A sponge city monitoring method and device based on rainwater monitoring

By using supervision models and iterative principal component analysis technologies in sponge cities, the drainage pipelines are adjusted based on rainwater monitoring data, and the problems of insufficient estimation of rainwater precipitation and unreasonable adjustment of drainage system are solved, and the smooth management and drainage system of sponge cities are achieved. optimization.

CN118691099BActive Publication Date: 2024-11-12XICHANG COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411187708.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-12
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

In the prior art, insufficient estimation of rainwater precipitation and unreasonable adjustment of drainage system often lead to urban waterlogging and road paralysis. How to correct and adjust the drainage system based on rainwater monitoring data to form smooth management of sponge cities is an urgent problem.

Method used

By obtaining multiple rainfall and water accumulation POIs on the urban drainage pipeline network, establishing associations to identify rainfall and water accumulation risk neighborhoods, obtaining ground collapse, traffic paralysis and rainfall records, combining drainage pipeline adjustment indicator information table, using supervision model and iterating main Component analysis and linear fitting models are performed for data analysis and correction, and drainage pipelines are adjusted to optimize urban drainage systems.

Benefits of technology

Effective correction and adjustment of the drainage system based on rainwater monitoring data is achieved, the smooth management of sponge cities is improved, and urban waterlogging and road paralysis are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118691099B_ABST
    Figure CN118691099B_ABST
Patent Text Reader

Abstract

The present application relates to the field of big data technology, and in particular to a sponge city monitoring method and device based on rainwater monitoring, wherein a plurality of rainfall waterlogging POIs are obtained on the urban drainage pipe network, and a plurality of rainfall waterlogging risk blocks are obtained through the association relationship between each rainfall waterlogging POI; the ground collapse records, traffic paralysis records and rainfall records are sequentially configured with each drainage pipe adjustment information index in the drainage pipe adjustment index information table to form a supervision model; the current ground collapse information of the rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block are calculated; the inferred information is compared with the current ground collapse information, the current traffic paralysis information and the current rainfall information to obtain the drainage pipe inspection result, and the urban drainage pipe is adjusted through the drainage pipe inspection result. The beneficial effect of the present invention is that the drainage system can be corrected and adjusted based on the rainwater monitoring data, thereby forming a smooth management of the sponge city.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of big data technology, and in particular to a sponge city monitoring method and device based on rainwater monitoring. Background Art

[0002] Sponge city refers to the use of low-impact development technology from a system perspective, using measures such as "infiltration, retention, storage, purification, use, and drainage" to manage urban rainwater resources and form an urban construction model with a benign hydrological cycle. As an important part of the city, the rainwater collection and discharge system is of great significance for the effective use of rainwater resources, alleviating urban waterlogging, and improving water quality. Abnormal analysis of rainwater monitoring data in the rainwater collection and discharge system can help the rainwater collection and discharge system optimize the treatment and utilization of rainwater.

[0003] During the urban construction process, sponge cities can simulate the original natural ecological water cycle model as much as possible, and have good "elasticity" in adapting to environmental changes and responding to natural disasters. They absorb water, store water, infiltrate water, and purify water when it rains, and "release" and utilize the stored water when needed, making the migration of water in the city more "natural".

[0004] However, in the existing technology, insufficient estimation of rainwater precipitation and unreasonable subsequent adjustment of the drainage system often result in urban waterlogging, road paralysis, etc. Therefore, how to correct and adjust the drainage system based on rainwater monitoring data to achieve smooth management of sponge cities is an urgent problem to be solved. Summary of the invention

[0005] To achieve the above objectives, this application provides the following technical solutions:

[0006] According to a first aspect of the present invention, the present invention claims protection for a sponge city monitoring method based on rainwater monitoring, the method specifically comprising:

[0007] Obtain multiple rainfall waterlogging POIs on the urban drainage pipeline network, and obtain multiple rainfall waterlogging risk blocks through the association relationship between each rainfall waterlogging POI;

[0008] Obtain a drainage pipe regulation index information table, as well as ground collapse records of each rainfall waterlogging POI and traffic paralysis records and rainfall records of each rainfall waterlogging risk block, and sequentially configure a supervision model with each drainage pipe regulation information index in the drainage pipe regulation index information table;

[0009] Calculate and obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block;

[0010] The inferred information of the supervision model is compared with the current ground collapse information, the current traffic paralysis information and the current rainfall information to obtain the drainage pipeline inspection result, and the urban drainage pipeline is adjusted according to the drainage pipeline inspection result.

[0011] Further, the drainage pipe regulation index information table, the ground collapse record of each rainfall waterlogging POI, the traffic paralysis record and the rainfall record of each rainfall waterlogging risk block are obtained, and the ground collapse record, the traffic paralysis record and the rainfall record are sequentially configured with each drainage pipe regulation information index in the drainage pipe regulation index information table to form a supervision model, specifically including:

[0012] Obtaining a drainage pipe adjustment index information table, and configuring a first random sample information table through the drainage pipe adjustment index information table;

[0013] Obtain the ground collapse record of each rainfall waterlogging POI and the traffic paralysis record and rainfall record of each rainfall waterlogging risk block, and sequentially configure the second random sample, the third random sample and the fourth random sample through the ground collapse record, the traffic paralysis record and the rainfall record;

[0014] Based on the divergence formula, a first divergence information table between the second random sample and the first random sample information table is obtained, a second divergence information table between the third random sample and the first random sample information table is obtained, and a third divergence information table between the fourth random sample and the first random sample information table is obtained;

[0015] Constructing a first iterative principal component analysis formula through the first divergence information table, the ground collapse record and the drainage pipe adjustment index information table;

[0016] Constructing a second iterative principal component analysis formula through the second divergence information table, the traffic paralysis record and the drainage pipe adjustment index information table;

[0017] Constructing a third iterative principal component analysis formula through the third divergence information table, the rainfall record and the drainage pipe adjustment index information table;

[0018] Based on the linear fitting model, smooth correction is performed on the inferred deviations of the first iterative principal component analysis formula, the second iterative principal component analysis formula and the third iterative principal component analysis formula in sequence.

[0019] Furthermore, the divergence formula satisfies:

[0020] ;

[0021] in, represents each divergence in the first divergence information table or the second divergence information table or the third divergence information table, P represents each first random sample in the first random sample information table, Q represents the second random sample or the third random sample or the fourth random sample, t represents the time period information table, N represents the Nth time period of t, P(t) represents the distribution column of each first random sample in the time period information table, and Q(t) represents the distribution column of the second random sample or the third random sample or the fourth random sample in the time period information table.

[0022] Furthermore, the linear fitting model is used to sequentially smooth and correct the inferred deviations of the first iterative principal component analysis formula, the second iterative principal component analysis formula, and the third iterative principal component analysis formula, specifically including:

[0023] Obtaining inferred ground collapse information through the first iterative principal component analysis formula, and obtaining a first deviation accuracy between the inferred ground collapse information and the ground collapse record;

[0024] Obtaining inferred traffic paralysis information through the second iterative principal component analysis formula, and obtaining a second deviation accuracy between the inferred traffic paralysis information and the traffic paralysis record;

[0025] Obtain inferred rainfall information by using the third iterative principal component analysis formula, and obtain a third deviation accuracy between the inferred rainfall information and the rainfall record;

[0026] sequentially checking whether the first deviation accuracy, the second deviation accuracy, and the third deviation accuracy are smoothness information, and if they are not smoothness information, correcting the first deviation accuracy, the second deviation accuracy, or the third deviation accuracy to smoothness information through a correction operation;

[0027] Obtaining the linear fitting order of the first deviation accuracy, the second deviation accuracy or the third deviation accuracy in sequence through the autocorrelation function and the partial autocorrelation function, and obtaining a linear fitting model through the linear fitting order;

[0028] Using a decision tree evaluation method to evaluate the parameters of the linear fitting model, inputting the first deviation accuracy, the second deviation accuracy, and the third deviation accuracy into the linear fitting model in sequence for inference correction, and obtaining an inference deviation correction value;

[0029] Through the first deviation accuracy, the second deviation accuracy, the third deviation accuracy and the respective inferred deviation correction values, the corrected inferred ground collapse information, the corrected inferred traffic paralysis information and the corrected inferred rainfall information are obtained in sequence.

[0030] Furthermore, the calculation obtains the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block, specifically including:

[0031] According to the road type of the rainfall waterlogging POI, the repairable paralysis information and the irreparable paralysis information of each rainfall waterlogging POI are obtained in turn;

[0032] Get the initial ground collapse value for each rainfall waterlogging POI;

[0033] The paralysis information input value of each rainfall waterlogging POI is obtained through the repairable paralysis information and the irreparable paralysis information, and the paralysis information input value of each rainfall waterlogging POI satisfies , ,in, Indicates the paralysis information input value of each rainfall and waterlogging POI. Indicates the repairable paralysis information of each rainfall waterlogging POI. Indicates the irreparable paralysis information of each rainfall waterlogging POI, and j represents an imaginary unit;

[0034] The deformation gradient matrix is ​​constructed by inputting the paralysis information of each rainfall waterlogging POI and the initial ground collapse value of the adjacent rainfall waterlogging POI that constitutes the rainfall waterlogging risk block with each rainfall waterlogging POI.

[0035] The ground collapse update value of each rainfall waterlogging POI is obtained through the deformation gradient matrix and the paralysis information input value of each rainfall waterlogging POI, and the ground collapse update value satisfies , where J represents the deformation gradient matrix, Indicates the ground collapse update value, Indicates the paralysis information input value;

[0036] The initial ground collapse value and the ground collapse update value of each rainfall waterlogging POI are added together to obtain the equilibrium ground collapse value of each rainfall waterlogging POI;

[0037] Obtain an adjacency matrix between each rainfall waterlogging POI and adjacent rainfall waterlogging POIs that constitute a rainfall waterlogging risk block with each rainfall waterlogging POI, and obtain a paralysis information input value of each rainfall waterlogging risk block through the adjacency matrix and the balanced ground collapse value of each rainfall waterlogging POI;

[0038] The current ground collapse value of each rainfall and waterlogging POI, the current traffic paralysis of each rainfall and waterlogging risk block and the current rainfall are obtained, wherein the current ground collapse value is the balanced ground collapse value of each rainfall and waterlogging POI, the traffic paralysis is the paralysis information input value of each rainfall and waterlogging risk block, and the rainfall is the real part of the paralysis information input value of each rainfall and waterlogging risk block.

[0039] Furthermore, the road type of the rain-water accumulation POI is used to sequentially obtain the repairable paralysis information and the irreparable paralysis information of each rain-water accumulation POI, specifically including:

[0040] Obtaining the road type of each rainfall waterlogging POI, wherein the road type includes a stable paralysis information road, a long-term pothole road, and a long-term pothole-long-term paralysis information road;

[0041] When the road type of the rainfall waterlogging POI is a stable paralysis information road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the rated paralysis information of the rainfall waterlogging POI;

[0042] When the road type of the rainfall waterlogging POI is a long-term pothole road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the ground collapse amplitude and pothole parameter information of the rainfall waterlogging POI;

[0043] When the road type of the rainfall waterlogging POI is a long-term pothole-long-term paralysis information road, the repairable paralysis information and unrepairable paralysis information of the rainfall waterlogging POI are obtained through the ground collapse amplitude, pothole parameters and paralysis information factor information of the rainfall waterlogging POI.

[0044] Furthermore, the paralysis information input value of each rainfall flooding risk block satisfies ,in, represents the paralysis information input value of each rainfall and waterlogging risk block, V represents the balanced ground collapse value of each rainfall and waterlogging POI, Y represents the adjacency matrix, Represents the conjugate operation of a complex number.

[0045] Furthermore, the deformation gradient matrix is ​​constructed by inputting the paralysis information of each rainfall waterlogging POI and the initial ground collapse values ​​of the adjacent rainfall waterlogging POIs that form the rainfall waterlogging risk block with each rainfall waterlogging POI, specifically including:

[0046] Get each rainfall accumulation The paralysis information input value and each rainfall water accumulation Adjacent rainfall flooding that constitutes a rainfall flooding risk block The initial ground collapse value;

[0047] Water accumulates through each rainfall The paralysis information input value and each rainfall water accumulation Adjacent rainfall flooding that constitutes a rainfall flooding risk block The initial ground collapse value is obtained to obtain multiple elements J(x,y) of the deformation gradient matrix, and the elements J(x,y) satisfy , where P(x) represents the water accumulation at each rainfall The repairable paralysis information, Q(x) represents each rainfall water accumulation Irreparable paralysis information, Indicates adjacent rainfall water accumulation The initial ground collapse value, represents partial derivative;

[0048] The deformation gradient matrix is ​​constructed by using a plurality of the elements J(x, y).

[0049] According to the second aspect of the present invention, the present invention claims protection for a sponge city monitoring device based on rainwater monitoring, the device specifically comprising:

[0050] A topological network unit is used to obtain multiple rainfall waterlogging POIs on the urban drainage pipe network, and obtain multiple rainfall waterlogging risk blocks through the association relationship between each rainfall waterlogging POI;

[0051] An inference information unit is used to obtain a drainage pipe regulation index information table, as well as ground collapse records of each rainfall waterlogging POI and traffic paralysis records and rainfall records of each rainfall waterlogging risk block, and configure a supervision model with the ground collapse records, traffic paralysis records and rainfall records in sequence with each drainage pipe regulation information index in the drainage pipe regulation index information table;

[0052] The current information unit is used to calculate and obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block;

[0053] A drainage pipe adjustment unit, used for comparing the inference information of the supervision model with the current ground collapse information, the current traffic paralysis information and the current rainfall information and obtaining a drainage pipe inspection result, and adjusting the urban drainage pipe according to the drainage pipe inspection result;

[0054] The sponge city monitoring device based on rainwater monitoring is used to execute the sponge city monitoring method based on rainwater monitoring as described above.

[0055] The present application relates to the field of big data technology, and in particular to a sponge city monitoring method and device based on rainwater monitoring, wherein a plurality of rainfall waterlogging POIs are obtained on the urban drainage pipe network, and a plurality of rainfall waterlogging risk blocks are obtained through the association relationship between each rainfall waterlogging POI; the ground collapse records, traffic paralysis records and rainfall records are sequentially configured with each drainage pipe adjustment information index in the drainage pipe adjustment index information table to form a supervision model; the current ground collapse information of the rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block are calculated; the inferred information is compared with the current ground collapse information, the current traffic paralysis information and the current rainfall information to obtain the drainage pipe inspection result, and the urban drainage pipe is adjusted through the drainage pipe inspection result. The beneficial effect of the present invention is that the drainage system can be corrected and adjusted based on the rainwater monitoring data, thereby forming a smooth management of the sponge city. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] Figure 1 A workflow diagram of a sponge city monitoring method based on rainwater monitoring as claimed in an embodiment of the present application;

[0057] Figure 2 A structural module diagram of a sponge city monitoring device based on rainwater monitoring as claimed in an embodiment of the present application. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0059] The terms "first", "second" and "third" in this application are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of indicated technical features. Therefore, the features defined as "first", "second" and "third" can explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "multiple" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined. All directional indications (such as up, down, left, right, front, back...) in the embodiments of this application are only used to explain the relative position relationship, movement, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication also changes accordingly. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally also includes steps or units that are not listed, or optionally also includes other steps or units inherent to these processes, methods, products or devices.

[0060] Reference to "embodiments" herein means that a particular feature, network, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0061] Reference Figure 1 The embodiment of the present invention provides a sponge city monitoring method based on rainwater monitoring, characterized in that the method specifically includes:

[0062] S101: A plurality of rainfall waterlogging POIs are obtained on the urban drainage pipe network, and a plurality of rainfall waterlogging risk blocks are obtained through association relationships between each rainfall waterlogging POI.

[0063] In this embodiment, the rainfall waterlogging POI can be obtained through the road conditions in the urban drainage pipe network, and then the rainfall waterlogging risk block can be obtained through the association between the rainfall waterlogging POIs. Assume that there are 4 rainfall waterlogging POIs in the drainage pipe, numbered M1, M2, M3 and M4, where M1 is connected to M2, M2 is connected to M3, M3 is connected to M4, and M4 is connected to M1. Then M1 and M2 constitute the rainfall waterlogging risk block P1, M2 and M3 constitute the rainfall waterlogging risk block P2, M3 and M4 constitute the rainfall waterlogging risk block P3, and M4 and M1 constitute the rainfall waterlogging risk block P4.

[0064] S102: Obtain a drainage pipe regulation index information table, as well as ground collapse records for each rainfall waterlogging POI and traffic paralysis records and rainfall records for each rainfall waterlogging risk block, and configure a supervision model with the ground collapse records, traffic paralysis records and rainfall records in sequence with each drainage pipe regulation information index in the drainage pipe regulation index information table.

[0065] In this embodiment, the traffic paralysis record represents the historical line load situation, and the rainfall record represents the historical line energy loss situation.

[0066] In some embodiments, the acquisition of the drainage pipe regulation index information table, the ground collapse record of each rainfall waterlogging POI, the traffic paralysis record and the rainfall record of each rainfall waterlogging risk block, and the configuration of the supervision model with each drainage pipe regulation information index in the drainage pipe regulation index information table in turn specifically include:

[0067] Obtaining a drainage pipe adjustment index information table, and configuring a first random sample information table through the drainage pipe adjustment index information table;

[0068] Obtain the ground collapse record of each rainfall waterlogging POI and the traffic paralysis record and rainfall record of each rainfall waterlogging risk block, and sequentially configure the second random sample, the third random sample and the fourth random sample through the ground collapse record, the traffic paralysis record and the rainfall record;

[0069] Based on the divergence formula, a first divergence information table between the second random sample and the first random sample information table is obtained, a second divergence information table between the third random sample and the first random sample information table is obtained, and a third divergence information table between the fourth random sample and the first random sample information table is obtained;

[0070] Constructing a first iterative principal component analysis formula through the first divergence information table, the ground collapse record and the drainage pipe adjustment index information table;

[0071] Constructing a second iterative principal component analysis formula through the second divergence information table, the traffic paralysis record and the drainage pipe adjustment index information table;

[0072] Constructing a third iterative principal component analysis formula through the third divergence information table, the rainfall record and the drainage pipe adjustment index information table;

[0073] Based on the linear fitting model, smooth correction is performed on the inferred deviations of the first iterative principal component analysis formula, the second iterative principal component analysis formula and the third iterative principal component analysis formula in sequence.

[0074] In this embodiment, the drainage pipe adjustment index information table includes weather adjustment index information, seasonal adjustment index information, and holiday adjustment index information, etc. The degree of correlation between different adjustment index information and ground collapse records, traffic paralysis records, or rainfall records is obtained through a divergence formula, and then the obtained divergence information table is normalized and used as the weight coefficient of the iterative principal component analysis formula.

[0075] As in the first iteration principal component analysis formula In the equation, y represents the ground collapse record. to In turn, it represents each drainage pipe regulation index information in the drainage pipe regulation index information table, to Represents the first scatter information table after normalization.

[0076] In the second iteration the principal component analysis formula In the above table, y represents traffic paralysis records. to In turn, it represents each drainage pipe regulation index information in the drainage pipe regulation index information table, to Represents the second scatter information table after normalization.

[0077] In the third iteration, the principal component analysis formula In the equation, y represents rainfall records. to In turn, it represents each drainage pipe regulation index information in the drainage pipe regulation index information table, to Represents the third scatter information table after normalization.

[0078] Specifically, the divergence formula satisfies:

[0079] ;

[0080] in, represents each divergence in the first divergence information table or the second divergence information table or the third divergence information table, P represents each first random sample in the first random sample information table, Q represents the second random sample or the third random sample or the fourth random sample, t represents the time period information table, N represents the Nth time period of t, P(t) represents the distribution column of each first random sample in the time period information table, and Q(t) represents the distribution column of the second random sample or the third random sample or the fourth random sample in the time period information table.

[0081] Specifically, the smoothing correction of the inferred deviations of the first iterative principal component analysis formula, the second iterative principal component analysis formula, and the third iterative principal component analysis formula in sequence based on the linear fitting model specifically includes:

[0082] Obtaining inferred ground collapse information through the first iterative principal component analysis formula, and obtaining a first deviation accuracy between the inferred ground collapse information and the ground collapse record;

[0083] Obtaining inferred traffic paralysis information through the second iterative principal component analysis formula, and obtaining a second deviation accuracy between the inferred traffic paralysis information and the traffic paralysis record;

[0084] Obtain inferred rainfall information by using the third iterative principal component analysis formula, and obtain a third deviation accuracy between the inferred rainfall information and the rainfall record;

[0085] sequentially checking whether the first deviation accuracy, the second deviation accuracy, and the third deviation accuracy are smoothness information, and if they are not smoothness information, correcting the first deviation accuracy, the second deviation accuracy, or the third deviation accuracy to smoothness information through a correction operation;

[0086] Obtaining the linear fitting order of the first deviation accuracy, the second deviation accuracy or the third deviation accuracy in sequence through the autocorrelation function and the partial autocorrelation function, and obtaining a suitable linear fitting model through the linear fitting order;

[0087] Using a decision tree evaluation method to evaluate the parameters of the linear fitting model, inputting the first deviation accuracy, the second deviation accuracy, and the third deviation accuracy into the linear fitting model in sequence for inference correction, and obtaining an inference deviation correction value;

[0088] Through the first deviation accuracy, the second deviation accuracy, the third deviation accuracy and the respective inferred deviation correction values, the corrected inferred ground collapse information, the corrected inferred traffic paralysis information and the corrected inferred rainfall information are obtained in sequence.

[0089] S103: Calculate and obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block.

[0090] In some embodiments, the calculation to obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block specifically includes:

[0091] According to the road type of the rainfall waterlogging POI, the repairable paralysis information and the irreparable paralysis information of each rainfall waterlogging POI are obtained in turn;

[0092] Get the initial ground collapse value for each rainfall waterlogging POI;

[0093] The paralysis information input value of each rainfall waterlogging POI is obtained through the repairable paralysis information and the irreparable paralysis information, and the paralysis information input value of each rainfall waterlogging POI satisfies , ,in, Indicates the paralysis information input value of each rainfall and waterlogging POI. Indicates the repairable paralysis information of each rainfall waterlogging POI. Indicates the irreparable paralysis information of each rainfall waterlogging POI, and j represents an imaginary unit;

[0094] The deformation gradient matrix is ​​constructed by inputting the paralysis information of each rainfall waterlogging POI and the initial ground collapse value of the adjacent rainfall waterlogging POI that constitutes the rainfall waterlogging risk block with each rainfall waterlogging POI.

[0095] The ground collapse update value of each rainfall waterlogging POI is obtained through the deformation gradient matrix and the paralysis information input value of each rainfall waterlogging POI, and the ground collapse update value satisfies , where J represents the deformation gradient matrix, Indicates the ground collapse update value, Indicates the paralysis information input value;

[0096] The initial ground collapse value and the ground collapse update value of each rainfall waterlogging POI are added together to obtain the equilibrium ground collapse value of each rainfall waterlogging POI;

[0097] Obtain an adjacency matrix between each rainfall waterlogging POI and adjacent rainfall waterlogging POIs that constitute a rainfall waterlogging risk block with each rainfall waterlogging POI, and obtain a paralysis information input value of each rainfall waterlogging risk block through the adjacency matrix and the balanced ground collapse value of each rainfall waterlogging POI;

[0098] The current ground collapse value of each rainfall and waterlogging POI, the current traffic paralysis of each rainfall and waterlogging risk block and the current rainfall are obtained, wherein the current ground collapse value is the balanced ground collapse value of each rainfall and waterlogging POI, the traffic paralysis is the paralysis information input value of each rainfall and waterlogging risk block, and the rainfall is the real part of the paralysis information input value of each rainfall and waterlogging risk block.

[0099] In this embodiment, the initial ground collapse value of each rainfall and water accumulation POI can be obtained through the design specifications and requirements of the rainfall and water accumulation system, such as the ground collapse level, ground collapse stability requirements, etc., or the historical operation information of the rainfall and water accumulation system (such as the ground collapse value at the previous moment) can be used as the initial ground collapse value.

[0100] Specifically, the road type of the rain-water accumulation POI is used to sequentially obtain the repairable paralysis information and the irreparable paralysis information of each rain-water accumulation POI, specifically including:

[0101] Obtaining the road type of each rainfall waterlogging POI, wherein the road type includes a stable paralysis information road, a long-term pothole road, and a long-term pothole-long-term paralysis information road;

[0102] When the road type of the rainfall waterlogging POI is a stable paralysis information road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the rated paralysis information of the rainfall waterlogging POI;

[0103] When the road type of the rainfall waterlogging POI is a long-term pothole road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the ground collapse amplitude and pothole parameter information of the rainfall waterlogging POI;

[0104] When the road type of the rainfall waterlogging POI is a long-term pothole-long-term paralysis information road, the repairable paralysis information and unrepairable paralysis information of the rainfall waterlogging POI are obtained through the ground collapse amplitude, pothole parameters and paralysis information factor information of the rainfall waterlogging POI.

[0105] In this embodiment, when the road type of the rainfall waterlogging POI is a stable paralysis information road, the repairable paralysis information and the irreparable paralysis information of the rainfall waterlogging POI can be obtained through the rated paralysis information of the rainfall waterlogging POI, and the rated paralysis information of the rainfall waterlogging POI can be obtained from the technical specifications of the road equipment; when the road type of the rainfall waterlogging POI is a long-term pothole road, the repairable paralysis information , irreparable paralysis information , where V represents the ground collapse amplitude of the rainfall waterlogging POI, Z represents the load pothole of the rainfall waterlogging POI, Re(Z) represents the real part of the load pothole, and Im(Z) represents the imaginary part of the load pothole; when the road type of the rainfall waterlogging POI is a long-term pothole-long-term paralysis information road, the paralysis information can be repaired , irreparable paralysis information , where V represents the ground collapse amplitude of the rainfall waterlogging POI, Z represents the load pothole of the rainfall waterlogging POI, and PF represents the paralysis information factor of the rainfall waterlogging POI.

[0106] Specifically, the paralysis information input value of each rainfall flooding risk block meets ,in, represents the paralysis information input value of each rainfall and waterlogging risk block, V represents the equilibrium ground collapse value of each rainfall and waterlogging POI, Y represents the adjacency matrix, and conj() represents the conjugate operation of complex numbers.

[0107] Specifically, the deformation gradient matrix is ​​constructed by inputting the paralysis information of each rainfall waterlogging POI and the initial ground collapse value of the adjacent rainfall waterlogging POI that constitutes the rainfall waterlogging risk block with each rainfall waterlogging POI, specifically including:

[0108] Get each rainfall accumulation The paralysis information input value and each rainfall water accumulation Adjacent rainfall flooding that constitutes a rainfall flooding risk block The initial ground collapse value;

[0109] Water accumulates through each rainfall The paralysis information input value and each rainfall water accumulation Adjacent rainfall flooding that constitutes a rainfall flooding risk block The initial ground collapse value is obtained to obtain multiple elements J(x,y) of the deformation gradient matrix, and the elements J(x,y) satisfy , where P(x) represents the water accumulation at each rainfall The repairable paralysis information, Q(x) represents each rainfall water accumulation Irreparable paralysis information, Indicates adjacent rainfall water accumulation The initial ground collapse value, represents partial derivative;

[0110] The deformation gradient matrix is ​​constructed by using a plurality of the elements J(x, y).

[0111] S104: Compare the inferred information of the supervision model with the current ground collapse information, the current traffic paralysis information and the current rainfall information to obtain the drainage pipe inspection result, and adjust the urban drainage pipe according to the drainage pipe inspection result.

[0112] In this embodiment, by comparing the inferred ground collapse of the POI with the current ground collapse, if the ground collapse exceeds or falls below a reasonable range, corresponding ground collapse adjustment measures may be taken, for example, adjusting the capacity of the underground water collector, adjusting the setting of the ground collapse adjustment device, or controlling the ground collapse fluctuation through a reactive power compensation device.

[0113] By comparing the difference between the estimated traffic jam and the current traffic jam, the load of the line can be checked. If the estimated traffic jam is higher than the line capacity, you can consider increasing the line capacity, such as increasing the conductor cross-sectional area of ​​the line or adjusting the line configuration. If the estimated traffic jam is lower than the line capacity, you can consider adjusting the load distribution, such as transferring part of the road from the high road line to the low road line to balance the road distribution.

[0114] By comparing the predicted rainfall with the current rainfall, the energy loss in the drainage pipes can be checked. If the rainfall is high, the topological network of the drainage pipes can be adjusted, such as adjusting the orientation of the risk blocks and reducing the long-distance drainage lines. Adjustments to the wind direction, wind force or adjacency parameters of the lines can also be considered, such as reducing the turns of the drainage lines, increasing the cross-sectional area of ​​the drainage lines or adjusting the adjacency of the risk blocks. The losses in the underground water collectors can also be reduced by improving the efficiency of the underground water collectors.

[0115] Reference Figure 2 The embodiment of the present invention further provides a sponge city monitoring device based on rainwater monitoring, and the device specifically includes:

[0116] A topological network unit 201 is used to obtain a plurality of rainfall waterlogging POIs on the urban drainage pipe network, and obtain a plurality of rainfall waterlogging risk blocks through the association relationship between each rainfall waterlogging POI;

[0117] The inference information unit 202 is used to obtain the drainage pipe regulation index information table, as well as the ground collapse record of each rainfall waterlogging POI and the traffic paralysis record and rainfall record of each rainfall waterlogging risk block, and configure the supervision model with the ground collapse record, the traffic paralysis record and the rainfall record in sequence with each drainage pipe regulation information index in the drainage pipe regulation index information table;

[0118] The current information unit 203 is used to calculate and obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block;

[0119] The drainage pipe adjustment unit 204 is used to compare the inferred information of the supervision model with the current ground collapse information, the current traffic paralysis information and the current rainfall information and obtain the drainage pipe inspection result, and adjust the urban drainage pipe according to the drainage pipe inspection result.

[0120] It is understandable that if Figure 1 The contents of the sponge city monitoring method embodiment based on rainwater monitoring shown in the figure are applicable to the sponge city monitoring device embodiment based on rainwater monitoring. The functions specifically implemented by the sponge city monitoring device embodiment based on rainwater monitoring are similar to those in the embodiment shown in the figure. Figure 1The embodiment of the sponge city monitoring method based on rainwater monitoring shown in FIG. Figure 1 The beneficial effects achieved by the sponge city monitoring method embodiment based on rainwater monitoring shown are also the same.

[0121] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in the current implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or units, which can be electrical, mechanical or other forms.

[0122] In addition, each functional unit in each embodiment of the present application can be integrated into one processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above integrated unit can be implemented in the form of hardware or in the form of software functional units. The above is only an implementation method of the present application, and does not limit the patent scope of the present application. Any equivalent network or equivalent process transformation made using the contents of the specification and drawings of this application, or directly or indirectly used in other related technical fields, is also included in the patent protection scope of the present application.

[0123] The specific implementation methods of the invention are described in detail above, but they are only examples, and the present application is not limited to the specific implementation methods described above. For those skilled in the art, any equivalent modification or substitution of the invention is also within the scope of the present application, and therefore, the equalization, modification, and improvement made without departing from the spirit and principle of the present application should be included in the scope of the present application.

Claims

1. A sponge city monitoring method based on rainwater monitoring, It is characterized in that The method specifically comprises: Obtain multiple rainfall waterlogging POIs on the urban drainage pipeline network, and obtain multiple rainfall waterlogging risk blocks through the association relationship between each rainfall waterlogging POI; Obtain a drainage pipe regulation index information table, as well as ground collapse records of each rainfall waterlogging POI and traffic paralysis records and rainfall records of each rainfall waterlogging risk block, and sequentially configure a supervision model with each drainage pipe regulation information index in the drainage pipe regulation index information table; Calculate and obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block; Compare the inferred information of the supervision model with the current ground collapse information, the current traffic paralysis information and the current rainfall information to obtain a drainage pipeline inspection result, and adjust the urban drainage pipeline according to the drainage pipeline inspection result; The drainage pipe regulation index information table is obtained, as well as the ground collapse record of each rainfall waterlogging POI and the traffic paralysis record and rainfall record of each rainfall waterlogging risk block, and the ground collapse record, the traffic paralysis record and the rainfall record are sequentially configured with each drainage pipe regulation information index in the drainage pipe regulation index information table. The supervision model specifically includes: Obtaining a drainage pipe adjustment index information table, and configuring a first random sample information table through the drainage pipe adjustment index information table; Obtain the ground collapse record of each rainfall waterlogging POI and the traffic paralysis record and rainfall record of each rainfall waterlogging risk block, and sequentially configure the second random sample, the third random sample and the fourth random sample through the ground collapse record, the traffic paralysis record and the rainfall record; Based on the divergence formula, a first divergence information table between the second random sample and the first random sample information table is obtained, a second divergence information table between the third random sample and the first random sample information table is obtained, and a third divergence information table between the fourth random sample and the first random sample information table is obtained; Constructing a first iterative principal component analysis formula through the first divergence information table, the ground collapse record and the drainage pipe adjustment index information table; Constructing a second iterative principal component analysis formula through the second divergence information table, the traffic paralysis record and the drainage pipe adjustment index information table; Constructing a third iterative principal component analysis formula through the third divergence information table, the rainfall record and the drainage pipe adjustment index information table; Based on the linear fitting model, smoothing and correcting the inferred deviations of the first iterative principal component analysis formula, the second iterative principal component analysis formula, and the third iterative principal component analysis formula in sequence; The step of sequentially smoothing and correcting the inferred deviations of the first iterative principal component analysis formula, the second iterative principal component analysis formula, and the third iterative principal component analysis formula based on the linear fitting model specifically includes: Obtaining inferred ground collapse information through the first iterative principal component analysis formula, and obtaining a first deviation accuracy between the inferred ground collapse information and the ground collapse record; Obtaining inferred traffic paralysis information through the second iterative principal component analysis formula, and obtaining a second deviation accuracy between the inferred traffic paralysis information and the traffic paralysis record; Obtain inferred rainfall information by using the third iterative principal component analysis formula, and obtain a third deviation accuracy between the inferred rainfall information and the rainfall record; sequentially checking whether the first deviation accuracy, the second deviation accuracy, and the third deviation accuracy are smoothness information, and if they are not smoothness information, correcting the first deviation accuracy, the second deviation accuracy, or the third deviation accuracy to smoothness information through a correction operation; Obtaining the linear fitting order of the first deviation accuracy, the second deviation accuracy or the third deviation accuracy in sequence through the autocorrelation function and the partial autocorrelation function, and obtaining a linear fitting model through the linear fitting order; Using a decision tree evaluation method to evaluate the parameters of the linear fitting model, inputting the first deviation accuracy, the second deviation accuracy, and the third deviation accuracy into the linear fitting model in sequence for inference correction, and obtaining an inference deviation correction value; By using the first deviation accuracy, the second deviation accuracy, the third deviation accuracy and their respective inferred deviation correction values, corrected inferred ground collapse information, corrected inferred traffic paralysis information and corrected inferred rainfall information are obtained in sequence; The calculation to obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block specifically includes: According to the road type of the rainfall waterlogging POI, the repairable paralysis information and the irreparable paralysis information of each rainfall waterlogging POI are obtained in turn; Get the initial ground collapse value for each rainfall waterlogging POI; The paralysis information input value of each rainfall waterlogging POI is obtained through the repairable paralysis information and the irreparable paralysis information. The paralysis information input value of each rainfall waterlogging POI satisfies: , in, Indicates the paralysis information input value of each rainfall and waterlogging POI. Indicates the repairable paralysis information of each rainfall waterlogging POI. Indicates the irreparable paralysis information of each rainfall waterlogging POI, and j represents an imaginary unit; The deformation gradient matrix is ​​constructed by inputting the paralysis information of each rainfall waterlogging POI and the initial ground collapse value of the adjacent rainfall waterlogging POI that constitutes the rainfall waterlogging risk block with each rainfall waterlogging POI. The ground collapse update value of each rainfall waterlogging POI is obtained through the deformation gradient matrix and the paralysis information input value of each rainfall waterlogging POI, and the ground collapse update value satisfies: , where J represents the deformation gradient matrix, Indicates the ground collapse update value, Indicates the paralysis information input value; The initial ground collapse value and the ground collapse update value of each rainfall waterlogging POI are added together to obtain the equilibrium ground collapse value of each rainfall waterlogging POI; Obtain an adjacency matrix between each rainfall waterlogging POI and adjacent rainfall waterlogging POIs that constitute a rainfall waterlogging risk block with each rainfall waterlogging POI, and obtain a paralysis information input value of each rainfall waterlogging risk block through the adjacency matrix and the balanced ground collapse value of each rainfall waterlogging POI; Obtain the current ground collapse value of each rainfall waterlogging POI, the current traffic paralysis of each rainfall waterlogging risk block and the current rainfall, wherein the current ground collapse value is the balanced ground collapse value of each rainfall waterlogging POI, the traffic paralysis is the paralysis information input value of each rainfall waterlogging risk block, and the rainfall is the real part of the paralysis information input value of each rainfall waterlogging risk block; The road type of the rain-water accumulation POI is used to sequentially obtain the repairable paralysis information and the irreparable paralysis information of each rain-water accumulation POI, specifically including: Obtaining the road type of each rainfall waterlogging POI, wherein the road type includes a stable paralysis information road, a long-term pothole road, and a long-term pothole-long-term paralysis information road; When the road type of the rainfall waterlogging POI is a stable paralysis information road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the rated paralysis information of the rainfall waterlogging POI; When the road type of the rainfall waterlogging POI is a long-term pothole road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the ground collapse amplitude and pothole parameter information of the rainfall waterlogging POI; When the road type of the rainfall waterlogging POI is a long-term pothole-long-term paralysis information road, the repairable paralysis information and irreparable paralysis information of the rainfall waterlogging POI are obtained through the ground collapse amplitude, pothole parameters and paralysis information factor information of the rainfall waterlogging POI; The paralysis information input value of each rainfall waterlogging risk block meets the following requirements: ,in, represents the paralysis information input value of each rainfall and waterlogging risk block, V represents the balanced ground collapse value of each rainfall and waterlogging POI, Y represents the adjacency matrix, Represents the conjugate operation of a complex number; The deformation gradient matrix is ​​constructed by inputting the paralysis information of each rainfall waterlogging POI and the initial ground collapse value of the adjacent rainfall waterlogging POI that forms the rainfall waterlogging risk block with each rainfall waterlogging POI, specifically including: Get each rainfall accumulation The paralysis information input value and each rainfall water accumulation Adjacent rainfall flooding that constitutes a rainfall flooding risk block The initial ground collapse value; Water accumulates through each rainfall The paralysis information input value and each rainfall water accumulation Adjacent rainfall flooding that constitutes a rainfall flooding risk block The initial ground collapse value is obtained to obtain multiple elements J(x, y) of the deformation gradient matrix, and the elements J(x, y) satisfy: , where P(x) represents the water accumulation at each rainfall The repairable paralysis information, Q(x) represents each rainfall water accumulation Irreparable paralysis information, Indicates adjacent rainfall water accumulation The initial ground collapse value, Represents partial derivative; constructs a deformation gradient matrix through multiple elements J(x,y).

2. The method according to claim 1, It is characterized in that The divergence formula satisfies: ; in, represents each divergence in the first divergence information table or the second divergence information table or the third divergence information table, P represents each first random sample in the first random sample information table, Q represents the second random sample or the third random sample or the fourth random sample, t represents the time period information table, N represents the Nth time period of t, P(t) represents the distribution column of each first random sample in the time period information table, and Q(t) represents the distribution column of the second random sample or the third random sample or the fourth random sample in the time period information table.

3. A sponge city monitoring device based on rainwater monitoring, It is characterized in that The device specifically comprises: A topological network unit is used to obtain multiple rainfall waterlogging POIs on the urban drainage pipe network, and obtain multiple rainfall waterlogging risk blocks through the association relationship between each rainfall waterlogging POI; An inference information unit is used to obtain a drainage pipe regulation index information table, as well as ground collapse records of each rainfall waterlogging POI and traffic paralysis records and rainfall records of each rainfall waterlogging risk block, and configure a supervision model with the ground collapse records, traffic paralysis records and rainfall records in sequence with each drainage pipe regulation information index in the drainage pipe regulation index information table; The current information unit is used to calculate and obtain the current ground collapse information of each rainfall waterlogging POI and the current traffic paralysis information and current rainfall information of each rainfall waterlogging risk block; A drainage pipe adjustment unit, used for comparing the inference information of the supervision model with the current ground collapse information, the current traffic paralysis information and the current rainfall information and obtaining a drainage pipe inspection result, and adjusting the urban drainage pipe according to the drainage pipe inspection result; The sponge city monitoring device based on rainwater monitoring is used to execute the sponge city monitoring method based on rainwater monitoring as described in any one of claims 1-2.