Shield attitude prediction data preprocessing combination method based on machine rock state recognition
Through the combination methods of non-excavation section data removal, data cleaning and machine rock state recognition, the problems of improper abnormal data processing and model overfitting in shield excavation data preprocessing are solved, and the accuracy of shield excavation posture prediction is improved and Efficiency enhances the perception of the state of the mechanic rock, guarantees the safety of the excavation process and the quality of the tunnel.
Patent Information
- Application Number
- CN202410999977.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the preprocessing method of shield excavation data cannot effectively delete abnormal data, resulting in the impact of model training effect and prediction accuracy, and the problems of overfitting and low explanatory nature are serious, and real-time perception of the mechanic rock state is lacking.
The combination method of non-excavation segment data removal, first-order difference method, Laida criterion and isolated forest was used to clean the data, and the combined feature parameters were obtained through gray correlation analysis and mechanostone state recognition, and data normalization and feature extraction were performed. Form a shield posture pretreatment method.
It significantly improves the accuracy and efficiency of shield tunneling posture prediction, reduces the risk of overfitting, improves the interpretability and generalization ability of the model, enhances the adaptability to complex underground environments, and ensures the safety of the tunneling process and Tunnel quality.
Smart Images

Figure CN118965187A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shield construction, and in particular to a shield posture prediction data preprocessing combination method based on machine-rock state recognition. Background Art
[0002] Shield attitude prediction is to mine the implicit shield attitude information from the millions of historical data automatically recorded by the shield tunneling system by using appropriate machine learning algorithms, establish the mapping relationship between shield operation parameters and shield attitude, and thus realize the intelligent prediction of shield attitude at a certain moment or a period of time in the future. However, in the original data set exported from the shield tunneling system, there are usually a large number of noisy data points and meaningless data points due to abnormal recording of shield machine sensors, shield machine failures, or shield machine non-operation time still being recorded. Direct model training and prediction will greatly affect the model prediction accuracy. Therefore, effective data preprocessing is an important foundation and one of the key steps for shield tunneling attitude prediction.
[0003] In the prior art, due to the large variation of shield tunneling data, the size of the abnormal value in a certain section is often equivalent to the normal data in another section. The traditional data preprocessing method not only cannot effectively delete such abnormal data, but also causes the mistaken deletion of normal data, resulting in the loss of real data. In view of the high dimensionality, strong parameter coupling, long-term trend and non-stationarity of shield tunneling parameters, poor data preprocessing effect or data distortion will greatly affect the model training effect and prediction accuracy. At the same time, the original data of the shield tunneling system not only stores a large amount of information characterizing the movement behavior of the shield machine, but also indirectly reflects the geological conditions of the underground space and the machine-rock working state. However, in the prior art, data preprocessing is still limited to the work of sorting out the data format, and fails to mine the mapping relationship between the shield operation parameters and the formation parameters implied in the data set based on prior knowledge. All data mining work is completely handed over to the model for processing, which not only causes the model to be highly dependent on the amount of data, increases the difficulty of prediction, and leads to overfitting of the model, but also the prediction process is not interpretable. Summary of the invention
[0004] The main purpose of the present invention is to provide a combined method for shield posture prediction data preprocessing based on machine-rock state recognition, which solves the problems of overfitting and low interpretability caused by improper abnormal data processing and excessive reliance on large amounts of data in traditional technologies, and significantly improves the accuracy and efficiency of shield tunneling posture prediction, thereby ensuring the safety of the tunneling process and the quality of the formed tunnel.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a shield posture prediction data preprocessing combination method based on machine-rock state recognition, comprising the following steps:
[0006] S1. Elimination of non-excavation segment data: Obtain the shield machine excavation history data, and use the non-excavation state judgment parameters to identify and eliminate the non-excavation segment data from the historical data;
[0007] S2, data outlier cleaning: use the combination of first-order difference method, Laida criterion and isolation forest method to screen and remove abnormal data from the data set completed in step S1;
[0008] S3, data normalization: divide the cleaned data set into training set and test set in a ratio of 8:2, and perform normalization;
[0009] S4. Feature extraction: After preliminary screening of the characteristic parameters related to the shield tunneling posture, the characteristic parameters with high correlation with the shield tunneling posture are obtained by using grey correlation analysis, and the parameters with the highest correlation with the shield posture are selected as the characteristic parameters;
[0010] S5. Adding combined features for machine-rock state identification: adding combined feature parameters that can reflect the machine-rock state to the selected feature parameters, and these combined feature parameters together with the selected feature parameters constitute the feature parameters of the shield tunneling posture;
[0011] The above steps complete the data preprocessing before shield posture prediction.
[0012] In the preferred solution, in step S1, the non-excavation state judgment parameters include: excavation speed, total cylinder thrust, cutter head torque, and cutter head speed. If any one of the non-excavation state judgment parameters is 0, it is judged that the shield machine is in a non-excavation state and is regarded as a non-excavation section. The specific detection formula F t It is expressed as:
[0013] F t =f(x1,t)f(x2,t)f(x3,t)f(x4,t);
[0014] Among them, f(x1,t), f(x2,t), f(x3,t), and f(x4,t) represent the values of the excavation speed, total cylinder thrust, cutter head torque, and cutter head speed at time t. If any of the parameters is 0, then F t If it is 0, the data at time t is judged as non-excavation section data.
[0015] In the preferred solution, in step S1, after the non-excavation section data is identified, the non-excavation section data is replaced with missing values, and all missing data are filled using linear interpolation.
[0016] In the preferred solution, in step S2, a combination of the first-order difference method, the Laida criterion and the isolation forest method is used to screen and remove abnormal data. The specific process includes the following sub-steps:
[0017] S21, using the first-order difference method to calculate the difference between each data point in the data set and the data of the previous time step, to obtain a data set of the change amount of each data point relative to the previous time step, that is, a set of data change rates;
[0018] S22, the 3σ method can be used to efficiently filter out the outliers of the data, and then replace the filtered outliers with missing values, and use the spline interpolation method to fill the missing values, and then use the reverse process of the first-order difference, that is, sum the change rate data after the 3σ method cleaning and the data at time t-1;
[0019] S23. Use the isolation forest method to process the data set after the above processing, replace the abnormal points screened out by the isolation forest with missing values, and then use linear interpolation to fill the missing values to obtain the final data after data cleaning.
[0020] In the preferred embodiment, in step S3, the data is processed using minimum-maximum normalization.
[0021] In step S4, the correlation between each historical feature data and the shield posture data is obtained by the grey correlation analysis method, and the correlation degree γ with the shield posture is selected. i The parameters ≥α are taken as feature parameters, where α∈[0,1], and the formula for calculating the grey relational coefficient is:
[0022]
[0023] Among them, Y o (k) represents the shield posture data of type o after preprocessing at the kth time point. i (k) represents the historical feature data of the i-th category after preprocessing at the k-th time point; n is the number of categories of the collected historical feature data after preliminary screening, and m is the number of time points for collecting data; ρ is the resolution coefficient, and its value range is (0,∞); ξ o,i (k) represents the grey correlation coefficient between the historical feature data after preprocessing of the i-th type and the shield posture data after preprocessing of the o-th type at the k-th time point;
[0024] Specific formula for calculating correlation:
[0025]
[0026] where γ i is the correlation between the historical characteristic data of the i-th shield machine and the shield machine posture data, γ i The closer it is to 1, the higher the correlation between this historical feature data and the shield posture data.
[0027] In the preferred scheme, in step S5, a combined characteristic parameter reflecting the machine-rock state is obtained by formula calculation of two or more characteristic parameters, and the combined characteristic parameter reflecting the machine-rock state includes: field penetration index FPI, cutter head torque index TPI per unit penetration, field penetration ratio index FPIR and screw machine performance index STP.
[0028] In the preferred solution, in step S5, the specific process of obtaining the combined characteristic parameters of the machine-rock state is as follows:
[0029] Field penetration index FPI: It indicates the proportional relationship between the total thrust of the shield and the excavation speed at a specific cutterhead speed, reflecting the softness and hardness of the stratum. The specific formula of the field penetration index FPI is:
[0030]
[0031] Where F is the total thrust, in kN; P is the penetration, in mm·r -1 ,in, v is the propulsion speed, in mm·min -1 , N is the cutter head speed, unit is r·min -1 ;
[0032] The cutter head torque index TPI per unit penetration: It indicates the proportional relationship between the shield torque and the tunneling speed at a specific cutter head speed. The specific formula of the cutter head torque index TPI per unit penetration is:
[0033]
[0034] Wherein, T1 is the cutter head torque, in kN·m;
[0035] Field insertion ratio index FPIR: including horizontal field insertion ratio FPIR H and vertical field cut-in ratio FPIR V , where the horizontal field cut-in ratio FPIR H FPI for the left stratum L FPI with the right stratum R FPIR V FPI for the upper stratum T FPI of the underlying strata B The specific formula is:
[0036]
[0037] FPIR H and vertical field cut-in ratio FPIR V The specific formula is:
[0038]
[0039] Among them, FPI L FPI is the ratio of the pressure of the left cylinder of the shield machine to the speed of the left cylinder at a specific cutterhead speed. R is the ratio of the right cylinder zone pressure to the right cylinder speed, FPI T FPI is the ratio of the upper cylinder zone pressure to the upper cylinder speed. B It is the ratio of the lower cylinder zone pressure to the lower cylinder speed.
[0040] Screw machine performance index STP: It indicates the screw machine torque and the maximum pressure difference inside the screw machine, reflecting the physical and mechanical properties of the shield tunneling stratum. The specific formula is:
[0041]
[0042] Wherein, P1 is the gate pressure before the screw machine, in kPa, and P2 is the gate pressure after the screw machine, in kPa; T s Expressed as screw machine torque, ΔP max Indicates the maximum pressure difference inside the screw machine.
[0043] The present invention provides a combined method for preprocessing shield posture prediction data based on machine-rock state recognition, which can clean abnormal data when the data fluctuation amplitude is too large to the greatest extent, avoid the accidental deletion of normal data, effectively retain the original information of the data, and based on mechanical relationships and business experience, add combined features that can feedback the geological conditions of the underground space and the working state of the machine-rock to the data set, effectively improve the model's real-time perception capability of the working state of the machine-rock, optimize the efficiency and accuracy of the shield tunneling posture prediction, and then help shield operators make early decisions, playing a role in ensuring the shield tunneling posture and the quality of the formed tunnel.
[0044] The beneficial effects of the present invention are:
[0045] 1) The present invention proposes a data preprocessing combination method for shield attitude prediction based on machine-rock state recognition combined input features, which can clean abnormal data when the data fluctuation amplitude is too large to the greatest extent, avoid the accidental deletion of normal data, effectively retain the original information of the data, and help to improve the accuracy of shield tunneling attitude prediction;
[0046] 2) With the help of a deep understanding of the machine-rock state, the constructed combined features significantly enhance the model's adaptability and prediction accuracy to complex underground environments, reduce dependence on massive data, reduce the risk of overfitting, and improve the model's interpretability and generalization capabilities.
[0047] 3) It improves the efficiency and accuracy of shield tunneling posture prediction and provides operators with more timely and accurate information, which helps them make more scientific and reasonable early decisions. It is of great value in ensuring the safety of the tunneling process and the quality of tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0049] Figure 1 is a flow chart of the combined processing method of abnormal data of the present invention;
[0050] Figure 2 is the abnormal data distribution diagram of the present invention;
[0051] Figure 3 It is a data distribution diagram after the abnormal data is processed by the first-order difference method and the 3σ method of the present invention;
[0052] Figure 4 It is a data distribution diagram after isolation forest processing of the present invention. DETAILED DESCRIPTION
[0053] Example 1
[0054] like Figures 1 to 4 As shown, a shield posture prediction data preprocessing combination method based on machine-rock state recognition includes the following steps:
[0055] S1. Elimination of non-excavation segment data: Obtain the shield machine excavation history data, and use the non-excavation state judgment parameters to identify and eliminate the non-excavation segment data from the historical data;
[0056] S2, data outlier cleaning: use the combination of first-order difference method, Laida criterion and isolation forest method to screen and remove abnormal data from the data set completed in step S1;
[0057] S3, data normalization: divide the cleaned data set into training set and test set in a ratio of 8:2, and perform normalization;
[0058] S4. Feature extraction: After preliminary screening of the characteristic parameters related to the shield tunneling posture, the characteristic parameters with high correlation with the shield tunneling posture are obtained by using grey correlation analysis, and the parameters with the highest correlation with the shield posture are selected as the characteristic parameters;
[0059] S5. Adding combined features for machine-rock state identification: adding combined feature parameters that can reflect the machine-rock state to the selected feature parameters, and these combined feature parameters together with the selected feature parameters constitute the feature parameters of the shield tunneling posture;
[0060] The above steps complete the data preprocessing before shield posture prediction.
[0061] The present invention proposes a combined method for preprocessing shield attitude prediction data based on machine-rock state recognition, aiming to comprehensively improve the accuracy and reliability of shield tunneling attitude prediction. By eliminating non-tunneling data, non-tunneling state data can be accurately identified and excluded to ensure the purity of the data set; the combination strategy of the first-order difference method, the Laida criterion and the isolation forest is adopted to efficiently clean outliers and purify data quality; data normalization processing further improves the consistency of the data set and the efficiency of model training. In the feature extraction stage, combined with gray correlation analysis, feature parameters highly correlated with the shield attitude are refined to lay a solid foundation for model construction. By adding combined features reflecting the machine-rock state, the model's perception of complex working conditions is significantly enhanced, and the accuracy of prediction is improved. This series of comprehensive preprocessing measures not only optimizes data quality, but also greatly improves the effectiveness of the shield tunneling attitude prediction model, providing strong technical support for ensuring the safety and efficiency of the tunneling process.
[0062] In the preferred solution, in step S1, the non-excavation state judgment parameters include: excavation speed, total cylinder thrust, cutter head torque, and cutter head speed. If any one of the non-excavation state judgment parameters is 0, it is judged that the shield machine is in a non-excavation state and is regarded as a non-excavation section. The specific detection formula F t It is expressed as:
[0063] F t =f(x1,t)f(x2,t)f(x3,t)f(x4,t);
[0064] Among them, f(x1,t), f(x2,t), f(x3,t), f)x4,t) represent the values of the excavation speed, total cylinder thrust, cutter head torque, and cutter head speed at time t. If any of the parameters is 0, then F t If it is 0, the data at time t is judged as non-excavation section data.
[0065] By using the non-excavation data elimination and interpolation processing strategy, the data records in the non-excavation state are accurately identified and marked by monitoring key parameters such as excavation speed, total cylinder thrust, cutter head torque, and cutter head speed. These non-excavation data often interfere with the excavation data analysis and affect the accuracy of shield attitude prediction due to the lack of relevance to actual excavation activities. By replacing the non-excavation data with missing values and filling them with linear interpolation, invalid information is removed and the continuity of the data sequence is maintained, effectively improving the quality of the data set. This processing method plays an important role in enhancing the clarity of the mapping relationship between shield operation parameters and shield attitude, improving the stability of the prediction model and the reliability of the prediction results, and ensuring the safety and efficiency of shield excavation.
[0066] In the preferred solution, in step S1, after the non-excavation section data is identified, the non-excavation section data is replaced with missing values, and all missing data are filled using linear interpolation.
[0067] Identify and replace missing values in non-excavation data, and then fill them in through linear interpolation, effectively purify the data set, eliminate the interference caused by non-excavation data, keep the data sequence intact, and significantly improve the accuracy and stability of the shield posture prediction model, which is crucial to ensuring excavation safety and efficiency.
[0068] In the preferred solution, in step S2, a combination of the first-order difference method, the Laida criterion and the isolation forest method is used to screen and remove abnormal data. The specific process includes the following sub-steps:
[0069] S21, using the first-order difference method to calculate the difference between each data point in the data set and the data of the previous time step, to obtain a data set of the change amount of each data point relative to the previous time step, that is, a set of data change rates;
[0070] S22, the 3σ method can be used to efficiently filter out the outliers of the data, and then replace the filtered outliers with missing values, and use the spline interpolation method to fill the missing values, and then use the reverse process of the first-order difference, that is, sum the change rate data after the 3σ method cleaning and the data at time t-1;
[0071] S23. Use the isolation forest method to process the data set after the above processing, replace the abnormal points screened out by the isolation forest with missing values, and then use linear interpolation to fill the missing values to obtain the final data after data cleaning.
[0072] The abnormal data processing strategy combining the first-order difference method, the Raida criterion and the isolation forest is adopted. First, the data fluctuation trend is captured by calculating the rate of change between data points; then, the Raida criterion is used to efficiently identify and mark abnormal values that deviate significantly from the normal range, and the spline interpolation method is combined to fill the gaps and restore data continuity; finally, the isolation forest algorithm is introduced to further fine-tune potential anomalies, and the data curve is smoothed again through linear interpolation. This series of operations not only effectively eliminates noise interference and ensures the purity and consistency of the data, but also enhances the internal logical coherence of the data set, providing a high-quality foundation for subsequent analysis and modeling, greatly improving the accuracy and reliability of shield posture prediction, and is an important technical support for ensuring the safety and efficiency of shield construction.
[0073] In the preferred embodiment, in step S3, the data is processed using minimum-maximum normalization.
[0074] In step S4, the correlation between each historical feature data and the shield posture data is obtained by the grey correlation analysis method, and the correlation degree γ with the shield posture is selected. iThe parameter ≥α is used as the characteristic parameter, where α∈[0,1], and the threshold value takes different values according to the actual project. The formula for calculating the grey correlation coefficient is:
[0075]
[0076] Among them, Y o (k) represents the shield posture data of the oth type after preprocessing at the kth time point; X i (k) represents the historical feature data of the i-th category after preprocessing at the k-th time point; n is the type of historical feature data collected, m is the number of time points for collecting data; ρ is the resolution coefficient, and its value range is (0,∞); ξ o,i (k) represents the grey correlation coefficient between the historical feature data after preprocessing of the i-th type and the shield posture data after preprocessing of the o-th type at the k-th time point;
[0077] Specific formula for calculating correlation:
[0078]
[0079] where γ i is the correlation between the historical characteristic data of the i-th shield machine and the shield machine posture data, γ i The closer it is to 1, the higher the correlation between this historical feature data and the shield posture data.
[0080] By applying the grey correlation analysis method, the correlation strength between different historical feature data and shield posture data was quantified, so as to screen out the most influential feature parameters. By calculating the grey correlation coefficient and correlation degree, it is revealed which factors play a decisive role in the change of shield posture. The correlation coefficient is obtained by comparing the similarity between historical features and posture data at each time point, while the correlation degree comprehensively evaluates the consistency of the entire sequence. Selecting parameters with high correlation can ensure that the model construction focuses on the most relevant variables, which not only improves the accuracy and efficiency of the prediction model, but also reduces unnecessary data redundancy, providing a solid theoretical basis for real-time monitoring and intelligent decision-making of shield construction. Through this method, the key factors affecting the shield posture can be identified more accurately, thereby optimizing the construction process and improving engineering safety and economic benefits.
[0081] In the preferred scheme, in step S5, a combined characteristic parameter reflecting the machine-rock state is obtained by formula calculation of two or more characteristic parameters, and the combined characteristic parameter reflecting the machine-rock state includes: field penetration index FPI, cutter head torque index TPI per unit penetration, field penetration ratio index FPIR and screw machine performance index STP.
[0082] In the preferred solution, in step S5, the specific process of obtaining the combined characteristic parameters of the machine-rock state is as follows:
[0083] Field penetration index FPI: It indicates the proportional relationship between the total thrust of the shield and the excavation speed at a specific cutterhead speed, reflecting the softness and hardness of the stratum. The specific formula of the field penetration index FPI is:
[0084]
[0085] Where F is the total thrust, in kN; P is the penetration, in mm·r -1 ,in, v is the propulsion speed, in mm·min -1 , N is the cutter head speed, unit is r·min -1 ;
[0086] The cutter head torque index TPI per unit penetration: It indicates the proportional relationship between the shield torque and the tunneling speed at a specific cutter head speed. The specific formula of the cutter head torque index TPI per unit penetration is:
[0087]
[0088] Wherein, T1 is the cutter head torque, in kN·m;
[0089] Field insertion ratio index FPIR: including horizontal field insertion ratio FPIR H and vertical field cut-in ratio FPIR V , where the horizontal field cut-in ratio FPIR H FPI for the left stratum L FPI with the right stratum R FPIR V FPI for the upper stratum T FPI of the underlying strata B The specific formula is:
[0090]
[0091] FPIR H and vertical field cut-in ratio FPIR V The specific formula is:
[0092]
[0093] Among them, FPI L FPI is the ratio of the pressure of the left cylinder of the shield machine to the speed of the left cylinder at a specific cutterhead speed. R is the ratio of the right cylinder zone pressure to the right cylinder speed, FPI T FPI is the ratio of the upper cylinder zone pressure to the upper cylinder speed. BIt is the ratio of the lower cylinder zone pressure to the lower cylinder speed.
[0094] Screw machine performance index STP: It indicates the screw machine torque and the maximum pressure difference inside the screw machine, reflecting the physical and mechanical properties of the shield tunneling stratum. The specific formula is:
[0095]
[0096] Wherein, P1 is the gate pressure before the screw machine, in kPa, and P2 is the gate pressure after the screw machine, in kPa; T s Expressed as screw machine torque, ΔP max Indicates the maximum pressure difference inside the screw machine.
[0097] The construction of combined characteristic parameters of machine-rock state, including the field penetration index FPI, the cutterhead torque index TPI per unit penetration, the field penetration ratio index FPIR (including horizontal field penetration ratio and vertical field penetration ratio), and the screw machine performance index STP, is a key measure to further deepen the understanding of the shield tunneling process and improve the effectiveness of the prediction model. The field penetration index FPI and the cutterhead torque index TPI per unit penetration directly reflect the formation hardness and the degree of cutter wear by quantifying the relationship between the total thrust, torque and tunneling speed of the shield, providing a basis for adjusting the tunneling parameters. The field penetration ratio index FPIR, especially its horizontal and vertical sub-items, reveals the heterogeneity of the formation structure by comparing the propulsion characteristics of the formations in different directions, which is helpful to predict the shield deviation trend. The screw machine performance index STP focuses on the operating state of the screw machine. The changes in its torque and internal and external pressure difference are directly related to the physical and mechanical properties of the tunneling formation, and has early warning value for assessing the difficulty of tunneling and preventing blockage. In summary, the introduction of these combined characteristic parameters not only enriches the data dimension and enhances the adaptability of the model to complex working conditions, but also promotes the refined management of the shield excavation process, which plays a vital role in improving construction efficiency and ensuring project safety.
[0098] Example 2
[0099] Further illustrate with reference to Example 1, Figure 1-4 As shown, the construction steps are as follows:
[0100] Step 1: Eliminate the data of non-excavation section: If any parameter of excavation speed, total cylinder thrust, cutter head torque, or cutter head speed is zero, the shield machine is in a non-excavation state and is considered as a non-excavation section. The data pattern recorded in the non-excavation section is an interference to the mapping relationship between the shield operation parameters and the shield posture in the excavation section. Therefore, the non-excavation section data needs to be detected and replaced with missing values, and all missing data are supplemented by linear interpolation. The non-excavation section data detection uses the following formula:
[0101] F t =f(x1,t)f(x2,t)f(x3,t)f(x4,t);
[0102] Among them, f(x1,t), f(x2,t), f(x3,t), and f(x4,t) represent the values of the excavation speed, total cylinder thrust, cutter head torque, and cutter head speed at time t. If any of the parameters is 0, then F t If it is 0, the data at time t is judged as non-excavation section data.
[0103] Step 2: Outlier cleaning: Due to the large variation in shield tunneling data, it is often the case that the size of the outlier in a certain section is comparable to the normal data in another section. The combination of the first-order difference method, the Laida criterion and the isolation forest method is used to screen and eliminate the outlier data.
[0104] Step 2.1: First, use the first-order difference method to calculate the difference between each data point in the data set and the data of the previous time step, and obtain the data set of the change amount of each data point relative to the previous time step, that is, the set of data change rates. The first-order difference method is as follows:
[0105] ΔX i (t) = X i (t)-X i (t-1);
[0106] Among them, X i (t) represents the k-th point data of the i-th feature in the data set after processing in step 1, X i (t-1) represents X i (t) Point data of the previous time step, ΔX i (t) represents X i (t) and X i The difference between (t-1).
[0107] The data set processed in step 2.2 and step 2.1 basically conforms to the normal distribution. Therefore, the 3σ method can be used to efficiently filter out the outliers of the data, and then replace the filtered outliers with missing values, and use the spline interpolation method to fill the missing values. Then, the reverse process of the first-order difference is used, that is, the change rate data after the 3σ method cleaning is summed with the data at time t-1. The formula of the 3σ method is:
[0108] |v i |=|x i -x|>3σ;
[0109] Among them, σ represents the standard deviation. The probability that the value in the normal distribution is distributed in (μ-3σ,μ+3σ) is 0.9974, and the possibility of exceeding this range is less than 0.3%. It can be considered that the value outside this range is an outlier; μ represents the mean, v i Represents a measurement value x i The residual error (1≤i≤n′, n′ represents the number of features of the data set after step 1 processing, that is, the number of samples), if x is detected i V i If x is greater than 3σ, then i Should be eliminated.
[0110] Step 2.3: After the data set is processed by the above method, there is usually still a small amount of uncleaned abnormal data. The isolation forest method has an excellent effect for the situation where there are few abnormal values and the proportion of the data set is low. Therefore, the isolation forest method is used to process the data set again, and the abnormal points screened by the isolation forest are replaced with missing values. Then linear interpolation is used to fill the missing values to obtain the final data after cleaning.
[0111] The isolation forest method is to judge samples distributed outside the high-density group as outliers: extract a part of the samples and put them into the root node of a single tree, set the cut value to split the tree, until the tree can no longer be split or the tree grows to the set height, and judge the first batch of isolated samples as outliers; perform the above operation on each tree in the forest, and then collect the segmentation results of the entire forest, and calculate the outlier score of each sample according to the following formula:
[0112]
[0113] c(n′)=2H(n′-1)-(2(n′-1) / n′);
[0114] Among them, h(x) is the depth of the sample in the tree, n′ is the number of samples, H is the harmonic constant, and samples with high scores are judged as outliers.
[0115] Step 3: Divide the cleaned data set into a training set and a test set in a ratio of 8:2, and use them to train and verify the prediction model respectively. Then, perform minimum-maximum normalization on the data set, and normalize the training set and the test set separately. This can avoid the interference of the test set data on the normalization of the training set, maintain the authenticity of the training set data, prevent the test set as unknown data from affecting the model training, and increase the persuasiveness of the model. The minimum-maximum normalization method is as follows:
[0116]
[0117] Where X represents any data point, Xnorm Represents the standard value X after normalization max Indicates the maximum value of a certain characteristic parameter, X min The minimum value of a certain characteristic parameter.
[0118] Step 4: Select characteristic parameters related to the shield tunneling posture based on business common sense, and then combine the characteristic parameters with high correlation with the shield tunneling posture obtained by grey correlation analysis, and comprehensively select the parameters with the highest correlation with the shield posture as characteristic parameters.
[0119] Step 5. Add the combined features for machine-rock state identification: Add the combined feature parameters that can reflect the machine-rock state to the selected feature parameters, and finally complete the data preprocessing before shield posture prediction.
[0120] These combined parameters are obtained through the formula calculation of two or more characteristic parameters, reflecting the interaction between the shield machine and the stratum, and playing a role in preliminarily extracting the properties of the shield tunneling stratum and the machine-rock working state information. The combined characteristic parameters of the machine-rock state include:
[0121] The field penetration index FPI indicates the proportional relationship between the total thrust of the shield and the excavation speed at a specific cutterhead speed, reflecting the softness and hardness of the stratum. It has a certain correlation with the stiffness, strength, integrity and bearing capacity of the soil of the excavation stratum. The change of the shield excavation posture is directly affected by the total thrust of the shield and the stiffness of the soil. Therefore, the field penetration index FPI is closely related to the change of the shield excavation posture:
[0122]
[0123] Where F is the total thrust, in kN; P is the penetration, in mm·r -1 ,in, v is the propulsion speed, in mm·min -1 , N is the cutter head speed, unit is r·min -1 .
[0124] The cutter head torque index TPI per unit penetration indicates the proportional relationship between the shield torque and the tunneling speed at a specific cutter head speed. The larger the stratum TPI, the greater the energy required by the shield machine to tunnel the stratum. Therefore, there is a certain inherent connection between TPI and the shield tunneling posture:
[0125]
[0126] Where T1 is the cutter head torque, in kN·m
[0127] The field penetration ratio index FPIR, under the same horizontal zone pressure difference conditions, the change rate and trend of the shield's horizontal posture will be significantly different due to the difference in the left and right strata's ability to resist shield tunneling, and the same is true for the vertical direction. This difference in stratum resistance can be expressed by FPIR:
[0128]
[0129] Among them, the horizontal field penetration ratio FPIR within the scope of the stratum affected by tunneling H That is, the left stratum FPI L FPI with right stratum R FPIR V The upper stratum FPI T FPI with lower strata B The ratio of FPI L FPI is the ratio of the pressure of the left cylinder of the shield machine to the speed of the left cylinder at a specific cutterhead speed. R is the ratio of the right cylinder zone pressure to the right cylinder speed, FPI T FPI is the ratio of the upper cylinder zone pressure to the upper cylinder speed. B It is the ratio of the lower cylinder zone pressure to the lower cylinder speed, as shown in the following formula.
[0130] The screw machine performance index STP, under the condition of a certain screw machine speed, the screw machine torque and the maximum pressure difference inside the screw machine can reflect the physical and mechanical properties of the shield tunneling stratum to a certain extent. Here, the screw machine performance index STP at a specific speed is used to express it:
[0131]
[0132] Wherein, P1 is the gate pressure before the screw machine, in kPa, and P2 is the gate pressure after the screw machine, in kPa; T s Expressed as screw machine torque, ΔP max Indicates the maximum pressure difference inside the screw machine.
[0133] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. A shield attitude prediction data preprocessing combination method based on machine-rock state recognition, characterized in that: S1. Elimination of non-excavation segment data: Obtain the shield machine excavation history data, and use the non-excavation state judgment parameters to identify and eliminate the non-excavation segment data from the historical data; S2, data outlier cleaning: use the combination of first-order difference method, Laida criterion and isolation forest method to screen and remove abnormal data from the data set completed in step S1; S3, data normalization: divide the cleaned data set into training set and test set, and perform normalization; S4. Feature extraction: After preliminary screening of the characteristic parameters related to the shield tunneling posture, the characteristic parameters with high correlation with the shield tunneling posture are obtained by using grey correlation analysis, and the parameters with the highest correlation with the shield posture are selected as the characteristic parameters; S5. Adding combined features for machine-rock state identification: adding combined feature parameters that can reflect the machine-rock state to the selected feature parameters, and these combined feature parameters together with the selected feature parameters constitute the feature parameters of the shield tunneling posture; The above steps complete the data preprocessing before shield posture prediction.
2. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 1 is characterized in that: In step S1, the non-excavation state judgment parameters include: excavation speed, total cylinder thrust, cutter head torque, and cutter head speed. If any one of the non-excavation state judgment parameters is 0, it is judged that the shield machine is in a non-excavation state and is regarded as a non-excavation section. The specific detection formula F t It is expressed as: Among them, f(x j ,t) represents the value of the jth non-excavation state judgment parameter at time t, Π represents multiplication, and n represents the number of types of non-excavation state judgment parameters; if any parameter in the value of the non-excavation state judgment parameter is 0, then F t is 0.
3. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 2 is characterized in that: In step S1, after the non-excavation section data is identified, the non-excavation section data is replaced with the missing values, and all the missing data are filled using linear interpolation.
4. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 1 is characterized in that: In step S2, a combination of the first-order difference method, the Laida criterion, and the isolation forest method is used to screen and remove abnormal data. The specific process includes the following sub-steps: S21, using the first-order difference method to calculate the difference between each data point in the data set and the data of the previous time step, to obtain a data set of the change amount of each data point relative to the previous time step, that is, a set of data change rates; S22, the 3σ method can be used to efficiently filter out the outliers of the data, and then replace the filtered outliers with missing values, and use the spline interpolation method to fill the missing values, and then use the reverse process of the first-order difference, that is, sum the change rate data after the 3σ method cleaning and the data at time t-1; S23. Use the isolation forest method to process the data set after the above processing, replace the abnormal points screened out by the isolation forest with missing values, and then use linear interpolation to fill the missing values to obtain the final data after data cleaning.
5. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 1 is characterized in that: In step S3, the data is processed using minimum-maximum normalization.
6. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 1 is characterized in that: In step S4, the correlation between each historical feature data and the shield posture data is obtained by the grey correlation analysis method, and the correlation degree γ with the shield posture is selected. i The parameters ≥α are taken as feature parameters, where α∈[0,1], and the formula for calculating the grey relational coefficient is: Δ o,i (k)=|Y o (k)-X i (k)|; i∈[1,n],k∈[1,m],o∈[1,4]; Among them, Y o (k) represents the shield posture data of the oth type after preprocessing at the kth time point; X i (k) represents the historical feature data of the i-th category after preprocessing at the k-th time point; n is the type of historical feature data collected, m is the number of time points for collecting data; ρ is the resolution coefficient, and its value range is (0,∞); ξ o,i (k) represents the grey correlation coefficient between the historical feature data after preprocessing of the i-th type and the shield posture data after preprocessing of the o-th type at the k-th time point; Specific formula for calculating correlation: where γ i is the correlation between the historical characteristic data of the i-th shield machine and the shield machine posture data, γ i The closer it is to 1, the higher the correlation between this historical feature data and the shield posture data.
7. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 1 is characterized in that: In step S5, a combined characteristic parameter reflecting the machine-rock state is obtained by formula calculation of two or more characteristic parameters, and the combined characteristic parameter reflecting the machine-rock state includes: field penetration index FPI, cutter head torque index TPI per unit penetration, field penetration ratio index FPIR and screw machine performance index STP.
8. The shield posture prediction data preprocessing combination method based on machine-rock state recognition according to claim 7 is characterized in that: In step S5, the specific process of obtaining the combined characteristic parameters of the machine-rock state is as follows: Field penetration index FPI: It indicates the proportional relationship between the total thrust of the shield and the excavation speed at a specific cutterhead speed, reflecting the softness and hardness of the stratum. The specific formula of the field penetration index FPI is: Where F is the total thrust; P is the penetration, where v is the propulsion speed, N is the cutter head speed; The cutter head torque index TPI per unit penetration: It indicates the proportional relationship between the shield torque and the tunneling speed at a specific cutter head speed. The specific formula of the cutter head torque index TPI per unit penetration is: Among them, T1 is the cutter head torque; Field insertion ratio index FPIR: including horizontal field insertion ratio FPIR H and vertical field cut-in ratio FPIR V , where the horizontal field cut-in ratio FPIR H FPI for the left stratum L FPI with the right stratum R FPIR V FPI for the upper stratum T FPI of the underlying strata B The specific formula is: Where i′={L,R,T,B}, L, R, T, B represent the left, right, top, and bottom strata respectively, and F i′ , P i′ represents the total thrust and penetration of the stratum at position i′, v i Advance velocity of the stratum at position i′; FPIR H and vertical field cut-in ratio FPIR V The specific formula is: Among them, FPI L FPI is the ratio of the pressure of the left cylinder of the shield machine to the speed of the left cylinder at a specific cutterhead speed. R is the ratio of the right cylinder zone pressure to the right cylinder speed, FPI T FPI is the ratio of the upper cylinder zone pressure to the upper cylinder speed. B is the ratio of the lower cylinder zone pressure to the lower cylinder speed; Screw machine performance index STP: It indicates the screw machine torque and the maximum pressure difference inside the screw machine, reflecting the physical and mechanical properties of the shield tunneling stratum. The specific formula is: Among them, P1 is the gate pressure before the screw machine, and P2 is the gate pressure after the screw machine; T s Expressed as screw machine torque, ΔP max Indicates the maximum pressure difference inside the screw machine.
Citation Information
Patent Citations
Current ring target prediction method and system in shield deviation rectification
CN110188947A