AI Technical Summary

Technical Problem

[0005]专利号CN202110162311.8解决了操作复杂且功能单一,且无法对水体进行实时监测的问题,专利号CN202210365203.5解决了湖水取样装置在实际使用时存在着结构过于简单,不方便对不同层次的湖水进行取样的问题;但无法使用单一装置在不同位置对选定的水中、岸边或是水体的正上方位置进行实时监测;为此,我们提出一种水工环地质环境监测警示装置来解决上述问题

Benefits of technology

[0026] 1. When the entire device is placed in water, it is submerged in water, and the bottom surface of the first assembly block is attached to the bottom of the water body. The weight of the entire device is increased by the set guide plate, and a correction mechanism is vertically inserted into the inner cavity of the connecting cavity. The correction mechanism monitors the water body in real time. The opening of the guide cavity allows the water to flow along its inner cavity wall. When the water flow impacts the inner cavity wall of the guide cavity, it will cause the entire device to fluctuate. The entire device in the fluctuating state will swing with the bottom position of the first assembly block as the fulcrum according to the frequency of the water flow, which is suitable for real-time monitoring of slow-flowing water.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The application discloses a kind of hydraulic environment monitoring warning devices of geology, belong to water body monitoring technical field.It includes support unit and monitoring unit, overall device is placed in the position needing to carry out environmental monitoring, position can be selected in water, shore or the position right above water body, when overall device is hung in the position right above water body, overall device is transversely vertically arranged in the position right above water body, the center position of pole in assembly is taken as buoyancy point, the support unit of other end and monitoring unit is vertically inserted into water, staff inserts into the inner cavity of series connection mechanism with cooperation mechanism, so that series connection mechanism and cooperation mechanism become a combined structure, at this time, the inner cavity of first series connection cavity is fixedly inserted by the penetration of insert, the outer end surface of support piece can be adjusted in length and width according to the demand of monitoring, so that the side end surface of support piece can be kept adhering at the bottom of water body, so that overall device can withstand the impact force of transverse water flow.