Power control system, load device, control method, and information processing device

Through the power control system, the compensation power supply unit and control unit of the load device are used to adjust the reactive power supply of multiple load devices, solving the problems of voltage rise and generator loss, and achieving more efficient generator utilization.

CN118975084APending Publication Date: 2024-11-15DAIKIN INDUSTRIES LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380032439.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-05-16
Filing Date
2023-05-16
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In power systems, voltage rise problems lead to losses of generator opportunities, especially when the power generation becomes larger when solar power generation is generated, and power generation cannot be maximized by controlling only reactive power supply.

Method used

By obtaining the supply information of the power generation device and the circuit, using the compensation power supply unit and the control unit of the load device, adjusting the reactive power supply unit to supply the circuit to multiple load devices, improving the control freedom and accuracy of the power factor, and ensuring Maximize generator opportunities.

Benefits of technology

It effectively suppresses the increase in circuit voltage, improves the utilization rate of generators, and avoids the loss of generators caused by single reactive power supply due to power factor control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118975084A_ABST
    Figure CN118975084A_ABST
Patent Text Reader

Abstract

The present invention addresses the problem of suppressing the loss of a generator compared to a case in which the power factor of a circuit is controlled only by the supply of reactive power from a power generation device to the circuit. The present invention is provided with: an acquisition means for acquiring supply information relating to the supply of power to a circuit by a power generation device that generates power and supplies power to the circuit; and a control means for controlling, on the basis of the supply information acquired by the acquisition means, the supply of reactive power to the circuit by a load device provided with a compensation power supply means capable of supplying reactive power to the circuit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a power control system, a load device, a control method and an information processing device. Background Art

[0002] As the introduction of power generation devices such as solar power generation and wind power generation increases, voltage increases in electric circuits of power systems have become a problem.

[0003] Patent document 1 describes the following: Based on the state quantity used to calculate the power factor of the cooperation point between the AC system and the demander, the reactive power output by the inverter required to make the power factor of the AC system and the demander above the specified power factor is calculated, and the inverter is controlled to maintain the power factor above the specified value.

[0004] Patent document 2 describes the following: for multiple inverters installed on multiple solar cells, the power factor of the first inverter whose corresponding solar cell is in a state of reduced power generation is reduced, and the power factor of the second inverter which is not in a state of reduced power generation is increased, thereby suppressing the reduction in the overall power generation of the solar power generation system.

[0005] Prior art literature

[0006] Patent Literature

[0007] Patent Document 1: Japanese Patent Application Publication No. 2020-182276

[0008] Patent Document 2: Japanese Patent No. 6713237 Summary of the invention

[0009] Problems to be solved by the invention

[0010] In order to suppress the voltage rise of the circuit, the reactive power supply from the power generation device to the circuit is sometimes controlled so that the power factor of the circuit becomes a predetermined value. In this case, the supply of active power to the circuit is limited when the power generation amount increases, such as on a sunny day in solar power generation, so the maximum amount of power generation is not performed, and the power generation opportunity is lost.

[0011] An object of the present disclosure is to suppress the loss of power generation opportunities compared to the case where the power factor of an electric circuit is controlled only by supplying reactive power from a power generation device to the electric circuit.

[0012] Means for solving problems

[0013] The power control system disclosed in the present invention comprises: an acquisition unit that acquires supply information related to power supply to a circuit by a power generation device that generates power and supplies power to the circuit; and a control unit that controls the supply of reactive power to the circuit by a load device based on the supply information acquired by the acquisition unit, wherein the load device comprises a compensation power supply unit capable of supplying reactive power to the circuit. In this case, compared with a case where the power factor of the circuit is controlled only by supplying reactive power from the power generation device to the circuit, the loss of power generation opportunity is suppressed.

[0014] Here, the load device may be a plurality of load devices dispersedly arranged in the circuit, and the control unit may control the supply of reactive power from the plurality of load devices to the circuit according to the supply information. In this case, by taking a plurality of load devices as the objects of control, the degree of freedom of control of the power factor is increased compared with the case where only one load device is taken as the object of control.

[0015] In addition, in the circuit, the system interconnection point where the power generation device is interconnected with the power system and the location where the plurality of load devices are connected to the power system may be different. In this case, by making the load devices connected to the location different from the system interconnection point the object of control, the degree of freedom of control of the power factor is improved compared to the case where only the load devices connected to the same location are the objects of control.

[0016] Furthermore, the plurality of load devices may be connected to a distribution line on the power system via a transformer, and the distribution line may be connected to the power generation device via the system interconnection point. In this case, by controlling the plurality of load devices connected to the same distribution line as the power generation device, the control accuracy is improved compared to the case where the load devices connected to different distribution lines are controlled.

[0017] In addition, the load devices may be a plurality of load devices connected to the power system at the same location on the circuit as the system interconnection point where the power generation device and the power system are interconnected, and the control unit controls the supply of reactive power to the circuit by the plurality of load devices based on the supply information acquired by the acquisition unit. In this case, by making the plurality of load devices connected to the same location as the system interconnection point of the power generation device as the object of control, the control accuracy is improved compared to the case where the load devices connected to different locations are made the object of control.

[0018] In addition, the compensation power supply unit of the load device may be capable of adjusting the apparent power in the load device, i.e., the device itself, and, when reactive power is supplied to the circuit according to the supply information, the compensation power supply unit is limited in adjusting the apparent power in the device itself. In this case, the apparent power in the device itself can be adjusted, and reactive power for supplying to the circuit can be ensured.

[0019] In addition, the load device may include the compensation power supply unit capable of supplying reactive power using a capacitor as a voltage source. In this case, the life of the load device is reduced compared to the case where the reactive power is supplied using a secondary battery as a voltage source.

[0020] Furthermore, the acquisition unit may acquire circuit information related to the apparent power of the circuit, and the control unit may control the supply of reactive power from the load device to the circuit based on the circuit information. In this case, the control accuracy of the power factor is improved compared to the case where the supply of reactive power of the load device is controlled regardless of the circuit information.

[0021] In addition, the circuit information may be circuit information of a circuit in the circuit that branches from a distribution line connected to the power generation device via a system interconnection point where the power generation device is interconnected with the power system and reaches the system interconnection point. In this case, the power factor of the circuit is controlled for each system interconnection point, and the control accuracy is improved.

[0022] In addition, the control unit may control the supply of reactive power from the load device to the circuit based on the power factor predetermined for the circuit and the supply information. In this case, the control accuracy of the power factor is improved compared to the case where the control is performed independently of the predetermined power factor.

[0023] In addition, the control unit may control the reactive power supplied by the power generation device to the circuit according to a condition predetermined for the load device. In this case, the degree of freedom of control of the power factor is improved compared to a case where the control unit controls only the load device.

[0024] Furthermore, the control unit may control the relationship between the reactive power supply of the power generation device to the circuit and the reactive power supply of the load device based on a condition predetermined for the position of the load device and a condition predetermined for the position of the power generation device. In this case, the control accuracy of the power factor is improved compared to a case where the control is performed regardless of the positions of the power generation device and the load device.

[0025] In addition, the acquisition unit may acquire loss information related to the loss of reactive power supplied by the load device in the circuit from the load device to the power generation device, and the control unit may control the reactive power supplied by the load device to the circuit based on the loss information. In this case, the accuracy of power factor control is improved compared to a case where control is performed regardless of the loss information.

[0026] From another point of view, the load device of the present disclosure includes: an acquisition unit that acquires supply information related to power supply to the circuit by a power generation device that generates power and supplies power to the circuit; and a compensation power supply unit that supplies reactive power to the circuit based on the supply information acquired by the acquisition unit. In this case, compared with the case where the power factor of the circuit is controlled only by supplying reactive power from the power generation device to the circuit, the loss of power generation opportunity is suppressed.

[0027] From another point of view, the control method disclosed in the present invention comprises: an acquisition step of acquiring supply information related to the power supply of a power generation device that generates power and supplies power to a circuit; and a control step of controlling the supply of reactive power to the circuit by a load device based on the supply information, wherein the load device comprises a compensation power supply unit capable of supplying reactive power to the circuit. In this case, compared with a case where the power factor of the circuit is controlled only by the supply of reactive power from the power generation device to the circuit, the loss of power generation opportunity is suppressed.

[0028] From another point of view, the information processing device of the present disclosure includes a control unit that controls the transmission and reception of information between the information processing device and other devices, the control unit obtains supply information related to the power supply of a power generation device that generates power and supplies power to a circuit, and the control unit sends instruction information for instructing the supply of reactive power to the circuit to a load device having a compensation power supply unit capable of supplying reactive power to the circuit based on the supply information. In this case, compared with the case where the power factor of the circuit is controlled only by the supply of reactive power from the power generation device to the circuit, the loss of power generation opportunity is suppressed.

[0029] From another point of view, the load device of the present disclosure includes: a receiving unit that receives instruction information for instructing to supply reactive power to the circuit based on supply information related to power supply from a power generation device that generates power and supplies power to the circuit; and a compensation power supply unit that supplies reactive power to the circuit according to the instruction information received by the receiving unit. In this case, compared with the case where the power factor of the circuit is controlled only by the reactive power supply from the power generation device to the circuit, the loss of power generation opportunity is suppressed.

[0030] In addition, the load device may include: a conversion unit that converts received power; and a heat pump unit that consumes the power converted by the conversion unit to adjust the temperature or humidity, and the compensation power supply unit uses a capacitor as a voltage source to supply reactive power to the power receiving path of the conversion unit. In this case, the complexity of the load device is suppressed. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 1 is a diagram showing an example of the overall configuration of a power supply system including a power control system to which the present embodiment is applied.

[0032] Figure 2 It is a diagram showing an example of the hardware configuration of the control device and the management server according to the present embodiment.

[0033] Figure 3 This is a diagram showing an example of the hardware configuration of a solar power generation device.

[0034] Figure 4 This is a diagram showing an example of the hardware configuration of an air conditioning device.

[0035] Figure 5 This is a diagram showing an example of the functional configuration of the solar power generation device, air conditioning device, control device, and management server according to the present embodiment.

[0036] Figure 6 It is a diagram showing an example of a circuit management table.

[0037] Figure 7 This is a diagram showing an example of a device management table.

[0038] Figure 8 This is a sequence diagram showing an example of the operations of the solar power generation device, the air conditioning device, the control device, and the management server.

[0039] Fig. 9 This is a flowchart showing an example of operation related to calculation of a required amount in the control device.

[0040] Fig.10 This is a flowchart showing an example of operations related to determination of a responsible device in the control device. DETAILED DESCRIPTION

[0041] Hereinafter, a mode of implementation (referred to as “embodiment”) will be described with reference to the drawings.

[0042] [Power supply system 1000]

[0043] Figure 1 1 is a diagram showing an example of the overall configuration of a power supply system 1000 including a power control system 1 to which the present embodiment is applied.

[0044] exist Figure 1 In the example of , the power supply system 1000 includes a power system 90 including a power plant 91 , a device group N ( N1 , N2 , N3 , N4 , N5 ), and a power control system 1 .

[0045] (Power System 90)

[0046] The power system 90 includes a power plant 91, which generates electricity and supplies electricity to consumers. Figure 1 In the example, a power system 90 is provided with a power station 91, a supply-side substation 92, a transmission line 93, a distribution line 930 (930b, 930c), a voltage regulating device 94, a receiving-side transformer 95 (95d, 95e, 95f, 95g, 95h), an introduction line 96 (96d, 96e, 96f, 96g, 96h), and a distribution substation 97.

[0047] In addition, with respect to the power distribution line 930 , the side where the power plant 91 is located is sometimes referred to as the “supply side”, and the side different from the supply side is sometimes referred to as the “receiving side”.

[0048] The power plant 91 is a device that generates power distributed in the power system 90. In this example, the power plant 91 generates more power than the equipment (described later) connected to the incoming line 96. More specifically, the power plant 91 generates the largest power among the equipment and devices connected to the transmission line 93, the distribution line 930, and the incoming line 96.

[0049] Examples of the power plant 91 include a thermal power plant, a hydroelectric power plant, a wind power plant, a solar power plant, a geothermal power plant, a nuclear power plant, and a pumped-water power plant.

[0050] The supply-side substation 92 converts and outputs the voltage from the power station 91. In more detail, the supply-side substation 92 is one or more substations installed on the supply side of the receiving-side transformer 95, and converts and outputs the voltage applied by the installed transformer. Examples of the transformer installed in the supply-side substation 92 include a transformer that converts the voltage from the power station 91 to a voltage of 275,000 V to 500,000 V, a transformer that converts a voltage of 275,000 V to 500,000 V to 154,000 V, a transformer that converts a voltage of 154,000 V to 66,000 V, and a transformer that converts a voltage of 66,000 V to 22,000 V.

[0051] The transmission line 93 is a line through which current generated by the voltage applied from the supply-side substation 92 flows. The transmission line 93 is connected to the distribution substation 97. The distribution substation 97 converts the voltage of 22,000 V to 6,600 V, for example. The distribution line 930 is a line through which current generated by the voltage applied from the distribution substation 97 flows. The current flows from the distribution substation 97 to the distribution line 930. Figure 1 In the example of FIG. 1 , the power distribution substation 97 is connected to two power distribution lines 930b and 930c.

[0052] The voltage regulator (SVC: Static Var Compensator or STATCOM) 94 regulates the voltage of the power distribution line 930. More specifically, the voltage regulator 94 detects the voltage of the power distribution line 930, and when the detected voltage is not within a predetermined range, regulates the voltage so that the voltage falls within the predetermined range.

[0053] In addition, Figure 1 In the example of , two voltage regulators 94 are provided corresponding to the two power distribution lines 930b and 930c to adjust their respective voltages.

[0054] The power distribution line 930 is connected to the power distribution substation 97 and is a line through which the current from the power distribution substation 97 flows. Figure 1 In the example of FIG. 1 , two distribution lines 930 b and 930 c are provided, and the current from the transmission line 93 flows to each distribution line 930 via a distribution substation 97 for changing the voltage.

[0055] In addition, each distribution line 930 is connected to a plurality of receiving-side transformers 95, and current flows to each receiving-side transformer 95. Figure 1 In the example of FIG. 1 , the distribution line 930b is connected to the receiving-side transformers 95d, 95e, and 95f, and the distribution line 930c is connected to the receiving-side transformers 95g and 95h.

[0056] The receiving side transformer 95 converts the voltage from the distribution line 930 and outputs it. In more detail, the receiving side transformer 95 is one or more transformers installed on the receiving side of the supply side substation 92, and converts the applied voltage and outputs it. As the receiving side transformer 95, a transformer that converts a voltage of 6600V to 100V or 200V can be cited. In addition, the receiving side transformer 95 can be a pole-mounted transformer or a power receiving device that converts a voltage of 6600V to 100V or 200V on the demand side.

[0057] The lead-in line 96 is a line through which a current generated by the voltage applied from the receiving-side transformer 95 flows. Figure 1In the example, lead-in wires 96d, 96e, 96f, 96g, and 96h are connected to receiving-side transformers 95d, 95e, 95f, 95g, and 95h, respectively, and a current generated by application of a voltage from each receiving-side transformer 95 flows through each lead-in wire 96.

[0058] As described above, in the power system 90, the power from the power station 91 is converted in the supply-side substation 92, and is branched to each receiving-side transformer 95 via the transmission line 93, the distribution substation 97, and the distribution line 930. Then, the branched power is converted in the receiving-side transformer 95, and is supplied to the device group N as the connection destination via the lead-in line 96. In this way, power distribution from the power station 91 to each device group N is performed based on the power system 90.

[0059] Here, the transmission line 93, the distribution line 930, and the lead-in line 96 are all examples of the circuit of this embodiment. Hereinafter, in this specification, these may be collectively referred to as a "circuit".

[0060] Circuit sensors 6 (6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h) for detecting parameters related to the apparent power of each circuit are installed on the transmission line 93, the distribution line 930, and the lead-in line 96. In addition, the parameters related to the apparent power are parameters that affect the apparent power. As parameters related to the apparent power, for example, in addition to the apparent power, active power, reactive power, current, voltage, and power factor, the apparent power, active power, and reactive power in a predetermined period can also be cited. The parameters related to the apparent power are an example of circuit information related to the apparent power of the circuit.

[0061] The circuit sensor 6 detects a parameter related to the apparent power at a predetermined time, for example. The predetermined time is not limited, and is, for example, 60 seconds. The circuit sensor 6 transmits the detected parameter and circuit identification information for identifying the circuit to the control device 10 (described later).

[0062] The parameters detected by the circuit sensor 6 are not limited to one. The circuit sensor 6 may detect a plurality of the above parameters, and may send information including the detected plurality of parameters to the control device 10. In addition, the parameters detected by the circuit sensor 6 may be the same type of parameters for each circuit sensor 6, or may be different types of parameters for each circuit sensor 6.

[0063] (Device Group N)

[0064] The device group N is a collection of devices connected to the power system 90 via a common incoming line 96. In other words, one or more devices belonging to a certain device group N are interconnected with the power system 90 via a common incoming line 96. Figure 1 In the example shown, five equipment groups N1, N2, N3, N4, and N5 are shown, and the solar power generation device 3, the air conditioning device 4, and the power storage device 5 belong to each equipment group N. For example, two solar power generation devices 3 and three air conditioning devices 4 belong to the equipment group N1, and these devices are interconnected with the power system 90 via a common lead-in line 96d. In addition, the equipment group N may also be composed of one device, such as only one solar power generation device 3 belongs to the equipment group N3.

[0065] Each device in the device group N may be a device owned by one customer or a plurality of customers. In addition, a plurality of devices belonging to different device groups N may be owned by one customer.

[0066] Here, the point where the device group N is connected in the incoming line 96, in other words, the point where the device belonging to the device group N is interconnected with the power system 90 is referred to as a system interconnection point P. In addition, when it is necessary to distinguish the system interconnection point P of each device group N, the same number i as the device group Ni is added and referred to as a system interconnection point Pi. For example, the solar power generation device 3 and the air conditioning device 4 belonging to the device group N1 are interconnected with the power system 90 at the system interconnection point P1.

[0067] In addition, Figure 1 In the example of FIG. 1 , each device in the device group N is connected to the incoming line 96 via the device connection line 7 branching from the system interconnection point P. The system interconnection point P can also be understood as a point where the device connection line 7 in the device group N is connected to the incoming line 96.

[0068] The solar power generation device 3 is a device that generates electricity by converting light energy such as sunlight into electrical energy. The solar power generation device 3 of this embodiment generates less power than the power station 91. The "generating less power" means that the maximum value of the power that the solar power generation device 3 can generate per unit time is less than the maximum value of the power that the power station 91 can generate per unit time, and does not mean that the power generated by the solar power generation device 3 is always less than the power generated by the power station 91.

[0069] The solar power generation device 3 can supply the generated power to the air conditioning device 4 or the power storage device 5 in the device group N via the device connection line 7. In addition, the solar power generation device 3 can supply the generated power to the circuit via the device connection line 7. The solar power generation device 3 of this embodiment is an example of a power generation device that supplies the generated power to the circuit.

[0070] The solar power generation device 3 of the present embodiment transmits the device identification information for identifying the device, the information indicating the state of the power supply, the information indicating the power generated by the device, the information indicating the active power supplied to the circuit, the information indicating the reactive power supplied to the circuit, and the information indicating the supply capacity of the reactive power that can be supplied to the circuit as the power generation device information to the management server 20 (described later) at predetermined time intervals. The predetermined time is not limited, and is, for example, 60 seconds.

[0071] In addition, the information indicating the state of the power supply, the information indicating the generated power, the information indicating the active power supplied to the circuit, and the information indicating the reactive power supplied to the circuit included in the power generation device information are all examples of supply information related to the power supplied from the solar power generation device 3 to the circuit.

[0072] The air conditioning device 4 is provided with a heat pump unit (using Figure 4 The heat pump unit consumes the power received via the device connection line 7 to adjust the temperature or humidity. In addition, "adjusting the temperature or humidity" includes the air-conditioning device 4 adjusting only one of the temperature and humidity and adjusting both the temperature and humidity.

[0073] In addition, the air conditioner 4 supplies reactive power to the circuit via the device connection line 7 according to an instruction from the control device 10. The air conditioner 4 of the present embodiment is an example of a load device including a compensation power supply unit capable of supplying reactive power to the circuit.

[0074] The power storage device 5 is a device that stores power received via the device connection line 7 and supplies the stored power in response to a request from a user. The power storage device 5 includes a secondary battery (storage battery) such as a lithium battery (not shown), and can supply power by charging and discharging the secondary battery. The power storage device 5 uses the secondary battery as a compensation power supply unit, and supplies reactive power to the circuit via the device connection line 7 in response to an instruction from the control device 10. The power storage device 5 of this embodiment is an example of a load device having a compensation power supply unit.

[0075] The air conditioner 4 or the power storage device 5 of the present embodiment sends the device identification information for identifying the device, the information indicating the state of the power supply, the information indicating the operating status, the information indicating the reactive power supplied to the circuit, and the information of the supply capacity as the load device information to the management server 20 (described later) at every predetermined time. The predetermined time is not limited, and is, for example, 60 seconds.

[0076] Note that the load device information may include any information capable of estimating or calculating the supply capacity of the air conditioner 4 or the power storage device 5 , and is not limited to the above-described example.

[0077] Group G is a collection of devices with a compensation power supply unit among devices belonging to the same device group N. For each group G, if it is necessary to distinguish, such as Figure 1 In the figure, the same number i as the equipment group Ni is assigned to the equipment group G1, G2, and G4, and the equipment group G1 is called a group Gi. For example, the group G1 is composed of three air conditioners 4 having a compensation power supply unit among the equipment belonging to the equipment group N1.

[0078] In addition, Figure 1 In the example of FIG. 5 , the group G consisting of only the air-conditioning device 4 is shown, but the group G may include the power storage device 5 or may consist of only the power storage device 5 .

[0079] (Power control system 1)

[0080] like Figure 1 As shown, the power control system 1 includes a control device 10 and a management server 20 .

[0081] The power control system 1 to which this embodiment is applied controls the supply of reactive power to the circuit by the compensation power supply means of the air conditioner 4 or the power storage device 5 based on information obtained from the solar power generation device 3 , the air conditioner 4 , and the circuit sensor 6 .

[0082] The control device 10 is an information processing device that instructs the air conditioner 4 or the power storage device 5 to supply reactive power to the circuit, and controls the reactive power supplied from each device to the circuit. In this embodiment, the control device 10 obtains the power generation device information of the solar power generation device 3 through the management server 20, and obtains the parameters related to the apparent power and the circuit identification information from the circuit sensor 6. Then, based on the obtained information, it is determined whether reactive power needs to be supplied to the circuit. If it is determined that reactive power needs to be supplied, the device connected to the power system 90 is instructed to supply reactive power.

[0083] The management server 20 is an information processing device that manages the power generation device information received from the solar power generation device 3 and the load device information received from the air conditioning device 4 or the power storage device 5 , and transmits the managed information in response to a request from the control device 10 .

[0084] Furthermore, when the control device 10 instructs the air-conditioning device 4 or the power storage device 5 to supply reactive power, the management server 20 of the present embodiment manages the contents of the instruction as a control history.

[0085] The control device 10 and the management server 20 are implemented by, for example, a computer. In addition, the control device 10 and the management server 20 may each be composed of a single computer, or may be implemented by distributed processing based on a plurality of computers. In addition, they may be implemented on virtual hardware provided by cloud computing.

[0086] Furthermore, in the present embodiment, the control device 10 and the management server 20 are implemented as separate devices, but the control device 10 and the management server 20 may be implemented as an integrated device.

[0087] In this embodiment, the control device 10 is connected to the management server 20, the circuit sensor 6, the solar power generation device 3, and the air conditioning device 4 via a network (not shown). In addition, the management server 20 is connected to the solar power generation device 3 and the air conditioning device 4 via a network. The network connecting the devices is not limited as long as it can send and receive information, and can be wired communication, wireless communication, or power line communication (PLC: Power Line Communication). In addition, the devices can be connected via multiple networks, communication lines, relay devices, etc.

[0088] Here, when the power generated by the solar power generation device 3 is small, even if almost all of the generated power is supplied to the circuit as active power, the power factor is close to 100%, and the voltage rise of the circuit is small. On the contrary, when the power generated by the solar power generation device 3 is large, if it is assumed that almost all of the generated power is supplied to the circuit as active power, the power factor is close to 100%, and the voltage rise of the circuit becomes large. Therefore, at least when the power generated by the solar power generation device 3 is large, it is necessary to control the power factor of the circuit to suppress the voltage rise.

[0089] The power control system 1 according to this embodiment controls the supply of reactive power to the circuit by the solar power generation device 3, the air conditioning device 4 and the power storage device 5 based on the power generation device information from the solar power generation device 3. The power factor of the circuit is controlled by the reactive power supplied from each device.

[0090] [Hardware structure of each device]

[0091] (Control Device 10 and Management Server 20)

[0092] Figure 2 1 is a diagram showing an example of the hardware configuration of the control device 10 and the management server 20 according to the present embodiment.

[0093] In the present embodiment, the control device 10 and the management server 20 are described using common drawings on the assumption that they have the same hardware configuration, but the control device 10 and the management server 20 may have different hardware configurations.

[0094] As shown in the figure, the control device 10 and the management server 20 are provided with a CPU (Central Processing Unit) 10a, a ROM (Read Only Memory) 10b, a RAM (Random Access Memory) 10c, a storage unit 10d, and a communication unit 10e (communication interface). In addition, the control device 10 and the management server 20 may also have an input unit for inputting information such as a keyboard and a mouse, and a display unit such as a liquid crystal display. These functional units are connected to a bus 10f, and data is sent and received via the bus 10f.

[0095] The ROM 10b and the storage unit 10d store programs to be executed by the CPU 10a. The CPU 10a reads out the programs stored in the ROM 10b and the storage unit 10d, and executes the programs using the RAM 10c as a work area.

[0096] In the present embodiment, the various functions of the control device 10 and the management server 20 are realized by the CPU 10 a executing the programs stored in the ROM 10 b and the storage unit 10 d .

[0097] (Solar power generation device 3)

[0098] Figure 3 It is a diagram showing an example of the hardware configuration of the solar power generation device 3 .

[0099] The solar power generation device 3 of the present embodiment is configured to include an information processing device 30 and a power generation device 31 .

[0100] As shown in the figure, the information processing device 30 includes a CPU 30a, a ROM 30b, a RAM 30c, a storage unit 30d, and a communication unit 30e (communication interface). In addition, these functional units are connected to a bus 30f. The hardware structure of the information processing device 30 is similar to that of the control device 10 and the management server 20 (see Figure 2 ) are the same, so the same name is given to each functional unit and detailed description is omitted.

[0101] The power generation device 31 includes a power conversion unit 31a, a power generation unit 31b, and a device connection line 7 (see Figure 1 ) connected to the power supply path 31c.

[0102] The power generation unit 31b is a functional unit including a so-called solar panel and a connection box, and converts the received light energy into DC power and stores it. In addition, the power conversion unit 31a is a so-called power conditioner, which converts the DC power stored in the power generation unit 31b into AC power and supplies it to the power supply path 31c. The power supplied to the power supply path 31c is supplied to the air conditioner 4 or the power storage device 5 in the device group N via the device connection line 7. In addition, the power supplied to the power supply path 31c is supplied to the circuit via the device connection line 7.

[0103] The power conversion unit 31a can be controlled by a control signal (using Figure 5 The power converter 31a is a power converter that is configured to convert the direct current from the power generating unit 31a to an alternating current (described later) and outputs reactive power together with the active power obtained by converting the direct current from the power generating unit 31b to an alternating current. In more detail, it is possible to output reactive power of a magnitude corresponding to the control signal from the information processing device 30. Here, there is an upper limit corresponding to the capacity of the power converter 31a on the power that can be taken in. Therefore, while ensuring the output of reactive power of a magnitude corresponding to the control signal, the power converter 31a limits the conversion and output of active power so that the taken-in power is below the upper limit. In this way, in the solar power generating device 3 of the present embodiment, when reactive power is supplied to the circuit, the supply of active power to the circuit is limited.

[0104] (Air conditioning device 4)

[0105] Figure 4 It is a diagram showing an example of the hardware configuration of the air-conditioning device 4 .

[0106] The air conditioning device 4 of the present embodiment is configured to include an information processing device 40 and a heat pump device 41 .

[0107] As shown in the figure, the information processing device 40 includes a CPU 40a, a ROM 40b, a RAM 40c, a storage unit 40d, and a communication unit 40e (communication interface). In addition, these functional units are connected to a bus 40f. The hardware structure of the information processing device 40 is similar to that of the control device 10 and the management server 20 (see Figure 2 ) are the same, so the same name is given to each functional unit and detailed description is omitted.

[0108] The heat pump device 41 includes an AF (active filter) 41a as an example of a compensation power supply unit, a power conversion unit 41b as an example of a conversion unit, a regulator 41c as an example of a heat pump unit, and a device connection line 7 (see Figure 1 ) connected to the power receiving path 41d.

[0109] The adjustment unit 41c adjusts the temperature or humidity of the ambient air. The adjustment unit 41c is provided with a compressor (not shown) having a motor that operates using the received power and a heat exchanger (not shown). The motor built into the compressor transmits the rotational motion to the compression unit, and the compression unit compresses the refrigerant. The refrigerant that is compressed and liquefied with a higher pressure and temperature is sent to the heat exchanger, which dissipates the heat to the outside air. In this way, the temperature or humidity of the ambient air is adjusted.

[0110] The power conversion unit 41b has an inverter (not shown) and a converter (not shown). The power conversion unit 41b uses the inverter and the converter to convert the power received via the power receiving path 41d into power of a specific voltage and frequency. The specific voltage and frequency refer to the voltage and frequency required for the operation of the motor built into the compressor provided in the adjustment unit 41c. The power conversion unit 41b supplies the converted power to the adjustment unit 41c to operate the adjustment unit 41c.

[0111] The AF 41a is electrically connected to the power conversion unit 41b in parallel with the power receiving path 41d, and adjusts the apparent power in the power receiving path 41d by supplying power to the power receiving path 41d. In this way, the AF 41a can adjust the apparent power in the device. In addition, the AF 41a controls the apparent power of the device according to the control signal (using the control signal) from the information processing device 40. Figure 5 AF 41a is an example of a compensation power supply unit of this embodiment. In addition, AF 41a of this embodiment can also ensure reactive power for supplying to the circuit by limiting the adjustment of apparent power in the device when supplying reactive power to the circuit.

[0112] In addition, the AF 41a includes a circuit (not shown) configured to include a capacitor as a voltage source. The capacitor and the circuit have capacitance and can supply reactive power by charging and discharging.

[0113] In this embodiment, the CPU 40a of the information processing device 40 performs various calculations in the air conditioner 4. However, in other embodiments, the AF 41a of the heat pump device 41 may include a CPU as a functional unit, and the CPU may perform various calculations.

[0114] Here, the CPUs 10a, 30a, and 40a (see Figure 2 to Figure 4 ) is provided to each device in a state where the program to be executed is stored in a computer-readable recording medium such as a magnetic recording medium (tape, disk, etc.), an optical recording medium (optical disk, etc.), a magneto-optical recording medium, a semiconductor memory, etc. In addition, the executed program can also be provided to each device using a communication unit such as the Internet.

[0115] [Functional structure of each device]

[0116] Figure 5 1 is a diagram showing an example of the functional configuration of the solar power generation device 3 , the air conditioning device 4 , the control device 10 , and the management server 20 according to the present embodiment.

[0117] In addition, Figure 5 , for convenience of explanation, in addition to the devices belonging to the power control system 1 and the device group N1, an incoming line 96d for distributing power to the device group N1 and a circuit sensor 6d attached to the incoming line 96d are also shown.

[0118] (Control device 10)

[0119] The control device 10 includes a communication processing unit 101 , a required quantity calculation unit 102 , a responsibility determination unit 103 , a share determination unit 104 , an instruction creation unit 105 , and a charge determination unit 106 .

[0120] The communication processing unit 101 communicates with the communication unit 10e (see Figure 2 ) to send and receive information with other devices. The communication processing unit 101 is an example of an acquisition unit, and requests the management server 20 to acquire the power generation device information of the solar power generation device 3. In addition, the communication processing unit 101 requests the management server 20 to acquire the load device information of the air conditioning device 4 or the power storage device 5. In addition, the parameters related to the apparent power of the target circuit and the circuit identification information are acquired from the circuit sensor 6. In addition, Figure 5 In the example of FIG. 1 , an example of a case where information of the service line 96 d is obtained from the circuit sensor 6 d is shown. However, the communication processing unit 101 of the present embodiment can obtain information from all the circuit sensors 6 on the power system 90 .

[0121] The communication processing unit 101 transmits the instruction information generated by the instruction generating unit 105 to each device as a destination. The instruction information generated by the instruction generating unit 105 and the information from the circuit sensor 6 acquired at the time of the instruction are transmitted to the management server 20.

[0122] The required amount calculation unit 102 determines whether reactive power needs to be supplied to the circuit, and if so, calculates the amount of reactive power that needs to be supplied (sometimes referred to as "required amount"). More specifically, the required amount calculation unit 102 manages the information obtained from the circuit sensor 6, and determines whether reactive power needs to be supplied to the target circuit based on the managed information and the power generation device information of the solar power generation device 3 obtained from the management server 20. Then, if it is determined that reactive power needs to be supplied, the required amount is calculated based on the managed information and the power generation device information.

[0123] Here, use Figure 6 The information managed by the demand calculation unit 102 will be described in detail. Here, the case where the current values ​​of the active power, reactive power, apparent power, and power factor of the target circuit are obtained from the circuit sensor 6 as parameters related to the apparent power will be described as an example.

[0124] Figure 6 It is a diagram showing an example of the circuit management table T1.

[0125] The demand quantity calculation unit 102 of this embodiment associates information about the pre-registered circuit and information obtained from the circuit sensor 6 for each circuit using circuit identification information, and manages the information as a circuit management table T1. Figure 6 As shown in the first column "Circuit Identification Information" of the circuit management table T1, as an example of circuit identification information, the number (6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h) of the circuit sensor 6 installed in each circuit is recorded.

[0126] In the required quantity calculation unit 102 of the present embodiment, as information related to the circuit, circuit identification information, circuit location information, a target value of the power factor of the circuit, an upper limit value of the active power supplied to the circuit, an upper limit value of the reactive power supplied to the circuit, and an upper limit value of the current supplied to the circuit are pre-registered.

[0127] The information on the circuit can be registered by, for example, directly inputting it into the control device 10. Alternatively, for example, the information can be acquired from a computer system or the like used by a manager of the power system 90 through communication and registered.

[0128] The circuit location information is information indicating the location of the target circuit in the power system 90. In this embodiment, Figure 6 As shown in the second column "Location / Destination Device Group" of the circuit management table T1, information indicating which device group N the circuit is connected to on the receiving side is used as the location information of the circuit. For example, the transmission line 93 (see Figure 1) is identified as a circuit connected to the device groups N1, N2, N3, N4, and N5 on the receiving side. In addition, the distribution line 930b represented by the circuit identification information "6b" is determined as a circuit connected to the device groups N1, N2, and N3 on the receiving side, and the lead-in line 96d represented by the circuit identification information "6d" is determined as a circuit connected to the device group N1 on the receiving side. In addition, the location information of the circuit is not limited as long as it is information indicating the location of the circuit as an object, and different information may be used. For example, the mapping data of the power system 90 may be registered in the control device 10, and the coordinates of the circuit or the installed circuit sensor 6 in the mapping data may be used as the location information of the circuit. In addition, for example, the connection relationship between the circuits may be used as the location information of the circuit, such as the transmission line 93 is connected to the distribution lines 930b and 930c via the distribution substation 97, and the distribution line 930b is connected to the lead-in lines 96d, 96e, and 96f.

[0129] The target value of the power factor is a target value when the power factor is controlled, which is predetermined for each circuit by a manager (power supplier) of the power system 90, for example, and is an example of a power factor predetermined for a circuit.

[0130] exist Figure 6 In the example, as shown in the 7th column "Power factor target value [%]" of the circuit management table T1, the target value of the power factor of all circuits is uniformly determined to be 90%, but a different value can also be determined for each circuit.

[0131] The upper limit value of active power is, for example, a value that is predetermined by the manager (power supplier) of the power system 90 as the upper limit value of the active power supplied for each circuit. The upper limit value of active power is determined, for example, based on the corresponding relationship between the supply of active power to the circuit and the voltage rise. More specifically, the upper limit value of active power is determined so that, when the supplied active power exceeds the upper limit value, a problem caused by the voltage rise occurs or the influence of the voltage rise is unacceptable.

[0132] exist Figure 6 In the example, as shown in the 8th column "Active power upper limit value [kW]" of the circuit management table T1, 1500kW to 7500kW is set for each circuit, but the same value may be set for all circuits, or different values ​​may be set.

[0133] The upper limit value of reactive power and the upper limit value of current are values ​​that are previously determined by a manager or the like for each circuit and serve as upper limits of reactive power or current to be supplied, similarly to the upper limit value of active power.

[0134] Here, according to the relationship between the power factor and the active power and reactive power, the upper limit value of the reactive power can be determined according to the target value of the power factor of the circuit and the upper limit value of the active power. Therefore, the upper limit value of the reactive power can also be calculated by the control device 10 based on the upper limit value of the active power and the target value of the power factor registered in advance. Conversely, the control device 10 can also calculate the upper limit value of the active power based on the upper limit value of the reactive power and the target value of the power factor registered in advance.

[0135] In addition, the upper limit of the apparent power can be determined based on the relationship between the apparent power and the active power and reactive power. And, by dividing the upper limit of the apparent power by the voltage of the circuit, the upper limit of the current can be determined. Therefore, the upper limit of the current can also be calculated by the control device 10 based on the upper limit of the active power, the upper limit of the reactive power and the voltage of the circuit.

[0136] exist Figure 6 In the example of , in the 3rd to 6th columns of the circuit management table T1, parameters related to the apparent power of the target circuit are managed in the information obtained from the circuit sensor 6. More specifically, the 3rd column "Active power [kW]" corresponds to the magnitude of the active power supplied to the circuit, the 4th column "Reactive power [kvar]" corresponds to the magnitude of the reactive power supplied to the circuit, the 5th column "Apparent power [kVA]" corresponds to the magnitude of the apparent power supplied to the circuit, and the 6th column "Current value of power factor [%]" corresponds to the current value of the power factor of the circuit.

[0137] In this way, the required quantity calculation unit 102 of the present embodiment manages the information on the circuit registered in advance and the information acquired from the circuit sensor 6 for each circuit using the circuit management table T1.

[0138] The calculation of the required quantity in the required quantity calculation unit 102 will be described.

[0139] Details Use Fig. 9 As described later, the demand calculation unit 102 of the present embodiment determines whether the power factor of the circuit needs to be controlled based on the power generation device information obtained from the management server 20, and when it is determined that the power factor control is needed, it is determined whether the demand is 0. Then, when it is determined that the demand is not 0 (reactive power needs to be supplied), the demand calculation unit 102 calculates the demand based on the formula (1) shown below. In formula (1), F[-] represents the target value of the power factor in the circuit that is the object of power factor control (sometimes referred to as the "object circuit"), P[W] represents the active power supplied to the object circuit, and Q[var] represents the reactive power supplied to the object circuit. When this formula (1) holds, the power factor of the circuit satisfies the target value F.

[0140]

[0141] The responsible determination unit 103 determines the device responsible for supplying reactive power to the circuit. More specifically, the responsible determination unit 103 grasps the reactive power supply capacity of the device connected to the power system 90 based on the load device information and the power generation device information. Then, based on the grasped supply capacity, it is determined which device is responsible for supplying reactive power, so that the required amount calculated by the required amount calculation unit 102 can be ensured, and the device responsible for supplying reactive power is determined. Hereinafter, the device determined as the device responsible for supplying reactive power is sometimes referred to as a "responsible device".

[0142] Details Use Fig.10 As described later, the responsibility determination unit 103 of this embodiment determines the responsible device by taking all of the solar power generation device 3, the air conditioning device 4, and the power storage device 5 connected to the power system 90 as candidates. At this time, the responsibility determination unit 103 determines the responsible device based on the conditions predetermined for the load devices such as the air conditioning device 4 and the power storage device 5.

[0143] The allocation decision unit 104 determines the allocation of reactive power to the responsible device. More specifically, the allocation decision unit 104 determines the magnitude of reactive power to be instructed to be supplied for each responsible device determined by the allocation decision unit 103 .

[0144] Note that the determination of the share by the share determination unit 104 will be described in detail later.

[0145] Instruction generation unit 105 generates instruction information for instructing the supply of reactive power to the circuit. More specifically, instruction generation unit 105 generates instruction information for instructing the supply of reactive power of the magnitude determined by sharing determination unit 104 to be supplied to each of the responsible devices determined by responsibility determination unit 103 as a destination, and transmits the instruction information to communication processing unit 101.

[0146] The charge determination unit 106 determines the charge related to the reactive power supplied from each device to the circuit. The charge determination unit 106 determines the charge subject related to the supply of reactive power based on, for example, the location of the circuit to which the reactive power is supplied, information of the customer who owns the device connected to the circuit, etc. In addition, for example, according to the instruction from the control device 10, the charge amount for the charge subject is determined based on the size of the reactive power supplied by each device to the circuit, the number of times the reactive power is supplied, etc.

[0147] Furthermore, when processing related to charging is not necessary, the charging determination unit 106 may not be provided.

[0148] (Management Server 20)

[0149] The management server 20 includes a communication processing unit 201 , a device information management unit 202 , a history management unit 203 , and a charge determination unit 204 .

[0150] The communication processing unit 201 communicates with the communication unit 10e (see Figure 2 ) to send and receive information with other devices. The communication processing unit 201 receives the power generation device information from the solar power generation device 3 and the load device information from the air conditioning device 4 or the power storage device 5, and causes the device information management unit 202 to manage. In addition, according to the request from the control device 10, the power generation device information, load device information and other information managed by the device information management unit 202 are sent. In addition, instruction information and the like are received from the control device 10.

[0151] Furthermore, the communication processing unit 101 may transmit history information (described later) managed by the history management unit 203 to a terminal of the manager or the like in response to a request from the manager or the like of the power system 90 .

[0152] The device information management unit 202 manages the power generation device information received from the solar power generation device 3 and the load device information received from the air conditioning device 4 or the power storage device 5 as information of the devices connected to the power system 90 (sometimes referred to as "device information"). More specifically, the device information management unit 202 manages the power generation device information and the load device information for each device, extracts the power generation device information and the load device information according to a request from the control device 10, and causes the communication processing unit 201 to transmit them.

[0153] use Figure 7 , specifically describing the information of the device managed by the device information management unit 202.

[0154] Figure 7 It is a diagram showing an example of the device management table T2.

[0155] In the device information management unit 202 of this embodiment, information related to the devices connected to the power system 90 is pre-registered for each device. And, the pre-registered information is associated with the received power generation device information and load device information through the device identification information, and managed as a device management table T2. Figure 7 As shown in the first column "Device Identification Information" of the device management table T2, as an example of device identification information, a character string hij including the device number h (=3, 4, 5), the number i of the device group Ni (=1, 2, 3, 4, 5) to which it belongs, and the letter j (=a, b, c) is recorded.

[0156] In the device information management unit 202 of the present embodiment, as information on devices connected to the power system 90 , device identification information, device location information, information on the group G to which the devices belong, and customer identification information are pre-registered.

[0157] The device location information is information indicating the location of the device in the power system 90. In this embodiment, Figure 7 As shown in the second column "Location / Device Group" of the device management table T2, as the location information of the device, the information of the device group N to which the device belongs is used. The location information of the device is not limited as long as it is information indicating the location of the device as the object, and different information may be used. For example, the mapping data of the power system 90 may be registered in the control device 10, and the coordinates of the device in the mapping data may be used as the location information of the device. In addition, for example, the information of the connected lead-in line 96, the information of the system interconnection point P, etc. may be used as the location information of the device.

[0158] The demander identification information is information used to identify the demander who owns the device. Figure 7 In the example, as shown in the 10th column "Customer Identification Information" of the equipment management table T2, five customers are identified by numbers C1, C2, C3, C4, and C5.

[0159] In the fourth to ninth columns of the device management table T2, information extracted from the power generation device information or the load device information of each device is managed.

[0160] The fourth column "Power" of the device management table T2 corresponds to information indicating the power status of each device, and is managed as "ON" for devices that are powered on, and "OFF" for devices that are not powered on. In addition, when the power generation device information or load device information from the device cannot be obtained, or when the device fails as information indicating the power status, it is managed as "Error" indicating that the device is in a faulty state. In addition, when the device is registered in advance as being in a faulty state, it is also managed as "Error".

[0161] The fifth column "Operation Status [kW]" of the equipment management table T2 corresponds to the information indicating the operation status included in the load device information. Figure 7 In the example of , the magnitude of active power received from the circuit and consumed in the air conditioner 4 and the magnitude of active power received from the circuit and stored in the power storage device 5 are used as information indicating the operating status.

[0162] In addition, the 6th column "Power generation status [kW]" of the equipment management table T2 corresponds to the information contained in the power generation device information indicating the power generated by the solar power generation device 3, and the 7th column "Active power supply [kW]" corresponds to the information contained in the power generation device information indicating the active power generated by the solar power generation device 3 and supplied to the circuit.

[0163] Furthermore, the eighth column "Reactive power supply [kvar]" of the device management table T2 corresponds to information indicating reactive power supplied to the circuit by each device included in the power generation device information or the load device information. Figure 7 In the example, no device is supplying reactive power, and the "Reactive power supplied [kWvar]" column is all zero.

[0164] The ninth column "supply capacity [kVA]" of the device management table T2 corresponds to the supply capacity information of each device included in the power generation device information or the load device information. In addition, in the present embodiment, the supply capacity information is obtained from each device for explanation, but the control device 10 and the management server 20 may calculate or estimate the supply capacity information based on the operating status of each device, the capacity of the device, and other information.

[0165] In this way, the device information management unit 202 of the present embodiment manages information about pre-registered devices and information acquired from each device for each device using the device management table T2.

[0166] The history management unit 203 manages the instruction information received from the control device 10 as a history of control related to the supply of reactive power. More specifically, the history management unit 203 receives the instruction information from the control device 10 and the information obtained by the control device 10 from the circuit sensor 6 before and after the instruction, and manages them as a control history.

[0167] In addition, a similar history management unit may be provided in the control device 10 to manage the control history. In addition, when the history management is not necessary, the history management unit 203 may not be provided.

[0168] The charge determination unit 204 determines charges to customers in the power system 90. For example, the charge determination unit 204 determines the charge amount to be charged to customers who own the equipment based on the power reception status and the like for each equipment connected to the power system 90 and registered in the management server 20.

[0169] Furthermore, when processing related to charging is not necessary, the charging determination unit 204 may not be provided.

[0170] (Solar power generation device 3)

[0171] The solar power generation device 3 includes a communication processing unit 301 , a signal generating unit 302 , and an information management unit 303 as functional structures implemented by the information processing device 30 .

[0172] The communication processing unit 301 communicates with the communication unit 30e (see Figure 3 The communication processing unit 301 transmits the power generation device information of the device managed by the information management unit 303 to the management server 20. In addition, the communication processing unit 301 receives the instruction information from the control device 10.

[0173] The signal generator 302 generates a control signal for the power generation device 31 based on the instruction information received from the control device 10. More specifically, the signal generator 302 generates a control signal for controlling the power supply path 31c to supply reactive power of a magnitude indicated by the instruction information, and transmits the control signal to the power generation device 31.

[0174] The information management unit 303 manages information related to the device. More specifically, the information management unit 303 manages device identification information, information indicating the state of the power supply, information indicating the power generated by the device, information indicating the active power supplied to the circuit, information indicating the reactive power supplied to the circuit, and information on the supply capacity. And, the information is sent to the management server 20 as power generation device information at predetermined times.

[0175] In addition, among the information managed by the information management unit 303, information that changes over time, such as information indicating the state of the power supply, information indicating the power generated by the device, information indicating the active power supplied to the circuit, information indicating the reactive power supplied to the circuit, and information on the supply capacity, is updated at a predetermined update time. The predetermined update time may be shorter than the predetermined time for sending the power generation device information to the management server 20, for example, 10 seconds.

[0176] (Air conditioning device 4)

[0177] The air conditioning device 4 includes a communication processing unit 401 , a signal generating unit 402 , and an information management unit 403 as functional configurations implemented by the information processing device 40 .

[0178] The communication processing unit 401 communicates with the communication unit 40e (see Figure 4 The communication processing unit 401 sends the load device information of the device managed by the information management unit 403 to the management server 20. In addition, the communication processing unit 401 receives the instruction information from the control device 10.

[0179] The signal generation unit 402 generates a control signal for the heat pump device 41 based on the instruction information received from the control device 10. More specifically, the signal generation unit 402 generates a control signal for controlling the supply of reactive power of the magnitude indicated by the instruction information from the AF 41a to the power receiving path 41d, and transmits the control signal to the heat pump device 41.

[0180] The information management unit 403 manages information related to the device. More specifically, the information management unit 403 manages device identification information, information indicating the state of the power supply, information indicating the operating status, information indicating the reactive power supplied to the circuit, and information indicating the supply capacity. And, the information is sent to the management server 20 as device information at predetermined times.

[0181] In addition, among the information managed by the information management unit 403, information that changes over time, such as information indicating the state of the power supply, information indicating the operating status, information indicating the reactive power supplied to the circuit, and information on the supply capacity, is updated at a predetermined update time. The predetermined update time may be shorter than the predetermined time for sending the equipment device information to the management server 20, for example, 10 seconds.

[0182] In addition, Figure 5 , the functional structure of the air conditioner 4 is shown in FIG. 1 , but in the power storage device 5 and the load device having other compensation power supply means (hereinafter, sometimes referred to as "load device such as the power storage device 5"), the functional structure related to supplying reactive power to the circuit is also similarly provided with a communication processing unit, a signal generating unit, and an information management unit. In addition, the load device such as the power storage device 5 manages the load device information and sends it to the management server 20, receives the instruction information from the control device 10, and generates a control signal based on the instruction information.

[0183] [Operation of each device]

[0184] (Control of reactive power supply)

[0185] Next, use Figure 8 The operations of the solar power generation device 3 , the air conditioning device 4 , the control device 10 , and the management server 20 will be described.

[0186] Figure 8 It is a sequence diagram showing an operation example of the solar power generation device 3 , the air conditioning device 4 , the control device 10 , and the management server 20 .

[0187] Here, the operation related to the control of supplying reactive power to the circuit will be mainly described. Figure 1) in which the operation related to supplying reactive power to the circuit is the same as that of the air conditioner 4, so only the air conditioner 4 is shown here. In addition, although one solar power generation device 3 and one air conditioner 4 are shown, the same operation is performed in all devices connected to the power system 90.

[0188] The air conditioner 4 transmits the load device information to the management server 20 at a predetermined time (S801). In addition, the solar power generation device 3 transmits the power generation device information to the management server 20 at a predetermined time (S802).

[0189] The management server 20 manages the received load device information and power generation device information as equipment information (S803). More specifically, the management server 20 updates and manages the equipment management table T2.

[0190] The control device 10 acquires the circuit information from the circuit sensor 6 at every predetermined time (S804). When the circuit information is acquired, the control device 10 requests the management server 20 for the device information (S805).

[0191] The management server 20 transmits the latest device information (S806) in response to the request from the control device 10. More specifically, the management server 20 transmits the information managed in the device management table T2 as the device information.

[0192] The control device 10 calculates the required amount of reactive power (S807). More specifically, the control device 10 determines whether the power factor of the circuit is required to be controlled based on the power generation device information. If it is determined that the power factor of the circuit is required to be controlled, it is determined whether the required amount is 0 based on the power generation device information and the circuit information. If it is determined that the required amount is not 0, the required amount is calculated based on the power generation device information and the circuit information.

[0193] Here, when it is determined that the power factor control of the circuit is not required, or when it is determined that the power factor control is required but the required amount is 0, the action related to the control of supplying reactive power to the circuit is terminated and the process returns to S801.

[0194] The operations of S801 to S806 are not limited to this order, and the control device 10 may obtain the power generation device information and the circuit information at least before calculating the required amount in S807.

[0195] When the required amount is calculated, the control device 10 determines the responsible device for supplying reactive power (S808) and determines the share of the responsible device (S809). More specifically, the control device 10 of this embodiment determines the responsible device and the share based on the circuit information, the power generation device information, and the load device information.

[0196] When the responsible device is determined, the control device 10 sends instruction information to the responsible device to instruct the supply of reactive power (S810). Figure 8 In FIG. 1 , an example is shown in which both the solar power generation device 3 and the air conditioning device 4 are determined as responsible devices and receive instructions. Figure 8 In FIG. 1 , an operation example of instructing one air conditioner 4 to supply reactive power is shown. However, when a plurality of air conditioners 4 are determined as responsible devices, instructions are given to a plurality of air conditioners 4. This also applies to the solar power generation device 3.

[0197] The solar power generation device 3 and the air conditioning device 4 that have received the instruction supply reactive power according to the instruction (S811, S812). More specifically, reactive power is supplied to the circuit at a level indicated by the instruction information.

[0198] The control device 10 obtains the circuit information from the circuit sensor 6 again (S813). Then, the instruction information sent in S810 and the circuit information obtained in S804 and S813 are sent to the management server 20 (S814). In other words, the content of the reactive power supply control that has been implemented and the circuit information before and after the control are sent to the management server 20.

[0199] The management server 20 manages the received instruction information and circuit information as a control history (S815).

[0200] Through the above-described operations, the control device 10 calculates the required amount, determines the responsible device and the share, and instructs the responsible device to control the supply of reactive power from the responsible device to the circuit. Then, the responsible device that receives the instruction from the control device 10 supplies reactive power to the circuit, thereby controlling the power factor of the circuit.

[0201] (Calculation of required quantity)

[0202] use Figure 1 , 6 , 7 and Fig. 9 , the operation of the control device 10 involved in the calculation of the required amount is described. Here, the operation after the control device 10 obtains the circuit information from the circuit sensor 6 and obtains the device information from the management server 20 ( Figure 8 The action at time S807 in the figure is described below.

[0203] Fig. 9 It is a flowchart showing an operation example related to calculation of the required amount in the control device 10 .

[0204] As described above, the required quantity calculation unit 102 (see Figure 5) Based on whether the power factor of the circuit needs to be controlled and whether the required amount is 0, the required amount is calculated.

[0205] The required quantity calculation unit 102 determines whether power factor control is required based on the device information received from the management server 20 (S901). More specifically, it is determined whether there is a solar power generation device 3 (hereinafter sometimes referred to as "target solar power generation device 3") whose active power supplied to the circuit exceeds a predetermined threshold. If it is determined that there is no target solar power generation device 3 and the power factor control of the circuit is not required (No in S901), the action related to the determination of the required quantity is terminated. If it is determined that there is a target solar power generation device 3 and the power factor control of the circuit is required (Yes in S901), enter S902.

[0206] Here, the predetermined threshold is assumed to be 1000 kW. Referring to the device management table T2, the value of the active power supply of the solar power generation device 3-1-b is 1600 kW, which exceeds the predetermined threshold of 1000 kW. Therefore, the determination in S901 is YES.

[0207] When it is determined that the control of the power factor of the circuit is required, the required amount calculation unit 102 determines the target circuit (S902). In this embodiment, based on the position information of the circuit and the position information of the target solar power generation device 3, the circuit located on the supply side relative to the solar power generation device 3 is used as a candidate for the target circuit. Then, the upper limit value of the active power is taken out from the circuit management table T1, and it is determined whether the active power supplied to the candidate circuit exceeds the upper limit value. Then, the circuit exceeding the upper limit value is determined as the target circuit.

[0208] According to the device management table T2, the solar power generation device 3-1-b belongs to the device group N1. In addition, according to the circuit management table T1, the circuits on the supply side relative to the device group N1 are the transmission line 93, the distribution line 930b, and the lead-in line 96d. Therefore, in this example, the transmission line 93, the distribution line 930b, and the lead-in line 96d become candidates for the target circuit. Figure 6 , Figure 7In the device group N1 located on the receiving side with respect to the incoming line 96d, the total active power supplied by the solar power generation device 3 (3-1-a, 3-1-b) is 500+1600=2100kW, which exceeds the upper limit of the active power of the incoming line 96d, 1500kW. Similarly, in the device groups N1, N2, and N3 located on the receiving side with respect to the distribution line 930b, the total active power supplied by the solar power generation device 3 is 3700kW, which is less than the upper limit of the active power of the distribution line 930b, 4500kW. In addition, in the device groups N1, N2, N3, N4, and N5 located on the receiving side with respect to the transmission line 93, the total active power supplied by the solar power generation device 3 is 5300kW, which is less than the upper limit of the active power of the transmission line 93, 7500kW. Therefore, in this example, the incoming line 96d is determined as the target circuit.

[0209] If the target circuit is determined, the demand calculation unit 102 determines whether the demand is 0 (S903). More specifically, the parameters related to the apparent power of the target circuit and the target value of the power factor are taken out from the circuit management table T1, and it is determined whether the power factor exceeds the target value when the active power generated by the solar power generation device 3 is supplied to the target circuit.

[0210] In this way, the demand calculation unit 102 of the present embodiment calculates the demand based on the parameters related to the apparent power of the target circuit and the information on the active power generated by the solar power generation device 3 and supplied to the circuit, and controls the supply of reactive power from each device to the circuit. As a result, the control accuracy of the power factor is improved compared to the case where the supply of reactive power to each device is controlled regardless of the parameters related to the apparent power.

[0211] When the power factor of the target circuit does not exceed the target value, the required quantity calculation unit 102 determines that the required quantity is 0 (Yes in S903), and the operation related to the determination of the required quantity ends. On the contrary, when the power factor of the target circuit exceeds the target value, it is determined that the required quantity is not 0 (No in S903), and the process proceeds to S904.

[0212] exist Figure 6 , Figure 7 In the example of , reactive power is not supplied to the incoming line 96d. Therefore, if the active power generated by the solar power generation device 3 is supplied, the power factor of the incoming line 96d is 100%, which exceeds the target value of 90%, so the determination of S903 is negative.

[0213] When it is determined that the required quantity is not 0, the required quantity calculation unit 102 calculates the required quantity (S904). More specifically, for each circuit specified in S902, the required quantity is calculated based on equation (1) using the circuit information and the device information.

[0214] As shown in the equipment management table T2, a total of 2100kW of active power is supplied from the solar power generation devices 3-1-a and 3-1-b to the lead-in line 96d. In addition, as shown in the circuit management table T1, the target value of the power factor of the lead-in line 96d is 90% (0.9). Moreover, in formula (1), if active power P = 2100kW and target value of power factor F = 0.9 are substituted, then reactive power Q = 1017kvar (decimal points are discarded). Thus, the required amount of reactive power is calculated to be 1017kvar.

[0215] Through the above operations, the calculation of the required amount is completed.

[0216] In this way, the demand calculation unit 102 of the present embodiment calculates the demand based on the information of the active power generated by the solar power generation device 3 and supplied to the circuit, and controls the supply of reactive power from each device to the circuit. In addition, instead of the information of the active power generated by the solar power generation device 3 and supplied to the circuit, the control can be performed based on the information of the active power generated by the solar power generation device 3. In addition, the active power generated by the solar power generation device 3 can be estimated using information such as the weather at the place where the solar power generation device 3 is installed, the area of ​​the light receiving part of the solar power generation device 3, and the intensity of sunlight measured by the radiometer, and the control can be performed based on the information of the estimated result. These information are all examples of supply information.

[0217] (Decision on responsible equipment)

[0218] use Figure 1 , Figure 6 , Figure 7 as well as Fig.10 , the determination of the responsible device in the control device 10 is described. Here, it is assumed that the control device 10 Fig. 9 The required amount is calculated for the action shown, and the subsequent actions are explained. Fig. 9 Similarly, the example used in the description is assumed to be that the target solar power generation device is the solar power generation device 3-1-b, the circuit that is the target of power factor control is the lead-in line 96d, and the calculated required amount is 1017 kvar.

[0219] Fig.10 This is a flowchart showing an example of operation related to determination of a responsible device in the control device 10 .

[0220] In addition, Fig.10 In FIG. 1 , the air conditioner 4 and the power storage device 5 are not distinguished and are described as “load devices”.

[0221] The responsibility determination unit 103 of the control device 10 (see Figure 5) First, the supply capacity of the load devices belonging to the same device group N as the target solar power generation device 3 is calculated (S1001). More specifically, the responsibility determination unit 103 determines the air conditioning device 4 and the power storage device 5 belonging to the same device group N as the target solar power generation device 3 based on the device information, and calculates the total supply capacity.

[0222] Here, the target solar power generation device 3-1-b belongs to the device group N1. Referring to the device management table T2, the supply capacities of the air conditioners 4-1-a, 4-1-b, and 4-1-c belonging to the same device group N1 are 50, 80, and 60 kVA, respectively. Therefore, the supply capacity of the load device belonging to the device group N1 is calculated to be 190 kVA.

[0223] When the supply capacity of the load devices belonging to the same equipment group N is calculated, the responsibility determination unit 103 determines whether the calculated supply capacity is greater than the required amount (S1002). If the supply capacity is greater than the required amount (S1002: Yes), the process proceeds to S1010, and the added load device is determined as the responsible equipment. If the supply capacity is not greater than the required amount (the supply capacity is less than the required amount) (S1002: No), the process proceeds to S1003.

[0224] Here, the supply capacity of the load device belonging to the equipment group N1 is 190 kVA, which is less than the required amount of 1017 kvar. Therefore, in this example, the determination of S1002 is NO, and the process proceeds to S1003.

[0225] The responsibility determination unit 103 adds the supply capacity of the load device of the nearest device group N among the device groups N different from the target solar power generation device 3 (S1003). The nearest device group is determined based on, for example, the location information of the device.

[0226] In this example, the supply capacity of the load device of the device group N2 closest to the device group N1 is added. Specifically, the supply capacity of the load device belonging to the device group N1, 190 kVA, is added to the supply capacity of the air conditioners 4-2-a and 4-2-b belonging to the device group N2, 80 and 0 kVA, and the supply capacity is calculated to be 270 kVA.

[0227] After adding the supply capacity of the nearest device group N, the responsibility determination unit 103 determines again whether the supply capacity is greater than the required amount (S1004). If the supply capacity is greater than the required amount (S1004: Yes), the process proceeds to S1010, and the added load device is determined as the responsible device. Then, the sharing determination unit 104 determines the share of each responsible device (S1011), instructs the responsible device to supply (S1012), and the actions involved in the determination of the responsible device are completed. If the supply capacity is not greater than the required amount (the supply capacity is less than the required amount) (S1004: No), the process proceeds to S1005.

[0228] Here, the supply capacity is 270 kVA, which is less than the required amount of 1017 kvar. Therefore, in this example, the determination in S1004 is NO, and the process proceeds to S1005.

[0229] The responsibility determination unit 103 adds the supply capacity of the load device of the next closest device group N (S1005). In addition, the next closest device group is determined based on, for example, the location information of the device.

[0230] In this example, since the equipment group N3 next to the equipment group N1 and below the equipment group N2 does not include any load device, 0 kVA is added and the supply capacity is calculated to be 270 kVA.

[0231] When the supply capacity is calculated, the responsibility determination unit 103 determines again whether the supply capacity is greater than the required amount (S1006). When the supply capacity is greater than the required amount (S1006: Yes), the process proceeds to S1010, and the load device that has been added is determined as the responsible device. When the supply capacity is not greater than the required amount (the supply capacity is less than the required amount) (S1006: No), it is determined whether the device group N added last time is the last device group N in the power system 90 (S1007). In other words, it is determined whether the addition is completed for all device groups N connected to the power system 90. When it is the last device group N (S1007: Yes), the process proceeds to S1008. When it is not the last device group N (S1007: No), the process returns to S1005, and steps S1005 to S1007 are repeated until it becomes the last device group N (S1007: Yes).

[0232] Here, the supply capacity at the time when the load device of the equipment group N3 is added is 270kVA, which is less than the required amount of 1017kvar. Therefore, in this example, the judgment of S1006 is no, and the process proceeds to S1007. Then, since the equipment group N3 is not the last equipment group N, the process returns to S1005, and the supply capacities of 50, 50, and 0kW of the air conditioners 4-4-a, 4-4-b, and 4-4-c of the next closest equipment group N4 are added, and the supply capacity is calculated to be 370kVA (<1017kvar). Similarly, the supply capacity of 170kVA of the power storage device 5-5-a of the equipment group N5 is added, and the supply capacity is calculated to be 540kVA. Then, it is determined that the supply capacity is less than the required amount of 1017kvar, and it is the last equipment group N (no in S1006 and yes in S1007).

[0233] If it is determined that it is the last equipment group N, the responsibility determination unit 103 adds the supply capacity of the solar power generation device 3 (S1008). Then, it is determined whether the calculated supply capacity is greater than the required amount (S1009). Fig.10 Although the description is omitted in the table, the supply capacity of the solar power generation device 3 is added in the same manner as the supply capacity of the load device, and is performed sequentially from the same device group N as the target solar power generation device 3. More specifically, the solar power generation devices 3 of the same device group N, the nearest device group N, the next nearest device group N, ..., and the last device group N are added in sequence, and a determination is made as to whether the supply capacity is above the required amount each time each device group N is added. Then, when the supply capacity becomes above the required amount at the time when any device group N is added (S1009: Yes), the process proceeds to S1010, and the added load device and solar power generation device 3 are determined as the responsible devices.

[0234] In this example, when the supply capacities of 200, 100, 150, and 200 kVA of the solar power generation devices 3-1-a, 3-1-b, 3-2-a, and 3-2-b belonging to the device groups N1 and N2 are added, the supply capacity becomes 1190 kVA, which is more than the required amount of 1017 kvar. Therefore, in S1010, all load devices belonging to the device groups N1 to N5 and the solar power generation device 3 belonging to the device groups N1 and N2 are determined as responsible devices.

[0235] In addition, when the supply capacity is not more than the required amount even if the solar power generation device 3 belonging to the last device group N is added (No in S1009), the responsibility determination unit 103 determines all the solar power generation devices 3 and the load devices as the responsible devices (S1013). Then, the sharing determination unit 104 instructs all the responsible devices to supply reactive power at the maximum amount that can be supplied (S1014). Thus, even when the supply capacity is insufficient relative to the required amount of reactive power, the power factor of the circuit becomes a value closer to the target value.

[0236] In the above example, the air conditioners 4-1-a, 4-1-b, and 4-1-c belonging to the same equipment group N1 as the target solar power generation device 3-1-b are determined as responsible equipment. In other words, the power control system 1 controls the air conditioners 4-1-a, 4-1-b, and 4-1-c connected to the power system 90 at the same location as the system interconnection point P1 where the solar power generation device 3-1-b and the power system 90 are interconnected to supply reactive power to the circuit. As a result, the control accuracy of the power factor is improved compared to the case where reactive power is supplied to the air conditioner 4 or the power storage device 5 connected to a location different from the system interconnection point P1.

[0237] In addition, in the above example, the air conditioners 4-2-a and 4-2-b belonging to the equipment group N2 different from the target solar power generation device 3-1-b are determined as responsible devices. In other words, the power control system 1 controls the air conditioners 4-2-a and 4-2-b connected to the power system 90 at a position different from the system interconnection point P1 where the solar power generation device 3-1-b and the power system 90 are interconnected to supply reactive power to the circuit. As a result, the degree of freedom of control of the power factor is improved compared to the case where only the air conditioner 4 or the power storage device 5 connected to the same position as the system interconnection point P1 is used as the control object. In addition, the air conditioners 4-2-a and 4-2-b are connected to the distribution line 930b connected to the solar power generation device 3-1-b via the system interconnection point P1 via the receiving side transformer 95e. As a result, the control accuracy of the power factor is improved compared to the case where the air conditioner 4 or the power storage device 5 connected to a different distribution line, such as the distribution line 930c, is used as the control object.

[0238] In addition, it is preferable to make the priority of the air conditioner 4 higher than that of the power storage device 5. Whenever the power storage device 5 supplies reactive power to the circuit, it repeatedly charges and discharges, so the number of times of charging and discharging increases. Here, the life of the secondary battery (battery) provided by the power storage device 5 is determined by the number of times of charging and discharging. Therefore, if the number of times the power storage device 5 supplies reactive power to the circuit increases, the number of times of charging and discharging the secondary battery (battery) increases, and the life of the power storage device 5 becomes shorter. In contrast, in a load device that supplies reactive power to the circuit through a unit different from the secondary battery (battery), such as the load device that supplies reactive power through a capacitor and the capacitance of the circuit, as the air conditioner 4, the number of times of charging and discharging has less influence on the life than the load device that supplies reactive power through the secondary battery (battery). In other words, even if the number of times the air conditioner 4 supplies reactive power to the circuit increases, the influence on the life of the air conditioner 4 is small. Therefore, in this embodiment, it is preferable to make the priority of the air conditioner 4 higher than that of the power storage device 5.

[0239] Furthermore, in the above example, the supply capacity of the solar power generation device 3 is added only when the required amount cannot be ensured even if the supply capacities of all the air-conditioning devices 4 and the power storage devices 5 are added together. In other words, with respect to the decision of the responsible equipment, the priority of the air-conditioning device 4 or the power storage device 5 is higher than the priority of the solar power generation device 3. As described above, in the solar power generation device 3 of the present embodiment, when reactive power is supplied to the circuit, the supply of active power to the circuit is restricted. As in the above example, by setting the priority according to the type of equipment, the priority of the air-conditioning device 4 or the power storage device 5 is higher than the priority of the solar power generation device 3, and it is difficult to restrict the supply of active power by the solar power generation device 3 compared with the case where no priority is set.

[0240] In addition, the power control system 1 to which this embodiment is applied controls the supply of reactive power from the solar power generation device 3 to the circuit in accordance with the situation that the required amount cannot be ensured even if the supply capacities of all the air conditioners 4 and the power storage devices 5 are added together. Thus, the degree of freedom in controlling the power factor is improved compared to the case where only the load device is controlled. In addition, the situation that the required amount cannot be ensured even if the supply capacities of all the air conditioners 4 and the power storage devices 5 are added together is an example of a condition predetermined for the load device.

[0241] In the above example, the priority level may not be set according to the type of equipment. For example, the responsible equipment may be determined based on the location of each equipment connected to the grid interconnection point P1 where the target solar power generation device 3-1-b is interconnected with the power grid 90.

[0242] In addition, a priority corresponding to the customer identification information attached to each device may also be set. In more detail, the priority of the solar power generation device 3, air conditioning device 4, or power storage device 5 owned by the same customer as the target solar power generation device 3 may also be increased. For example, when referring to the device management table T2, the target solar power generation device 3-1-b in the above example is owned by the customer identified by the customer identification information C1. In this case, the priority of the device (the device belonging to the device group N1, N4) to which the customer identification information C1 is attached may be made higher than the priority of other devices (the devices belonging to other device groups N2, N3, N5) to determine the responsible device.

[0243] In addition, a priority corresponding to the supply capacity of each device may be set. For example, the priority may be increased for devices with large supply capacity, and conversely, the priority may be decreased for devices with small supply capacity. In this way, by setting a priority corresponding to the supply capacity to determine the responsible device, the power factor of the circuit can be adjusted with a smaller number of devices compared to the case where the responsible device is determined regardless of the supply capacity.

[0244] Furthermore, a priority corresponding to the operating status or power generation status of each device may be set instead of the supply capacity. For example, the priority of a device with a high operating status or power generation status value may be higher than that of a device with a low operating status or power generation status value to determine the responsible device.

[0245] (Decision to Share)

[0246] Next, refer to Figure 1 , Figure 6 , Figure 7 , the determination of the sharing of the responsible device in the control device 10 will be described. Here, the case where the target circuit is the incoming line 96d and the responsible device is determined to be all the load devices belonging to the device groups N1 to N5 and the solar power generation device 3 will be described as an example.

[0247] As described above, the allocation determination unit 104 determines the magnitude of reactive power (sometimes referred to as “instructed value”) to be supplied for each responsible device when ensuring the required amount calculated by the required amount calculation unit 102 .

[0248] The sharing determination unit 104 may determine the sharing, for example, based on the positions of each responsible device and the target circuit. More specifically, the sharing may be determined in such a way that the indication value of the responsible device close to the target circuit is larger than the indication value of the responsible device far away. Alternatively, the sharing may be determined by using the upper limit determined by the supply capacity as the indication value in order from the responsible device closest to the target circuit, and only the responsible device farthest from the target circuit has an indication value lower than the upper limit. In addition, the position refers to the position in the electrical connection, and the position close / far refers to the short / long distance of the electrical connection.

[0249] For example, the indicated values ​​of the air conditioners 4-1-a, 4-1-b, and 4-1-c, which are located close to the lead-in line 96d of the target circuit, become larger. On the contrary, the indicated values ​​of the solar power generation device 3-5-a and the power storage device 5-5-a, which are located far away, become smaller. In this example, the relationship between the indicated value of the air conditioner 4-1-a and the indicated value of the solar power generation device 3-5-a is determined according to the position of each device. More specifically, the indicated value of the air conditioner 4-1-a becomes larger because the position of the air conditioner 4-1-a is closer than the position of the solar power generation device 3-5-a (an example of a condition predetermined with respect to the position of the load device) with respect to the target circuit, and the indicated value of the solar power generation device 3-5-a becomes smaller because the position of the solar power generation device 3-5-a is farther than the position of the air conditioner 4-1-a (an example of a condition predetermined with respect to the position of the power generation device). By controlling the supply of reactive power in accordance with the conditions related to the position of the load device and the conditions related to the position of the power generation device in this manner, the control accuracy of the power factor is improved compared to a case where control is performed regardless of the position of each device.

[0250] For example, the share determination unit 104 may determine the share using the priority corresponding to the type of the aforementioned device, the priority corresponding to the demander identification information, the priority corresponding to the supply capacity, and the priority corresponding to the operating status or power generation status. More specifically, the share may be determined in such a way that the indication value of the responsible device with a high priority is larger than the indication value of the responsible device with a low priority. In addition, the share may be determined in order from the responsible device with a high priority using the upper limit determined by the supply capacity as the indication value, and only the responsible device with the lowest priority has an indication value lower than the upper limit.

[0251] [Control method]

[0252] The above-mentioned embodiment can also be understood as a control method for controlling the supply of reactive power from the air conditioner 4 to the circuit. More specifically, the present embodiment can be understood as a control method having the following steps: an acquisition step of acquiring supply information related to the power supply from the solar power generation device 3 to the circuit; and a control step of controlling the supply of reactive power from the air conditioner 4 or the power storage device 5 to the circuit according to the supply information.

[0253] [Modifications, etc.]

[0254] (Number of power control systems 1)

[0255] In the above-mentioned embodiment, the case where the power control system 1 is provided with one control device 10 and one management server 20 is described, but the number of the control devices 10 and the management server 20 is not limited. In the power control system 1, more than two control devices 10 and management servers 20 may be provided. For example, a control device 10 and a management server 20 may be provided for each device group N. In addition, when the power control system 1 includes a plurality of control devices 10 and management servers 20, each device is connected via a network to form a system capable of transmitting and receiving information to each other.

[0256] (Other examples of load devices)

[0257] In the above-mentioned embodiment, as an example of a load device having a compensating power supply unit, a conversion unit, and a heat pump unit, a case of using an air conditioner 4 is described. As a load device having a conversion unit and a heat pump unit, in addition, a display cabinet, a refrigerator, a freezer, a water heater, etc. for regulating the internal temperature can also be cited for an HVAC (Heating Ventilation and Air Conditioning) system. The load device having such a heat pump unit has an AF 41a that can be used as a compensating power supply unit and a power conversion unit 41b that can be used as a conversion unit, or functional units similar to these, and the compensating power supply unit and the conversion unit may not be newly installed. Therefore, compared with a device without a heat pump unit, the complexity of the load device can be suppressed.

[0258] However, the load device is not limited to the one including the heat pump unit, and various devices such as a lighting device and a display device that are connected to and used in the power system 90 can be used.

[0259] In addition, as described above, in a load device that realizes the compensation power supply unit by a secondary battery (storage battery) like the power storage device 5, when the number of times reactive power is supplied to the circuit increases, the life becomes shorter. Therefore, the compensation power supply unit of the load device can be realized by a unit different from the secondary battery (storage battery), for example, it can be realized by using a capacitor as a voltage source like the AF 41a of the air conditioner 4. Thereby, it is possible to suppress the life of the load device from being shortened due to the supply of reactive power to the circuit.

[0260] (Other examples of power generation devices)

[0261] In the above-mentioned embodiment, the case where the solar power generation device 3 connected to the receiving side compared to the lead-in line 96d is used is described, but the solar power generation device 3 may be connected closer to the supply side. For example, it can be used as a so-called large-scale solar power generation device to perform large-scale power generation and power supply. In addition, the power generation device is not limited to solar power generation, and a power generation device based on various renewable energy sources such as wind power generation, hydropower generation, geothermal power generation, and biomass power generation may also be used.

[0262] In addition, in the above-mentioned embodiment, the case where the power station 91 generates the largest power among the equipment and devices connected to the circuit is described. In other words, the power generation device such as the solar power generation device 3 generates less power than the power station 91. However, the size of the power generated by the power generation device is not limited, for example, the power generation device may generate more power than the power station 91. In addition, the power generation device may also be a device or a machine that generates power at the power station 91 and supplies it to the power transmission line 93.

[0263] (Target value of power factor)

[0264] In the above-mentioned embodiment, it is described that the required amount is calculated based on the target value of the power factor as an example of a predetermined power factor, and the supply of reactive power from each device to the circuit is controlled. However, the control device 10 controls the supply of reactive power based on at least the supply information, and the predetermined power factor may not be used. However, by controlling the supply of reactive power of the load device based on the predetermined power factor and the supply information, the control accuracy of the power factor is improved compared to the case where the control is performed independently of the predetermined power factor.

[0265] (Loss information)

[0266] During the period from being supplied from each device to reaching the target circuit, reactive power may be lost due to the influence of the impedance and resistance of the path, the load connected in the middle, etc. Therefore, the control device 10 may also obtain loss information related to the loss of reactive power in the path to the target circuit, and control the supply of reactive power to the circuit based on the loss information. For example, in Figure 1 In the example of FIG. 1 , when reactive power is supplied from the air conditioner 4-2-a to the incoming line 96d, there is a possibility that loss occurs in the path including the equipment connection line 7, the incoming line 96e, the receiving-side transformers 95d and 95e, and the distribution line 930b. The sharing determination unit 104 of the control device 10 may also obtain loss information related to the path and determine the instruction value for the air conditioner 4-2-a in consideration of the loss in the path.

[0267] The loss information may be any information that can calculate or estimate the loss in the path, and may be the length and thickness of the distribution line serving as the path, the type of transformer, the size of the load, and the like.

[0268] (Decision on equipment responsibility and sharing)

[0269] In the above embodiment, the responsible device is determined from all devices connected to the power system 90 based on the location of each device, etc. In other embodiments, a part or all of the devices connected to the power system 90 may be specified in advance and the specified devices may be used as the responsible devices.

[0270] In addition, in the above-mentioned embodiment, the case where the indication value for each responsible device is determined based on the position of each device, etc. is described. In other embodiments, the indication value for each responsible device may be predetermined. For example, the same indication value may be determined for all responsible devices. In addition, for example, the indication value when each device is determined to be a responsible device may be predetermined for each device.

[0271] (Determination of target circuit)

[0272] In the above-mentioned embodiment, the object circuit that is the object of power factor control is determined by taking the circuit on the supply side relative to the object solar power generation device 3 as a candidate, and by the total active power supplied by the solar power generation device 3 associated with the circuit and the upper limit value of the active power of the circuit. In other embodiments, a predetermined voltage threshold value may be set for the circuit, and the circuit exceeding the voltage threshold value may be determined as the object circuit. In addition, the required amount of reactive power may be calculated, and the power generation device and load device associated with the determined circuit may be used as the responsible equipment to share the supply of reactive power.

[0273] Furthermore, when there are a plurality of circuits satisfying the conditions of the target circuit, a circuit closer to the supply side may be preferentially determined as the target circuit.

[0274] Furthermore, when the total active power supplied by the power generation devices associated with the circuit exceeds a predetermined threshold, the circuit may be selected as a candidate for the target circuit. The target circuit is determined based on, for example, the upper limit of the active power of the circuit and the voltage threshold. The predetermined threshold of the total active power is, for example, the maximum value of the power that the power generation devices associated with the circuit can output to the circuit, that is, the total of the interconnected outputs multiplied by a specific ratio (for example, 90%).

[0275] In addition, as another embodiment, the object circuit can also be determined as an incoming line 96 associated with the object power generation device. The required amount is calculated based on the active power and target power factor of the determined incoming line 96, and the power generation device and load device associated with the determined circuit are used as responsible equipment to share the supply of reactive power.

[0276] (Load device with control unit)

[0277] In the above-mentioned embodiment, it is described that the control device 10, which is separate from the load device, instructs the load device to supply reactive power. In other embodiments, the control device 10 and the load device may be configured as one body, or various functions of the control device 10 may be implemented by an information processing device possessed by the load device. For example, the information processing device 40 of any air-conditioning device 4 in the power system 90 may be used to instruct the supply of reactive power to each device and the device itself. In addition, the management server 20 and the load device may also be configured as one body, for example, the information processing device 40 may be used to manage the power generation device information and the load device information. Furthermore, the control device 10, the management server 20, and the load device may all be configured as one body. In other words, the control device 10 and the management server 20 may also be implemented inside the information processing device 40 of an air-conditioning device 4. In order to realize the acquisition unit and the control unit, the control device 10 and the management server 20 are implemented inside the air-conditioning device 4 to implement the cooperation with the solar power generation device 3, which can become the simplest structure. The acquisition unit acquires the supply information related to the power supply of the power generation device that generates power and supplies power to the circuit to the circuit, and the control unit controls the supply of reactive power from the load device to the circuit according to the supply information obtained by the acquisition unit. The load device has a compensation power supply unit that can supply reactive power to the circuit.

[0278] Furthermore, the control device 10 and the management server 20 may be realized inside the information processing device 30 of the solar power generation device 3 .

[0279] In addition, the above-described structures are not limited to the above-described embodiments and modifications, and can be modified within the scope of the gist. In other words, it can be understood that various modifications of the embodiments or details can be made without departing from the gist and scope of the claims.

[0280] For example, a part of each structure may be omitted, or other functions may be added to each structure. Regarding the multiple structural examples described, the structure included in one structural example may be replaced with the structure included in other structural examples, or the structure included in one structural example may be added to other structural examples.

[0281] Description of symbols

[0282] 1: Power control system; 3: Solar power generation device; 4: Air conditioning device; 5: Power storage device; 6, 6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h: Circuit sensor; 10: Control device; 20: Management server; 10a, 30a, 40a: CPU; 41: Heat pump device; 41a: AF; 90: Power system; 91: Power station; 93: Transmission line; 95, 95d, 95e, 95f, 95g, 95h: Receiving side transformer; 96, 96d, 96e, 96f, 96g, 96h: Lead-in line; 930, 930b, 930c: Distribution line.

Claims

1. A power control system comprising: an acquisition unit that acquires supply information related to power supply to the circuit by a power generation device that generates power and supplies the power to the circuit; and A control unit controls supply of reactive power by a load device to the circuit based on the supply information acquired by the acquisition unit, wherein the load device includes a compensation power supply unit capable of supplying reactive power to the circuit.

2. The power control system according to claim 1, wherein: The load device is a plurality of load devices dispersedly arranged in the circuit. The control unit controls supply of reactive power from the plurality of load devices to the circuit based on the supply information.

3. The power control system according to claim 2, wherein: In the circuit, a system interconnection point where the power generation device is interconnected with the power system is different from a point where the plurality of load devices are connected to the power system.

4. The power control system according to claim 3, wherein: The plurality of load devices are connected to a distribution line on the power system via a transformer, and the distribution line is connected to the power generation device via the system interconnection point.

5. The power control system according to claim 1, wherein: The load devices are a plurality of load devices connected to the power system at the same location on the circuit as the system interconnection point where the power generation device and the power system are interconnected, The control unit controls supply of reactive power to the circuit by the plurality of load devices based on the supply information acquired by the acquisition unit.

6. The power control system according to claim 1, wherein: The compensating power supply unit of the load device is capable of adjusting the apparent power in the load device, i.e., the device itself, and when reactive power is supplied to the circuit according to the supply information, the compensating power supply unit is restricted from adjusting the apparent power in the device itself.

7. The power control system according to claim 1, wherein: The load device includes the compensation power supply unit capable of supplying reactive power using a capacitor as a voltage source.

8. The power control system according to claim 1, wherein: The acquisition unit acquires circuit information related to the apparent power of the circuit. The control unit controls supply of reactive power by the load device to the circuit based on the circuit information.

9. The power control system according to claim 8, wherein: The circuit information is circuit information of a circuit, among the circuits, branching from a distribution line connected to the power generation device via a system interconnection point interconnected with the power system and reaching the system interconnection point.

10. The power control system according to claim 1, wherein: The control unit controls supply of reactive power from the load device to the circuit based on a power factor predetermined for the circuit and the supply information.

11. The power control system according to claim 1, wherein: The control unit controls supply of reactive power from the power generation device to the electric circuit based on a condition predetermined for the load device.

12. The power control system according to claim 11, wherein: The control unit controls the relationship between reactive power supply from the power generation device to the circuit and reactive power supply to the load device based on a condition predetermined for the position of the load device and a condition predetermined for the position of the power generation device.

13. The power control system according to claim 1, wherein: The acquisition unit acquires loss information related to loss of reactive power supplied by the load device in a circuit from the load device to the power generation device. The control unit controls reactive power supplied by the load device to the circuit according to the loss information.

14. A load device comprising: an acquisition unit that acquires supply information related to power supply to the circuit by a power generation device that generates power and supplies the power to the circuit; and A compensation power supply unit supplies reactive power to the circuit based on the supply information acquired by the acquisition unit.

15. A control method, comprising: an acquisition step of acquiring supply information related to power supply to the circuit by a power generation device that generates power and supplies the power to the circuit; and The control step controls the supply of reactive power by a load device to the circuit based on the supply information, wherein the load device includes a compensation power supply unit capable of supplying reactive power to the circuit.

16. An information processing device comprising a control unit for controlling the transmission and reception of information between the information processing device and another device. The control unit obtains supply information related to power supply to the circuit by a power generation device that generates power and supplies the power to the circuit, The control unit transmits instruction information for instructing the supply of reactive power to the circuit to a load device including a compensation power supply unit capable of supplying reactive power to the circuit, based on the supply information.

17. A load device comprising: a receiving unit that receives instruction information for instructing to supply reactive power to the circuit based on supply information related to power supply to the circuit by a power generation device that generates power and supplies the power to the circuit; and A compensation power supply unit supplies reactive power to the circuit according to the instruction information received by the receiving unit.

18. The load device according to claim 17, wherein: The load device comprises: a conversion unit that converts the received power; and a heat pump unit that consumes the electric power converted by the conversion unit to adjust the temperature or humidity, The compensation power supply unit supplies reactive power to a power receiving path of the conversion unit using a capacitor as a voltage source.