A method, device, medium and equipment for capturing work reports

The crawling script is written through the graph neural network algorithm and the incremental crawling technology is adopted to solve the problem of low efficiency in crawling and analysis of work reports in the existing technology, and achieve fast and efficient crawling and analysis of work reports.

CN118885655BActive Publication Date: 2025-04-04ANRUI DIGITAL INFORMATION TECH CO LTD
2 Cites 0 Cited by

Patent Information

Application Number
CN202410967401.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2025-04-04
Estimated Expiration
2044-07-18

AI Technical Summary

Technical Problem

The prior art is difficult to quickly and efficiently capture and analyze a large number of work reports, resulting in a large amount of time consumption.

Method used

Graph neural network algorithm is used to write a crawling script, obtain incremental data of work reports through incremental crawling technology, and use parallel processing technology to improve crawling efficiency.

Benefits of technology

It has achieved rapid and efficient capture and analysis of a large number of work reports, improving analysis efficiency.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention discloses a method, device, medium and equipment for capturing work reports. The method includes: writing a capture script using a graph neural network algorithm according to target work report information; logging into a target capture website through the capture script to obtain the target work report; obtaining the capture location and status of the target work report, marking the end point timestamp of the capture end point of the target work report; obtaining incremental data of the target work report from a data source according to the end point timestamp; processing and storing the incremental data, and updating the end point timestamp according to the location and status of the incremental data; and continuously capturing data information of the target work report according to the updated end point timestamp.
Need to check novelty before this filing date? Find Prior Art