Control system and control method for different types of energy storage participating in power grid peak load regulation and frequency regulation

By designing the system of the grid dispatching center AGC and energy storage control area, the allocation of energy storage resources is optimized, and the application limitations of different types of energy storage entities in the power grid peak-shaving and frequency-modulation control are solved, and the coordinated control of multiple types of energy storage resources is realized, and the expansion of The power grid peak-shaving and frequency regulation resource scope is supported to support win-win results for different investment entities.

CN118523372BActive Publication Date: 2024-11-29STATE GRID SHANDONG ELECTRIC POWER CO
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410726096.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-06
Publication Date
2024-11-29
Estimated Expiration
2044-06-06

AI Technical Summary

Technical Problem

The existing technology cannot fully utilize the rapid and flexible regulation capabilities of different types of energy storage entities, resulting in limited application of energy storage in power grid peak-shaving and frequency regulation control, and it is impossible to effectively coordinate the energy storage resources of different investment entities to participate in the power grid auxiliary service market.

Method used

A control system for different types of energy storage participating in peak and frequency regulation of the power grid is designed, including the main control area of ​​the AGC and energy storage control area of ​​the power grid dispatch center. Through the quasi-regulation identification module, group control module and distribution strategy module, it is based on the energy storage power station's The models and states are grouped and allocated, optimize the adjustment requirements of energy storage resources, and realize coordinated control of multiple types of energy storage.

Benefits of technology

It has realized unified peak-to-frequency control of energy storage resources of different investment entities, expanded the scope of peak-to-frequency control resources of the power grid, supported energy storage resources to participate in the grid auxiliary service market, and improved the grid frequency control effect and win-win cooperation among investors.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118523372B_ABST
    Figure CN118523372B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of active power control of electric power systems, and specifically relates to a control system and a control method for different types of energy storage to participate in peak-shaving and frequency regulation of power grids. The dispatcher selects to put into peak-shaving control mode or frequency regulation control mode, and selects grouping rules through a grouping control module. The power grid dispatching center AGC calculates the total energy storage control demand for a certain period of time in the future and sends it to the energy storage control area. The accurate regulation identification module determines and counts the energy storage power stations that accept peak-shaving and frequency regulation control; the grouping control module groups the energy storage power stations that accept peak-shaving and frequency regulation control according to the selected grouping rules to obtain multiple energy storage groups; the allocation strategy module sends the total energy storage control demand to each energy storage group according to the corresponding inter-group allocation strategy; the allocation strategy module allocates the energy storage control demand allocated to each energy storage group to each energy storage power station according to the adjustment capacity ratio according to the corresponding intra-group allocation strategy. The technical solution expands the scope of power grid peak-shaving and frequency regulation resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of active power control of electric power systems, and in particular relates to a control system and a control method for different types of energy storage participating in peak load and frequency regulation of electric power grids. Background Art

[0002] In recent years, electrochemical energy storage technology has developed rapidly, and the maturity and technical economy of battery energy storage technology have been continuously improved. The equivalent life-cycle electricity cost of lithium-ion batteries and lead-carbon batteries is already lower than the peak-valley electricity price difference in many provinces in my country, and has the conditions for implementing applications for the purpose of peak-valley difference arbitrage. The instantaneous, rapid and precise control capability of electrochemical energy storage over power provides excellent technical support for its high-quality participation in auxiliary services such as grid frequency regulation and peak regulation. On the power generation side, the energy storage system is matched with renewable energy power generation, which can flexibly regulate the overall output of new energy sites such as wind power and photovoltaic power, has a fast response speed, and can play the role of peak and frequency regulation and reactive power support, effectively solving the safety and reliability problems brought to the grid by the randomness, volatility and intermittency of high-proportion renewable energy power generation. Energy storage can also be combined with thermal power automatic power generation control for frequency regulation, and the regulation time can be reduced by improving the regulation rate and accuracy, and the regulation performance value can be improved to obtain benefits. On the transmission and distribution side, energy storage can be used to delay the investment in line or distribution transformer reconstruction, extend the life of lines or equipment, ease transmission congestion, improve the utilization rate of power equipment, and reduce power supply costs while improving power supply reliability and power quality. On the electricity consumption side, users can use energy storage to charge during off-peak electricity price periods and discharge during peak electricity price periods, thereby arbitrage through the difference between peak and valley electricity prices.

[0003] As more and more energy storage power stations are applied to the frequency regulation auxiliary market at home and abroad, the domestic circles are paying more and more attention to the control strategy of energy storage technology participating in peak and frequency regulation. The focus of energy storage investment and construction has also shifted from grid-side energy storage to energy storage equipped with new energy sites, shared energy storage and user-side energy storage. A large number of new energy sites are equipped with energy storage, shared energy storage and user-side energy storage connected to the grid, and are actively willing to participate in the grid peak and frequency regulation auxiliary service market. However, the application focus of energy storage at this stage is often limited to thermal power equipped with energy storage and grid-side energy storage, which cannot give full play to the rapid and flexible regulation capabilities of energy storage of various investment entities.

[0004] To this end, it is urgently necessary to target the control needs of various investment entities' energy storage participating in the peak-shaving and frequency regulation of the power grid, and to target the control strategies for different types of entity energy storage participating in the peak-shaving control of the main station. It is also necessary to comprehensively consider the regulation costs, market requirements and regulation capabilities of different types of energy storage to carry out coordinated control of multiple types of energy storage, support the participation of energy storage resources of different investment entities in the power grid ancillary service market, and at the same time improve the frequency control effect of the power grid. Summary of the invention

[0005] The technical problem to be solved by the present invention is to make up for the deficiencies of the prior art and provide a control system and a control method for different types of energy storage participating in power grid peak load and frequency regulation.

[0006] To solve the above technical problems, the technical solution of the present invention is:

[0007] A control system for different types of energy storage to participate in power grid peak and frequency regulation, including a power grid dispatching center AGC, the power grid dispatching center AGC includes an AGC main control area and an energy storage control area, the AGC main control area is used to control conventional energy storage within the dispatching range, and the energy storage control area is used to control energy storage power stations within the dispatching range;

[0008] The energy storage control area includes an alignment identification module, a grouping control module, an allocation strategy module, and several energy storage power station monomer models;

[0009] The single-unit model of the energy storage power station is constructed based on the energy storage power station, including the adjustment parameter section, the network model section, the safety constraint section, and the adjustment intention section;

[0010] The adjustment parameter sections include: energy storage installed capacity, maximum discharge capacity, maximum charging capacity, adjustment accuracy, response delay, adjustment cost, and allowable control state;

[0011] The network model segments include: access grid voltage level, access grid connection point, and new energy stations to be built;

[0012] The safety constraint section includes: energy storage state of charge SOC safety upper limit value, energy storage state of charge SOC safety lower limit value, energy storage control maximum deviation, energy storage control dead zone, energy storage prohibited adjustment state;

[0013] The adjustment intention segment includes: the start time of control permission, the end time of control permission, the SOC control threshold, the control price threshold, and the power restriction status of the new energy station;

[0014] The peak-shaving and frequency-regulating identification module is used to determine whether the corresponding energy storage power station accepts peak-shaving and frequency-regulating control based on the single energy storage power station model, and to count the energy storage power stations that accept peak-shaving and frequency-regulating control;

[0015] The grouping control module includes n grouping rules for a number of energy storage power station monomer models, and divides the energy storage power station monomer models of the energy storage power station subject to peak load and frequency regulation control into a plurality of energy storage groups according to the grouping rules;

[0016] The allocation strategy module includes inter-group allocation strategy and intra-group allocation strategy. The inter-group allocation strategy is used to distribute the total energy storage control demand issued by the power grid dispatching center AGC to each energy storage group, and the intra-group allocation strategy is used to distribute the energy storage control demand allocated to the energy storage group to each energy storage power station according to the adjustment capacity ratio.

[0017] Furthermore, n=6, and the 6 grouping rules are:

[0018] Grouping rule I: Group energy storage investors by category and sort the energy storage groups by category priority. The categories of energy storage investors include grid-side energy storage, shared energy storage, new energy storage and user-side energy storage.

[0019] Grouping rule II: Grouping is done by dividing the energy storage installed capacity into intervals according to the energy storage installed capacity;

[0020] Grouping rule III: Group the energy storage according to the grid voltage level to which it is connected, and sort the energy storage groups in order of the grid voltage level;

[0021] Grouping rule IV: Group the energy storage according to the geographical areas where they are connected, and sort the energy storage groups in order of load size;

[0022] Grouping rule V: Grouping is done according to the energy storage regulation capability, and the energy storage groups are sorted in order according to the energy storage regulation capability. The energy storage regulation capability is the ratio of the regulation rate of the energy storage group to the installed capacity of the energy storage group.

[0023] Grouping rule VI: Group the energy storage units according to their energy storage regulation costs, and sort the energy storage units in order of their energy storage regulation costs.

[0024] Furthermore, the inter-cluster allocation strategy includes the inter-cluster allocation strategy STRA and the inter-cluster allocation strategy STRAB.

[0025] The inter-group allocation strategy STRA corresponds to the grouping rules I, III, IV, V and VI, and sends the total energy storage control demand issued by the power grid dispatching center AGC to each energy storage group in sequence according to the sorting order and the single maximum allocation amount until all are sent;

[0026] The inter-cluster allocation strategy STRAB corresponds to clustering rule II, and allocates energy storage according to the proportion of the installed capacity of each energy storage group.

[0027] Furthermore, the judgment criteria of the accuracy recognition module are: according to the state of the regulation intention segment in the single model of the energy storage power station, when the regulation intention is met, the energy storage power station accepts peak-shaving and frequency regulation control; when the regulation intention is not met, the energy storage power station does not accept peak-shaving and frequency regulation control.

[0028] Furthermore, the energy storage control area also includes a safety verification module, which is used to perform safety verification on the operating status of the energy storage power station:

[0029] If the SOC of the energy storage power station is greater than the safety upper limit, the charging control target will not be set temporarily;

[0030] If the SOC of the energy storage power station is lower than the safety lower limit, the control target of discharging will be temporarily not set;

[0031] If the new energy station supporting the energy storage power station is in a power-limited state, the control target of temporarily not discharging electricity will be achieved;

[0032] If the energy storage power station is a shared energy storage, when any new energy station corresponding to the shared energy storage is in a power-limited state, the control target of temporarily not discharging will be met;

[0033] If the energy storage power station is storing energy on the user side, if the energy storage is in a high electricity price range, the control target of charging will not be set temporarily;

[0034] If the grid frequency deviation is greater than a specified threshold, any further grid frequency control targets are temporarily not issued.

[0035] A control method for different types of energy storage participating in power grid peak load regulation and frequency regulation, using the control system for different types of energy storage participating in power grid peak load regulation and frequency regulation as described above, comprises the following steps:

[0036] Step 1: The dispatcher puts the energy storage control area into peak load control mode or frequency regulation control mode through the grid dispatch center AGC, and selects the grouping rules through the grouping control module;

[0037] If the available regulation reserve of the current conventional units is less than the threshold for starting the energy storage resource peak load regulation, then the energy storage resource is started to participate in the grid peak load regulation control mode;

[0038] If the current grid ACE is greater than the energy storage resource frequency regulation start threshold, and the grid frequency deviation exceeds the specified threshold, then the energy storage resource is started to participate in the grid frequency regulation control mode;

[0039] Step 2: The grid dispatching center AGC calculates the total energy storage control demand for a certain period of time in the future and sends the total energy storage control demand to the energy storage control area;

[0040] Step 3: The peak-shaving and frequency-regulating identification module determines whether the corresponding energy storage power station accepts peak-shaving and frequency-regulating control based on the single energy storage power station model, and counts the energy storage power stations that accept peak-shaving and frequency-regulating control;

[0041] Step 4: The grouping control module groups the energy storage power stations that are subject to peak load and frequency regulation control counted in step 3 according to the grouping rule selected in step 1 to obtain multiple energy storage groups;

[0042] Step 5: The allocation strategy module sends the total energy storage control demand issued by the grid dispatching center AGC to each energy storage group according to the corresponding inter-group allocation strategy for the multiple energy storage groups in step 4;

[0043] Step 6: The allocation strategy module allocates the energy storage control demand allocated to each energy storage group to each energy storage power station according to the adjustment capacity ratio based on the corresponding intra-group allocation strategy for each energy storage group.

[0044] Furthermore, in the peak load control mode, the calculation method of the total energy storage control demand is:

[0045] (1)

[0046] in, To control the peak demand, is the load change in the future period, It is used as a standby for the current conventional units. is the reasonable threshold value of the available regulation reserve of conventional units, is the coefficient of restitution.

[0047] Furthermore, in the frequency modulation control mode, the calculation method of the total energy storage control demand is:

[0048] (2)

[0049] in, For frequency control needs, is the participation coefficient of energy storage in frequency regulation, and , is the regional control deviation of the power grid.

[0050] The beneficial effects that can be achieved by the present invention are as follows: the present invention proposes to unify the energy storage of different investment entities in the AGC for modeling, and according to the current different control requirements of the power grid for peak load regulation and frequency regulation, the regulation requirements are optimally allocated among the energy storage of different investment entities according to the regulation cost, regulation capacity and regulation capability, so as to realize the participation of grid-side energy storage, energy storage built in new energy sites, shared energy storage and user-side energy storage in the unified peak load regulation and frequency regulation control of the power grid, expand the scope of power grid peak load regulation and frequency regulation resources, support the participation of energy storage resources of different investment entities in the power grid auxiliary service market, and realize a win-win situation for the power grid, new energy sites and energy storage system investors. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a schematic diagram of the structural framework of an embodiment of the present invention. DETAILED DESCRIPTION

[0052] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0053] In response to the frequency and interconnection line control requirements of provincial power grids, a control system for different types of energy storage to participate in power grid peak and frequency regulation is provided, including the provincial power grid dispatching center AGC (Automatic Generation Control, AGC). The power grid dispatching center AGC includes the AGC main control area and the energy storage control area. The AGC main control area is used to control conventional energy storage within the dispatching range. It is mainly responsible for implementing closed-loop control of conventional water and thermal energy storage within the dispatching range. The goal is to ensure that the power grid frequency and interconnection line power are close to the planned values, while absorbing as much new energy as possible. The energy storage control area is used to monitor and control energy storage power stations within the dispatching range.

[0054] The energy storage control area includes an accurate adjustment identification module, a grouping control module, an allocation strategy module, a safety verification module and several single energy storage power station models.

[0055] The single model of the energy storage power station is constructed based on the energy storage power station, including the adjustment parameter section, network model section, safety constraint section, and adjustment willingness section.

[0056] The adjustment parameter sections include: energy storage installed capacity, maximum discharge capacity, maximum charging capacity, adjustment accuracy, response delay, adjustment cost, and allowable control state.

[0057] The network model segments include: grid access voltage level, grid access point, and supporting new energy stations.

[0058] The safety constraint segments include: energy storage state of charge SOC safety upper limit, energy storage state of charge SOC safety lower limit, energy storage control maximum deviation, energy storage control dead zone, and energy storage prohibited adjustment state.

[0059] The adjustment intention section includes: the start time of allowed control, the end time of allowed control, the SOC control threshold, the control allowable electricity price threshold, and the power restriction status of the equipped new energy station.

[0060] The accurate regulation identification module is used to judge whether the corresponding energy storage power station accepts peak-shaving and frequency regulation control according to the single-unit model of the energy storage power station, and to count the energy storage power stations that accept peak-shaving and frequency regulation control; the judgment criteria are: according to the state of the regulation willingness segment in the single-unit model of the energy storage power station, when the regulation willingness is met, the energy storage power station accepts peak-shaving and frequency regulation control; when the regulation willingness is not met, the energy storage power station does not accept peak-shaving and frequency regulation control.

[0061] The grouping control module includes 6 grouping rules for several energy storage power station monomer models, and divides the energy storage power station monomer models of the energy storage power station subject to peak load and frequency regulation control into multiple energy storage groups according to the grouping rules;

[0062] The 6 grouping rules are:

[0063] Grouping rule I: Group energy storage investors by category and sort the energy storage groups by category priority. The categories of energy storage investors include grid-side energy storage, shared energy storage, new energy storage and user-side energy storage.

[0064] Grouping rule II: Grouping is done by dividing the installed capacity into intervals, such as 10MW, 50MW and 100MW installed capacity.

[0065] Grouping rule III: Group the energy storage according to the grid voltage level (such as 10kV, 110kV and 220kV) to which it is connected, and sort the energy storage groups in order of the grid voltage level;

[0066] Grouping rule IV: Group the energy storage according to the geographical division (such as the name of the region) where the energy storage is connected, and sort the energy storage groups in order of load size;

[0067] Grouping rule V: Grouping is done according to the energy storage regulation capability, and the energy storage groups are sorted in order according to the energy storage regulation capability. The energy storage regulation capability is the ratio of the regulation rate of the energy storage group to the installed capacity of the energy storage group (e.g. 0-10%, 10%-30%, 30%-50%).

[0068] Grouping rule VI: Group according to the energy storage regulation cost, for example, 1 yuan / MW to 10 yuan / MW, 10 yuan / MW to 50 yuan / MW, and sort the energy storage groups in order of the energy storage regulation cost.

[0069] The allocation strategy module includes inter-group allocation strategy and intra-group allocation strategy.

[0070] The inter-cluster allocation strategy is used to distribute the total energy storage control demand issued by the power grid dispatching center AGC to each energy storage group. The inter-cluster allocation strategy includes the inter-cluster allocation strategy STRA and the inter-cluster allocation strategy STRAB.

[0071] The inter-group allocation strategy STRA corresponds to the grouping rules I, III, IV, V and VI, and sends the total energy storage control demand issued by the power grid dispatching center AGC to each energy storage group in sequence according to the sorting order and the single maximum allocation amount until all are sent;

[0072] The inter-cluster allocation strategy STRAB corresponds to clustering rule II, and allocates energy storage according to the proportion of the installed capacity of each energy storage group.

[0073] The intra-group allocation strategy is used to distribute the energy storage control demand allocated to the energy storage group to each energy storage power station according to the adjustment capacity ratio.

[0074] The safety check module is used to perform safety check on the operating status of the energy storage power station:

[0075] If the SOC of the energy storage power station is greater than the safety upper limit, the charging control target will not be set temporarily;

[0076] If the SOC of the energy storage power station is lower than the safety lower limit, the control target of discharging will be temporarily not set;

[0077] If the new energy station supporting the energy storage power station is in a power-limited state, the control target of temporarily not discharging electricity will be achieved;

[0078] If the energy storage power station is a shared energy storage, when any new energy station corresponding to the shared energy storage is in a power-limited state, the control target of temporarily not discharging will be met;

[0079] If the energy storage power station is storing energy on the user side, if the energy storage is in a high electricity price range, the control target of charging will not be set temporarily;

[0080] If the grid frequency deviation is greater than a specified threshold, any further grid frequency control targets are temporarily not issued.

[0081] The control method of the control system using different types of energy storage as described above to participate in the peak load and frequency regulation of the power grid includes the following steps:

[0082] Step 1: The dispatcher puts the energy storage control area into peak load control mode or frequency regulation control mode through the grid dispatch center AGC, and selects the grouping rules through the grouping control module;

[0083] If the available regulation reserve of the current conventional units is less than the threshold for starting the energy storage resource peak load regulation, then the energy storage resource is started to participate in the grid peak load regulation control mode;

[0084] If the current grid ACE is greater than the energy storage resource frequency regulation start threshold, and the grid frequency deviation exceeds the specified threshold, then the energy storage resource is started to participate in the grid frequency regulation control mode.

[0085] Step 2: The grid dispatching center AGC calculates the total energy storage control demand for a certain period of time in the future and sends the total energy storage control demand to the energy storage control area;

[0086] In the peak load control mode, the total demand for energy storage control is calculated as follows:

[0087] (1)

[0088] in, To control the peak demand, is the load change in the future period, It is used as a standby for the current conventional units. is the reasonable threshold value of the available regulation reserve of conventional units, is the coefficient of restitution;

[0089] In frequency control mode, the total energy storage control demand is calculated as follows:

[0090] (2)

[0091] in, For frequency control needs, is the participation coefficient of energy storage in frequency regulation, and , is the regional control deviation of the power grid.

[0092] Step 3: The peak-shaving and frequency-regulating identification module determines whether the corresponding energy storage power station accepts peak-shaving and frequency-regulating control based on the single energy storage power station model, and counts the energy storage power stations that accept peak-shaving and frequency-regulating control.

[0093] Step 4: The grouping control module groups the energy storage power stations that are subject to peak load and frequency regulation control counted in step 3 according to the grouping rules selected in step 1 to obtain multiple energy storage groups.

[0094] Step 5: The allocation strategy module distributes the total energy storage control demand issued by the grid dispatching center AGC to each energy storage group according to the corresponding inter-group allocation strategy for the multiple energy storage groups in step 4.

[0095] Step 6: The allocation strategy module allocates the energy storage control requirements assigned to each energy storage group to each energy storage power station according to the corresponding intra-group allocation strategy in accordance with the adjustment capacity ratio. Before issuing control requirements to each energy storage power station, the safety verification module is used to perform a safety verification on the operating status of the energy storage power station, and the control requirements are issued to the energy storage power stations that meet the requirements based on the safety verification results.

Claims

1. A control system for different types of energy storage to participate in power grid peak and frequency regulation, characterized by: It includes the power grid dispatching center AGC, which includes the AGC main control area and the energy storage control area. The AGC main control area is used to control conventional energy storage within the dispatching range, and the energy storage control area is used to control energy storage power stations within the dispatching range; The energy storage control area includes an alignment identification module, a grouping control module, an allocation strategy module, and several energy storage power station monomer models; The single-unit model of the energy storage power station is constructed based on the energy storage power station, including the adjustment parameter section, the network model section, the safety constraint section, and the adjustment intention section; The adjustment parameter sections include: energy storage installed capacity, maximum discharge capacity, maximum charging capacity, adjustment accuracy, response delay, adjustment cost, and allowable control state; The network model segments include: access grid voltage level, access grid connection point, and new energy stations to be built; The safety constraint section includes: energy storage state of charge SOC safety upper limit value, energy storage state of charge SOC safety lower limit value, energy storage control maximum deviation, energy storage control dead zone, energy storage prohibited adjustment state; The adjustment intention segment includes: the start time of control permission, the end time of control permission, the SOC control threshold, the control price threshold, and the power restriction status of the new energy station; The peak-shaving and frequency-regulating identification module is used to determine whether the corresponding energy storage power station accepts peak-shaving and frequency-regulating control based on the single energy storage power station model, and to count the energy storage power stations that accept peak-shaving and frequency-regulating control; The grouping control module includes n grouping rules for a number of energy storage power station monomer models, n=6, and divides the energy storage power station monomer models of the energy storage power station subject to peak load and frequency regulation control into a plurality of energy storage groups according to the grouping rules; The allocation strategy module includes inter-group allocation strategy and intra-group allocation strategy. The inter-group allocation strategy is used to send the total energy storage control demand issued by the power grid dispatching center AGC to each energy storage group, and the intra-group allocation strategy is used to distribute the energy storage control demand allocated to the energy storage group to each energy storage power station according to the adjustment capacity ratio. The control method comprises the following steps: Step 1: The dispatcher puts the energy storage control area into peak load control mode or frequency regulation control mode through the grid dispatch center AGC, and selects the grouping rules through the grouping control module; If the available regulation reserve of the current conventional units is less than the threshold for starting the energy storage resource peak load regulation, then the energy storage resource is started to participate in the grid peak load regulation control mode; If the current grid ACE is greater than the energy storage resource frequency regulation start threshold, and the grid frequency deviation exceeds the specified threshold, then the energy storage resource is started to participate in the grid frequency regulation control mode; Step 2: The grid dispatching center AGC calculates the total energy storage control demand for a certain period of time in the future and sends the total energy storage control demand to the energy storage control area; Step 3: The peak-shaving and frequency-regulating identification module determines whether the corresponding energy storage power station accepts peak-shaving and frequency-regulating control based on the single energy storage power station model, and counts the energy storage power stations that accept peak-shaving and frequency-regulating control; Step 4: The grouping control module groups the energy storage power stations that are subject to peak load and frequency regulation control counted in step 3 according to the grouping rule selected in step 1 to obtain multiple energy storage groups; Step 5: The allocation strategy module sends the total energy storage control demand issued by the grid dispatching center AGC to each energy storage group according to the corresponding inter-group allocation strategy for the multiple energy storage groups in step 4; Step 6: The allocation strategy module allocates the energy storage control demand allocated to each energy storage group to each energy storage power station according to the adjustment capacity ratio based on the corresponding intra-group allocation strategy for each energy storage group.

2. The control system for different types of energy storage participating in power grid peak and frequency regulation according to claim 1 is characterized in that: The 6 grouping rules are: Grouping rule I: Group energy storage investors by category and sort the energy storage groups by category priority. The categories of energy storage investors include grid-side energy storage, shared energy storage, new energy storage and user-side energy storage. Grouping rule II: Grouping is done by dividing the energy storage installed capacity into intervals according to the energy storage installed capacity; Grouping rule III: Group the energy storage according to the grid voltage level to which it is connected, and sort the energy storage groups in order of the grid voltage level; Grouping rule IV: Group the energy storage according to the geographical areas where they are connected, and sort the energy storage groups in order of load size; Grouping rule V: Grouping is done according to the energy storage regulation capability, and the energy storage groups are sorted in order according to the energy storage regulation capability. The energy storage regulation capability is the ratio of the regulation rate of the energy storage group to the installed capacity of the energy storage group. Grouping rule VI: Group the energy storage units according to their energy storage regulation costs, and sort the energy storage units in order of their energy storage regulation costs.

3. The control system for different types of energy storage participating in power grid peak and frequency regulation according to claim 2 is characterized by: The inter-cluster allocation strategy includes the inter-cluster allocation strategy STRA and the inter-cluster allocation strategy STRAB. The inter-group allocation strategy STRA corresponds to the grouping rules I, III, IV, V and VI, and sends the total energy storage control demand issued by the power grid dispatching center AGC to each energy storage group in sequence according to the sorting order and the single maximum allocation amount until all are sent; The inter-cluster allocation strategy STRAB corresponds to clustering rule II, and allocates energy storage according to the proportion of the installed capacity of each energy storage group.

4. The control system for different types of energy storage participating in power grid peak and frequency regulation according to claim 1 is characterized by: The judgment criteria of the accurate adjustment identification module are: according to the state of the adjustment intention segment in the single model of the energy storage power station, when the adjustment intention is met, the energy storage power station accepts peak-shaving and frequency-regulating control; when the adjustment intention is not met, the energy storage power station does not accept peak-shaving and frequency-regulating control.

5. The control system for different types of energy storage participating in power grid peak and frequency regulation according to claim 1 is characterized by: The energy storage control area also includes a safety verification module, which is used to perform safety verification on the operating status of the energy storage power station: If the SOC of the energy storage power station is greater than the safety upper limit, the charging control target will not be set temporarily; If the SOC of the energy storage power station is lower than the safety lower limit, the control target of discharging will be temporarily not set; If the new energy station supporting the energy storage power station is in a power-limited state, the control target of temporarily not discharging will be achieved; If the energy storage power station is a shared energy storage, when any new energy station corresponding to the shared energy storage is in a power-limited state, the control target of temporarily not discharging will be met; If the energy storage power station is storing energy on the user side, if the energy storage is in a high electricity price range, the control target of charging will not be set temporarily; If the grid frequency deviation is greater than a specified threshold, any further grid frequency control targets are temporarily not issued.

6. The control system for different types of energy storage participating in power grid peak load and frequency regulation according to claim 1 is characterized in that: In the peak load control mode, the calculation method of the total energy storage control demand is: (1) in, To control the peak demand, is the load change in the future period, It is used as a standby for the current conventional units. is the reasonable threshold value of the available regulation reserve of conventional units, is the coefficient of restitution.

7. The control system for different types of energy storage participating in power grid peak load regulation and frequency regulation according to claim 1 is characterized in that: In frequency control mode, the calculation method of total energy storage control demand is: (2) in, For frequency control needs, is the participation coefficient of energy storage in frequency regulation, and , is the regional control deviation of the power grid.

Citation Information

Patent Citations

  • Dynamic autonomous decentralized coordinated source load peaking control method

    CN108390387A

  • Method and system for controlling load side resources to participate in master station AGC peak regulation

    CN112865081A

  • Distributed energy storage multilayer control method based on optimal power flow

    CN114696345A

  • Resource scheduling method and apparatus for energy storage device pool, device, system, and medium

    US20230138636A1