Multi-batch liquid long-distance pipeline scheduling method, equipment and storage medium
By using pressure drop estimator and neural network optimization scheduling model in liquid fuel long-distance long-distance pipeline systems, the problems of low accuracy and potential risks in the prior art are solved, and more efficient energy saving and consumption reduction effects are achieved.
Patent Information
- Application Number
- CN202410949671.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2025-03-18
- Estimated Expiration
- 2044-07-16
AI Technical Summary
The existing long-distance long-distance liquid fuel pipeline systems have problems of low accuracy and potential risks in energy saving and consumption reduction, mainly because the model lacks accuracy when dealing with pressure drop parameters, and key components such as outbound pressure reducing valves are ignored.
A multi-batch liquid long-distance long-distance pipeline scheduling method is proposed. By obtaining the technical parameters and real-time operating status of each component of the pipeline system, the pressure drop estimator is used to predict the pressure drop of the pipeline, and the neural network is trained in combination with the particle swarm algorithm and the Levenberg-Marquardt algorithm to establish an optimized scheduling model to minimize the total power consumption of the system.
It improves the accuracy of the pipeline system regulation model, reduces potential risks, improves the energy saving effect of the system, and optimizes the energy efficiency of the system through event-triggered scheduling.