Saggog large base source network storage direct current comprehensive benefit evaluation method in extreme scene

By adopting the comprehensive benefit evaluation method of source network storage of Shagohuang Large Base in extreme scenarios in the new energy base in Shagohuang area, the route and energy storage configuration are optimized, and the problem of extreme weather in the wind and light units is solved and the system is improved. Responsiveness and low-carbon benefits.

CN118970875APending Publication Date: 2024-11-15ECONOMIC RES INST OF STATE GRID GANSU ELECTRIC POWER +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410877089.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the new energy base in the Shagohuang area, the wind and light units are difficult to maintain normal operation due to extreme weather, resulting in fluctuations in output power. The existing technology has failed to effectively curb this impact and improve the problem of responding to extreme weather capabilities.

Method used

A comprehensive benefit evaluation method for source network storage of Shagohuang Large Base in extreme scenarios is adopted, and through typical scenario clustering, power supply optimization planning, joint planning of transportation and storage, and optimization evaluation of extreme weather scenarios, combined with line expansion, energy storage investment and operation and maintenance Cost, introduce loss-load costs to measure system flexibility, optimize line and energy storage configuration.

Benefits of technology

The system operation safety, economy and environmental protection under extreme weather conditions have been improved, the optimal planning scheme has been provided, and the new energy base's ability to deal with extreme weather and low-carbon benefits have been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure QLYQS_2
    Figure QLYQS_2
  • Figure QLYQS_7
    Figure QLYQS_7
  • Figure QLYQS_11
    Figure QLYQS_11
Patent Text Reader

Abstract

The invention, which belongs to the technical field of the electric power system, discloses a Saggog large base source network direct current storage comprehensive benefit evaluation method in an extreme scene, comprising the following steps: according to a typical scene clustering result, carrying out power supply optimization planning by taking the minimum investment cost, operation cost and loss load cost of line extension and energy storage as a target; based on a power supply unit capacity configuration result obtained by power supply optimization planning, considering an elastic index of the system, and carrying out transmission and storage combined planning; and extracting an extreme weather scene, and optimally performing optimization planning and evaluation on transmission and storage by considering network storage configuration cost, operation and maintenance cost and loss load cost. According to the method, multi-target two-step planning and comprehensive evaluation are carried out on the source network storage direct current of the new energy base in the Sagomean region from the operation safety, economy, flexibility and environmental protection of the new energy base, the optimal planning scheme can be obtained, and real evaluation is carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a method for evaluating the comprehensive benefits of power source, grid, storage and direct current of the Shagohuang large base under extreme scenarios, and belongs to the technical field of power system measurement. Background Art

[0002] The centralized development and long-distance transmission of new energy power generation bases in desert Gobi desert areas face many problems and challenges. Considering the increasing environmental pollution caused by greenhouse gas emissions, ice disasters, typhoons, sandstorms and other weather are becoming more and more difficult to predict. The special desert climate in the desert Gobi desert area leads to frequent extreme weather. Various types of wind and solar units are difficult to maintain normal operation due to extreme weather. It is necessary to reasonably configure the capacity of various devices in the new energy base to smooth the impact of output power fluctuations and improve the ability of the desert Gobi desert new energy base to cope with extreme weather. Summary of the invention

[0003] The purpose of the present invention is to provide a method for evaluating the comprehensive benefits of the power grid, storage and direct current of the Shagohuang base under extreme scenarios, so as to solve the problem in the prior art that various types of wind and solar power units are difficult to maintain normal operation due to the influence of extreme weather.

[0004] A comprehensive benefit evaluation method for the Shagohuang base power grid storage and direct current under extreme scenarios, including: S1 performs power optimization planning based on the clustering results of typical scenarios, with the goal of minimizing the investment cost, operating cost and load loss cost of line expansion and energy storage; S2 conducts transmission and storage joint planning based on the capacity configuration results of power generation units obtained from power optimization planning and considering the elasticity index of the system; S3 extracts extreme weather scenarios and optimizes the planning and evaluation of transmission and storage by taking into account the network storage configuration cost, operation and maintenance cost, and load loss cost.

[0005] S1 includes: the objective function of the model minimizes the comprehensive cost consisting of investment cost and operating cost, considers the impact of extreme weather, introduces the load loss cost to measure the resilience level of the system under extreme weather scenarios, minimizes the load loss cost with the goal of optimizing the comprehensive benefits, and minimizes the objective function for: ; In the formula, is the investment cost of line expansion and energy storage, is the running cost, is the loss of load cost; Including line investment cost and energy storage investment cost: ; In the formula, is the line investment cost, is the energy storage investment cost; calculate : ; In the formula, is the line discount rate, n is the line investment period, is the unit line cost, is the line length of the transmission corridor ij, is a 0-1 variable for the number of new p lines in transmission corridor ij; calculate : ; ; ; In the formula, is the fixed cost of energy storage at k nodes, is the k-node energy storage configuration 0-1 variable, is the variable cost of energy storage at k nodes, is the value range of k nodes, Discount for energy storage, Operating cost factor, Maintenance cost factor, Disposal cost coefficient, Unit power energy storage investment cost, is the k-node energy storage configuration power, Unit storage capacity cost, is the k-node energy storage configuration capacity, is the energy storage discount rate, and N is the energy storage investment period.

[0006] S2 includes, calculation : ; In the formula, is the unit energy storage charging cost, is the unit energy storage discharge cost, is the charging power of the k-node energy storage at time t, is the discharge power of the energy storage at node k at time t; calculate : ; In the formula, is the unit loss of load cost, is the load loss ratio of node i at time t, is the normal operation load of node i at time t, The range of i nodes.

[0007] S3 includes constraints such as the number of newly built lines and energy storage configurations, energy storage rated power and capacity configuration constraints, unit output constraints, node power balance constraints, branch power constraints, and energy storage operation continuity constraints.

[0008] Constraints on the number of new lines and energy storage configurations: ; ; In the formula, is the range of the transmission corridor ij, is the maximum number of new lines in transmission corridor ij, is the maximum number of energy storage configurations, set to 4.

[0009] Configuration constraints on energy storage rated power and capacity: ; ; In the formula, is the minimum energy storage configuration capacity, is the maximum energy storage configuration capacity, is the minimum energy storage rated power, is the maximum energy storage rated power.

[0010] Constraints on unit output: ; ; In the formula, is the minimum thermal power output of node i, is the maximum thermal power output of node i, is the thermal power output of node i at time t, is the photovoltaic power output of node i at time t, is the maximum photovoltaic output of node i.

[0011] Power balance constraints on nodes: ; In the formula, is the node-branch matrix of the existing line, The active power of the existing branch at time t is: is the node-branch association matrix to be constructed, is the active power of the branch to be built at time t, is the wind power output of node i at time t, is the energy storage charging and discharging power at time t, is the active load of node i at time t.

[0012] Power constraints on branches: ; In the formula, is the existing line power in transmission corridor ij, is the number of existing lines in transmission corridor ij, is the power of the p new lines in the transmission corridor ij, is the maximum capacity of the line.

[0013] Constraints on the continuity of energy storage operation: ; ; ; ; ; ; In the formula, is the 0-1 charging decision variable of node i at time t, is the 0-1 discharge decision variable of node i at time t, is the initial capacity, is the capacity of node k at time t, is the charging efficiency, is the discharge efficiency, is the capacity of node k at time T, is the charging power of node k at time T, is the discharge power of node k at time T, is the time interval from t to T.

[0014] Compared with the prior art, the present invention has the following beneficial effects: starting from the safety, economy, flexibility and environmental protection of the operation of the new energy base, the present invention takes into account the investment cost, operation cost, low-carbon benefit and the benefits of the high-elasticity system under extreme weather conditions relative to the elasticity of the system that has not been considered, and conducts multi-objective two-step planning and comprehensive evaluation of the source, grid, storage and direct current of the new energy base in the Shagohuang area, which can obtain the optimal planning scheme and conduct a real evaluation. DETAILED DESCRIPTION

[0015] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0016] A comprehensive benefit evaluation method for the Shagohuang base power grid storage and direct current under extreme scenarios, including: S1 performs power optimization planning based on the clustering results of typical scenarios, with the goal of minimizing the investment cost, operating cost and load loss cost of line expansion and energy storage; S2 conducts transmission and storage joint planning based on the capacity configuration results of power generation units obtained from power optimization planning and considering the elasticity index of the system; S3 extracts extreme weather scenarios and optimizes the planning and evaluation of transmission and storage by taking into account the network storage configuration cost, operation and maintenance cost, and load loss cost.

[0017] S1 includes: the objective function of the model minimizes the comprehensive cost consisting of investment cost and operating cost, considers the impact of extreme weather, introduces the load loss cost to measure the resilience level of the system under extreme weather scenarios, minimizes the load loss cost with the goal of optimizing the comprehensive benefits, and minimizes the objective function for: ; In the formula, is the investment cost of line expansion and energy storage, is the running cost, is the loss of load cost; Including line investment cost and energy storage investment cost: ; In the formula, is the line investment cost, is the energy storage investment cost; calculate : ; In the formula, is the line discount rate, n is the line investment period, is the unit line cost, is the line length of the transmission corridor ij, is a 0-1 variable for the number of new p lines in transmission corridor ij; calculate : ; ; ; In the formula, is the fixed cost of energy storage at k nodes, is the k-node energy storage configuration 0-1 variable, is the variable cost of energy storage at k nodes, is the value range of k nodes, Discount for energy storage, Operating cost factor, Maintenance cost factor, Disposal cost coefficient, Unit power energy storage investment cost, is the k-node energy storage configuration power, Unit storage capacity cost, is the k-node energy storage configuration capacity, is the energy storage discount rate, and N is the energy storage investment period.

[0018] S2 includes, calculation : ; In the formula, is the unit energy storage charging cost, is the unit energy storage discharge cost, is the charging power of the k-node energy storage at time t, is the discharge power of the energy storage at node k at time t; calculate : ; In the formula, is the unit loss of load cost, is the load loss ratio of node i at time t, is the normal operation load of node i at time t, The range of i nodes.

[0019] S3 includes constraints such as the number of newly built lines and energy storage configurations, energy storage rated power and capacity configuration constraints, unit output constraints, node power balance constraints, branch power constraints, and energy storage operation continuity constraints.

[0020] Constraints on the number of new lines and energy storage configurations: ; ; In the formula, is the range of the transmission corridor ij, is the maximum number of new lines in transmission corridor ij, is the maximum number of energy storage configurations, set to 4.

[0021] Configuration constraints on energy storage rated power and capacity: ; ; In the formula, is the minimum energy storage configuration capacity, is the maximum energy storage configuration capacity, is the minimum energy storage rated power, is the maximum energy storage rated power.

[0022] Constraints on unit output: ; ; In the formula, is the minimum thermal power output of node i, is the maximum thermal power output of node i, is the thermal power output of node i at time t, is the photovoltaic power output of node i at time t, is the maximum photovoltaic output of node i.

[0023] Power balance constraints on nodes: ; In the formula, is the node-branch matrix of the existing line, The active power of the existing branch at time t is: is the node-branch association matrix to be constructed, is the active power of the branch to be built at time t, is the wind power output of node i at time t, is the energy storage charging and discharging power at time t, is the active load of node i at time t.

[0024] Power constraints on branches: ; In the formula, is the existing line power in transmission corridor ij, is the number of existing lines in transmission corridor ij, is the power of the p new lines in the transmission corridor ij, is the maximum capacity of the line.

[0025] Constraints on the continuity of energy storage operation: ; ; ; ; ; ; In the formula, is the 0-1 charging decision variable of node i at time t, is the 0-1 discharge decision variable of node i at time t, is the initial capacity, is the capacity of node k at time t, is the charging efficiency, is the discharge efficiency, is the capacity of node k at time T, is the charging power of node k at time T, is the discharge power of node k at time T, is the time interval from t to T.

[0026] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features may be replaced by equivalents, and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for evaluating the comprehensive benefits of the Shagohuang large-scale power generation, grid storage and direct current in extreme scenarios, characterized in that: include: S1 performs power optimization planning based on the clustering results of typical scenarios, with the goal of minimizing the investment cost, operating cost and load loss cost of line expansion and energy storage; S2 conducts transmission and storage joint planning based on the capacity configuration results of power generation units obtained from power optimization planning and considering the elasticity index of the system; S3 extracts extreme weather scenarios and optimizes the planning and evaluation of transmission and storage by taking into account the network storage configuration cost, operation and maintenance cost, and load loss cost.

2. According to the method for evaluating the comprehensive benefits of the power grid and direct current storage of the Shagohuang base in extreme scenarios in claim 1, it is characterized in that: S1 includes: the objective function of the model minimizes the comprehensive cost consisting of investment cost and operating cost, considers the impact of extreme weather, introduces the load loss cost to measure the resilience level of the system under extreme weather scenarios, minimizes the load loss cost with the goal of optimizing the comprehensive benefits, and minimizes the objective function for: ; In the formula, is the investment cost of line expansion and energy storage, is the running cost, is the loss of load cost; Including line investment cost and energy storage investment cost: ; In the formula, is the line investment cost, is the energy storage investment cost; calculate : ; In the formula, is the line discount rate, n is the line investment period, is the unit line cost, is the line length of the transmission corridor ij, is a 0-1 variable for the number of new p lines in transmission corridor ij; calculate : ; ; ; In the formula, is the fixed cost of energy storage at k nodes, is the k-node energy storage configuration 0-1 variable, is the variable cost of energy storage at k nodes, is the value range of k nodes, Discount for energy storage, Operating cost factor, Maintenance cost factor, Disposal cost coefficient, Unit power energy storage investment cost, is the k-node energy storage configuration power, Unit storage capacity cost, is the k-node energy storage configuration capacity, is the energy storage discount rate, and N is the energy storage investment period.

3. The method for evaluating the comprehensive benefits of the power grid and direct current storage of the Shagohuang base under extreme scenarios according to claim 2 is characterized in that: S2 includes, calculation : ; In the formula, is the unit energy storage charging cost, is the unit energy storage discharge cost, is the charging power of the k-node energy storage at time t, is the discharge power of the energy storage at node k at time t; calculate : ; In the formula, is the unit loss of load cost, is the load loss ratio of node i at time t, is the normal operation load of node i at time t, The range of i nodes.

4. The method for evaluating the comprehensive benefits of the power grid and direct current storage of the Shagohuang base under extreme scenarios according to claim 3 is characterized in that: S3 includes constraints such as the number of newly built lines and energy storage configurations, energy storage rated power and capacity configuration constraints, unit output constraints, node power balance constraints, branch power constraints, and energy storage operation continuity constraints.

5. According to the method for evaluating the comprehensive benefits of the power grid and direct current storage of the Shagohuang base in extreme scenarios in claim 4, it is characterized in that: Constraints on the number of new lines and energy storage configurations: ; ; In the formula, is the range of the transmission corridor ij, is the maximum number of new lines in transmission corridor ij, is the maximum number of energy storage configurations, set to 4.

6. The method for evaluating the comprehensive benefits of the power grid and direct current storage of the Shagohuang base in extreme scenarios according to claim 5 is characterized in that: Configuration constraints on energy storage rated power and capacity: ; ; In the formula, is the minimum energy storage configuration capacity, is the maximum energy storage configuration capacity, is the minimum energy storage rated power, is the maximum energy storage rated power.

7. The method for evaluating the comprehensive benefits of the power grid, storage and direct current of the Shagohuang base under extreme scenarios according to claim 6 is characterized in that: Constraints on unit output: ; ; In the formula, is the minimum thermal power output of node i, is the maximum thermal power output of node i, is the thermal power output of node i at time t, is the photovoltaic output of node i at time t, is the maximum photovoltaic output of node i.

8. The method for evaluating the comprehensive benefits of the power grid, storage and direct current of the Shagohuang base in extreme scenarios according to claim 7 is characterized in that: Power balance constraints on nodes: ; In the formula, is the node-branch matrix of the existing line, The active power of the existing branch at time t is: is the node-branch association matrix to be constructed, is the active power of the branch to be built at time t, is the wind power output of node i at time t, is the energy storage charging and discharging power at time t, is the active load of node i at time t.

9. The method for evaluating the comprehensive benefits of the power grid, storage and direct current of the Shagohuang base in extreme scenarios according to claim 8 is characterized in that: Power constraints on branches: ; In the formula, is the existing line power in transmission corridor ij, is the number of existing lines in transmission corridor ij, is the power of the p new lines in the transmission corridor ij, is the maximum capacity of the line.

10. The method for evaluating the comprehensive benefits of the power grid, storage and direct current of the Shagohuang base in extreme scenarios according to claim 9 is characterized in that: Constraints on the continuity of energy storage operation: ; ; ; ; ; ; In the formula, is the 0-1 charging decision variable of node i at time t, is the 0-1 discharge decision variable of node i at time t, is the initial capacity, is the capacity of node k at time t, is the charging efficiency, is the discharge efficiency, is the capacity of node k at time T, is the charging power of node k at time T, is the discharge power of node k at time T, is the time interval from t to T.

Citation Information

Cited By

  • Screening curve model-based two-dimensional flexible resource optimal configuration and scheduling method

    CN121766808A

  • A two-dimensional flexibility resource optimization configuration and scheduling method based on a screening curve model

    CN121766808B