A method, system and medium for carbon asset management in building materials mines
By constructing a carbon emission dynamic data model and a genetic algorithm to optimize the allocation of carbon emission shares, the problem of accurate estimation and dynamic regulation in carbon emission management of building materials mines is solved, and the reasonable allocation of carbon resources and the sufficient supply of carbon assets are achieved.
Patent Information
- Application Number
- CN202410851091.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-28
AI Technical Summary
Existing carbon emission management technology cannot accurately estimate the total carbon emissions of building materials mines and lacks dynamic control capabilities, resulting in unreasonable carbon resource allocation and exceeding the existing total quota.
By predicting the total carbon emissions of building materials mines in real time, constructing a dynamic data model of carbon emissions, using genetic algorithms to optimize the allocation of carbon emission shares, determining a reasonable carbon resource exchange plan, and dynamically regulating carbon emissions to ensure that each building materials mine obtains sufficient carbon Asset quota.
Real-time carbon asset control and management of building materials mines has been achieved to ensure normal production, avoid problems with unreasonable carbon resource allocation and exceeding the existing total quota, and make timely carbon resource exchange plans to ensure the rational use of carbon resources.
Smart Images

Figure CN118428693B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of carbon asset management, and in particular to a carbon asset management method, system and medium for a building materials mine. Background Art
[0002] As the task of reducing greenhouse gas emissions both domestically and internationally becomes increasingly arduous, carbon trading (carbon asset trading) as a market mechanism can encourage companies to reduce carbon emissions and voluntarily implement various emission reduction projects, thereby effectively reducing global carbon dioxide emissions. If the carbon emissions of a controlled emission company exceed its own quota, it needs to purchase the corresponding quota from other companies; if the carbon emissions of a controlled emission company do not exceed its own quota, it can sell the excess quota to other companies. In addition, companies can also obtain issuance volume by implementing some emission reduction projects to offset part of their own quotas, or sell them to other companies.
[0003] Building materials mines will generate certain carbon emissions during mining production. For example, ore mining usually requires the use of large-scale mechanical equipment, excavators, loaders, transport vehicles, etc. These mechanical equipment use fuel or electricity as energy. The process of burning fossil fuels or electricity production will produce greenhouse gases such as carbon dioxide. The mining process of mines consumes a lot of energy, including electricity, diesel, natural gas, etc. The production and use of these energy sources will be accompanied by a certain amount of carbon emissions, especially if the energy comes from fossil fuels, the carbon emissions will be higher. In addition, during the mining process, blasting operations are often required to break rocks or ores for subsequent mining, transportation, etc. The explosion gas, smoke, etc. generated by blasting operations will also lead to certain carbon emissions. Therefore, it is necessary to implement certain carbon emission management for building materials mining enterprises.
[0004] Existing carbon emission management usually integrates known carbon emission situations to determine whether they meet the current carbon emission quota of the enterprise. However, in the process of mining, the building materials enterprises use a variety of technical means and transportation methods, as well as changes in destinations, resulting in floating emissions, not constant emissions. In addition, there are certain changes in carbon emissions caused by changes in production, which makes it impossible to accurately estimate the total carbon emissions of building materials mines at the current time, and lacks certain dynamic control capabilities. Summary of the invention
[0005] To solve the above problems, the present invention provides a method, system and medium for carbon asset management of building materials mines. The method predicts the total carbon emissions of each building materials mine in real time, dynamically adjusts the carbon emission share, determines the reasonable allocation plan of the current carbon emissions, and gives a reasonable carbon resource exchange plan.
[0006] To achieve the above object, the present invention provides the following technical solutions.
[0007] A method for managing carbon assets in a building materials mine comprises the following steps:
[0008] Based on historical mining output data, the building material ore output data of each building material mine in the future production cycle is predicted, and the initial carbon emission quota of each building material mine is obtained based on the proportion of building material ore output data of each building material mine and the total carbon emission quota allowed in the current production cycle;
[0009] Determine the carbon emission data related to carbon emission and the carbon emission impact factors corresponding to each carbon emission data, determine the energy utilization type based on the carbon emission data, and determine the dynamic carbon emission amount based on this; construct a carbon emission dynamic data model for each building materials mine based on the carbon emission impact factors and dynamic carbon emission amount;
[0010] Obtain the current accumulated carbon emission data and building material ore production data of each building material mine, and determine the carbon emission amount according to the carbon emission dynamic data model; fit the carbon emission state curve based on the data points of carbon emissions at multiple historical moments and the current data points, and predict the carbon emission share required by each building material mine at the end of the current production cycle; determine the difference between the initial carbon emission quota and the carbon emission share of each building material mine as the surplus carbon emission quota;
[0011] When the sum of the surplus carbon emission quotas is greater than or equal to 0, the total amount of the initial carbon emission quotas of each building material mine is taken as the total carbon emission quota, and the surplus carbon emission quota is greater than or equal to 0 as a constraint condition, and the optimized carbon emission share allocation is close to the required carbon emission share as the fitness function, and the carbon emission share allocation of each building material mine in the current production cycle is optimized through a genetic algorithm;
[0012] According to the carbon emission share allocation, obtain the dynamic carbon emission quota of each building materials mine at the current moment, and update the initial carbon emission quota of each building materials mine;
[0013] At the next moment, the difference between the initial carbon emission quota and the carbon emission share is repeatedly executed to obtain the dynamic carbon emission quota, and the initial carbon emission quota of each building material mine is updated again;
[0014] When the sum of surplus carbon emission quotas is less than 0, the excess carbon assets are calculated based on the end point of the carbon emission status curve, and the building material ore output data of each building material mine in the current production cycle is adjusted to proportionally reduce the carbon emission-related production data, regenerate the carbon emission dynamic quota for regulation, and regenerate the difference between the initial carbon emission quota and the carbon emission share;
[0015] Integrate the excess carbon assets from each production cycle of the year and determine the carbon assets to be purchased in the next year to meet the current production capacity of each building materials mine.
[0016] Preferably, it also includes:
[0017] When the difference between the initial carbon emission quota and the carbon emission share is positive, the surplus carbon emission quota is calculated based on the end point of the carbon emission status curve and included in the total carbon emission quota allowed for the next production cycle; the surplus carbon emission quota of each building materials mine at the end of the production cycle of the year is calculated to determine the tradable carbon assets for the next year.
[0018] Preferably, the method of predicting the building material ore production data of each building material mine in a future production cycle based on historical mining production data comprises the following steps:
[0019] Obtain some historical mining production data, and use the STL decomposition method to decompose the time series of some historical mining production data into three components: trend, seasonal term and residual;
[0020] Constructing a building material ore production prediction model based on a seasonal ARIMA model, presetting parameters of the building material ore production prediction model, and fitting the building material ore production prediction model; the parameters of the building material ore production prediction model include autoregressive order, difference order and moving average order, as well as seasonal autoregressive order, seasonal difference order and seasonal moving average order;
[0021] The decomposed historical mining output data is used to train the building material ore output prediction model, and the residual sum of squares of the building material ore output prediction model is calculated; the parameters of the building material ore output prediction model are adjusted, and the residual sum of squares of all parameter combinations are calculated. The parameter combination corresponding to the minimum residual sum of squares is taken as the optimal parameter combination, and the optimal building material ore output prediction model is constructed;
[0022] Use the best building material ore production forecasting model to predict the building material ore production in the next production cycle.
[0023] Preferably, the carbon emission dynamic data model of each building material mine is constructed according to the carbon emission influencing factors and the dynamic carbon emission amount, comprising the following steps:
[0024] Determine carbon emission data related to carbon emissions, determine the type of energy use based on the carbon emission data, and determine the dynamic carbon emissions based on this; where the dynamic carbon emissions include the carbon emissions generated by the unit of energy use, measured in carbon emissions per unit of energy;
[0025] According to the floating upper limit of carbon emission data, determine the carbon emission impact factor corresponding to each carbon emission data;
[0026] Calculate the carbon emissions per unit of building material ore output of each mine based on various carbon emission influencing factors and dynamic carbon emissions;
[0027]
[0028] In the formula, is the dynamic carbon emissions, is the carbon emission influencing factor, m The number of carbon emission data types.
[0029] Preferably, the carbon emission data includes equipment power consumption data, equipment fuel data, blasting material data, and environmental carbon loss percentage data, all of which are converted into energy usage.
[0030] Preferably, the method of fitting the carbon emission state curve based on the data points of carbon emissions at multiple historical moments and the current data points to predict the carbon emission share required by each building material mine at the end of the current production cycle includes the following steps:
[0031] Collect carbon emission data points at multiple historical moments, including time and corresponding carbon emission;
[0032] Construct an n-order polynomial model, use the least squares fitting algorithm to fit the second-order polynomial model to the data points, obtain the coefficients of the polynomial, and the equation for fitting the carbon emission status curve;
[0033] The residual between the fitting curve and the actual data points is calculated. When it exceeds the preset threshold, the order of the polynomial model is adjusted to refit the carbon emission status curve.
[0034] Preferably, the optimization of the carbon emission share allocation of each building material mine in the current production cycle by genetic algorithm comprises the following steps:
[0035] Determine the initial carbon emission quota of each building materials mine as a preset value, and calculate the difference between the initial carbon emission quota and the carbon emission share of each building materials mine;
[0036] Define a fitness function to make the optimized carbon emission share allocation as close as possible to the required carbon emission share. This function takes into account the difference between the initial carbon emission quota and the carbon emission share of each building materials mine, as well as the constraints of the total carbon emission quota:
[0037]
[0038] In the formula, n is the total amount of building materials mines; It is the initial quota for carbon emissions; Assigning quantities to current carbon emission shares; The required carbon emission share
[0039] Use genetic algorithms to optimize the allocation of carbon emission shares;
[0040] Through multiple iterations of optimization process, until the convergence condition is reached, the optimized carbon emission share allocation scheme is obtained.
[0041] A building materials mine carbon asset management system, comprising:
[0042] The carbon emission initial allocation module is used to predict the building material ore production data of each building material mine in the future production cycle based on historical mining production data, and obtain the initial carbon emission quota of each building material mine based on the proportion of building material ore production data of each building material mine and the total carbon emission quota allowed in the current production cycle;
[0043] The carbon emission model building module is used to determine the carbon emission data related to carbon emission and the carbon emission impact factors corresponding to each carbon emission data, determine the energy utilization type based on the carbon emission data, and thereby determine the dynamic carbon emission amount; it is also used to build a carbon emission dynamic data model for each building material mine based on the carbon emission impact factors and the dynamic carbon emission amount;
[0044] The carbon emission calculation module is used to obtain the current accumulated carbon emission data and building material ore production data of each building material mine, and determine the carbon emission amount according to the carbon emission dynamic data model; it is also used to fit the carbon emission state curve based on the data points of carbon emissions at multiple historical moments and the current data points, and predict the carbon emission share required by each building material mine at the end of the current production cycle; it is also used to determine the difference between the initial carbon emission quota and the carbon emission share of each building material mine as the surplus carbon emission quota;
[0045] The carbon emission quota optimization module is used to take the total amount of the initial carbon emission quota of each building material mine as the total carbon emission quota and the surplus carbon emission quota as 0 as the constraint condition when the sum of the surplus carbon emission quota is greater than or equal to 0, and take the optimized carbon emission share allocation close to the required carbon emission share as the fitness function, and optimize the carbon emission share allocation of each building material mine in the current production cycle through the genetic algorithm; when the sum of the surplus carbon emission quota is less than 0, calculate the excess carbon assets according to the end point of the carbon emission state curve, and adjust the building material ore output data of each building material mine in the current production cycle, and then proportionally reduce the carbon emission related production data, regenerate the carbon emission dynamic quota for regulation, and regenerate the difference between the initial carbon emission quota and the carbon emission share; integrate the excess carbon assets of each production cycle of the year, and determine the carbon assets to be purchased in the next year to meet the current production capacity of each building material mine;
[0046] The carbon emission quota update module is used to obtain the dynamic carbon emission quota of each building material mine at the current moment according to the carbon emission share allocation, and update the initial carbon emission quota of each building material mine; it is also used to repeat the difference between the initial carbon emission quota and the carbon emission share at the next moment, obtain the dynamic carbon emission quota, and update the initial carbon emission quota of each building material mine again.
[0047] A computer-readable storage medium stores a data processing program, and when the data processing program is executed by a processor, the steps of the building materials mine carbon asset management method are implemented.
[0048] Beneficial effects of the present invention:
[0049] The present invention proposes a carbon asset management method, system and medium for building materials mines. The method uses the real-time accumulated carbon emission data at the current moment to construct a carbon emission dynamic data model for each building materials mine according to carbon emission influencing factors and dynamic carbon emissions. The dynamic carbon emission total amount of each building materials mine is predicted based on the carbon emission dynamic data model, and a genetic algorithm is used to dynamically regulate the carbon emission share to determine a reasonable allocation plan for the current carbon emissions.
[0050] This method can conduct real-time carbon asset regulation and management, so that each building materials mine can obtain sufficient carbon asset quotas to ensure normal production in the current period. This method can determine the current carbon asset surplus and make carbon resource exchange plans and ore production plans in a timely manner to avoid unreasonable carbon resource allocation and exceeding the existing total quota. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 is a specific flow chart of an embodiment of the present invention;
[0052] Figure 2 is a flow chart of a method for predicting the output of building materials ore according to an embodiment of the present invention;
[0053] Figure 3 is a flow chart for calculating the carbon emissions emitted by each unit of building material ore output of a mine in an embodiment of the present invention;
[0054] Figure 4 It is a flow chart of optimizing carbon emission share allocation according to an embodiment of the present invention. DETAILED DESCRIPTION
[0055] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0056] Example 1
[0057] This embodiment proposes a carbon asset management method for building materials mines, such as Figure 1 As shown, Figure 1 This is a flow chart of the carbon asset management method for building materials mines, which specifically includes the following steps:
[0058] S1: Based on historical mining output data, predict the building material ore output data of each building material mine in the future production cycle, and obtain the initial carbon emission quota of each building material mine based on the proportion of building material ore output data of each building material mine and the total carbon emission quota allowed in the current production cycle.
[0059] Specifically, Figure 2 As shown:
[0060] S1.1: Obtain some historical mining production data.
[0061] S1.2: The STL decomposition method is used to decompose some historical mining production data into three components: trend, seasonal term and residual.
[0062] A building material ore production prediction model based on the seasonal ARIMA model is constructed, the parameters of the building material ore production prediction model are preset, and the building material ore production prediction model is fitted; the parameters of the building material ore production prediction model include autoregressive order, difference order and moving average order, as well as seasonal autoregressive order, seasonal difference order and seasonal moving average order.
[0063] S1.3: Use the decomposed historical mining output data to train the building materials ore production prediction model, and calculate the residual sum of squares of the building materials ore production prediction model; adjust the parameters of the building materials ore production prediction model, calculate the residual sum of squares of all parameter combinations, and take the parameter combination corresponding to the minimum residual sum of squares as the optimal parameter combination to construct the optimal building materials ore production prediction model.
[0064] S1.4: Use the best building material ore production prediction model to predict the building material ore production in the next production cycle.
[0065] S2: Determine the carbon emission data related to carbon emissions and the carbon emission impact factors corresponding to each carbon emission data, determine the energy utilization type based on the carbon emission data, and determine the dynamic carbon emissions based on this; construct a carbon emission dynamic data model for each building materials mine based on the carbon emission impact factors and dynamic carbon emissions.
[0066] Specifically, Figure 3 As shown:
[0067] S2.1: Determine carbon emission data related to carbon emissions, determine the type of energy utilization based on the carbon emission data, and determine the dynamic carbon emissions based on this; among which, the dynamic carbon emissions include the carbon emissions generated by unit energy use, measured in carbon emissions per unit of energy.
[0068] S2.2: Determine the carbon emission impact factor corresponding to each carbon emission data based on the floating upper limit of the carbon emission data.
[0069] S2.3: Calculate the carbon emissions per unit of building material ore output of each mine based on various carbon emission influencing factors and dynamic carbon emissions;
[0070]
[0071] In the formula, is the dynamic carbon emissions, is the carbon emission influencing factor, m The number of carbon emission data types.
[0072] Carbon emission data, specifically:
[0073] Use of mechanical equipment: Ore mining usually requires the use of large mechanical equipment, such as excavators, loaders, transport vehicles, etc. These mechanical equipment use fuel or electricity as energy, and the process of burning fossil fuels or producing electricity will produce greenhouse gases such as carbon dioxide.
[0074] Energy consumption: The mining process of mines consumes a lot of energy, including electricity, diesel, natural gas, etc. The production and use of these energy sources are accompanied by a certain amount of carbon emissions, especially if the energy comes from fossil fuels, the carbon emissions will be higher.
[0075] Blasting operations: During the mining process, blasting operations are often required to break rocks or ores for subsequent mining, transportation, etc. The explosive gas, smoke, etc. generated by blasting operations will also lead to certain carbon emissions.
[0076] Transportation and logistics: Transporting ore from the mine to a processing plant or export port also consumes energy and is associated with carbon emissions. The type of transport, distance and mode of transport (such as land, sea, rail, etc.) will affect the amount of carbon emissions.
[0077] Land use change: Mining may lead to land use change, including vegetation destruction, land degradation, etc., thus affecting carbon cycle and carbon storage. For example, mining may lead to a reduction in vegetation, reducing the ability of plants to absorb carbon dioxide.
[0078] To sum up, carbon emissions from mineral mining mainly come from the use of mechanical equipment, energy consumption, blasting operations, transportation and logistics, and changes in land use. Therefore, carbon emission data, including equipment power consumption data, equipment fuel data, blasting material data, and environmental carbon loss percentage data, are all converted into energy usage for quantification.
[0079] S3: Obtain the current accumulated carbon emission data and building material ore production data of each building material mine, and determine the carbon emission according to the carbon emission dynamic data model; fit the carbon emission status curve based on the data points of carbon emissions at multiple historical moments and the current data points, and predict the carbon emission share required by each building material mine at the end of the current production cycle; determine the difference between the initial carbon emission quota and the carbon emission share of each building material mine as the surplus carbon emission quota.
[0080] Specific:
[0081] S3.1: Collect carbon emissions data points at multiple historical moments, including time and corresponding carbon emissions.
[0082] S3.2: Construct an n-order polynomial model, use the least squares fitting algorithm to fit the second-order polynomial model to the data points, obtain the coefficients of the polynomial, and the equation for fitting the carbon emission status curve.
[0083] S3.3: Calculate the residual between the fitted curve and the actual data points. When it exceeds the preset threshold, adjust the order of the polynomial model and refit the carbon emission status curve.
[0084] S4: When the sum of the surplus carbon emission quotas is greater than or equal to 0, the total amount of the initial carbon emission quotas of each building material mine is taken as the total carbon emission quota, and the surplus carbon emission quota is greater than or equal to 0 as constraints, and the optimized carbon emission share allocation is close to the required carbon emission share as the fitness function, and the carbon emission share allocation of each building material mine in the current production cycle is optimized through a genetic algorithm.
[0085] Specifically, Figure 4 As shown:
[0086] S4.1: Determine the initial carbon emission quota of each building materials mine as the preset value, and calculate the difference between the initial carbon emission quota and the carbon emission share of each building materials mine;
[0087] S4.2: Define a fitness function to make the optimized carbon emission share allocation as close as possible to the required carbon emission share. This function takes into account the difference between the initial carbon emission quota and the carbon emission share of each building materials mine, as well as the constraints of the total carbon emission quota:
[0088]
[0089] In the formula, n is the total amount of building materials mines; It is the initial quota for carbon emissions; Assigning quantities to current carbon emission shares; is the required carbon emission share;
[0090] S4.3: Use genetic algorithms to optimize the allocation of carbon emission shares; this will involve basic operations of genetic algorithms such as creating an initial population, selection, crossover, and mutation.
[0091] S4.4: Through multiple iterations of optimization process, until the convergence condition is reached, the optimized carbon emission share allocation plan is obtained.
[0092] S5: According to the carbon emission share allocation, the dynamic carbon emission quota of each building material mine at the current moment is obtained, and the initial carbon emission quota of each building material mine is updated.
[0093] S6: Repeat the calculation of the difference between the initial carbon emission quota and the carbon emission share at the next moment to obtain the dynamic carbon emission quota, and update the initial carbon emission quota of each building material mine again.
[0094] Furthermore, when the sum of surplus carbon emission quotas is less than 0, the excess carbon assets are calculated according to the end point of the carbon emission status curve, and the building material ore output data of each building material mine in the current production cycle is adjusted, thereby proportionally reducing the carbon emission-related production data, regenerating the carbon emission dynamic quota for regulation, and regenerating the difference between the initial carbon emission quota and the carbon emission share;
[0095] Integrate the excess carbon assets from each production cycle of the year and determine the carbon assets to be purchased in the next year to meet the current production capacity of each building materials mine.
[0096] In addition, when the difference between the initial carbon emission quota and the carbon emission share is positive, the surplus carbon emission quota is calculated based on the end point of the carbon emission status curve and incorporated into the total carbon emission quota allowed for the next production cycle; the surplus carbon emission quota of each building materials mine at the end of the production cycle of the year is calculated to determine the tradable carbon assets for the next year.
[0097] The method proposed in this embodiment aims to effectively supervise the carbon emission balance and carbon emission data of the production line. Through the real-time accumulated carbon emission data at the current moment, a dynamic data model of carbon emissions for each building material mine is constructed according to carbon emission influencing factors and dynamic carbon emissions. The total dynamic carbon emissions of each building material mine at the current time are predicted based on the carbon emission dynamic data model, and a genetic algorithm is used to dynamically adjust the carbon emission share to determine a reasonable allocation plan for the current carbon emissions.
[0098] This method can regulate and manage carbon assets in real time, so that each building materials mine can obtain sufficient carbon asset quotas to ensure normal production in the current period. This method can determine the current carbon asset surplus and make carbon resource exchange plans and ore production plans in a timely manner to avoid unreasonable carbon resource allocation and exceeding the existing total quota, which will lead to additional expenditure on carbon resources.
[0099] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for managing carbon assets in a building materials mine, characterized in that: The following steps are involved: Based on historical mining output data, the building material ore output data of each building material mine in the future production cycle is predicted, and the initial carbon emission quota of each building material mine is obtained based on the proportion of building material ore output data of each building material mine and the total carbon emission quota allowed in the current production cycle; Determine the carbon emission data related to carbon emission and the carbon emission impact factors corresponding to each carbon emission data, determine the energy utilization type based on the carbon emission data, and determine the dynamic carbon emission amount based on this; construct a carbon emission dynamic data model for each building materials mine based on the carbon emission impact factors and dynamic carbon emission amount; Obtain the current accumulated carbon emission data and building material ore production data of each building material mine, and determine the carbon emission amount according to the carbon emission dynamic data model; fit the carbon emission state curve based on the data points of carbon emissions at multiple historical moments and the current data points, and predict the carbon emission share required by each building material mine at the end of the current production cycle; determine the difference between the initial carbon emission quota and the carbon emission share of each building material mine as the surplus carbon emission quota; When the sum of surplus carbon emission quotas is greater than or equal to 0, the total amount of the initial carbon emission quotas of each building material mine is taken as the total carbon emission quota, and the surplus carbon emission quota is greater than or equal to 0 as a constraint condition, and a fitness function is defined. This function considers the difference between the initial carbon emission quota and the carbon emission share of each building material mine, and optimizes the carbon emission share allocation of each building material mine in the current production cycle through a genetic algorithm; According to the carbon emission share allocation, obtain the dynamic carbon emission quota of each building materials mine at the current moment, and update the initial carbon emission quota of each building materials mine; At the next moment, the difference between the initial carbon emission quota and the carbon emission share is repeatedly executed to obtain the dynamic carbon emission quota, and the initial carbon emission quota of each building material mine is updated again; When the sum of surplus carbon emission quotas is less than 0, the excess carbon assets are calculated based on the end point of the carbon emission status curve, and the building material ore output data of each building material mine in the current production cycle is adjusted to proportionally reduce the carbon emission-related production data, regenerate the carbon emission dynamic quota for regulation, and regenerate the difference between the initial carbon emission quota and the carbon emission share; Integrate the excess carbon assets of each production cycle of the year and determine the carbon assets to be purchased in the next year to meet the current production capacity of each building materials mine; The method of constructing a carbon emission dynamic data model for each building materials mine according to the carbon emission influencing factors and the dynamic carbon emission amounts includes the following steps: Determine carbon emission data related to carbon emissions, determine the type of energy use based on the carbon emission data, and determine the dynamic carbon emissions based on this; where the dynamic carbon emissions include the carbon emissions generated by the unit of energy use, measured in carbon emissions per unit of energy; According to the floating upper limit of carbon emission data, determine the carbon emission impact factor corresponding to each carbon emission data; Calculate the carbon emissions per unit of building material ore output of each mine based on various carbon emission influencing factors and dynamic carbon emissions; ; In the formula, A i is the dynamic carbon emissions, a i is the carbon emission influencing factor, m is the number of carbon emission data types; The method of optimizing the carbon emission share allocation of each building material mine in the current production cycle by using a genetic algorithm includes the following steps: Determine the initial carbon emission quota of each building materials mine as a preset value, and calculate the difference between the initial carbon emission quota and the carbon emission share of each building materials mine; Define a fitness function that takes into account the difference between the initial carbon emission quota and the carbon emission share of each building materials mine, as well as the constraints of the total carbon emission quota: ; In the formula, n is the total amount of building materials mines; α i It is the initial quota for carbon emissions; x i Assigning quantities to current carbon emission shares; β i is the required carbon emission share; Use genetic algorithms to optimize the allocation of carbon emission shares; Through multiple iterations of the optimization process, until the convergence condition is reached, the optimized carbon emission share allocation is obtained.
2. The carbon asset management method for building materials mines according to claim 1, characterized in that: Also includes: When the difference between the initial carbon emission quota and the carbon emission share is positive, the surplus carbon emission quota is calculated according to the end point of the carbon emission status curve and included in the total carbon emission quota allowed in the next production cycle; Calculate the surplus carbon emission quota of each building materials mine at the end of the production cycle of the year and determine the tradable carbon assets for the next year.
3. The carbon asset management method for building materials mines according to claim 1, characterized in that: The method of predicting the building material ore production data of each building material mine in a future production cycle based on historical mining production data includes the following steps: Obtain some historical mining production data, and use the STL decomposition method to decompose the time series of some historical mining production data into three components: trend, seasonal term and residual; Constructing a building material ore production prediction model based on a seasonal ARIMA model, presetting parameters of the building material ore production prediction model, and fitting the building material ore production prediction model; the parameters of the building material ore production prediction model include autoregressive order, difference order and moving average order, as well as seasonal autoregressive order, seasonal difference order and seasonal moving average order; The decomposed historical mining output data is used to train the building material ore output prediction model, and the residual sum of squares of the building material ore output prediction model is calculated; the parameters of the building material ore output prediction model are adjusted, and the residual sum of squares of all parameter combinations are calculated. The parameter combination corresponding to the minimum residual sum of squares is taken as the optimal parameter combination, and the optimal building material ore output prediction model is constructed; Use the best building material ore production forecasting model to predict the building material ore production in the next production cycle.
4. The carbon asset management method for building materials mines according to claim 1, characterized in that: The carbon emission data includes equipment power consumption data, equipment fuel data, blasting material data, and environmental carbon loss percentage data, all of which are converted into energy usage.
5. The carbon asset management method for building materials mines according to claim 1, characterized in that: The method of fitting the carbon emission state curve based on the data points of carbon emissions at multiple historical moments and the current data points to predict the carbon emission share required by each building material mine at the end of the current production cycle includes the following steps: Collect carbon emission data points at multiple historical moments, including time and corresponding carbon emission; Build n The second-order polynomial model uses the least squares fitting algorithm to fit the second-order polynomial model to the data points, obtain the coefficients of the polynomial, and the equation for fitting the carbon emission status curve; The residual between the fitting curve and the actual data points is calculated. When it exceeds the preset threshold, the order of the polynomial model is adjusted to refit the carbon emission status curve.
6. A building materials mine carbon asset management system, characterized in that: include: The carbon emission initial allocation module is used to predict the building material ore production data of each building material mine in the future production cycle based on historical mining production data, and obtain the initial carbon emission quota of each building material mine based on the proportion of building material ore production data of each building material mine and the total carbon emission quota allowed in the current production cycle; The carbon emission model building module is used to determine the carbon emission data related to carbon emission and the carbon emission impact factors corresponding to each carbon emission data, determine the energy utilization type based on the carbon emission data, and thereby determine the dynamic carbon emission amount; it is also used to build a carbon emission dynamic data model for each building material mine based on the carbon emission impact factors and the dynamic carbon emission amount; The carbon emission calculation module is used to obtain the current accumulated carbon emission data and building material ore production data of each building material mine, and determine the carbon emission amount according to the carbon emission dynamic data model; it is also used to fit the carbon emission state curve based on the data points of carbon emissions at multiple historical moments and the current data points, and predict the carbon emission share required by each building material mine at the end of the current production cycle; it is also used to determine the difference between the initial carbon emission quota and the carbon emission share of each building material mine as the surplus carbon emission quota; The carbon emission quota optimization module is used to define a fitness function when the sum of the surplus carbon emission quota is greater than or equal to 0, taking the total amount of the initial carbon emission quota of each building material mine as the total carbon emission quota, and the surplus carbon emission quota is greater than or equal to 0 as a constraint condition. The function takes into account the difference between the initial carbon emission quota and the carbon emission share of each building material mine, and optimizes the carbon emission share allocation of each building material mine in the current production cycle through a genetic algorithm; when the sum of the surplus carbon emission quota is less than 0, the excess carbon assets are calculated according to the end point of the carbon emission state curve, and the building material ore output data of each building material mine in the current production cycle is adjusted, thereby proportionally reducing the carbon emission-related production data, regenerating the carbon emission dynamic quota for regulation, and regenerating the difference between the initial carbon emission quota and the carbon emission share; integrating the excess carbon assets of each production cycle of the year, and determining the carbon assets to be purchased in the next year to meet the current production capacity of each building material mine; The carbon emission quota update module is used to obtain the dynamic carbon emission quota of each building material mine at the current moment according to the carbon emission share allocation, and update the initial carbon emission quota of each building material mine; it is also used to repeat the difference between the initial carbon emission quota and the carbon emission share at the next moment, obtain the dynamic carbon emission quota, and update the initial carbon emission quota of each building material mine again.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a data processing program, and when the data processing program is executed by a processor, the steps of the building materials mine carbon asset management method according to any one of claims 1 to 5 are implemented.