AC / DC hybrid active power distribution system for buildings with multiple load levels and flexible control method

By introducing bidirectional converters and unidirectional converters in building power distribution systems, combined with flexible control methods, the problem of insufficient DC power supply control in the existing technology is solved, and the system adapts to power consumption requirements and load power supply in different scenarios is realized. flexibility.

CN118157245BActive Publication Date: 2024-12-03ZHEJIANG UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410176670.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-08
Publication Date
2024-12-03
Estimated Expiration
2044-02-08

AI Technical Summary

Technical Problem

The existing distribution system lacks effective control methods after being connected to the DC power supply, and the traditional methods mainly target a single power supply, lack universality, and cannot effectively utilize DC power supply and AC power supply to meet the power consumption needs in different scenarios. .

Method used

A multi-load hierarchical building AC-DC hybrid active power distribution system was designed, and the DC system was interacted with the AC system through a bidirectional converter and a one-way converter. A flexible control method was adopted to complete the real-time power and energy storage system based on the load. , adaptive and selective unloading of loads of different levels to ensure that the system can effectively supply power in different scenarios.

Benefits of technology

The power distribution system adapts to the power consumption needs in different scenarios, ensures the power supply demand for AC non-special and special loads, and improves the flexibility and reliability of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118157245B_ABST
    Figure CN118157245B_ABST
Patent Text Reader

Abstract

The present invention discloses a multi-load graded AC / DC hybrid active power distribution system for buildings, which includes a DC system and an AC system, wherein the DC system and the AC system interact with each other through a bidirectional converter and a unidirectional converter; the DC system includes a distributed power supply for power supply, and a DC I bus, a DC II bus, and a DC III bus for transmitting DC power; the AC system includes a first AC power supply and a second AC power supply for power supply, and an AC I bus, an AC II bus, an AC III bus, and an AC IV bus for transmitting AC power. The present invention also provides a flexible control method. The system provided by the present invention can cope with power demand in different scenarios.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power distribution system planning, and in particular relates to a multi-load graded building AC / DC hybrid active power distribution system and a flexible control method. Background Art

[0002] In recent years, with the continuous reduction of fossil energy, increasingly serious environmental pollution and rapid social and economic development, traditional power distribution systems are facing many new problems. At the same time, with the large-scale access of renewable energy distributed power sources, new active distribution systems have gradually become a research hotspot. The new active distribution system that combines traditional AC systems with modern DC systems is the direction of future building power distribution systems.

[0003] The analysis of existing distribution systems is mainly divided into two categories. One is to analyze the main influencing factors of the power supply capacity of the AC / DC hybrid distribution system, and combine the current distribution system structure and equipment capacity to summarize a reasonable AC / DC hybrid distribution system construction plan. The other is based on the coordination ability of the flexible soft switch on the distribution system, verifying the effect of the flexible soft switch on the optimization of the distribution system operation after access, and combining the construction and operation costs. Under the premise of optimal operation of the distribution system, the optimal access position and capacity of the flexible soft switch in the distribution system are calculated.

[0004] Patent document CN113890120A discloses an AC / DC power distribution system based on a flexible interconnection device and an energy flow method, including a first medium-voltage AC bus, a second medium-voltage AC bus, a first transformer, a second transformer, a first low-voltage AC bus, a second low-voltage AC bus, a DC interconnection line, a first circuit breaker, a second circuit breaker, a third circuit breaker, a fourth circuit breaker, a fifth circuit breaker, a sixth circuit breaker, a first flexible interconnection device, a second flexible interconnection device, a third flexible interconnection device, an AC load, and a DC load. The system is only for AC power supply, and does not consider the control method after connecting to the DC power supply.

[0005] Patent document CN116979701A discloses a power distribution method, system and storage medium for large-scale textile equipment, which includes receiving cloth parameters input on the input interface of the central console; the central console uses a first decision algorithm to determine the number and type of equipment to be turned on based on the cloth parameters; the cloud server receives the number and type of equipment sent by the central console, and uses an optimization control algorithm to obtain the voltage and current required for powering each device; the cloud server inputs the voltage and current, and the number and type of equipment into the power supply system to determine whether the current environmental safety factor meets the preset conditions; when the current environmental safety factor meets the preset conditions, the power supply system outputs the voltage and current. This method is only for a single power supply and the modulation parameters are only related to the textile factory, and is not universal. Summary of the invention

[0006] The purpose of the present invention is to provide a multi-load graded building AC / DC hybrid active distribution system and a flexible control method, which can effectively utilize DC power supply and AC power supply to meet the power demand of the distribution system in different scenarios.

[0007] In order to achieve the first object of the present invention, the following technical solution is provided: a multi-load graded building AC / DC hybrid active power distribution system, comprising a DC system and an AC system, wherein the DC system and the AC system perform AC / DC power supply interaction through a bidirectional converter and a unidirectional converter;

[0008] The DC system includes a distributed power supply for power supply, and a DC bus section I, a DC bus section II and a DC bus section III for transmitting DC power, the DC bus section I load has an energy storage system and a bidirectional converter and a unidirectional converter for AC and DC power supply interaction, the DC bus section II load has a DC primary load branch and a DC secondary load branch, the DC bus section III load has a DC tertiary load branch, the DC bus section I is directly connected to the distributed power supply, the DC bus section I is connected to the DC bus section II through a first DC switch, and the DC bus section I is connected to the DC bus section III through a second DC switch;

[0009] The AC system includes a first AC power source and a second AC power source for power supply, and an AC I bus, an AC II bus, an AC III bus, and an AC IV bus for transmitting AC power, wherein the first AC power source is directly connected to the AC I bus, and the AC I bus load has a first multi-level load branch, the second AC power source is directly connected to the AC II bus, and the AC II bus load has a second multi-level load branch, the AC III bus load has an AC special-grade load branch, and the AC IV bus load has an AC non-special-grade load branch that needs to be guaranteed;

[0010] One end of the AC I section bus is connected to one end of the AC III section bus through a first AC switch, the other end of the AC III section bus is connected to the unidirectional converter through a converter switch, the other end of the AC I section bus is connected to the AC II section bus and the bidirectional converter, a second AC switch is provided between the AC I section bus and the AC II section bus, and a first bidirectional converter switch is provided between the AC I section bus and the bidirectional converter;

[0011] The other end of the AC II segment bus is connected to one end of the AC IV segment bus through a third AC switch, and the other end of the AC IV segment bus is connected to the bidirectional converter through a second bidirectional converter switch.

[0012] The present invention combines a DC system and an AC system through a bidirectional converter and a unidirectional converter to cope with the power demand of the power distribution system in different scenarios.

[0013] Specifically, the first multi-stage load branch includes an AC primary load connected to the AC I section bus and an AC secondary dual power supply main circuit.

[0014] Specifically, the second multi-level load branch includes a dual power supply backup circuit for AC primary loads connected to the AC II section bus, a dual power supply backup circuit for AC secondary loads, a dual power supply main circuit for AC special loads, and AC tertiary loads.

[0015] Specifically, electrical interlocking and mechanical interlocking are provided between the switches of the first AC power source and the second AC power source and the second AC switch to ensure that only two of the three switches are in a closed state at the same time.

[0016] Specifically, a DC / DC bidirectional converter is provided at the input end of the energy storage system.

[0017] Specifically, the switching state of the converter switch is opposite to that of the first AC switch.

[0018] Specifically, the first AC power source and the second AC power source are both municipal AC power sources.

[0019] Specifically, the distributed power source uses renewable energy power generation.

[0020] In order to achieve the second invention purpose of the present invention, the following technical scheme is provided: a flexible control method is implemented through the above-mentioned multi-load graded building AC / DC hybrid active distribution system, and according to the total real-time power of loads in the building AC / DC hybrid active distribution system, the energy storage situation of the energy storage system, and the power supply status of the first AC power supply and the second AC power supply, the first, second and third level loads are adaptively and selectively unloaded to meet the power supply needs of AC non-special grade guaranteed loads and AC special grade load branches when the first AC power supply and / or the second AC power supply are disconnected.

[0021] Compared with the prior art, the present invention has the following beneficial effects:

[0022] By setting switches in the AC system and the DC system and using bidirectional converters and unidirectional converters to interact with AC and DC power sources, the power distribution system can adapt to power demand in different scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A schematic diagram of a building AC / DC hybrid active power distribution system provided in this embodiment;

[0024] Figure 2 A schematic diagram of a power distribution system for scenario 1 and scenario 2 provided in this embodiment;

[0025] Figure 3 A schematic diagram of a power distribution system for scenario three provided in this embodiment;

[0026] Figure 4 A schematic diagram of a power distribution system for scenario 4 provided in this embodiment;

[0027] Figure 5 A schematic diagram of a power distribution system for scenario 5 provided in this embodiment;

[0028] Figure 6 A schematic diagram of a power distribution system for scenario 6 provided in this embodiment;

[0029] Figure 7 A schematic diagram of a power distribution system for scenario seven provided in this embodiment;

[0030] Figure 8 A schematic diagram of a power distribution system for scenario eight provided in this embodiment;

[0031] Fig. 9 A schematic diagram of a power distribution system for scenario nine provided in this embodiment. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0033] like Figure 1 As shown, the building AC / DC hybrid active distribution system provided by this embodiment is composed of an AC part and a DC part. For the convenience of description, the AC system part is simplified to power supply, transformer, AC bus, switch, and load, and the DC system part is simplified to distributed power supply, energy storage system, DC bus, converter, switch, and load.

[0034] Among them, the AC system part and the DC system part interact with each other through the AC / DC bidirectional converter and the DC / AC unidirectional transformer.

[0035] The specific circuit structure of the AC system is as follows:

[0036] According to the standard load, it can be divided into special load, first-level load, second-level load and third-level load according to its importance.

[0037] For different levels of load power supply requirements: Level 3 loads can be powered by a single power supply, Level 2 loads by dual power supplies, Level 1 loads by dual power supplies, and special loads should be equipped with emergency power supplies in addition to dual power supplies, and it is strictly forbidden to connect other loads to the emergency power supply system. In addition to the regulations, backup power supplies can also be set up according to power needs. For example, if the user needs non-special-level loads that need to be guaranteed, this type of load needs to be powered by a third power supply in addition to dual power supplies, so it needs to be connected to the backup power supply system (it is strictly forbidden to connect to the emergency power supply system).

[0038] In order to meet the power supply requirements of the above-mentioned secondary and above loads, the AC system power supply consists of dual power supplies: medium-voltage municipal AC power supply 1 and medium-voltage municipal AC power supply 2. The medium-voltage municipal power supplies 1 and 2 convert the municipal medium voltage into low voltage through transformers TA1 and TA2 to supply the user-side loads. After the voltage transformation, they are connected to the AC I section bus and the AC II section bus through AC switches AK1 and AK2 respectively. A second AC switch AK3 is set between the AC I and II sections of the bus. The non-guaranteed load is disconnected before the switch is switched on to ensure the normal operation of the transformer. Electrical interlocking and mechanical interlocking are set between the AC switch AK1 of the medium-voltage municipal AC power supply 1 and the AC switch AK2 of the medium-voltage municipal AC power supply 2 and the second AC switch AK3. Under any circumstances, only two switches of AK1, AK2 and the second AC switch AK3 can be in the closed state.

[0039] In order to ensure the access of the third power supply for the AC special-grade load and at the same time meet the independence of its emergency power supply system, a segmented bus is set on the AC section I bus through the first AC switch AK4: the AC section III bus, and the special-grade load is mounted on the AC section III bus. The AC section III bus interacts with the AC power supply provided by the DC system through the converter switch AK6. Only one of the first AC switch AK4 and the converter switch AK6 can be in a closed state.

[0040] In order to ensure the access of the third power supply for the AC non-special grade load to be protected, and at the same time meet the requirement that the third power supply is supplied by the backup power supply system and is not connected to the emergency power supply system, a segmented bus is set on the AC II section bus through the third AC switch AK5: the AC IV section bus, and the non-special grade load to be protected is mounted on the AC IV section bus, and the AC IV section bus interacts with the AC power provided by the DC system through the first bidirectional converter switch AK7.

[0041] Considering that the secondary and above loads are subjected to dual power conversion after being connected to this system, the dual power conversion is divided into main and backup circuits. Normally, the load is powered by the main circuit, and it automatically switches to the backup circuit when the main circuit is powered off. Therefore, in order to ensure that the load capacity mounted under transformers TA1 and TA2 is relatively balanced, and at the same time to ensure the power supply requirements of the system in different subsequent scenarios, the dual power main circuit of AC primary load and AC secondary load is mounted on the AC I section bus, and the dual power backup circuit of AC primary load and AC secondary load, the dual power main circuit of AC special load, and AC tertiary load are mounted on the AC II section bus.

[0042] The specific circuit structure of the DC system is as follows:

[0043] The DC system loads are divided into primary, secondary and tertiary DC loads according to their importance. The distributed power supply is connected to the DC I bus through the DC / DC converter and the switch DK1 of the distributed power supply. To ensure the independent power supply of the secondary and tertiary DC loads and facilitate flexible control, the DC I bus is connected to the DC II bus through the first DC switch DK2 and to the DC III bus through the DC switch DK3. The primary DC load is mounted on the DC II bus through the DC switch DK8, and the secondary DC load is mounted on the DC II bus through the DC switch DK9. The tertiary DC load is mounted on the DC III bus through the DC switch DK10.

[0044] The DC I section bus is connected to the AC I section bus of the AC system through the DC switch DK5, AC / DC bidirectional converter, AC / DC interactive line 2, and the first bidirectional converter switch AK7, and is connected to the AC IV section bus of the AC system through the DC switch DK5, AC / DC bidirectional converter, AC / DC interactive line 3, and AC switch AK8. It is connected to the AC III section bus of the AC system through the DC switch DK4, DC / AC unidirectional converter, AC / DC interactive line 1, and converter switch AK6, and is connected to the energy storage system through the DC switch DK6, DC / DC bidirectional converter and energy storage DC switch DK7.

[0045] This embodiment also provides a flexible control method, which is implemented by the building AC / DC hybrid active power distribution system provided by the above embodiment. According to the total real-time power of the loads in the building AC / DC hybrid active power distribution system, the energy storage status of the energy storage system, and the power supply status of the first AC power source and the second AC power source, the first, second and third level loads are adaptively and selectively unloaded to meet the power supply requirements of the AC non-special level load and the AC special level load branch when the first AC power source or / and the second AC power source are disconnected. The specific power supply requirements are as follows:

[0046] 1) When the first AC power source and the second AC power source are both supplying power normally, the second AC switch and the converter switch are in the open state, and the other switches are in the closed state;

[0047] like Figure 2 As shown, scenario 1: when the total real-time power of the load is less than the real-time output power of the distributed power source, the distributed distributed power source supplies power to the energy storage system until the upper limit of the state of charge of the energy storage system, and then the remaining power of the distributed power source is incorporated into the AC system through the bidirectional converter;

[0048] Scenario 2: When the total real-time power of the load is greater than the real-time output power of the distributed power source, all loads are powered by the first AC power source, the second AC power source and the distributed power source;

[0049] 2) When the first AC power source and the second AC power source have abnormal power supply;

[0050] like Figure 3 As shown, scenario three: when the first AC power source is disconnected, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected. If the sum of the AC power source power of the second AC power source and the real-time output power of the distributed power source is greater than the total real-time power of the load, no load is unloaded;

[0051] like Figure 4 As shown, scenario 4: when the first AC power source is disconnected from power supply, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected;

[0052] If the sum of the AC power supply power of the second AC power supply and the real-time output power of the distributed power supply is less than the total real-time power of the load, and the charge state of the energy storage system is greater than the sum of the power consumption capacity of the special load, the non-special load to be guaranteed, and the first and second level loads that can be guaranteed within the first AC power supply restoration time t, the energy storage system is discharged to gradually unload the third level load according to the real-time charge state of the energy storage system;

[0053] like Figure 5 As shown, scenario five: when the first AC power source is disconnected from power supply, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected;

[0054] If the sum of the AC power source power of the second AC power source and the real-time output power of the distributed power source is less than the total real-time power of the load, and the state of charge of the energy storage system is greater than the sum of the power consumption capacity of the special-grade load, the non-special-grade load to be guaranteed, and the first and second-level loads that can be guaranteed within the first AC power source restoration time t, the energy storage system is discharged until the state of charge of the energy storage system is equal to the sum of the power consumption capacity of the special-grade load, the non-special-grade load to be guaranteed, and the first and second-level loads that can be guaranteed within the first and second AC power source restoration time, and all the third-level loads are unloaded;

[0055] like Figure 6 As shown, scenario six: when both the first AC power source and the second AC power source are disconnected from power supply, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected;

[0056] If the real-time output power of the distributed power source is greater than the total real-time power of the load, and the state of charge of the energy storage system is greater than the sum of the power consumption capacity of the special-grade load, non-special-grade load to be guaranteed, and the first and second level loads that can be guaranteed within the first and second AC power supply restoration time t, then no load will be unloaded;

[0057] If the real-time output power of the distributed power source is greater than the total real-time power of the load, and the state of charge of the energy storage system is greater than the sum of the special-grade load and non-special-grade load that can be guaranteed within the first and second AC power restoration time t, and is less than the sum of the special-grade load, non-special-grade load that can be guaranteed within the first and second AC power restoration time, and the power consumption capacity of the first and second level loads, the third level load is partially unloaded to ensure that the distributed power source can charge the energy storage system while supplying power to the real-time load;

[0058] like Figure 7 As shown, scenario seven: when both the first AC power source and the second AC power source are disconnected from power supply, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected;

[0059] If the sum of the real-time output power of the distributed power source and the rated power of the energy storage system is greater than the total real-time power of the load, and the state of charge of the energy storage system is greater than the sum of the power consumption capacity of the special-grade load, non-special-grade load to be guaranteed, and the first and second level loads that can be guaranteed within the first and second AC power supply restoration time t, as the state of charge of the energy storage system decreases during the power supply process, the third level load is gradually unloaded until the state of charge of the energy storage system is equal to the sum of the power consumption capacity of the special-grade load, non-special-grade load to be guaranteed, and the first and second level loads that can be guaranteed within the first and second AC power supply restoration time;

[0060] like Figure 8 As shown, scenario eight: when both the first AC power source and the second AC power source are disconnected from power supply, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected;

[0061] If the sum of the real-time output power of the distributed power source and the rated power of the energy storage system is less than the power of the secondary load and above, and the state of charge of the energy storage system is greater than the sum of the power consumption capacity of the special-grade load and the non-special-grade load that can be guaranteed within the time when the first and second AC power sources are restored, and less than the sum of the power consumption capacity of the special-grade load, the non-special-grade load that can be guaranteed, and the first and second level loads that can be guaranteed within the time when the first and second AC power sources are restored, then all the third-level loads are unloaded, and as the state of charge of the energy storage system decreases during the power supply process, the first and second level loads are gradually unloaded until the state of charge of the energy storage system is equal to the sum of the power consumption capacity of the special-grade load and the non-special-grade load that can be guaranteed within the time when the first and second AC power sources are restored, at which time the first, second and third level loads are completely cut off;

[0062] like Fig. 9 As shown, scenario nine: when both the first AC power source and the second AC power source are disconnected from power supply, the second AC switch and the converter switch are controlled to be closed, and the first AC switch and the first bidirectional converter switch are disconnected;

[0063] If the sum of the real-time output power of the distributed power source and the rated power of the energy storage system is less than the total real-time power of the AC special-grade load and the AC non-special-grade guaranteed load, and the state of charge of the energy storage system is less than the power consumption capacity of the special-grade load and the non-special-grade guaranteed load that can be guaranteed within the time when the first and second AC power sources are restored, all first-, second- and third-grade loads will be directly unloaded, and as the state of charge of the energy storage system decreases during the power supply process, the non-special-grade guaranteed load will be gradually unloaded until the state of charge of the energy storage system decreases to the power consumption capacity of the special-grade load that can be guaranteed within the time when the first and second AC power sources are restored, and all loads except the special-grade load are unloaded.

[0064] In addition, the terms "upper", "lower", "inner", "outer", "front", "rear" are used for descriptive purposes only and should not be understood as indicating or implying relative importance. Unless otherwise specifically stated, the relative steps, numerical expressions and values ​​of the components and steps described in these embodiments do not limit the scope of the present invention.

[0065] Of course, the above description is only a specific embodiment of the present invention and is not intended to limit the scope of implementation of the present invention. All equivalent changes or modifications made according to the structure, characteristics and principles described in the patent application scope of the present invention should be included in the patent application scope of the present invention.

[0066] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims

1. A multi-load graded AC / DC hybrid active power distribution system for buildings. It is characterized in that It includes a DC system and an AC system, wherein the DC system and the AC system perform AC / DC power supply interaction via a bidirectional converter and a unidirectional converter; The DC system includes a distributed power supply for power supply, and a DC bus section I, a DC bus section II and a DC bus section III for transmitting DC power, the DC bus section I load has an energy storage system and a bidirectional converter and a unidirectional converter for AC and DC power supply interaction, the DC bus section II load has a DC primary load branch and a DC secondary load branch, the DC bus section III load has a DC tertiary load branch, the DC bus section I is directly connected to the distributed power supply, the DC bus section I is connected to the DC bus section II through a first DC switch, and the DC bus section I is connected to the DC bus section III through a second DC switch; The AC system includes a first AC power source and a second AC power source for power supply, and an AC I bus, an AC II bus, an AC III bus, and an AC IV bus for transmitting AC power, wherein the first AC power source is directly connected to the AC I bus, and the AC I bus load has a first multi-level load branch, the second AC power source is directly connected to the AC II bus, and the AC II bus load has a second multi-level load branch, the AC III bus load has an AC special-grade load branch, and the AC IV bus load has an AC non-special-grade load branch that needs to be guaranteed; One end of the AC I section bus is connected to one end of the AC III section bus through a first AC switch, the other end of the AC III section bus is connected to the unidirectional converter through a converter switch, the other end of the AC I section bus is connected to the AC II section bus and the bidirectional converter, a second AC switch is provided between the AC I section bus and the AC II section bus, and a first bidirectional converter switch is provided between the AC I section bus and the bidirectional converter; The other end of the AC II segment bus is connected to one end of the AC IV segment bus through a third AC switch, and the other end of the AC IV segment bus is connected to the bidirectional converter through a second bidirectional converter switch.

2. The multi-load graded building AC / DC hybrid active power distribution system according to claim 1, It is characterized in that The first multi-stage load branch includes a dual power supply main circuit of an AC primary load and an AC secondary load connected to an AC I-section bus.

3. The multi-load graded building AC / DC hybrid active power distribution system according to claim 1, It is characterized in that The second multi-level load branch includes a dual power backup circuit for AC primary loads connected to the AC II section bus, a dual power backup circuit for AC secondary loads, a dual power main circuit for AC special loads, and AC tertiary loads.

4. The multi-load graded building AC / DC hybrid active power distribution system according to claim 1, It is characterized in that A DC / DC bidirectional converter is provided at the input end of the energy storage system.

5. The multi-load graded building AC / DC hybrid active power distribution system according to claim 1, It is characterized in that The switching state of the converter switch is opposite to that of the first AC switch.

6. The multi-load graded building AC / DC hybrid active power distribution system according to claim 1, It is characterized in that The first AC power source and the second AC power source are both municipal AC power sources.

7. The multi-load graded building AC / DC hybrid active power distribution system according to claim 1, It is characterized in that The distributed power source adopts renewable energy power generation.

8. A flexible control method, It is characterized in that This is achieved through the multi-load graded building AC / DC hybrid active distribution system as described in any one of claims 1 to 7. According to the total real-time power of loads in the building AC / DC hybrid active distribution system, the energy storage situation of the energy storage system, and the power supply status of the first AC power supply and the second AC power supply, the first, second and third level loads are adaptively selectively unloaded to meet the power supply needs of the AC non-special grade guaranteed loads and the AC special grade load branches when the first AC power supply and / or the second AC power supply are disconnected.