A plugging and dredging efficiency enhancement system and efficiency enhancement method for large bottom water oil reservoir
By optimizing the composition and injection steps of water plugging agents, the bottom water channel is sealed deep and carbon dioxide is used to divert, solving the problem of insufficient entry depth of plugging agents in clastic rock reservoirs, and improving the water plugging efficiency and reservoir development effect.
Patent Information
- Application Number
- CN202210152101.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-02-18
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-02-18
AI Technical Summary
The high water content of horizontal wells in clastic rock reservoirs leads to poor reservoir development results. The existing frozen glue water blocking agent has insufficient depth to enter the formation, and it is impossible to effectively start the remaining oil in the hypopermeability section.
The blocking and elimination system of the large bottom water reservoir is adopted, and the composition of water blocking agents is optimized, including 35-40% weak frozen glue, 10-20% strong frozen glue, 3-10% carbon dioxide and 15-35% formation water, combined with Specific injection steps and doses, deeply seal the bottom water channel and use carbon dioxide to drain the remaining oil in the hypotonic section.
It significantly improves the oil increase and efficiency of single wells with blocked water, reduces the water content, and enhances the development effect of the reservoir.
Smart Images

Figure BDA0003510857480000071 
Figure BDA0003510857480000081
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of oil reservoir development, and particularly relates to a plugging and dredging efficiency enhancement system and efficiency enhancement method for a large bottom water oil reservoir. Background Art
[0002] Clastic oil reservoirs are ultra-deep (4200-5100m), high-temperature (105-137℃), high-salt (total formation water mineralization 21-24×104mg / L), and large bottom water (water-oil volume ratio greater than 50) reservoirs, and are mostly developed using horizontal wells. Due to the strong heterogeneity of the reservoir, as the development progresses, the edge and bottom water quickly advances along the high permeability ridge or high permeability strip, resulting in high water content in the horizontal wells and a rapid decline in oil production, which seriously affects the development effect of the reservoir. Therefore, the high water content problem in horizontal wells has seriously affected the efficient development of clastic oil reservoirs. It is very necessary to develop water-blocking agents that meet the water-blocking requirements of large bottom water reservoirs.
[0003] CN105131921A discloses a salt-resistant, high-temperature-resistant, high-strength gel plugging agent, which contains, by weight: 20 to 25 parts of sulfonated modified small molecule biopolymer, 2.5 to 4 parts of small molecule acrylamide and sodium methyl propylene sulfonate copolymer, 1.3 to 3 parts of cross-linking agent, and 0.5 to 1.5 parts of pH regulator; wherein the cross-linking agent is a phenolic resin compound, which is prepared from a phenolic compound and an aldehyde compound or a compound that can produce aldehyde; the sulfonated modified small molecule biopolymer is prepared from a plant extract by sulfonation with sodium sulfite; and the pH regulator is one of ammonium chloride, formic acid, oxalic acid, and citric acid. The invention is effective at a temperature of 120°C and a salinity of 20×10 4 mg / l, the gel strength is 4×10 4 -10×10 4 mPa﹒ S, gelation time is 4-6 hours, suitable for horizontal wells in bottom water sandstone reservoirs.
[0004] Li Liang et al., in response to the need to improve the recovery rate of the highly heterogeneous reservoirs in the high-temperature and high-salinity reservoirs in Tahe, disclosed a gel foam flooding system with the formula of 0.4% to 0.5% HTSP polymer + 0.09% to 0.16% REL&MNE crosslinker + 0.2% to 0.3% HTS-1 foaming agent. The comprehensive value of the foam is more than twice that of ordinary foam. Physical simulation experiments were conducted to evaluate the formation adaptability and recovery performance of the gel foam system. The experimental results showed that the gel foam has a good selectivity and adaptability to the formation, and has a good selectivity and adaptability to the formation in the range of 0.6 to 3.3 μm. 2Within the range, as the permeability increases, the residual resistance coefficient increases, and the profile improvement effect is obvious. Compared with ordinary foam, simple gas drive and water drive, gel foam technology can effectively start low permeability oil layers, increase the recovery rate by 26.93%, which is 2.3 times that of ordinary foam, 6.2 times that of gas injection, and 14.17% higher than the final recovery rate of ordinary water drive (Gel foam flooding technology for high-temperature and high-salinity oil reservoirs in Tahe, Petroleum Drilling and Production Technology, Vol. 38, No. 2, March 2016, pp. 260-266).
[0005] CN110982502A discloses a heat-resistant and salt-resistant gel foam containing a phosphonic acid structure, and its preparation method and application. The heat-resistant and salt-resistant gel foam is prepared by introducing carbon dioxide gas into a liquid gel; the mass percentage components of the liquid gel are: 0.3% to 0.9% of a heat-resistant and salt-resistant polymer, 0.2% to 0.9% of phenol or hydroquinone, 0.2% to 0.9% of an aldehyde compound, 0.2% to 0.8% of a foaming agent, 0.3% to 0.6% of an organic matter containing a phosphonic acid structure, 0.3% to 0.7% of an auxiliary agent, and the balance is water; it is used for selective water plugging under high-temperature and high-salt formation conditions.
[0006] In the past two years, gel plugging technology for clastic reservoirs has become an effective means of controlling water in high-water-content horizontal wells, and has achieved good results in controlling water and increasing oil production. However, there are still problems such as the shallow depth of chemical plugging agents entering the formation, insufficient release of the potential of the low-permeability section, and the retention of some residual oil in the low-permeability section, which cannot be started. Summary of the invention
[0007] In order to solve the above technical problems, the present invention provides a plugging and dredging efficiency enhancement system and efficiency enhancement method for large bottom water oil reservoirs, which increases the oil production and water plugging efficiency of a single well by optimizing the deep plugging of the bottom water channel by the water plugging agent and the carbon dioxide dredging system to dredge the residual oil that is difficult to start in the low permeability section.
[0008] In order to achieve the above object, the present invention provides the following technical solutions:
[0009] A plugging and dredging efficiency enhancement system for a large bottom water oil reservoir is composed, by mass fraction, of 35-40% weak jelly, 10-20% strong jelly, 3-10% carbon dioxide and 15-35% formation water.
[0010] Preferably, the weak gel comprises, by mass percentage, 0.15-0.25% HTS, 0.02-0.04% cross-linking agent and the balance formation water.
[0011] Preferably, the super-freeze gel comprises, by mass percentage, 0.15-0.25% HTS, 0.05-0.08% cross-linking agent and the balance formation water.
[0012] in,
[0013] The HTS described in the present invention is an HTS functional polymer.
[0014] The cross-linking agent is a phenolic cross-linking agent, preferably a REL&MNE phenolic cross-linking agent.
[0015] The present invention also provides a plugging and dredging efficiency enhancement method for a large bottom water oil reservoir, which utilizes the above-mentioned plugging and dredging composite efficiency enhancement system for a large bottom water oil reservoir to perform plugging and dredging, and specifically comprises the following steps:
[0016] (1) Injection of pre-slug;
[0017] (2) Injection of a carbon dioxide slug;
[0018] (3) Injection of hydrophobic slug;
[0019] (4) Injecting weak frozen gel plug;
[0020] (5) Injecting the strong freezing glue plug;
[0021] (6) Injection of medium oil slug;
[0022] (7) Inject displacement fluid into the plug.
[0023] Preferably, medium oil is injected into the front segment plug in step (1); further preferably, the injection amount of the medium oil is 3-4% of the volume of the main plugging agent.
[0024] Preferably, carbon dioxide is injected into the carbon dioxide slug in step (2); further preferably, the injection amount of the carbon dioxide is 3-10% of the volume of the main plugging agent.
[0025] Preferably, medium oil is injected into the medium hydrophobic segment plug in step (3); further preferably, the injection amount of the medium oil is 3-10% of the volume of the main plugging agent.
[0026] Preferably, in step (4), weak gel is injected into the weak gel segment plug; further preferably, the injection amount of the weak gel is 30-40% of the volume of the main plugging agent.
[0027] Preferably, in step (5), strong freezing glue is injected into the strong freezing glue segment plug; further preferably, the injection amount of the strong freezing glue is 10-20% of the volume of the main plugging agent.
[0028] Preferably, in step (6), medium oil is injected into the medium oil segment plug; further preferably, the injection amount of the medium oil is 5-22% of the volume of the main plugging agent.
[0029] Preferably, formation water is injected into the displacement fluid slug in step (7); further preferably, the injection amount of the formation water is 15-35% of the volume of the main plugging agent.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] The present invention aims at the problem that the plugging agent in the gel plugging of large bottom water clastic rock reservoir has a shallow depth of entering the formation, the potential of the low permeability section is not released enough, and part of the remaining oil is retained in the low permeability section formation and cannot be started. The present invention provides a large bottom water oil reservoir plugging and dredging composite efficiency enhancement system and efficiency enhancement method thereof, through carrying out research on clastic rock horizontal well plugging and dredging composite technology, optimizing the deep plugging of the bottom water channel by high-efficiency water plugging agent, and dredging the residual oil that is difficult to start in the low permeability section by the carbon dioxide dredging system, thereby increasing the oil production and water plugging efficiency of a single well. Engineering application shows that the efficiency enhancement system and efficiency enhancement method have a good effect on increasing oil production in the Tahe Oilfield, and the water content is significantly reduced. DETAILED DESCRIPTION
[0032] The present invention will be described clearly and completely below in conjunction with specific embodiments. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] Before further describing the specific embodiments of the present invention, it should be understood that the scope of protection of the present invention is not limited to the specific embodiments described below; it should also be understood that the terms used in the examples of the present invention are for describing specific embodiments rather than for limiting the scope of protection of the present invention.
[0034] A plugging and dredging efficiency enhancement system for a large bottom water oil reservoir, which is composed of 35-40% weak jelly, 10-20% strong jelly, 3-10% carbon dioxide and 15-35% formation water by mass fraction;
[0035] The weak gel comprises, by mass percentage, 0.15-0.25% HTS, 0.02-0.04% cross-linking agent and the balance formation water;
[0036] The strong freezing gel comprises, by mass percentage, 0.15-0.25% HTS, 0.05-0.08% cross-linking agent and the balance formation water;
[0037] The HTS is an HTS functional polymer; the cross-linking agent is a phenolic cross-linking agent, preferably a REL&MNE phenolic cross-linking agent.
[0038] The present invention also provides a plugging and dredging efficiency enhancement method for a large bottom water oil reservoir, which utilizes the above-mentioned plugging and dredging composite efficiency enhancement system for a large bottom water oil reservoir to perform plugging and dredging, and specifically comprises the following steps:
[0039] (1) Injecting medium oil into the formation as a pre-slug; wherein the injection amount of the medium oil is 3-4% of the volume of the main plugging agent.
[0040] (2) Injecting carbon dioxide into the formation as a carbon dioxide slug; wherein the injection amount of the carbon dioxide is 3-10% of the volume of the main plugging agent.
[0041] (3) Injecting medium oil into the formation as a medium hydrophobic segment plug; wherein the injection amount of the medium oil is 3-10% of the volume of the main plugging agent.
[0042] (4) Injecting weak-freeze gel into the formation as a weak-freeze gel plug; wherein the injection amount of the weak-freeze gel is 30-40% of the volume of the main plugging agent.
[0043] (5) Injecting strong-freeze glue into the formation as a strong-freeze glue plug; wherein the injection amount of the strong-freeze glue is 10-20% of the volume of the main plugging agent.
[0044] (6) Injecting medium oil into the formation as a medium oil segment plug; wherein the injection amount of the medium oil is 5-22% of the volume of the main plugging agent.
[0045] (7) Injecting formation water into the formation as a displacement fluid plug, wherein the injection amount of the formation water is 15-35% of the volume of the main plugging agent.
[0046] The clastic reservoirs in the Tahe Oilfield are ultra-deep (4200-5100m), high-temperature (105-137℃), high-salinity (total mineralization of formation water 21-24×10 4 mg / L) and large bottom water (water-oil volume ratio greater than 50) reservoirs. Due to the strong heterogeneity of the reservoir, the edge and bottom water quickly advance along the high permeability ridge or high permeability strip, resulting in high water content in the horizontal wells. At present, there are 97 oil wells with water content ≥80%, accounting for 52.2% of the total number of horizontal wells, with a daily oil production of 220.2t, accounting for only 15.6% of the daily oil production of horizontal wells, and the average daily oil production of a single well is only 2.27t. The high water content of horizontal wells has seriously affected the efficient development of clastic reservoirs.
[0047] In order to better understand the technical effects achieved by the present invention, the HMQ well in Tatian Oilfield is taken as an example to introduce its specific construction in detail.
[0048] Example 1: Construction and production of HMQ6 well
[0049] A pilot test of horizontal well plugging and dredging composite technology was carried out in HMQ6 well, with a cumulative injection of 375m of main plugging agent. 3 , the specific injection steps are as follows:
[0050] S1) Inject medium oil into the formation as a front slug 11.25 cubic meters;
[0051] S2) injecting 37.5 cubic meters of carbon dioxide into the formation;
[0052] S3) injecting medium oil into the formation as a medium hydrophobic slug of 11.25 cubic meters;
[0053] S4) injecting 150 cubic meters of weakly frozen gel slug into the formation;
[0054] S5) injecting 37.5 cubic meters of strong freezing gel plug into the formation;
[0055] S6) injecting 18.75 cubic meters of medium oil slug into the formation;
[0056] S7) injecting 108.75 cubic meters of displacement fluid plug into the formation, wherein the displacement fluid is formation water, and shutting down the well after the injection is completed.
[0057] The well was reopened after being shut down for 10 days. Initially, production was carried out on a 5*4 working system, and the water content dropped to 71%. The cumulative oil production increased by 733 tons.
[0058] Example 2: Construction and production of HMQ7 well
[0059] A pilot test of horizontal well plugging and dredging composite technology was carried out in HMQ7 well, with a cumulative injection of 375m of main plugging agent. 3 , the specific injection steps are as follows:
[0060] S1) injecting medium oil into the formation as a front slug 15 cubic meters;
[0061] S2) injecting a slug of 11.25 cubic meters of carbon dioxide into the formation;
[0062] S3) injecting 37.5 cubic meters of medium oil into the formation as a medium hydrophobic slug;
[0063] S4) injecting 112.5 cubic meters of weakly frozen gel slug into the formation;
[0064] S5) injecting 75 cubic meters of strong freezing gel plug into the formation;
[0065] S6) injecting 67.5 cubic meters of medium oil slug into the formation;
[0066] S7) injecting 56.25 cubic meters of displacement fluid into the formation, wherein the displacement fluid is formation water, and shutting down the well after the injection is completed.
[0067] The well was opened after being shut down for 10 days. Initially, production was carried out on a 5*4 working system, and the water content dropped to 70%. The cumulative oil production increased by 692 tons.
[0068] Example 3: Construction and production of HMQ8 well
[0069] A pilot test of horizontal well plugging and dredging composite technology was carried out in HMQ8 well, with a cumulative injection of 375m of main plugging agent.3 , the specific injection steps are as follows:
[0070] S1) Inject medium oil into the formation as a front slug 11.25 cubic meters;
[0071] S2) injecting a 15 cubic meter slug of carbon dioxide into the formation;
[0072] S3) injecting medium oil into the formation as a medium hydrophobic slug 15 cubic meters;
[0073] S4) injecting 131.25 cubic meters of weakly frozen gel slug into the formation;
[0074] S5) injecting 45 cubic meters of strong freezing gel slug into the formation;
[0075] S6) injecting 26.25 cubic meters of medium oil slug into the formation;
[0076] S7) injecting 131.25 cubic meters of displacement fluid plug into the formation, wherein the displacement fluid is formation water, and shutting down the well after the injection is completed.
[0077] The well was reopened after being shut down for 10 days. Initially, production was carried out on a 5*4 working system, and the water content dropped to 72%. The cumulative oil production increased by 745 tons.
[0078] Example 4: Construction and production of HMQ9 well
[0079] A pilot test of horizontal well plugging and dredging composite technology was carried out in HMQ9 well, with a cumulative injection of 375m of main plugging agent. 3 , the specific injection steps are as follows:
[0080] S1) injecting medium oil into the formation as a front slug 15 cubic meters;
[0081] S2) injecting a 26.25 cubic meter slug of carbon dioxide into the formation;
[0082] S3) injecting 22.5 cubic meters of medium oil into the formation as a medium hydrophobic slug;
[0083] S4) injecting 112.5 cubic meters of weakly frozen gel slug into the formation;
[0084] S5) injecting 56.25 cubic meters of strong freezing gel plug into the formation;
[0085] S6) injecting 82.5 cubic meters of medium oil slug into the formation;
[0086] S7) injecting 60 cubic meters of displacement fluid into the formation, wherein the displacement fluid is formation water, and the well is shut down after the injection is completed.
[0087] The well was reopened after being shut down for 10 days. Initially, production was carried out on a 5*4 working system, and the water content dropped to 70%. The cumulative oil production increased by 717 tons.
[0088] The test results of Examples 1-4 are shown in Table 1.
[0089] Table 1
[0090]
[0091]
[0092] Comparative Example 1
[0093] A pilot test of horizontal well plugging and dredging composite technology was carried out in HMQ1 well, with a total injection of 518m of main plugging agent 3 , the specific injection steps are as follows:
[0094] S1) injecting medium oil into the formation as a front slug 20 cubic meters;
[0095] S2) injecting 23 cubic meters of carbon dioxide into the formation;
[0096] S3) injecting medium oil into the formation as a medium hydrophobic slug 20 cubic meters;
[0097] S4) injecting 110 cubic meters of weakly frozen gel slug into the formation;
[0098] S5) injecting 125 cubic meters of strong freezing gel slug into the formation;
[0099] S6) injecting 120 cubic meters of medium oil slug into the formation;
[0100] S7) injecting 100 cubic meters of displacement fluid plug into the formation, wherein the displacement fluid is formation water, and shutting down the well after the injection is completed.
[0101] The well was reopened after being shut down for 10 days. Initially, production was carried out on a 5*4 working system, and the water content dropped to 85%. The cumulative oil production increased by 378 tons.
[0102] Comparative Example 2
[0103] Compared with Example 1, for the HMQ2 well, step S2 is removed from the construction of the well, and the remaining steps are exactly the same as in Example 1. The well was opened after being shut down for 12 days. The initial production working system was 5*4, with a daily oil production of 12.17 tons and a daily oil increase of 10.7 tons. The water content dropped to 88%, and the cumulative oil increase was 295 tons. The water control and oil increase effect was poor.
[0104] Comparative Example 3
[0105] Compared with Example 1, for the HMQ3 well, the order of steps S2 and S4 in the construction of the well was changed, and the remaining steps were exactly the same as those of the HMQ1 well. The well was opened after being shut down for 12 days. The initial production working system was 5*4, with a daily oil production of 14.72 tons and a daily oil increase of 13.01 tons. The water cut dropped to 83%, and the cumulative oil increase was 457 tons. The effect of water control and oil increase was poor.
[0106] Comparative Example 4
[0107] Compared with Example 1, in the well numbered HMQ4, the injection amount of the carbon dioxide slug in step S2 during the construction of the well is 42 cubic meters, and the remaining steps are exactly the same as in Example 1. The well is opened after being shut down for 12 days. The initial production working system is 5*4, the daily oil production is 15.33 tons, the daily oil increase is 14.17 tons, the water content drops to 77%, the cumulative oil increase is 577 tons, and the water control and oil increase effect is poor.
[0108] Comparative Example 5
[0109] Compared with Example 1, in the well numbered HMQ5, the injection amount of the carbon dioxide slug in step S2 during the construction of the well is 10 cubic meters, and the remaining steps are exactly the same as in Example 1. The well is opened after being shut down for 12 days. The initial production working system is 5*4, the daily oil production is 14.93 tons, the daily oil increase is 13.75 tons, the water content drops to 79%, the cumulative oil increase is 512 tons, and the water control and oil increase effect is poor.
[0110] The above shows and describes the basic principles, main features and advantages of the present invention, so the above is only an embodiment of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions only describe the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention also includes various equivalent changes and improvements, which will fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A plugging and dredging efficiency enhancement system for a large bottom water oil reservoir, characterized in that: By mass fraction, it is composed of 35-40% weak jelly, 10-20% strong jelly, 3-10% carbon dioxide and 15-35% formation water; The weak gel, calculated by mass percentage, includes: 0.15-0.25% HTS, 0.02-0.04% cross-linking agent and the balance formation water; the strong gel, calculated by mass percentage, includes: 0.15-0.25% HTS, 0.05-0.08% cross-linking agent and the balance formation water.
2. The plugging and dredging efficiency enhancement system according to claim 1 is characterized in that: The cross-linking agent is a phenolic cross-linking agent.
3. A method for plugging and dredging efficiency enhancement in a large bottom water oil reservoir, characterized in that: The method of using the large bottom water oil reservoir plugging and dredging composite synergistic system according to any one of claims 1 to 2 to carry out plugging and dredging comprises the following steps: (1) Injection of pre-slug; (2) Injection of carbon dioxide slug; (3) Hydrophobic slug during injection; (4) Injecting weak frozen gel plug; (5) Injection of strong freezing glue plug; (6) Injection of medium oil slug; (7) Injection of displacement fluid slug; In step (1), medium oil is injected into the front segment plug; the injection amount of the medium oil is 3-4% of the volume of the main plugging agent; In step (2), carbon dioxide is injected into the carbon dioxide slug; the injection amount of the carbon dioxide is 3-10% of the volume of the main plugging agent; In step (3), medium oil is injected into the medium hydrophobic segment plug; the injection amount of the medium oil is 3-10% of the volume of the main plugging agent; In step (4), weak gel is injected into the weak gel segment plug; the injection amount of the weak gel is 30-40% of the volume of the main plugging agent; In step (5), the strong freezing glue is injected into the strong freezing glue segment plug; the injection amount of the strong freezing glue is 10-20% of the volume of the main plugging agent; In step (6), medium oil is injected into the medium oil segment plug; the injection amount of the medium oil is 5-22% of the volume of the main plugging agent; In step (7), formation water is injected into the displacement fluid segment plug; the injection amount of the formation water is 15-35% of the volume of the main plugging agent.
4. The method for increasing efficiency of blocking and dredging according to claim 3, characterized in that: The weak gel described in step (4) comprises, by mass percentage, 0.15-0.25% HTS, 0.02-0.04% cross-linking agent and the balance formation water; the strong gel described in step (5) comprises, by mass percentage, 0.15-0.25% HTS, 0.05-0.08% cross-linking agent and the balance formation water; the cross-linking agent is a phenolic cross-linking agent.
