A construction site personnel safety emergency guarantee system and operation method thereof
By deploying smart terminal equipment and smart mobile APP at the construction site, combining face recognition and QR code recognition technology, real-time positioning of construction personnel and emergency plan generation are realized, and the difficulty of determining personnel location in emergencies is solved. The problem has improved the safety emergency response capabilities of the construction site.
Patent Information
- Application Number
- CN202411244193.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2044-09-06
AI Technical Summary
During the construction process, the location of personnel cannot be accurately determined during an emergency safety accident, resulting in difficulty in searching and rescue and the inability to rescue in time.
Provide a safety emergency guarantee system for personnel on the construction site, including hardware and software. The hardware includes smart terminal equipment for entrance and exit passages, user smartphone equipment and monitoring terminal smart TV equipment. The software includes personnel safety emergency guarantee platform, smartphone APP and smart The TV terminal APP obtains the identity information of construction workers through facial recognition or QR code recognition, and real-time positioning and trajectory tracking, and generates emergency plans and notice texts in case of an emergency.
The construction site personnel have achieved timely requests for help and rescue, which has increased the chance of survival of trapped people and reduced the difficulty and risk of accident handling.
Smart Images

Figure CN118799152B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of emergency safety protection for construction personnel, and in particular to a construction site personnel emergency safety protection system and an operation method thereof. Background Art
[0002] Safety is of vital importance in the construction process. However, unexpected safety accidents often occur, resulting in injuries, entrapment or burial of personnel. During the emergency rescue process, the location of personnel cannot be accurately determined, making search and rescue difficult and unable to provide timely rescue. Summary of the invention
[0003] The purpose of this application is to provide a construction site personnel safety emergency guarantee system and its operation method, which can realize the safety management of on-site personnel and further realize timely rescue and relief.
[0004] To achieve the above objectives, this application provides the following solutions:
[0005] The present application provides a construction site personnel safety emergency guarantee system and its operation method. The construction site personnel safety emergency guarantee system includes: hardware and software; the hardware includes: intelligent terminal devices for entry and exit channels, user smartphone devices, smart TV devices at the monitoring end and cloud servers; the software includes: a personnel safety emergency guarantee platform, a smartphone APP, an entry and exit smart terminal APP and a smart TV terminal APP; the personnel safety emergency guarantee platform is deployed on the cloud server, the smartphone APP is deployed on the user smartphone device, the entry and exit smart terminal APP is deployed on the entry and exit channel smart terminal device, and the smart TV terminal APP is deployed on the monitoring end smart TV device; the entry and exit channel smart terminal devices, the user smartphone devices and the monitoring end smart TV devices are all connected to the cloud server.
[0006] The entry and exit channel intelligent terminal equipment includes: an entry intelligent terminal, an entry behavior confirmation device, an exit intelligent terminal and an exit behavior confirmation device; the entry intelligent terminal is arranged on the outside of the gate of the entry channel of the construction site, the exit intelligent terminal is arranged on the inside of the gate of the exit channel of the construction site, the entry behavior confirmation device is arranged at the end of the entrance direction of the entry channel, and the exit behavior confirmation device is arranged at the end of the exit direction of the exit channel; the entry intelligent terminal is connected to the control end of the gate lock of the gate of the entry channel of the construction site, the entry behavior confirmation device is connected to the entry intelligent terminal, and the entry behavior confirmation device is used to detect whether the construction personnel enter the construction site through the entry channel; the exit intelligent terminal is connected to the control end of the gate lock of the gate of the exit channel of the construction site, the exit behavior confirmation device is connected to the exit intelligent terminal, and the exit behavior confirmation device is used to detect whether the construction personnel enter the construction site through the entry channel; the exit intelligent terminal is connected to the control end of the gate lock of the gate of the exit channel of the construction site, the exit behavior confirmation device is connected to the exit intelligent terminal, and the exit behavior confirmation device is used to detect whether the construction personnel enter the construction site through the entry channel Detect whether the construction personnel leave the construction site through the exit channel; the entry intelligent terminal and the exit intelligent terminal are both connected to the cloud server; the entry intelligent terminal is used to obtain the identity information of the construction personnel and perform verification. When the verification is passed, the gate lock of the gate of the entry channel is controlled to be opened, and when the first feedback signal of the construction personnel entering the construction site through the entry channel detected by the entry behavior confirmation device is received, the gate lock of the gate of the entry channel is controlled to be closed, and the identity information of the construction personnel and the first feedback signal are sent to the cloud server; the exit intelligent terminal is used to obtain the identity information of the construction personnel and perform verification. When the verification is passed, the gate lock of the gate of the exit channel is controlled to be opened, and when the second feedback signal of the construction personnel entering the construction site through the exit channel detected by the exit behavior confirmation device is received, the gate lock of the gate of the exit channel is controlled to be closed, and the identity information of the construction personnel and the second feedback signal are sent to the cloud server.
[0007] Optionally, the entry and exit channel smart terminal device also includes: an entry code scanning device and an exit code scanning device, the entry code scanning device is connected to the entry smart terminal, and the exit code scanning device is connected to the exit smart terminal; the entry code scanning device and the exit code scanning device are used to scan and obtain the entry and exit QR codes of the construction personnel's user smart phone devices.
[0008] Optionally, the cloud server is used to send a positioning start instruction to the user smartphone device of the construction worker corresponding to the construction worker's identity information after receiving the construction worker's identity information and the first feedback signal sent by the entry smart terminal, activate the one-key help button of the construction worker's user smartphone device, and perform real-time positioning and trajectory tracking of all construction workers on the construction site; after receiving the trigger signal of the one-key help button of the construction worker's user smartphone device, an emergency plan is generated, and the emergency plan and the location of the rescuer are sent to the user smartphone device of the executor in the emergency plan; the executors include rescue personnel and management personnel at the construction site, and the rescuer is the construction worker who triggered the one-key help button of the user smartphone device; the cloud server is also used to send a positioning close instruction to the user smartphone device of the construction worker corresponding to the construction worker's identity information after receiving the construction worker's identity information and the second feedback signal sent by the exit smart terminal, and close the construction worker's The one-key call for help button on the user smartphone device of the worker; the user smartphone device of the construction worker is used for the construction worker to interact with the cloud server, and the construction worker is located in real time when the positioning start instruction is received; the user smartphone device of the executor is provided with a one-key clearing button; the cloud server is also used to generate a notification text after receiving the trigger signal of the one-key clearing button, and send the notification text to the user smartphone devices of all construction workers on the construction site to notify the construction workers to leave the site; the cloud server is also used to monitor the location of each construction worker after sending the notification text, initiate a telephone notification to the construction worker whose location has not changed, determine the construction worker who has not answered the call as the injured person to be rescued, determine the rescue plan according to the location of the injured person to be rescued, and send the rescue plan and the location of the injured person to the user smartphone device of the executor in the rescue plan; the smart TV device on the monitoring end is used to display the real-time location and movement trajectory of all personnel on the construction site through an electronic map.
[0009] Optionally, the method of generating an emergency plan includes: determining the accident location and the required number of rescue personnel based on the number and position distribution of construction workers who trigger the one-touch rescue button; determining the required number of rescue personnel whose construction site is closer to the accident location based on the positions of each rescue personnel at the construction site and the accident location, and adding them to the emergency plan; determining at least one manager whose construction site is closer to the accident location based on the positions of each manager at the construction site and the accident location, and adding him to the emergency plan; adding the accident location to the emergency plan.
[0010] Optionally, after receiving the trigger signal of the one-key clearing button, the notification text is generated in the following manner: determine the accident location and accident type based on the number of executors who trigger the one-key clearing button, their position distribution and the voice information in the trigger signal; obtain the construction site conditions within a preset range centered on the accident location based on the accident location; use a trained situation prediction model to predict the accident situation within a preset time period in the future based on the accident location, accident type and construction site conditions; the situation prediction model is obtained based on long-short-term memory model training; formulate an evacuation route based on the accident location, accident type and accident situation within a preset time period in the future; and generate a notification document including the accident location, accident type and evacuation route.
[0011] Optionally, the method of obtaining the identity information of the construction workers is: obtaining the identity information of the construction workers by face recognition, or obtaining the identity information of the construction workers by entry and exit QR code recognition; the identity information of the construction workers includes registration information, ID card information and face information.
[0012] The entry and exit QR code is generated in the following manner: when the user smartphone device of the construction worker receives the SMS invitation sent by the user smartphone device of the labor manager, the construction worker downloads the smartphone APP according to the link in the SMS invitation, completes the account registration in the smartphone APP, and sends the registration information to the cloud server; when the construction worker enters the construction site for the first time, the entry smart terminal collects the ID card information and facial information of the construction worker, and sends the ID card information and facial information to the cloud server; the cloud server generates the entry and exit QR code based on the registration information, the ID card information and the facial information, and sends the entry and exit QR code to the user smartphone device of the construction worker.
[0013] Optionally, the personnel safety emergency support platform includes: a management module, a device management module, a data acquisition module, a warning notification module, a project management module, a statistics module and a system setting module; the management module is used to manage user identities and permissions, and the users include at least construction personnel; the device management module is used to add the entry and exit channel intelligent terminal device to the personnel safety emergency support platform, and establish an association relationship with the project information in the project management module; the data acquisition module is used to receive information of each entry and exit channel intelligent terminal device at the construction site; the warning notification module is used to generate and push warning information; the warning information is information generated based on the trigger signal of the one-key help button of the user's smart phone device of the construction personnel; the project management module is used to manage the construction project information and the electronic fence of the construction site; the statistics module is used to analyze and count the information sent by the various entry and exit channel intelligent terminal devices at the construction site and the information of the rescue personnel, and display the analyzed and statistical data on the monitoring end smart TV device through the smart TV terminal APP; the system setting module is used to manage the management module, data acquisition module, warning notification module, project management module and statistics module.
[0014] Optionally, the project management module includes a project management submodule and an electronic fence management submodule; the project management submodule is used for creating and managing construction project information; the electronic fence management submodule is used for creating and managing electronic fences based on actual fences at the construction site; the electronic fence includes: a primary fence, a secondary fence and a tertiary fence; the primary fence corresponds to the outermost physical protection fence at the construction site; the primary fence is provided with a mark for an intelligent terminal device for entry and exit channels; the secondary fence corresponds to the physical fence of sub-areas that are solely responsible for different construction units within the construction site; the tertiary fence is an electronic fence that represents the management area within the sub-areas that are solely responsible for different construction units.
[0015] In a second aspect, the present application provides an operation method of the above-mentioned construction site personnel safety emergency guarantee system, the operation method comprising:
[0016] S1: Deploy intelligent entry and exit terminal devices at the personnel entrances and exits of the construction site.
[0017] S2: Site managers and construction workers download and install the smartphone APP on the user's smartphone device.
[0018] S3: The site manager creates a project in the personnel safety emergency support platform.
[0019] S4: The site manager creates the project site electronic fence in the project information.
[0020] S5: The site manager will add the deployed entry and exit channel intelligent terminal equipment to the current project.
[0021] S6: The site management personnel will add labor personnel and construction personnel to the current project.
[0022] S7: Construction workers use smartphone APP to display their personal entry and exit QR code, interact with the smart terminal device of the entry and exit channel, and scan the code to enter.
[0023] S8: After the smart terminal device at the entry and exit channel interacts with the smartphone APP for the personal entry and exit QR code, the cloud server sends a command to turn on the positioning function of the user's smartphone device and activate the one-click rescue function in the smartphone APP.
[0024] According to the specific embodiments provided in this application, this application discloses the following technical effects:
[0025] The present application provides a construction site personnel safety emergency guarantee system, the construction site personnel safety emergency guarantee system includes: hardware and software; the hardware includes: access channel intelligent terminal equipment, user smart phone equipment, monitoring end smart TV equipment and cloud server; the software includes: personnel safety emergency guarantee platform, smart phone APP, access channel intelligent terminal APP and smart TV terminal APP; the personnel safety emergency guarantee platform is deployed on the cloud server, the smart phone APP is deployed on the user smart phone device, the access channel intelligent terminal APP is deployed on the access channel intelligent terminal equipment, and the smart TV terminal APP is deployed on the monitoring end smart TV equipment; the access channel intelligent terminal equipment, the user smart phone equipment and the monitoring end smart TV equipment are all connected to the cloud server. The present application realizes the safety management of construction site personnel by combining software and hardware, thereby realizing timely rescue and relief. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0027] Figure 1 A structural diagram of a construction site personnel safety emergency support system provided in accordance with one embodiment of the present application.
[0028] Figure 2 A schematic diagram of the connection relationship between a smart terminal and a scanning device provided in one embodiment of the present application. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0030] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0031] like Figure 1 As shown, an embodiment of the present invention discloses a construction site personnel safety emergency protection system, and the construction site personnel safety emergency protection system includes: hardware and software; the hardware includes: entry and exit channel intelligent terminal equipment, user smart phone equipment, monitoring end smart TV equipment and cloud server; the software includes: personnel safety emergency protection platform, smart phone APP, entry and exit intelligent terminal APP and smart TV terminal APP; the personnel safety emergency protection platform is deployed on the cloud server, the smart phone APP is deployed on the user smart phone device, the entry and exit intelligent terminal APP is deployed on the entry and exit channel intelligent terminal equipment, and the smart TV terminal APP is deployed on the monitoring end smart TV equipment; the entry and exit channel intelligent terminal equipment, the user smart phone equipment and the monitoring end smart TV equipment are all connected to the cloud server.
[0032] Wherein, the intelligent terminal equipment for the entry and exit channels includes: an entry intelligent terminal, an entry behavior confirmation device, an exit intelligent terminal and an exit behavior confirmation device; the entry intelligent terminal is arranged on the outside of the gate of the entry channel of the construction site, the exit intelligent terminal is arranged on the inside of the gate of the exit channel of the construction site, the entry behavior confirmation device is arranged at the end of the entrance direction of the entry channel, and the exit behavior confirmation device is arranged at the end of the exit direction of the exit channel; the entry intelligent terminal is connected to the control end of the gate lock of the gate of the entry channel of the construction site, the entry behavior confirmation device is connected to the entry intelligent terminal, and the entry behavior confirmation device is used to detect whether the construction personnel enter the construction site through the entry channel; the exit intelligent terminal is connected to the control end of the gate lock of the gate of the exit channel of the construction site, the exit behavior confirmation device is connected to the exit intelligent terminal, and the exit behavior confirmation device Used to detect whether the construction workers leave the construction site through the exit channel; the entry smart terminal and the exit smart terminal are both connected to the cloud server; the entry smart terminal is used to obtain the identity information of the construction workers and perform verification. When the verification is passed, the gate lock of the gate of the entry channel is controlled to be opened, and when the first feedback signal of the construction workers entering the construction site through the entry channel detected by the entry behavior confirmation device is received, the gate lock of the gate of the entry channel is controlled to be closed, and the identity information of the construction workers and the first feedback signal are sent to the cloud server; the exit smart terminal is used to obtain the identity information of the construction workers and perform verification. When the verification is passed, the gate lock of the gate of the exit channel is controlled to be opened, and when the second feedback signal of the construction workers entering the construction site through the exit channel detected by the exit behavior confirmation device is received, the gate lock of the gate of the exit channel is controlled to be closed, and the identity information of the construction workers and the second feedback signal are sent to the cloud server.
[0033] Furthermore, the cloud server is used to send a positioning start instruction to the user smartphone device of the construction worker corresponding to the construction worker's identity information after receiving the construction worker's identity information and the first feedback signal sent by the entry smart terminal, activate the one-key emergency button of the construction worker's user smartphone device, and perform real-time positioning and trajectory tracking of all construction workers on the construction site, and generate an emergency plan after receiving the trigger signal of the one-key emergency button of the construction worker's user smartphone device, and send the emergency plan and the location of the rescuer to the user smartphone device of the executor in the emergency plan; the executor includes rescue personnel and management personnel at the construction site, and the rescuer is the construction worker who triggered the one-key emergency button of the user smartphone device; the cloud server is also used to send a positioning close instruction to the user smartphone device of the construction worker corresponding to the construction worker's identity information after receiving the construction worker's identity information and the second feedback signal sent by the exit smart terminal, and close the one-key emergency button of the construction worker's user smartphone device.
[0034] The construction workers' user smartphone devices are used for interaction between the construction workers and the cloud server, and when the positioning start command is received, the construction workers are located in real time.
[0035] In this embodiment, after receiving the trigger signal of the one-touch help button of the user's smart phone device of the construction worker, an emergency plan can be generated to adapt to different rescue needs, with greater flexibility and adaptability. As a preferred implementation scheme, the method of generating an emergency plan includes: determining the accident location and the required number of rescuers according to the number and location distribution of the construction workers who triggered the one-touch help button; determining the required number of rescuers who are closer to the accident location at the construction site according to the location of each rescuer at the construction site and the accident location, and adding them to the emergency plan; determining at least one manager who is closer to the accident location at the construction site according to the location of each manager at the construction site and the accident location, and adding him to the emergency plan; adding the accident location to the emergency plan.
[0036] As a preferred implementation scheme, the user smartphone device of the executor is provided with a one-click clearing button; the cloud server is also used to generate a notification text after receiving the trigger signal of the one-click clearing button, and send the notification text to the user smartphone devices of all construction workers on the construction site to notify the construction workers to evacuate the site; the cloud server is also used to monitor the location of each construction worker after sending the notification text, initiate telephone notifications to construction workers whose locations have not changed, determine the construction workers who have not answered the phone as injured persons to be rescued, determine the rescue plan according to the location of the injured persons to be rescued, and send the rescue plan and the location of the injured persons to the user smartphone device of the executor in the rescue plan.
[0037] Exemplarily, when the trigger signal of the one-touch site clearance button is triggered by the executor after receiving the location of the person calling for help, the notification text includes the location of the dangerous situation so that the construction personnel can bypass the dangerous area when leaving the site to prevent secondary injuries.
[0038] The smart TV device on the monitoring end is used to display the real-time location and movement trajectory of all personnel on the construction site through an electronic map.
[0039] As a preferred implementation scheme, after receiving the trigger signal of the one-key clearing button, the notification text is generated in the following manner: the accident location and accident type are determined based on the number of executors who trigger the one-key clearing button, their position distribution and the voice information in the trigger signal; the construction site conditions within a preset range centered on the accident location are obtained based on the accident location; based on the accident location, the accident type and the construction site conditions, a trained situation prediction model is used to predict the accident situation within a preset time period in the future; the situation prediction model is obtained based on the long short-term memory model training; an evacuation route is formulated based on the accident location, the accident type and the accident situation within a preset time period in the future; and a notification document including the accident location, the accident type and the evacuation route is generated.
[0040] The steps of training the long-term and short-term memory model include: obtaining the historical accident location, accident type and construction site conditions (the construction site conditions can be represented by on-site pictures or described by text features, for example, describing the construction type, type and quantity of raw materials on site). The historical accident location, accident type and construction site conditions are used as input, and the accident diffusion range after a preset time period is used as output to construct training samples and train the long-term and short-term memory model. In the embodiment of the present invention, one type of accident can also be trained separately to obtain a situation prediction model corresponding to each type of accident. Then, when performing situation prediction, the model is first selected for the accident type, and prediction is performed based on the selected model.
[0041] The present invention sets a one-touch emergency button on the user's smart phone device of the construction workers and activates it when entering the construction site. The user's smart phone device is used as an auxiliary device, so that the construction workers can call for help in time when encountering or discovering danger. When the management personnel receive the distress signal, they can promptly issue an evacuation notice for the personnel on the site. Other construction workers can promptly avoid the dangerous area when leaving the site after receiving the evacuation notice. The rescue team can accurately locate the position of the injured or trapped person when receiving the distress signal, so as to carry out accurate rescue operations according to the emergency plan and improve the survival probability of the trapped people.
[0042] As a specific implementation method, the hardware involved in the embodiment of the present invention also includes: a gate, a communication box, and a code scanning device.
[0043] For example, the gate includes three-roll gate, wing gate, swing gate, full-height rolling gate and other types, which are used to control the entry and exit of personnel at the construction site, and have functions such as anti-tailgating and anti-collision. It can be set separately in the entrance channel and exit channel, or it can be shared by the entrance channel and exit channel.
[0044] The communication box is used to realize the two-end mutual communication of each device in the intelligent terminal device of the entry and exit channel, that is, to realize the connection between the gate motor lock (i.e., gate lock), the intelligent terminal (in the embodiment of the present application, the intelligent terminal is the abbreviation of the entry intelligent terminal and / or the exit intelligent terminal), and the infrared sensing switch (in the embodiment of the present application, the infrared sensing switch is selected as the entry behavior confirmation device and the exit behavior confirmation device), to realize the mutual cooperation between the three different hardware and ensure the signal reception of the infrared sensing switch.
[0045] Scanning device: used to expand the QR code scanning function of smart terminals. The scanning device can be connected to the smart terminal using a hardware interface (such as a USB interface). Figure 2 As shown, at this time, the code scanning device can be inserted into the USB interface through the embedded QR code scanner plug, and the code scanning device and the smart terminal can also be connected using the Internet of Things, which is not limited here. In this embodiment, the model of the smart terminal is ZD-F0802A or ZD-F0802B, and smart terminals with other signals can also be selected, which is not limited here. In the embodiment of the present application, the code scanning device includes an entry code scanning device and an exit code scanning device, the entry code scanning device is connected to the entry smart terminal, and the exit code scanning device is connected to the exit smart terminal; the entry code scanning device and the exit code scanning device are used to scan and obtain the entry and exit QR codes of the user's smart phone device of the construction personnel.
[0046] Furthermore, the entry smart terminal and exit smart terminal in the embodiment of the present application are smart terminals based on the Android kernel, integrating modules such as face recognition and QR code recognition, and are used to read and record the identity information of people entering and leaving.
[0047] Furthermore, the entry and exit behavior confirmation device in the embodiment of the present application (in the embodiment of the present application, the entry and exit behavior confirmation device is the abbreviation of the entry behavior confirmation device and the exit behavior confirmation device) adopts an infrared sensing switch, which is installed at the end of the gate to detect the actions of people when passing through the gate, triggering the smart terminal to interact with the cloud server, and completing data recording and command issuance.
[0048] Furthermore, the monitoring-end smart TV device in the embodiment of the present application is installed in a conference room or monitoring center as a supporting monitoring display device. The specific location of people in the venue and basic information in the venue can be obtained in real time through the monitoring large screen.
[0049] Furthermore, the cloud server in the embodiment of the present application is used to store, process and analyze data from smart terminals, and provide functions such as personnel positioning, trajectory tracking, and data analysis.
[0050] Furthermore, the entry and exit smart terminal APP in the embodiment of the present application is installed on the entry and exit channel smart terminal device, providing a user interface to facilitate management personnel to perform equipment settings, data viewing and other operations.
[0051] Furthermore, the smartphone APP in the embodiment of the present application is installed on the user's smartphone device of the construction worker, providing functions such as personal information viewing and emergency assistance.
[0052] Furthermore, the smart TV terminal APP in the embodiment of the present application is installed on the monitoring center TV (i.e., the monitoring end smart TV device) to view the site personnel location information and personnel safety emergency management related data. Exemplarily, the monitoring center TV is a TV device based on the Android bottom layer.
[0053] The principle of implementing the system of the embodiment of the present invention based on the above hardware and software is as follows.
[0054] Before entering the barrier, construction workers open the smartphone APP in advance and display their personal entry and exit QR code.
[0055] The intelligent entry terminal reads the identity information of construction workers through facial recognition or QR code recognition, and verifies it with the cloud server. After approval, it issues a channel opening instruction.
[0056] When the channel is opened, the gate lock of the entrance channel is unlocked and people are waiting to pass through. The infrared sensor switch at the end of the entrance channel senses the passing of people, feeds back instructions to the smart terminal, and closes the gate lock.
[0057] The intelligent entry terminal responds to the command of the infrared sensor switch and interacts with the cloud server. The cloud server sends a positioning start command to the person's smartphone APP and activates the one-key emergency button in the APP to standby mode.
[0058] At this time, the cloud server continuously receives real-time location information uploaded by the smartphone APP, realizing personnel safety emergency response functions such as personnel positioning, trajectory tracking, one-click help, and emergency rescue.
[0059] In the event of a safety accident, construction workers can trigger rescue instructions through the one-touch SOS button on the smartphone APP.
[0060] Managers can check the location and number of personnel through smartphone apps and formulate precise rescue plans.
[0061] Exemplarily, in the embodiment of the present invention, an Alibaba Cloud server is constructed as a cloud server, and a personnel safety emergency protection platform is deployed in the cloud server, wherein the personnel safety emergency protection platform includes the following functional modules.
[0062] 1.1. Management module, including: user management submodule and authority management submodule.
[0063] The user management submodule includes: employee real-name information unit, user authority allocation unit, user grouping unit, and user login / logout unit.
[0064] The permission management submodule includes: role permission setting unit, permission review unit, and permission change recording unit.
[0065] 1.2. The equipment management module is used to add the intelligent terminal equipment of the entry and exit channel to the personnel safety emergency support platform and establish an association relationship with the project information in the project management module.
[0066] 1.3. Data acquisition module, used to receive information from intelligent terminal devices at each entrance and exit channel of the construction site, including: hardware device access submodule, equipment configuration submodule, equipment status monitoring submodule and data transmission submodule.
[0067] 1.4. Early warning notification module, used for generating and pushing early warning information; the early warning information includes early warning information generated based on the trigger signal of the one-key emergency button of the user's smart phone device of the construction personnel, including: early warning rule setting submodule, early warning message push submodule, and early warning feedback processing submodule.
[0068] 1.5. Project management module, used for managing construction project information and electronic fences at construction sites, including: project information management submodule and electronic fence management submodule.
[0069] The project information management submodule includes: project creation and editing unit, emergency rescue creation and editing unit, and historical project data unit.
[0070] The electronic fence management submodule includes: a fence division unit, a fence area management unit, and a fence alarm unit.
[0071] 1.6. The statistical module is used to analyze and count the information sent by the smart terminal devices at each entrance and exit channel of the construction site and the information of the rescue personnel, and display the analyzed and statistical data on the smart TV device at the monitoring end through the smart TV terminal APP, including: trend analysis submodule, comparative analysis submodule and visual display submodule.
[0072] 1.7. System setting module, used for managing the management module, data collection module, early warning notification module, project management module and statistical module, including: system parameter configuration submodule and system maintenance and upgrade submodule.
[0073] Among them, the system parameter configuration submodule includes: basic parameter setting unit, warning threshold setting unit, and system log management unit.
[0074] The system maintenance and upgrade submodule includes: system backup unit, system recovery unit, and software version update unit.
[0075] In the project management module, create the basic information of the current project; after the project is created, enter the electronic fence management submodule, and according to the actual situation of the fence design at the construction site, use the map function contained in the electronic fence management submodule to manually mark the scope of the electronic fence at the construction site; click a starting point on the map, and then click in sequence according to the scope of the outer fence of the construction site. The map tool starts to connect the lines according to the starting point until the end point coincides with the starting point to form an encirclement, completing the creation of the first-level fence in the electronic fence; after the first-level fence is created, the color of the area surface and outer line of this area can be adjusted, as well as text notes; further create second-level and third-level fences within the first-level fence, and the creation method is the same as the creation method of the first-level fence.
[0076] Exemplarily, in an embodiment of the present invention, a physical protection fence is set up at the outermost part of the entire construction site and marked as a primary fence. The construction inside the fence is divided according to the construction area, and each sub-fence is set up for the sub-area that different construction units are responsible for separately, and marked as a secondary fence. The living area for construction personnel is enclosed on the periphery of the primary fence, and 8 groups of intelligent terminal devices for entry and exit channels are set up at the entrances and exits of the living area. The devices all use face recognition to enter and exit; the primary fence is set up with multiple entrances and exits in different directions according to the site planning requirements, and more than 3 groups of intelligent terminal devices for entry and exit channels are set up at the multiple entrances and exits. The devices all use the entry and exit QR code recognition method to enter and face recognition to exit. Deploy the secondary fence in the same way as the primary fence. Divide the construction sites into management areas: production area, temporary material storage area, safety area, etc. These separate management areas are marked as tertiary fences. For the convenience of management, the tertiary fences do not have separate physical fences, but are managed only by drawing lines or placing isolation objects. The tertiary fences do not have independent smart terminal devices for entry and exit channels, but can be managed through the platform's electronic fences. After the physical fence of the construction site is set, the electronic fence can be adjusted according to the site conditions until the scope of the electronic fence is consistent with the setting of the construction site.
[0077] In the embodiment of the present invention, all the equipment on site uses the wireless device of the Internet of Things to connect all the sensors to the Internet and connect to the cloud server through the Internet. After the deployment of the intelligent terminal equipment of the access channel is completed, it is connected to the cloud server, and the intelligent terminal equipment of the access channel can be added to the current project; when adding the project, it is necessary to fill in the following: equipment number, equipment name, equipment deployment coordinates according to actual requirements; after successfully joining the project, the electronic fence, electronic fence sub-area of the current construction site, and the working status of each intelligent terminal equipment of the access channel can be clearly displayed in the project map in the visualization display module (in the embodiment of the present application, the intelligent TV device at the monitoring end uses the monitoring large screen as the visualization display module).
[0078] When construction workers enter the site for the first time, they need to perform real-name authentication through the smart entry terminal, then open the entry and exit QR code in the smartphone APP and scan the code to enter, which specifically includes the following steps S2.1-S2.5.
[0079] S2.1. After the construction company confirms the cooperative construction party, it invites the construction company's labor manager to join the platform cooperation project through text messages in the smartphone APP; the labor manager completes the account registration through the mobile phone number and authenticates the current company information to complete the account joining the project process.
[0080] S2.2. In the smartphone APP, the labor administrator uses the construction worker invitation module in the smartphone APP to invite construction workers who need to enter the site for the current construction project to the current project, and sets basic information such as the type of work corresponding to each construction worker.
[0081] S2.3. After receiving the SMS invitation on the user's smartphone device, the invited construction worker clicks on the link in the SMS to download the smartphone APP to complete the account registration and automatically enters the construction project. At this time, an identity identification code can be generated.
[0082] Advantages: The combination of software and hardware can help managers invite construction personnel to join the project in a convenient way anytime and anywhere. The advantage of anytime and anywhere is that there is no need for personnel to be present in person. Only text messages can be used to allow qualified personnel to join the project. During the process of joining the project, the identity can be confirmed by comparing the person with the ID card.
[0083] Current situation: Management personnel are required to lead construction personnel to the project site to queue up and register to join the project. Complex operations such as taking photos, filling out forms, and entering basic personnel information are also required.
[0084] S2.4. Construction workers go to the construction site with their ID cards and enter the entrance channel in turn. The smart entrance terminal on the three-wheel gate (or full-height gate) of the entrance channel and the ID code of the construction worker's user smartphone device will verify whether the construction worker is the current project worker. After confirming the identity, the ID card information of the construction worker entering the site for the first time will be collected, and they will be allowed to pass after completing the facial recognition authentication; workers who are not entering the site for the first time will be released directly.
[0085] Advantages: All intelligent terminal devices for entry and exit channels can be used in conjunction with users' smartphones to complete the entire process of identity registration, real-name authentication, face recognition, and face information collection. No professional cooperation is required. Construction personnel can operate independently according to the voice prompts of the entry intelligent terminal. Multiple sets of equipment on site can be used simultaneously, solving the queuing problem caused by a single device for collection in the traditional mode. Temporary entrants can enter the venue independently.
[0086] Current situation: At present, construction workers need to be led by labor personnel to the office work area of the general contractor's project site before they can enter the site. A device will input the identity information and complete the employee's real name, and then input the face. The whole process is long and cumbersome. Construction workers frequently enter and exit the site, and the personnel are mixed. Real-name authentication and record keeping require the cooperation of a professional. Often, one or two people cannot enter the site directly, and a certain number of people need to gather to log in uniformly.
[0087] S2.5. An infrared sensor is installed at the end of the entrance channel. After the infrared sensor confirms that the current construction worker has passed, it notifies the cloud server to send a positioning activation command to activate the positioning function of the construction worker's smartphone APP; at this time, the specific location information of the construction worker in the venue is uploaded.
[0088] Advantages: A sensor device is set at the end of the channel, which can be activated after the identity verification of the personnel is successful. When the sensor device senses the person passing through, the cloud server will record the accurate record of the person's entry, eliminating the situation where the face recognition is successful but the person fails to enter. When the construction personnel enter the site effectively, the positioning function of the smartphone APP is activated, and the location trajectory of the construction personnel can be tracked without the need for external devices.
[0089] Current situation: At present, the site management only uses face recognition for entry. After the face recognition is successful, the site equipment considers that the person has entered the site, but it is not certain whether the person has left after the face recognition. In addition, when locating construction workers by face recognition, they need to use peripherals: wearable positioning bracelets and positioning safety helmets to locate and track the construction workers. These devices are expensive and difficult to maintain. At the same time, such peripherals may be used interchangeably, and the positioning is often successful but the basic information of the construction workers is inaccurate.
[0090] S2.6. The smart TV device at the monitoring end uses a large monitoring screen as a visual display module. In the electronic fence map displayed, the specific location information of the construction workers and the historical trajectory of their activities are displayed on the map in the form of bubbles with their head portraits. These location information are counted by the cloud server to obtain statistical information including: the current number of people on site, the number of people entering the site today, the number of people in the project, the distribution of work types, the list of people on site for the longest time, the trend of the cumulative number of people in the project, etc.
[0091] Advantages: The monitoring screen is uniformly equipped in the form of modules, and only the intelligent terminal equipment of the entry and exit channels is used to activate the positioning of the construction personnel's smartphone APP. The monitoring screen can be used for projects of all sizes. Its biggest advantage is that the management personnel can intuitively see all kinds of real-time data and personnel status at the construction site through the monitoring screen.
[0092] Current situation: At present, there is no large monitoring screen in the construction site management. The large monitoring screen is often expensive. When a small-cost and low-scale construction site needs such a large monitoring screen to display some real-time data of the construction site, there is no additional funds to develop and use it.
[0093] When an accident occurs at the construction site, construction workers or administrators can use the following functions of the smartphone APP: one-click rescue, one-click site clearance notification, personnel trajectory tracking, electronic emergency plan execution and other personnel safety emergency protection functions. For details, see 3.1-3.3.
[0094] 3.1. The role of one-button help and electronic emergency plan: To use this function, you need to install a smartphone APP on the user's smartphone device. When the positioning function of the smartphone APP is activated, the one-button help button is activated from the original prohibited state to the standby state. When construction workers encounter or discover danger, they can click this button. After receiving the trigger signal of the button, the cloud server can automatically generate an emergency plan based on the number and location distribution of construction workers who triggered the one-button help button. You can also select based on the pre-selected emergency plan. At this time, the cloud server gives several danger options preset by the system, such as: fire, individual trapped, group trapped, etc.; each danger category corresponds to a set of electronic emergency plans, but this method is less flexible and adaptable than the aforementioned method of automatically generating emergency plans.
[0095] After the emergency plan is generated or selected, the cloud server executes the emergency plan and notifies all relevant personnel of the emergency plan of the rescue signal of the person in need of help through three methods: message push on the smartphone APP, text message, and phone call. The emergency plan is also pushed, texted, and played to the recipient in accordance with the preset content of the emergency plan. The recipient executes the corresponding rescue measures according to the corresponding emergency plan.
[0096] 3.2. The role of the one-click clearing button in an accident: When a dangerous situation occurs on the site, the manager or the executor of the emergency plan can use this function to quickly and conveniently notify all construction workers on the site to leave quickly. The system automatically determines whether anyone in the current site has clicked the help button. If so, the manager clicks the one-click clearing button, and the system automatically generates a set of notification texts according to the type of dangerous situation triggered to inform all construction workers to leave the site. At the same time, after receiving this notification, the construction workers can view the specific location of the current dangerous situation and bypass this dangerous area when leaving the site to prevent secondary injuries. If there is no SOS button in the venue and the manager clicks on one-click to clear the venue, only a general evacuation notice will be generated, and the specific location of the danger will not be displayed on the map of the smart TV terminal APP; when the location information of the construction worker does not change after receiving the clearance notice, the system determines that the construction worker may be in a state of not receiving the notification. At this time, the system initiates a telephone notification, inquiring about the safety status of the construction worker, and asking the construction worker to execute the clearance operation; if no one answers the telephone inquiry, the management personnel will be notified whether to list the construction worker as an injured person to be rescued, and the system background will mark the location information of this construction worker; when the safe and uninjured construction personnel execute the evacuation and leave the venue normally through the entry and exit channel, the exit smart terminal on the channel will send the information of the exit personnel to the cloud server, and the cloud server will turn off the positioning function of the construction personnel's user smartphone device; and update the list of people on site. At this time, the people left out of the venue are the trapped people.
[0097] 3.3. The decision-making role of the monitoring center TV (i.e., the smart TV device at the monitoring end) in accidents: When a dangerous situation occurs on site, the TV in the monitoring center will flash repeatedly in a striking red color, and display the specific location, name, phone number, and subcontractor or general contractor of the current distress signal in the center of the TV; and display the type of the current distress signal: fire, individual trapped, group trapped, etc.; when the manager initiates a one-click site clearance notice, the movement trajectory of all construction personnel can be seen on the monitoring center TV, and the execution status of the site clearance and evacuation notice can be checked in real time; every time a construction worker leaves the site safely, the list of on-site personnel is reduced by one, and after the final site clearance and evacuation work is completed, the remaining personnel in the site are all trapped persons; through the data displayed on the monitoring center TV.
[0098] According to the specific embodiments provided in this application, this application discloses the following technical effects.
[0099] Low cost: Compared with smart helmets, positioning bracelets and other equipment, the present invention has lower cost and is easier to popularize.
[0100] Easy to use: Construction workers only need to install the smartphone APP on their smartphones and use the smartphone APP to show the entry and exit QR code and interact with the barrier to complete identity recognition, data recording, entry positioning, emergency rescue and other functions without carrying additional equipment.
[0101] Easy to maintain: Users and managers do not need to perform routine maintenance and upkeep on additional hardware.
[0102] Easy to manage: Managers can use the intelligent terminal devices at the entry and exit channels to perform equipment settings, data viewing and other operations, which is convenient and efficient.
[0103] The embodiment of the present application also provides an operation method of the above-mentioned construction site personnel safety emergency guarantee system, and the operation method includes the following steps S1-S8.
[0104] S1: Deploy intelligent entry and exit terminal devices at the personnel entrances and exits of the construction site.
[0105] S2: Site managers and construction workers download and install the smartphone APP on the user's smartphone device.
[0106] S3: The site manager creates a project in the personnel safety emergency support platform.
[0107] S4: The site manager creates the project site electronic fence in the project information.
[0108] S5: The site manager will add the deployed entry and exit channel intelligent terminal equipment to the current project.
[0109] S6: The site management personnel will add labor personnel and construction personnel to the current project.
[0110] S7: Construction workers use smartphone APP to display their personal entry and exit QR code, interact with the smart terminal device of the entry and exit channel, and scan the code to enter.
[0111] S8: After the smart terminal device at the entry and exit channel interacts with the smartphone APP for the personal entry and exit QR code, the cloud server sends a command to turn on the positioning function of the user's smartphone device and activate the one-click rescue function in the smartphone APP.
[0112] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0113] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A construction site personnel safety emergency guarantee system, characterized in that: The construction site personnel safety emergency guarantee system includes: hardware and software; The hardware includes: intelligent terminal devices for entry and exit channels, user smartphones, monitoring smart TV devices and cloud servers; The software includes: personnel safety emergency support platform, smartphone APP, entry and exit smart terminal APP and smart TV terminal APP; The personnel safety emergency support platform is deployed on the cloud server, the smartphone APP is deployed on the user's smartphone device, the entry and exit smart terminal APP is deployed on the entry and exit channel smart terminal device, and the smart TV terminal APP is deployed on the monitoring end smart TV device; The smart terminal devices at the entrance and exit channels, the user's smartphone devices and the smart TV devices at the monitoring end are all connected to the cloud server; The entry and exit channel intelligent terminal equipment includes: an entry intelligent terminal, an entry behavior confirmation device, an exit intelligent terminal and an exit behavior confirmation device; The entry intelligent terminal is arranged on the outside of the gate of the entry passage of the construction site, the exit intelligent terminal is arranged on the inside of the gate of the exit passage of the construction site, the entry behavior confirmation device is arranged at the end of the entrance direction of the entry passage, and the exit behavior confirmation device is arranged at the end of the exit direction of the exit passage; The entry intelligent terminal is connected to the control end of the gate lock of the gate of the entrance passage of the construction site, and the entry behavior confirmation device is connected to the entry intelligent terminal. The entry behavior confirmation device is used to detect whether the construction personnel enter the construction site through the entrance passage; The exit intelligent terminal is connected to the control end of the gate lock of the exit passage of the construction site, and the exit behavior confirmation device is connected to the exit intelligent terminal, and the exit behavior confirmation device is used to detect whether the construction personnel leave the construction site through the exit passage; The entry smart terminal and the exit smart terminal are both connected to the cloud server; The entry intelligent terminal is used to obtain the identity information of the construction personnel, perform verification, and control the gate lock of the gate of the entry channel to open when the verification is passed. After receiving the first feedback signal detected by the entry behavior confirmation device that the construction personnel have entered the construction site through the entry channel, the gate lock of the gate of the entry channel is controlled to close, and the identity information of the construction personnel and the first feedback signal are sent to the cloud server; The exit smart terminal is used to obtain the identity information of the construction personnel, perform verification, and control the gate lock of the gate of the exit passage to open when the verification is passed. When receiving the second feedback signal detected by the exit behavior confirmation device that the construction personnel enter the construction site through the exit passage, the gate lock of the gate of the exit passage is controlled to close, and the identity information of the construction personnel and the second feedback signal are sent to the cloud server; The cloud server is used to send a positioning start instruction to the user smart phone device of the construction worker corresponding to the construction worker's identity information after receiving the construction worker's identity information and the first feedback signal sent by the entry smart terminal, activate the one-key help button of the user smart phone device of the construction worker, and perform real-time positioning and trajectory tracking of all construction workers on the construction site. After receiving the trigger signal of the one-key help button of the user smart phone device of the construction worker, an emergency plan is generated, and the emergency plan and the location of the person seeking help are sent to the user smart phone device of the executor in the emergency plan; the executor includes the rescue personnel and management personnel on the construction site, and the person seeking help is the construction worker who triggered the one-key help button of the user smart phone device; The cloud server is also used to send a positioning shutdown instruction to the user smart phone device of the construction worker corresponding to the construction worker identity information after receiving the construction worker identity information and the second feedback signal sent by the exit smart terminal, and turn off the one-key emergency button of the user smart phone device of the construction worker; The construction workers' user smartphones are used to interact with the cloud server and locate the construction workers in real time when receiving the positioning start command; The executive's user smartphone device is equipped with a one-touch clear button; The cloud server is also used to generate a notification text after receiving a trigger signal from the one-key clearing button, and send the notification text to the user smartphones of all construction workers at the construction site to notify the construction workers to leave the site; The cloud server is also used to monitor the location of each construction worker after sending the notification text, initiate a phone notification to the construction workers whose locations have not changed, identify the construction workers who have not answered the phone as injured persons to be rescued, determine a rescue plan based on the location of the injured persons to be rescued, and send the rescue plan and the location of the injured persons to the user's smartphone device of the person who executes the rescue plan; The smart TV device at the monitoring end is used to display the real-time location and movement trajectory of all personnel at the construction site through an electronic map; Ways to generate emergency plans include: Determine the accident location and the number of rescue workers required based on the number and location distribution of construction workers who triggered the one-touch rescue button; According to the positions of the rescuers at the construction site and the accident location, determine the required number of rescuers at the construction site that is closer to the accident location, and add them to the emergency plan; According to the positions of various managers at the construction site and the accident location, determining at least one manager at the construction site that is closer to the accident location, and adding the manager to the emergency plan; Add the accident location to the emergency plan; After receiving the trigger signal of the one-key clear button, the method of generating the notification text is as follows: Determine the accident location and type based on the number and location distribution of personnel who triggered the one-touch clearing button and the voice information in the trigger signal; According to the accident location, obtain the construction site conditions within a preset range centered on the accident location; According to the accident location, accident type and construction site conditions, the trained situation prediction model is used to predict the accident situation within a preset time period in the future; the situation prediction model is obtained based on the long short-term memory model training; Develop an evacuation route based on the accident location, accident type, and accident situation within a preset time period in the future; Generate notification documents including accident location, accident type and evacuation route; The personnel safety emergency support platform includes: a management module, an equipment management module, a data acquisition module, an early warning notification module, a project management module, a statistics module and a system setting module; The management module is used for managing user identities and permissions, and the users at least include construction personnel; The equipment management module is used to add the intelligent terminal equipment of the access channel to the personnel safety emergency support platform, and establish an association relationship with the project information in the project management module; The data acquisition module is used to receive information from intelligent terminal devices at each entry and exit channel of the construction site; The warning notification module is used to generate and push warning information; the warning information is information generated based on a trigger signal of a one-touch emergency button on a user's smartphone device of a construction worker; The project management module is used to manage the construction project information and the electronic fence of the construction site; The statistical module is used to analyze and count the information sent by the smart terminal devices at each entrance and exit channel of the construction site and the information of the rescue personnel, and display the analyzed and statistical data on the smart TV device at the monitoring end through the smart TV terminal APP; The system setting module is used to manage the management module, data acquisition module, early warning notification module, project management module and statistics module; The monitoring screen serves as a visual display module, which displays the specific location information of the construction workers on their electronic map, as well as the historical trajectory of their activities. After other related information is counted by the cloud server, the monitoring screen also displays the current number of people on site, the number of people entering the site today, the number of people in the project, the distribution of work types, the list of people on site for the longest time, and the trend of the cumulative number of people in the project.
2. The construction site personnel safety emergency guarantee system according to claim 1, characterized in that: The entry and exit channel intelligent terminal device also includes: an entry code scanning device and an exit code scanning device, the entry code scanning device is connected to the entry intelligent terminal, and the exit code scanning device is connected to the exit intelligent terminal; The entry code scanning device and the exit code scanning device are used to scan and obtain the entry and exit QR codes of the construction personnel's user smart phone devices.
3. The construction site personnel safety emergency guarantee system according to claim 1, characterized in that: The method of obtaining the identity information of the construction personnel is: obtaining the identity information of the construction personnel by face recognition, or obtaining the identity information of the construction personnel by entry and exit QR code recognition; The identity information of the construction personnel includes registration information, ID card information and face information. The entry and exit QR code is generated in the following way: When the construction worker's user smartphone device receives the SMS invitation sent by the labor manager's user smartphone device, the construction worker downloads the smartphone APP according to the link in the SMS invitation, completes the account registration in the smartphone APP, and sends the registration information to the cloud server; When a construction worker enters the construction site for the first time, the entry intelligent terminal collects the construction worker's ID card information and facial information, and sends the ID card information and facial information to the cloud server; The cloud server generates the entry and exit QR code based on the registration information, the ID card information and the facial information, and sends the entry and exit QR code to the user's smartphone device of the construction worker.
4. The construction site personnel safety emergency guarantee system according to claim 1, characterized in that: The project management module includes a project management submodule and an electronic fence management submodule; The project management submodule is used for creating and managing construction project information; The electronic fence management submodule is used to create and manage the electronic fence according to the actual fence of the construction site; The electronic fence includes: primary fence, secondary fence and tertiary fence; The first-level fence corresponds to the outermost physical protection fence of the construction site; the first-level fence is provided with a mark of the intelligent terminal device of the entry and exit channel; The secondary fence corresponds to the physical fence of the sub-areas that different construction units are solely responsible for within the construction site; The third-level fence is an electronic fence that represents the management area within the sub-area that different construction units are solely responsible for.
5. An operating method of the construction site personnel safety emergency guarantee system according to any one of claims 1 to 4, characterized in that: The operation method comprises: S1: Deploy intelligent terminal devices at the entrances and exits of the construction site; S2: Site managers and construction workers download and install the smartphone APP on the user's smartphone device; S3: The site manager creates a project in the personnel safety emergency support platform; S4: The site manager creates the project site electronic fence in the project information; S5: The site manager adds the deployed entry and exit channel intelligent terminal equipment to the current project; S6: The site management personnel will add laborers and construction personnel to the current project; S7: Construction workers use smartphone apps to display their personal entry and exit QR codes, interact with the entry and exit smart terminal devices, and scan the code to enter the site; S8: After the smart terminal device at the entry and exit channel interacts with the smartphone APP for the personal entry and exit QR code, the cloud server sends a command to turn on the positioning function of the user's smartphone device and activate the one-click rescue function in the smartphone APP.