[0008] Optionally, the step of calling the reference drawing library and referencing drafting standard configurations to draw according to the construction drawing commissioned design task, and obtaining reference files corresponding to at least one specialty, includes:

[0009] Determine the design authority corresponding to the construction drawing commissioning task and the information submission template corresponding to at least one specialty;

[0010] The resource library is invoked, and the resource templates corresponding to the at least one profession are used to draw the resource files, thereby obtaining resource files corresponding to at least one profession.

[0011] Optionally, the construction drawing commissioned design task includes a collaborative design task for the main civil engineering frame, a collaborative design task for equipment layout, and a collaborative design task for professional pipelines. The step of calling the reference drawing library and referencing drafting standard configurations to draw according to the construction drawing commissioned design task, and obtaining reference files corresponding to at least one profession, includes:

[0012] Based on the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of the equipment professional layout, and the collaborative design tasks of the professional pipeline, the drawing library is called and the standard drawing configuration is referenced to draw, resulting in the first data file corresponding to the collaborative design task of the main civil engineering frame, the second data file corresponding to the collaborative design task of the equipment professional layout, and the third data file corresponding to the collaborative design task of the professional pipeline.

[0013] Based on the second and third funding documents, a fourth funding document is determined.

[0014] Optionally, generating the reference drawings corresponding to the construction drawing design task based on the reference documents corresponding to the at least one specialty includes:

[0015] According to the aggregation rules, the fourth submission document is aggregated by floor to obtain the fifth submission document;

[0016] Based on the first and fifth information submission documents, the target information drawings corresponding to the construction drawing commissioned design task are generated.

[0017] Optionally, after obtaining at least one professional qualification document, the method further includes:

[0018] The document submissions corresponding to the at least one profession are checked and marked to obtain at least one inspection report corresponding to the document submissions corresponding to the at least one profession, wherein the inspection report corresponds one-to-one with the document submissions;

[0019] If any of the at least one inspection reports fails to meet the inspection conditions, a document modification instruction is issued, wherein the document modification instruction is used to instruct the modification of the information submission document corresponding to any of the inspection reports.

[0020] Optionally, generating the target reference drawings corresponding to the construction drawing design task based on the reference documents corresponding to the at least one specialty includes:

[0021] Based on the information submission documents corresponding to at least one of the aforementioned specialties, generate the initial information submission drawings corresponding to the construction drawing commissioning design task.

[0022] If the initial reference drawings meet the reference conditions, then the initial reference drawings are determined to be the target reference drawings corresponding to the construction drawing commissioned design task.

[0023] Optionally, after generating the initial reference drawings corresponding to the construction drawing commissioning task based on the reference documents corresponding to the at least one specialty, the method further includes:

[0024] Structural calculations and collision checks were performed on the initial drawings.

[0025] If the initial data drawings do not meet the structural verification and collision check conditions, a drawing modification instruction is issued, wherein the document modification instruction is used to instruct the initial data drawings to be modified.

[0026] According to another aspect of this disclosure, a multi-disciplinary construction drawing commissioning and information provision device for coal preparation plants is provided, comprising:

[0027] The task acquisition unit is used to acquire construction drawing design commission tasks;

[0028] The document drawing unit is used to draw according to the construction drawing commission design task, call the information library and reference the drafting standard configuration to obtain information files corresponding to at least one profession.

[0029] The drawing generation unit is used to generate target reference drawings corresponding to the construction drawing commissioning task based on the reference documents corresponding to the at least one specialty if the reference documents corresponding to the at least one specialty meet the inspection conditions.

[0030] Optionally, the file drawing unit is used to draw according to the construction drawing commissioned design task, by calling the reference drawing library and referencing the drafting standard configuration to obtain reference files corresponding to at least one specialty. Specifically, it is used for:

[0031] Determine the design authority corresponding to the construction drawing commissioning task and the information submission template corresponding to at least one specialty;

[0032] The resource library is invoked, and the resource templates corresponding to the at least one profession are used to draw the resource files, thereby obtaining resource files corresponding to at least one profession.

[0033] Optionally, the construction drawing commissioned design task includes a collaborative design task for the main civil engineering frame, a collaborative design task for equipment layout, and a collaborative design task for professional pipelines. The file drawing unit, used to draw according to the construction drawing commissioned design task by calling the reference drawing library and referencing drafting standard configurations to obtain reference files corresponding to at least one profession, is specifically used for:

[0034] Based on the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of the equipment professional layout, and the collaborative design tasks of the professional pipeline, the drawing library is called and the standard drawing configuration is referenced to draw, resulting in the first data file corresponding to the collaborative design task of the main civil engineering frame, the second data file corresponding to the collaborative design task of the equipment professional layout, and the third data file corresponding to the collaborative design task of the professional pipeline.

[0035] Based on the second and third funding documents, a fourth funding document is determined.

[0036] Optionally, when the drawing generation unit generates the reference drawings corresponding to the construction drawing commissioned design task based on the reference documents corresponding to the at least one specialty, it is specifically used for:

[0037] According to the aggregation rules, the fourth submission document is aggregated by floor to obtain the fifth submission document;

[0038] Based on the first and fifth information submission documents, the target information drawings corresponding to the construction drawing commissioned design task are generated.

[0039] Optionally, the multi-disciplinary construction drawing submission device for the coal preparation plant further includes a document checking unit and a document modification unit, used after obtaining the submission documents corresponding to at least one specialty:

[0040] The document inspection unit is used to inspect and mark the document submissions corresponding to the at least one profession, and to obtain at least one inspection report corresponding to the document submissions corresponding to the at least one profession, wherein the inspection report corresponds one-to-one with the document submissions;

[0041] The document modification unit is configured to issue a document modification instruction if any of the at least one inspection reports does not meet the inspection conditions, wherein the document modification instruction is used to instruct the modification of the information submission document corresponding to any of the inspection reports.

[0042] Optionally, when the drawing generation unit generates the target reference drawings corresponding to the construction drawing commissioned design task based on the reference documents corresponding to the at least one specialty, it is specifically used for:

[0043] Based on the information submission documents corresponding to at least one of the aforementioned specialties, generate the initial information submission drawings corresponding to the construction drawing commissioning design task.

[0044] If the initial reference drawings meet the reference conditions, then the initial reference drawings are determined to be the target reference drawings corresponding to the construction drawing commissioned design task.

[0045] Optionally, after generating the initial reference drawings corresponding to the construction drawing commissioned design task based on the reference documents corresponding to the at least one specialty, the drawing generation unit is further configured to:

[0046] Structural calculations and collision checks were performed on the initial drawings.

[0047] If the initial data drawings do not meet the structural verification and collision check conditions, a drawing modification instruction is issued, wherein the document modification instruction is used to instruct the initial data drawings to be modified.

[0048] According to another aspect of this disclosure, a terminal is provided, comprising:

[0049] At least one processor; and

[0050] A memory communicatively connected to the at least one processor; wherein,

[0051] The memory stores instructions that can be executed by the at least one processor to enable the at least one processor to perform the method described in any one of the preceding aspects.

[0052] According to another aspect of this disclosure, a non-transitory computer-readable storage medium is provided storing computer instructions, wherein the computer instructions are used to cause the computer to perform the method described in any one of the preceding aspects.

[0053] According to another aspect of this disclosure, a computer program product is provided, comprising a computer program that, when executed by a processor, implements the method described in any one of the preceding aspects.

[0054] In one or more embodiments of this disclosure, a construction drawing design commission task is obtained; based on the construction drawing design commission task, a reference drawing library is invoked to draw according to the standard drafting configuration, resulting in reference files corresponding to at least one specialty; if the reference files corresponding to at least one specialty meet the check conditions, then the target reference drawing corresponding to the construction drawing design commission task is generated based on the reference files corresponding to at least one specialty. Therefore, by simultaneously drawing reference files corresponding to at least one specialty, the reference drawing cycle can be shortened. Simultaneously, by invoking the reference drawing library to obtain reference files using the standard drafting configuration, reference drawing symbols and rules can be standardized, improving reference drawing efficiency and reducing the error rate.

[0055] It should be understood that the description in this section is not intended to identify key or essential features of the embodiments of this disclosure, nor is it intended to limit the scope of this disclosure. Other features of this disclosure will become readily apparent from the following description. Attached Figure Description

[0056] The accompanying drawings are provided to better understand this solution and do not constitute a limitation of this disclosure. Wherein:

[0057] Figure 1 This illustration shows a background diagram of a method for commissioning and providing information on multi-disciplinary construction drawings for coal preparation plants, as provided in an embodiment of this disclosure.

[0058] Figure 2 This diagram illustrates a flowchart of the first method for commissioning and providing multi-disciplinary construction drawings for coal preparation plants, as provided in this embodiment of the present disclosure.

[0059] Figure 3 This diagram illustrates a flow chart of a second method for commissioning and providing multi-disciplinary construction drawings for coal preparation plants, as provided in an embodiment of this disclosure.

[0060] Figure 4 This diagram illustrates the structure of a multi-disciplinary construction drawing commissioning tool for coal preparation plants, as provided in an embodiment of this disclosure.

[0061] Figure 5 This diagram illustrates a third method for commissioning and providing multi-disciplinary construction drawings for coal preparation plants, as provided in this embodiment of the present disclosure.

[0062] Figure 6 This diagram shows a structural schematic of the first type of multi-disciplinary construction drawing commissioning and information provision device for coal preparation plants provided in this embodiment of the present disclosure;

[0063] Figure 7 This diagram illustrates the structure of a second type of multi-disciplinary construction drawing commissioning and information provision device for coal preparation plants, as provided in an embodiment of this disclosure.

[0064] Figure 8 This is a block diagram of a terminal used to implement the multi-disciplinary construction drawing commissioning and information provision method for coal preparation plants according to embodiments of this disclosure. Detailed Implementation

[0065] The exemplary embodiments of this disclosure are described below with reference to the accompanying drawings, including various details of the embodiments to aid understanding, and should be considered merely exemplary. Therefore, those skilled in the art will recognize that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of this disclosure. Similarly, for clarity and brevity, descriptions of well-known functions and structures are omitted in the following description.

[0066] Building Information Modeling (BIM) is a management information system for the construction industry. Based on intelligent 3D models, it enables engineering and construction professionals to gain relevant insights, analyses, and tools, thereby planning, designing, constructing, and managing buildings and infrastructure more efficiently.

[0067] In the field of BIM-based forward design for coal preparation plants, the construction drawing design for coal preparation plant projects is currently mainly carried out in a streamlined manner. The design content of various disciplines is highly interconnected, requiring mutual submission of construction drawing data. Supported by existing design tools and methodologies, the relevant multi-disciplinary construction drawing data submission process for coal preparation plants is as follows: Figure 1 As shown, the process includes the following steps:

[0068] Step 1: The coal preparation process layout is entrusted to provide data, and the equipment professionals conduct the layout design;

[0069] Step 2: Investment is provided for equipment 1 to equipment n, where n is a positive integer;

[0070] Step 3: Civil engineering professionals receive and confirm the documents;

[0071] Step 4: Civil engineering identification of the workshop to which the equipment belongs, the location of the equipment, and the equipment information. According to civil engineering drawing standards, redraw the information of each equipment foundation, embedded parts, openings, etc., on a workshop floor level basis.

[0072] Step 5: The civil engineering team completes the preliminary construction drawing design and submits architectural drawings.

[0073] Step 6: The coal preparation, water, heating, and electricity professionals receive the architectural drawings and then "revise" them according to their own needs.

[0074] Step 7: The coal preparation, water, heating, and electricity professionals conduct pipeline design and provide information on pipe holes and embedded parts. Then, they return to Step 5 to complete the civil engineering construction drawing design.

[0075] As can be easily understood, as shown in steps two, four, and five of the data submission process, the lack of unified drawing standards between the equipment and civil engineering disciplines, as well as the mismatch between data transmission and reception methods, means that after receiving the data, the civil engineering discipline still needs to perform a large amount of identification, conversion, and drawing work. This not only increases the amount of repetitive work and prolongs the design cycle, but also increases the risk of errors in information identification and drawing, making it difficult to control the quality of construction drawing designs for embedded parts, holes, foundations, etc.

[0076] In addition, as shown in step five of the document submission process, civil engineering professionals often need to complete their own basic design before submitting architectural drawings to other professionals such as process (piping), water supply and drainage, fire protection (water), heating, ventilation and air conditioning, and electrical engineering. Because the design cycle for civil engineering is relatively long, it often greatly restricts the development of downstream professional design work.

[0077] Secondly, as shown in step six of the information submission process, due to the lack of information submission rules and the need for comprehensive information expression in drawings, civil engineering architectural drawings usually carry a complete set of information to downstream disciplines (including building outlines, embedded parts, holes, various markings and annotations, etc.). At the same time, the drawing styles are usually inconsistent with those of downstream disciplines, resulting in a large amount of work for downstream disciplines, such as deletion, style adjustment, and verification of design scales, which reduces work efficiency.

[0078] Furthermore, as shown in step seven of the data submission process, the submission of information on openings and embedded parts by the process (piping), water supply and drainage, fire protection (water), heating, ventilation and air conditioning, and electrical engineering disciplines to the civil engineering disciplines is delayed compared to the civil engineering design process. This results in a delay in the completion of the civil engineering construction drawings and extends the design cycle.

[0079] In summary, the process of commissioning construction drawings for coal preparation plants involves several issues, including inconsistent standards for submission, non-standard management of the submission process and versions, a large workload for data identification, a large workload for repetitive drawing, and numerous quality problems such as omissions and errors by the receiving party. Additionally, the process is inefficient and has a long design cycle.

[0080] The present disclosure will now be described in detail with reference to specific embodiments.

[0081] In the first embodiment, such as Figure 2 As shown, Figure 2 This illustration shows a flowchart of a first method for commissioning and providing information on multi-disciplinary construction drawings for a coal preparation plant, according to an embodiment of this disclosure. This method can be implemented using a computer program and can run on an apparatus for commissioning and providing information on multi-disciplinary construction drawings for a coal preparation plant. The computer program can be integrated into an application or run as a standalone utility application.

[0082] The multi-disciplinary construction drawing commissioning and information generation device for coal preparation plants can be a terminal with multi-disciplinary construction drawing commissioning and information generation functions. This terminal includes, but is not limited to: wearable devices, handheld devices, personal computers, tablets, vehicle-mounted devices, smartphones, computing devices, or other processing devices connected to a wireless modem. In different networks, the terminal can be called by different names, such as: user equipment, access terminal, user unit, user station, mobile station, mobile station, remote station, remote terminal, mobile device, user terminal, terminal, wireless communication equipment, user agent or user device, cellular phone, cordless phone, personal digital assistant (PDA), 5G network, 4G network, 3G network, or terminals in future evolved networks.

[0083] Specifically, the methods for submitting multi-disciplinary construction drawings for this coal preparation plant include:

[0084] S101, Obtain the construction drawing design commission task;

[0085] According to some embodiments, the construction drawing design commissioning task refers to the task received by the terminal when the coal preparation profession commissions process layout information. This construction drawing design commissioning task does not specifically refer to a single fixed task. For example, the construction drawing design commissioning task may change when the process layout commission changes.

[0086] It is easy to understand that when the terminal submits information for commissioned construction drawings for a coal preparation plant across multiple disciplines, it can obtain the commissioned design task for the construction drawings.

[0087] S102, based on the design task entrusted by the construction drawings, call the information library and reference the standard drafting configuration to draw, and obtain information files corresponding to at least one profession;

[0088] According to some embodiments, the resource library refers to a library of graphics and its corresponding annotation rules.

[0089] In some embodiments, the standard drafting configuration refers to the configuration formed after the drafting standards of various disciplines are unified.

[0090] In some embodiments, the information submission document is a document obtained after a design task is commissioned based on construction drawings.

[0091] It is easy to understand that when the terminal receives a construction drawing design commission, it can call the reference drawing library to draw according to the construction drawing design commission, and obtain reference drawings for at least one profession.

[0092] S103 If at least one professional document meets the inspection criteria, then the target document corresponding to the construction drawing commissioning design task is generated based on the document corresponding to at least one professional document.

[0093] According to some embodiments, the check condition refers to the condition used to determine whether the submission document is acceptable. This check condition is not specifically defined as a single fixed condition. For example, the check condition may change when the submission document changes.

[0094] In some embodiments, the target reference drawing refers to the reference drawing required for a construction drawing design task generated from reference documents corresponding to at least one discipline. This target reference drawing does not specifically refer to a particular fixed drawing. For example, the target reference drawing may change when the construction drawing design task changes.

[0095] It is easy to understand that when the terminal obtains a reference document corresponding to at least one specialty, if the terminal determines that the reference document corresponding to at least one specialty meets the inspection conditions, the terminal can generate the target reference drawing corresponding to the construction drawing commissioning design task based on the reference document corresponding to at least one specialty.

[0096] In summary, the method provided in this disclosure involves obtaining a construction drawing design commission; drawing at least one professional reference file by calling a reference drawing library and referencing standard drafting configurations based on the commission; and generating a target reference drawing corresponding to the construction drawing design commission based on the reference file for at least one professional discipline. Therefore, by simultaneously drawing at least one professional reference file, the reference cycle can be shortened. Furthermore, by calling a reference drawing library and referencing standard drafting configurations to obtain the reference file, reference symbols and rules can be standardized, improving efficiency and reducing error rates.

[0097] Please see Figure 3 , Figure 3 This illustration shows a flowchart of a second method for commissioning and providing information on multi-disciplinary construction drawings for a coal preparation plant, as provided in this embodiment. Specifically, the method includes:

[0098] S201, Obtain the construction drawing design commission task;

[0099] According to some embodiments, Figure 4This diagram illustrates the structure of a multi-disciplinary construction drawing submission tool for a coal preparation plant, as provided in an embodiment of this disclosure. This tool can run on a terminal. Figure 4 As shown, it includes a capital contribution process driving module, which in turn includes a process guidance sub-module.

[0100] In some embodiments, the process guidance submodule has built-in workflow-driven rules, which include, but are not limited to, assignment of funding tasks, management of funding permissions, creation of funding templates, and design and implementation of funding.

[0101] It is easy to understand that when the terminal submits information for multi-disciplinary construction drawings for a coal preparation plant, the process guidance submodule can issue a construction drawing design task under the program-driven function.

[0102] S202, determine the design authority corresponding to the construction drawing commission design task and at least one professional information submission template;

[0103] According to some embodiments, such as Figure 4 As shown, the workflow guidance submodule includes built-in workflows, file templates, and permission rules. Therefore, when a construction drawing design task is assigned, this workflow guidance submodule can also set design permissions and create upstream professional information submission templates.

[0104] S203, call the resource library, draw according to design permissions and resource templates corresponding to at least one profession, and obtain resource files corresponding to at least one profession;

[0105] According to some embodiments, such as Figure 4 As shown, the information submission process-driven module also includes an information submission design submodule, which has a built-in information submission library and standards. Therefore, after the process guidance submodule completes the setting of design permissions and creates upstream professional information submission templates, the information submission design submodule can programmatically retrieve the information submission library, reference the drafting standard configuration, and draw up the commissioned construction drawings for the foundations, embedded parts, equipment, and pipeline openings of professional equipment such as coal preparation, equipment, electrical, water supply and drainage, fire protection, heating, ventilation, and dust removal, thereby obtaining the information submission documents corresponding to at least one of these professional fields.

[0106] In some embodiments, the reference library and standards include, but are not limited to, embedded parts, holes, annotations, dimensioning rules and graphic libraries.

[0107] In some embodiments, the resource design submodule can also enable interactive referencing during the resource design phase.

[0108] S204, inspect and mark the supporting documents corresponding to at least one profession, and obtain at least one inspection report corresponding to the supporting documents corresponding to at least one profession;

[0109] According to some implementation examples Figure 4 As shown, the multi-disciplinary construction drawing commissioning tool for the coal preparation plant also includes a commissioning inspection module. This module has built-in inspection workflow, consistency inspection rules, inspection record tools (such as electronic record tools for inspection opinions), and reporting tools.

[0110] In some embodiments, the inspection report corresponds one-to-one with the information submission document. Specifically, the inspection report can be generated based on the inspection findings.

[0111] It is easy to understand that when the process guidance submodule obtains the resource submission document corresponding to at least one profession, the workflow status of the resource submission document changes from "design" to "inspection". The resource submission inspection module can inspect and mark the resource submission document corresponding to at least one profession, and obtain at least one inspection report corresponding to the resource submission document corresponding to at least one profession.

[0112] S205, if any of the inspection reports in at least one inspection report does not meet the inspection conditions, a document modification instruction shall be issued;

[0113] According to some embodiments, a document modification instruction is used to instruct modifications to the information submission document corresponding to any inspection report. This document modification instruction is not specifically defined by a single fixed instruction. For example, the document modification instruction can change when a modification instruction for a document modification instruction is received.

[0114] In some embodiments, when the data submission inspection module determines that any one of the inspection reports in at least one inspection report does not meet the inspection conditions, the data submission inspection module may issue a document modification instruction to modify the data submission document corresponding to that inspection report until all inspection reports meet the inspection conditions.

[0115] S206 If at least one professional document meets the inspection conditions, then based on the at least one professional document, generate the initial document for the construction drawing commissioned design task.

[0116] According to some embodiments, such as Figure 4 As shown, the multi-disciplinary construction drawing commissioning tool for this coal preparation plant also includes a data collection and adoption module, which has built-in classification reference rules, summary reference rules, floor-level reference and citation rules, and category reference and citation rules.

[0117] In some embodiments, if the data submission inspection module determines that all inspection reports meet the inspection conditions, the data submission adoption module can automatically summarize the upstream professional construction drawing commissions by floor according to the built-in rules, that is, summarize the data submission documents corresponding to at least one professional discipline on each floor, generate initial data submission drawings for embedded parts, holes, etc., and automatically establish references.

[0118] S207, Perform structural calculations and collision checks on the initial drawings;

[0119] It is easy to understand that when the terminal receives the initial data drawings, it can perform structural calculations and collision checks on the initial data drawings.

[0120] S208, If the initial drawings do not meet the conditions for structural verification and collision check, a drawing modification instruction shall be issued.

[0121] According to some embodiments, a document modification instruction is used to instruct modifications to the initial reference drawings. This document modification instruction is not specifically defined by a single, fixed instruction. For example, the document modification instruction can change when a modification instruction corresponding to the document modification instruction is received.

[0122] It is easy to understand that when the terminal performs structural calculations and collision checks on the initial reference drawings, if the terminal determines that the initial reference drawings do not meet the conditions for structural calculations and collision checks, the terminal can issue a drawing modification command.

[0123] S209. If the initial reference drawings meet the reference conditions, then the initial reference drawings are determined to be the target reference drawings corresponding to the construction drawing commissioned design task.

[0124] It is easy to understand that when the terminal performs structural calculations and collision checks on the initial reference drawings, if the terminal determines that the initial reference drawings meet the conditions for structural calculations and collision checks, then the terminal can determine that the initial reference drawings are the target reference drawings corresponding to the construction drawing commissioned design task.

[0125] In summary, the method provided in this disclosure involves: obtaining a construction drawing design commission task; determining the design permissions corresponding to the construction drawing design commission task and at least one professional reference template; calling the reference library and drawing according to the design permissions and at least one professional reference template to obtain reference files corresponding to at least one professional; checking and marking the reference files corresponding to at least one professional to obtain at least one check report corresponding to the reference files corresponding to at least one professional; if any check report in the at least one check report does not meet the check conditions, a file modification instruction is issued; if the reference files corresponding to at least one professional meet the check conditions, an initial reference drawing corresponding to the construction drawing design commission task is generated based on the reference files corresponding to at least one professional; performing structural calculations and collision checks on the initial reference drawings; if the initial reference drawings do not meet the structural calculation and collision check conditions, a drawing modification instruction is issued; if the initial reference drawings meet the reference conditions, the initial reference drawings are determined to be the target reference drawings corresponding to the construction drawing design commission task. Therefore, by standardizing the data submission process through program-driven methods; compiling unified data submission symbols and rules and embedding them into templates and drawing libraries for easy access under program-driven implementation; automatically classifying data, automatically establishing reference relationships as needed, and automatically summarizing data from various disciplines by floor, which can then be directly used; compared to traditional design methods, this reduces the secondary drawing work for the data recipient, reduces the workload of repetitive drawing between disciplines, avoids the risk of errors caused by secondary drawing, shortens the design cycle, improves data submission efficiency, and reduces the error rate.

[0126] Please see Figure 5 , Figure 5 This illustration shows a flowchart of a third method for commissioning and providing information on multi-disciplinary construction drawings for coal preparation plants, as provided in this embodiment. Specifically, this method includes:

[0127] S301, Obtain the construction drawing design commission task;

[0128] According to some embodiments, the commissioned design task for construction drawings includes, but is not limited to, collaborative design tasks for the main civil engineering frame, collaborative design tasks for equipment layout, and collaborative design tasks for professional pipelines.

[0129] It is easy to understand that when the terminal commissions the submission of multi-disciplinary construction drawings for a coal preparation plant, the terminal can obtain collaborative design tasks for the main civil engineering framework, collaborative design tasks for equipment layout, and collaborative design tasks for professional pipelines.

[0130] S302, based on the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of equipment layout and the collaborative design tasks of professional pipelines, respectively call the data provision library and reference the standard drawing configuration to draw, and obtain the first data provision file corresponding to the collaborative design task of the main civil engineering frame, the second data provision file corresponding to the collaborative design task of equipment layout and the third data provision file corresponding to the collaborative design task of professional pipelines.

[0131] According to some embodiments, when drawing is performed by calling the reference drawing library and referencing the standard configuration for drawing according to the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of equipment professional layout, and the collaborative design tasks of professional pipelines, the civil engineering, equipment, coal preparation (pipeline), water supply and drainage and fire protection, heating, ventilation and dust removal, electrical and other professional disciplines carry out the design of building structure, equipment and pipelines simultaneously, and obtain the first reference document, the second reference document and the third reference document.

[0132] In some embodiments, during the design of the second and third reference documents, the design of construction drawing commissioning data such as embedded parts, loads, and holes can be carried out in real time by referring to each other, so as to obtain the first reference document.

[0133] S303, based on the second and third capital submission documents, determine the fourth capital submission document;

[0134] According to some embodiments, the fourth information document is a summary of the second and third information documents obtained after the civil engineering, equipment, coal preparation (pipeline), water supply and drainage and fire protection, heating, ventilation and dust removal, electrical and other professionals have carried out equipment and pipeline design.

[0135] S304. If at least one professional qualification document meets the inspection conditions, the fourth qualification document is summarized by floor according to the summary rules to obtain the fifth qualification document.

[0136] It is easy to understand that when the first and fourth data submission documents are obtained, if the terminal determines that the first and fourth data submission documents meet the inspection conditions, the terminal can automatically classify, summarize, and automatically establish reference relationships for the fourth data submission document to obtain the fifth data submission document.

[0137] S305, Based on the first and fifth information submission documents, generate the target information drawings corresponding to the construction drawing commissioned design task.

[0138] According to some embodiments, when the fifth reference document is obtained, the secondary beam design can be carried out based on the construction drawing commissioning information such as embedded parts, loads, and holes in the first reference document, as well as the construction drawing commissioning information such as equipment and pipelines on each floor in the fifth reference document, to obtain the sixth reference document corresponding to the secondary beam design.

[0139] In some embodiments, structural verification and collision checks can be performed based on the obtained first, fifth, and sixth reference documents to generate target reference drawings corresponding to the construction drawing commissioning design task.

[0140] In summary, the method provided in this embodiment obtains the construction drawing commissioned design task; based on the civil engineering main frame collaborative design task, the equipment professional layout collaborative design task, and the professional pipeline collaborative design task, it calls the reference drawing library and uses the standard configuration for drawing to obtain the first reference file corresponding to the civil engineering main frame collaborative design task, the second reference file corresponding to the equipment professional layout collaborative design task, and the third reference file corresponding to the professional pipeline collaborative design task; based on the second and third reference files, it determines the fourth reference file; if the reference file corresponding to at least one professional meets the check conditions, it summarizes the fourth reference file by floor according to the summary rules to obtain the fifth reference file; based on the first and fifth reference files, it generates the target reference drawing corresponding to the construction drawing commissioned design task. Therefore, by transforming the reference from individual equipment to construction drawing commissioned reference by floor, and based on the standards built into the module, the design standards of the construction drawing commissioned data can be unified. Meanwhile, by automatically receiving, classifying, and summarizing data, and automatically establishing reference relationships as needed, the process is simplified, the workload of civil engineering is reduced, and the risk of errors caused by secondary data drawing is avoided, thus reducing the error rate. In addition, building, equipment, and pipeline designs are carried out simultaneously and collaboratively, with real-time mutual reference. The intervention point of pipeline design is significantly moved forward. Civil engineering professionals do not need to wait for the completion of pipeline construction drawings to receive feedback on load, opening, and embedded parts data. There is no need to have architectural drawings before pipeline design can begin, avoiding secondary modifications to architectural drawings during pipeline design, shortening the design cycle, and improving data collection efficiency.

[0141] The collection, storage, use, processing, transmission, provision, and disclosure of user personal information involved in the technical solution disclosed herein comply with the provisions of relevant laws and regulations and do not violate public order and good morals.

[0142] The following are embodiments of the apparatus disclosed herein, which can be used to execute embodiments of the method disclosed herein. For details not disclosed in the apparatus embodiments of this disclosure, please refer to the embodiments of the method disclosed herein.

[0143] Please see Figure 6 This illustration shows a structural schematic diagram of a first type of multi-disciplinary construction drawing commissioning and data extraction device for coal preparation plants provided in this embodiment. This multi-disciplinary construction drawing commissioning and data extraction device for coal preparation plants can be implemented as all or part of a device through software, hardware, or a combination of both. The multi-disciplinary construction drawing commissioning and data extraction device 600 for coal preparation plants includes a task acquisition unit 601, a document drawing unit 602, and a drawing generation unit 603, wherein:

[0144] Task acquisition unit 601 is used to acquire construction drawing design commission tasks;

[0145] The document drawing unit 602 is used to draw according to the design task entrusted by the construction drawings, call the information library and reference the drafting standard configuration to obtain information files corresponding to at least one profession.

[0146] The drawing generation unit 603 is used to generate target reference drawings corresponding to the construction drawing commissioning design task based on reference documents corresponding to at least one discipline if the reference documents corresponding to at least one discipline meet the inspection conditions.

[0147] Optionally, the document drawing unit 602 is used to draw at least one professional reference document by calling the reference drawing library and referencing the drafting standard configuration according to the design task commissioned by the construction drawings. Specifically, it is used for:

[0148] Determine the design authority corresponding to the construction drawing design task and the information submission template for at least one specialty;

[0149] Call the resource library, draw according to design permissions and at least one resource template corresponding to a profession, and obtain resource files corresponding to at least one profession.

[0150] Optionally, the construction drawing design commissioning tasks include collaborative design tasks for the main civil engineering frame, collaborative design tasks for equipment layout, and collaborative design tasks for professional pipelines. The document drawing unit 602 is used to draw according to the construction drawing commissioning tasks, calling the reference drawing library and referencing drafting standard configurations to obtain reference files corresponding to at least one profession. Specifically, it is used for:

[0151] Based on the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of equipment layout, and the collaborative design tasks of professional pipelines, the drawing library is called and the standard drawing configuration is referenced to draw the first data file corresponding to the collaborative design task of the main civil engineering frame, the second data file corresponding to the collaborative design task of equipment layout, and the third data file corresponding to the collaborative design task of professional pipelines.

[0152] Based on the second and third capital contribution documents, the fourth capital contribution document is determined.

[0153] Optionally, the drawing generation unit 603 is used to generate reference drawings corresponding to the construction drawing commissioned design task based on reference documents corresponding to at least one specialty, specifically for:

[0154] According to the aggregation rules, the fourth submission document is aggregated by floor to obtain the fifth submission document;

[0155] Based on the first and fifth information submission documents, generate the target information drawings corresponding to the commissioned construction drawing design task.

[0156] Optional, Figure 7 This diagram illustrates the structure of a second type of multi-disciplinary construction drawing commissioning and information extraction device for coal preparation plants, as provided in an embodiment of this disclosure. Figure 7 As shown, the multi-disciplinary construction drawing submission device 600 for coal preparation plants also includes a document inspection unit 604 and a document modification unit 605, used to: after obtaining submission documents corresponding to at least one specialty:

[0157] Document inspection unit 604 is used to inspect and mark the document submission documents corresponding to at least one profession, and obtain at least one inspection report corresponding to the document submission documents corresponding to at least one profession, wherein the inspection report corresponds one-to-one with the document submission documents;

[0158] The document modification unit 605 is used to issue a document modification instruction if any of the inspection reports in at least one inspection report does not meet the inspection conditions. The document modification instruction is used to instruct the modification of the information document corresponding to any inspection report.

[0159] Optionally, the drawing generation unit 603 is used to generate target reference drawings corresponding to the construction drawing commissioned design task based on reference documents corresponding to at least one discipline, specifically for:

[0160] Based on the information submission documents corresponding to at least one specialty, generate the initial information submission drawings corresponding to the construction drawing commissioning design task.

[0161] If the initial reference drawings meet the reference conditions, then the initial reference drawings are determined to be the target reference drawings corresponding to the construction drawing commissioned design task.

[0162] Optionally, the drawing generation unit 603, after generating the initial reference drawings corresponding to the construction drawing commissioned design task based on reference documents corresponding to at least one discipline, is further used for:

[0163] Perform structural calculations and collision checks on the initial drawings.

[0164] If the initial data drawings do not meet the conditions for structural verification and collision check, a drawing modification instruction will be issued. The document modification instruction is used to indicate that the initial data drawings should be modified.

[0165] It should be noted that the coal preparation plant multi-disciplinary construction drawing commissioning and information extraction device provided in the above embodiments is only illustrated by the division of the above functional modules when executing the coal preparation plant multi-disciplinary construction drawing commissioning and information extraction method. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the equipment can be divided into different functional modules to complete all or part of the functions described above. In addition, the coal preparation plant multi-disciplinary construction drawing commissioning and information extraction device and the coal preparation plant multi-disciplinary construction drawing commissioning and information extraction method embodiments provided in the above embodiments belong to the same concept, and its implementation process is detailed in the method embodiments, which will not be repeated here.

[0166] In summary, the apparatus provided in this embodiment includes a task acquisition unit for acquiring construction drawing design commission tasks; a document drawing unit for drawing according to the construction drawing design commission tasks by calling a reference drawing library and referencing drafting standard configurations to obtain reference documents corresponding to at least one specialty; and a drawing generation unit for generating target reference drawings corresponding to the construction drawing design commission tasks based on the reference documents corresponding to at least one specialty if the reference documents corresponding to at least one specialty meet the inspection conditions. Therefore, by simultaneously drawing reference documents corresponding to at least one specialty, the reference cycle can be shortened. Furthermore, by calling a reference drawing library and referencing drafting standard configurations to obtain reference documents, reference symbols and rules can be standardized, improving reference efficiency and reducing the error rate.

[0167] The collection, storage, use, processing, transmission, provision, and disclosure of user personal information involved in the technical solution disclosed herein comply with the provisions of relevant laws and regulations and do not violate public order and good morals.

[0168] According to embodiments of this disclosure, this disclosure also provides a terminal, a readable storage medium, and a computer program product.

[0169] Figure 8 A schematic block diagram of an example terminal 800 that can be used to implement embodiments of the present disclosure is shown. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or claimed herein.

[0170] like Figure 8 As shown, terminal 800 includes a computing unit 801, which can perform various appropriate actions and processes based on a computer program stored in read-only memory (ROM) 802 or a computer program loaded from storage unit 808 into random access memory (RAM) 803. RAM 803 may also store various programs and data required for the operation of terminal 800. The computing unit 801, ROM 802, and RAM 803 are interconnected via bus 804. Input / output (I / O) interface 805 is also connected to bus 804.

[0171] Multiple components in terminal 800 are connected to I / O interface 805, including: input unit 806, such as keyboard, mouse, etc.; output unit 807, such as various types of displays, speakers, etc.; storage unit 808, such as disk, optical disk, etc.; and communication unit 809, such as network card, modem, wireless transceiver, etc. Communication unit 809 allows terminal 800 to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunications networks.

[0172] The computing unit 801 can be various general-purpose and / or special-purpose processing components with processing and computing capabilities. Some examples of the computing unit 801 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special-purpose artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, a digital signal processor (DSP), and any suitable processor, controller, microcontroller, etc. The computing unit 801 performs the various methods and processes described above, such as the coal preparation plant multi-disciplinary construction drawing commissioning and data extraction method. For example, in some embodiments, the coal preparation plant multi-disciplinary construction drawing commissioning and data extraction method can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as storage unit 808. In some embodiments, part or all of the computer program can be loaded and / or installed on terminal 800 via ROM 802 and / or communication unit 809. When the computer program is loaded into RAM 803 and executed by the computing unit 801, one or more steps of the coal preparation plant multi-disciplinary construction drawing commissioning and data extraction method described above can be performed. Alternatively, in other embodiments, the computing unit 801 may be configured by any other suitable means (e.g., by means of firmware) to perform a method for commissioning and providing information on multi-disciplinary construction drawings for coal preparation plants.

[0173] Various embodiments of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), systems-on-a-chip (SoCs), payload-programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various embodiments may include implementations in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which may be a dedicated or general-purpose programmable processor, capable of receiving data and instructions from a storage system, at least one input device, and at least one output device, and transmitting data and instructions to the storage system, the at least one input device, and the at least one output device.

[0174] The program code used to implement the methods of this disclosure may be written in any combination of one or more programming languages. This program code may be provided to a processor or controller of a general-purpose computer, special-purpose computer, or other programmable data processing apparatus, such that when executed by the processor or controller, the program code causes the functions / operations specified in the flowcharts and / or block diagrams to be implemented. The program code may be executed entirely on a machine, partially on a machine, as a standalone software package partially on a machine and partially on a remote machine, or entirely on a remote machine or server.

[0175] In the context of this disclosure, a machine-readable medium can be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, apparatus, or device. A machine-readable medium can be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium can be, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, apparatus, or devices, or any suitable combination of the foregoing. More specific examples of machine-readable storage media include electrical connections based on one or more wires, portable computer disks, hard disks, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage devices, magnetic storage devices, or any suitable combination of the foregoing.

[0176] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device for displaying information to the user (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor); and a keyboard and pointing device (e.g., a mouse or trackball) through which the user provides input to the computer. Other types of devices can also be used to provide interaction with the user; for example, feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including sound input, voice input, or tactile input).

[0177] The systems and technologies described herein can be implemented in computing systems that include backend components (e.g., as data servers), or middleware components (e.g., application servers), or frontend components (e.g., user computers with graphical user interfaces or web browsers through which users can interact with implementations of the systems and technologies described herein), or any combination of such backend, middleware, or frontend components. The components of the system can be interconnected via digital data communication of any form or medium (e.g., communication networks). Examples of communication networks include local area networks (LANs), wide area networks (WANs), the Internet, and blockchain networks.

[0178] Computer systems can include clients and servers. Clients and servers are generally located far apart and typically interact via a communication network. This is achieved through computer programs running on respective computers and having a client-server relationship with each other.

[0179] The sequence establishes the relationship between the client and the server. The server can be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system. It solves the shortcomings of traditional physical hosts and VPS services ("Virtual Private Server", or simply "VPS"), such as high management difficulty and weak business scalability. The server can also be a server for a distributed system, or a server combined with blockchain.

[0180] It should be understood that steps can be reordered, added, or deleted using the various flow patterns shown above. For example,

[0181] The steps described in this disclosure can be executed in parallel, sequentially, or in different orders. As long as the desired result of the technical solution disclosed in this disclosure can be achieved, this document does not impose any restrictions.

[0182] The specific embodiments described above do not constitute a limitation on the scope of protection of this disclosure. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of this disclosure should be included within the scope of protection of this disclosure.

Claims

1. A method for commissioning and providing multi-disciplinary construction drawings for a coal preparation plant, characterized in that, include: Obtain a construction drawing design commission; Based on the construction drawing commission design task, the data library is called to reference the standard drafting configuration for drawing, and at least one data file corresponding to a professional is obtained; If the information submission documents corresponding to at least one specialty meet the inspection conditions, then the target information submission drawings corresponding to the construction drawing commissioning design task are generated based on the information submission documents corresponding to at least one specialty. When the construction drawing design commissioning task includes collaborative design tasks for the main civil engineering frame, collaborative design tasks for equipment layout, and collaborative design tasks for professional pipelines, the step of calling the reference drawing library and referencing drafting standard configurations to draw according to the construction drawing design commissioning task, and obtaining reference files corresponding to at least one profession, includes: Based on the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of the equipment professional layout, and the collaborative design tasks of the professional pipeline, the drawing library is called and the standard drawing configuration is referenced to draw, resulting in the first data file corresponding to the collaborative design task of the main civil engineering frame, the second data file corresponding to the collaborative design task of the equipment professional layout, and the third data file corresponding to the collaborative design task of the professional pipeline. Based on the second and third capital submission documents, a fourth capital submission document is determined; According to the aggregation rules, the fourth submission document is aggregated by floor to obtain the fifth submission document; Based on the first and fifth information submission documents, the target information drawings corresponding to the construction drawing commissioned design task are generated.

2. The method according to claim 1, characterized in that, The step of commissioning a design task based on the construction drawings, calling the reference drawing library and referencing standard drafting configurations to draw, and obtaining reference files corresponding to at least one specialty, also includes: Determine the design authority corresponding to the construction drawing commissioning task and the information submission template corresponding to at least one specialty; The resource library is invoked, and the resource templates corresponding to the at least one profession are used to draw the resource files, thereby obtaining resource files corresponding to at least one profession.

3. The method according to claim 1, characterized in that, After obtaining at least one professional qualification document, the process also includes: The document submissions corresponding to the at least one profession are checked and marked to obtain at least one inspection report corresponding to the document submissions corresponding to the at least one profession, wherein the inspection report corresponds one-to-one with the document submissions; If any of the at least one inspection reports fails to meet the inspection conditions, a document modification instruction is issued, wherein the document modification instruction is used to instruct the modification of the information submission document corresponding to any of the inspection reports.

4. The method according to claim 1, characterized in that, The step of generating target reference drawings corresponding to the construction drawing commissioning task based on reference documents corresponding to at least one specialty includes: Based on the information submission documents corresponding to at least one of the aforementioned specialties, generate the initial information submission drawings corresponding to the construction drawing commissioning design task. If the initial reference drawings meet the reference conditions, then the initial reference drawings are determined to be the target reference drawings corresponding to the construction drawing commissioned design task.

5. The method according to claim 4, characterized in that, After generating the initial reference drawings corresponding to the construction drawing commissioning task based on the reference documents corresponding to the at least one specialty, the method further includes: Structural calculations and collision checks were performed on the initial drawings. If the initial reference drawings do not meet the conditions for structural verification and collision check, a drawing modification instruction is issued, wherein the drawing modification instruction is used to instruct the initial reference drawings to be modified.

6. A device for commissioning and providing multi-disciplinary construction drawings for a coal preparation plant, characterized in that, include: The task acquisition unit is used to acquire construction drawing design commission tasks; The document drawing unit is used to draw according to the construction drawing commission design task, call the information library and reference the drafting standard configuration to obtain information files corresponding to at least one profession. The drawing generation unit is used to generate target reference drawings corresponding to the construction drawing commissioning design task based on the reference documents corresponding to the at least one specialty if the reference documents corresponding to the at least one specialty meet the inspection conditions. When the construction drawing design commissioning task includes collaborative design tasks for the main civil engineering frame, collaborative design tasks for equipment layout, and collaborative design tasks for professional pipelines, the step of calling the reference drawing library and referencing drafting standard configurations to draw according to the construction drawing design commissioning task, and obtaining reference files corresponding to at least one profession, includes: Based on the collaborative design tasks of the main civil engineering frame, the collaborative design tasks of the equipment professional layout, and the collaborative design tasks of the professional pipeline, the drawing library is called and the standard drawing configuration is referenced to draw, resulting in the first data file corresponding to the collaborative design task of the main civil engineering frame, the second data file corresponding to the collaborative design task of the equipment professional layout, and the third data file corresponding to the collaborative design task of the professional pipeline. Based on the second and third capital submission documents, a fourth capital submission document is determined; According to the aggregation rules, the fourth submission document is aggregated by floor to obtain the fifth submission document; Based on the first and fifth information submission documents, the target information drawings corresponding to the construction drawing commissioned design task are generated.

7. A terminal, comprising: At least one processor; as well as A memory communicatively connected to the at least one processor; characterized in that, The memory stores instructions that can be executed by the at least one processor to enable the at least one processor to perform the method of any one of claims 1-5.

8. A non-transitory computer-readable storage medium storing computer instructions, characterized in that, The computer instructions are used to cause the computer to perform the method according to any one of claims 1-5.

Citation Information

Patent Citations

  • PDMS and Revit are two platforms of multi-disciplinary funding and collection methods

    CN109325726A

  • Two-dimensional and three-dimensional collaborative design platform based on CAD and Revit

    CN113836613A