Groundwater guide and drainage new well installation equipment
By designing automated groundwater drainage new well installation equipment, using hydraulic cylinders and motors to drive slides and clamps, the vertical installation of concrete pipes is realized, solving the problem of manual installation in the existing technology, and improving installation efficiency and accuracy , reducing operation difficulty and risk of pipeline damage.
Patent Information
- Application Number
- CN202411178347.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, the vertical installation of concrete pipes requires manual operation, which increases the working strength and installation difficulty of the operator.
A groundwater drainage new well installation equipment including support rods, pulleys, hydraulic cylinders, clamping components and drive components is designed. Through the cooperation of hydraulic cylinders and motor drive slides and clamps, the docking and installation of concrete pipes are automatically completed to reduce the Manual operation.
The vertical installation automation of concrete pipes is realized, which reduces the working strength and installation difficulty of operators, improves installation efficiency and accuracy, and reduces the risk of pipeline damage.
Smart Images

Figure CN119061990A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pipeline installation, and in particular to a new underground water drainage well installation device. Background Art
[0002] Concrete pipes are widely used in municipal engineering and industrial production. The underground drainage system of landfills is also composed of concrete pipes. At present, the traditional pipeline installation mainly transports the pipes to the designated location through transportation devices, and then after the trench is excavated, the pipes are lifted by mechanical equipment and manually aligned with the concrete pipes for installation. At the same time, the accuracy of manual alignment and installation of pipes in the trench is relatively low, and it is easy to cause the pipe mouth to be damaged due to improper operation of the operator, which in turn affects the service life of the pipe. The efficiency of concrete pipe alignment and installation is relatively low, and the time cost, labor cost, and money cost are relatively high.
[0003] In the prior art CN219408917U, a docking mechanism is provided to lift the concrete pipes to be docked and an infrared alignment device is used to align the interfaces between the concrete pipes, thereby solving the technical problem that when the concrete pipes are aligned and installed in the excavated trench, it is difficult to manually align and install the pipe mouths for docking, resulting in low docking accuracy of the concrete pipes. The difficulty of manually aligning and installing the pipe interfaces is reduced, the docking accuracy of the concrete pipes during alignment and installation is improved, and the docking efficiency of the concrete pipes during alignment and installation is improved, the labor cost is reduced, and structural collisions of the pipes during docking are avoided, thereby reducing damage to the pipes while reducing manual docking errors and extending the service life of the pipes.
[0004] However, in the prior art, the device is only suitable for horizontal installation of concrete pipes as a drainage well. Vertical installation of concrete pipes requires manual installation, which increases the workload of operators. Summary of the invention
[0005] The purpose of the present invention is to provide a new underground water drainage well installation device, which solves the problem in the prior art that the device is only suitable for horizontal installation of concrete pipes as new drainage wells, and vertical installation of concrete pipes requires manual installation, which increases the workload of operators.
[0006] To achieve the above-mentioned purpose, the present invention provides a new underground water drainage well installation device, including two support rods, two pulleys, a support platform and an installation mechanism, the installation mechanism includes two hydraulic cylinders, a mounting plate, two clamping assemblies and two driving assemblies, the clamping assembly includes a connecting kit, a fixing block, a clamping plate, two fixing plates, two sliding blocks, four limit blocks and a clamping block, the fixing plate has a through groove and two limit grooves, the two pulleys are respectively arranged at one end of the two support rods, the two ends of the support platform are respectively fixedly connected to the other end of the two support rods, the two limit grooves are located in the through groove, and the two hydraulic cylinders are installed in the hydraulic cylinders. The pressure cylinder is fixedly connected to the base, the mounting plate is fixedly connected to the output ends of the two hydraulic cylinders, the two clamping assemblies are arranged at the two ends of the mounting plate, the two driving assemblies are arranged on the two support rods, the connecting kit is arranged between the fixed block and the mounting plate, the clamping plate is fixedly connected to the fixed block, the two fixed plates are respectively fixedly connected to the two ends of the clamping plate, the two sliding blocks are respectively located in the two through grooves, the four limit blocks are respectively fixedly connected to the two sliding blocks, and are respectively located in the four limit grooves, and the clamping block is fixedly connected to the bottom of the clamping plate.
[0007] Wherein, the connection kit includes two mounting grooves and two mounting blocks, the two mounting grooves are respectively arranged at the two ends of the mounting plate, the two mounting blocks are respectively fixedly connected to the two ends of the fixed block, and are slidably connected to the mounting plate, and are respectively located in the two mounting grooves.
[0008] Wherein, the driving assembly includes a motor and a screw rod, the motor is fixedly connected to the support rod, the screw rod is fixedly connected to the output end of the motor and extends between the two support rods, wherein the two sliders are threadedly connected to the screw rod.
[0009] Wherein, the mounting mechanism further comprises a mounting tube, which is fixedly connected to the mounting plate and is located below the mounting plate.
[0010] Wherein, the installation mechanism also includes two support frames, and the two support frames are fixedly connected to the support platform and the two support rods respectively.
[0011] Wherein, the groundwater drainage new well installation equipment also includes four supporting mechanisms, and the four supporting mechanisms are arranged between the two support rods and the two screw rods.
[0012] Wherein, the support mechanism includes a support rod and a bearing, one end of the support rod is fixedly connected to the support rod, the outer side wall of the bearing is fixedly connected to the other end of the support rod, and the inner side wall of the bearing is rotatably connected to the screw.
[0013] The present invention provides a new underground water drainage well installation device, the two pulleys are respectively arranged at one end of the two support rods, the two ends of the support platform are respectively fixedly connected to the other end of the two support rods, the two limit grooves are located in the through grooves, the two hydraulic cylinders are fixedly connected to the support platform, the mounting plate is fixedly connected to the output ends of the two hydraulic cylinders, the two clamping assemblies are arranged at the two ends of the mounting plate, the two driving assemblies are arranged on the two support rods, the connecting kit is arranged between the fixing block and the mounting plate, the clamping plate is fixedly connected to the fixing block, the two fixing plates are respectively fixedly connected to the two ends of the clamping plate, the two sliding blocks are respectively located in the two through grooves, the four limit blocks are respectively fixedly connected to the two sliding blocks, and are respectively located in the four limit grooves, the clamping block is fixedly connected to the bottom of the clamping plate, and the concrete is installed. When the concrete pipe is installed, the two clamps clamp the concrete pipe and move the concrete pipe to an appropriate position, and the two hydraulic cylinders are started. The output ends of the two hydraulic cylinders extend and drive the two clamps to move downward. The limit blocks on both sides of the slider slide in the limit grooves, which play an auxiliary guiding role in the movement of the two clamps. When the two clamps contact the docking position of the concrete pipe, the two driving assemblies are started at the same time, and the two driving assemblies drive the four sliders to move to both sides. Since the limit blocks on both sides of the slider are stuck in the limit grooves of the fixed plate, the clamps follow the movement when the slider moves. The two clamps move to both sides and pull the two clamps out from under the concrete pipe, and the concrete pipes are docked. The process of installing the concrete pipe does not require manual operation by the operator, which reduces the difficulty of the operator's work. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0015] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the groundwater drainage new well installation equipment of the present invention.
[0016] Figure 2 yes Figure 1 Enlarged view of point A in the middle.
[0017] Figure 3 yes Figure 1 Enlarged view of point B in the middle.
[0018] Figure 4 It is a schematic diagram of the overall structure of the second embodiment of the groundwater drainage new well installation equipment of the present invention.
[0019] Figure 5It is a schematic diagram of the overall structure of the third embodiment of the groundwater drainage new well installation equipment of the present invention.
[0020] Figure 6 yes Figure 5 Enlarged view of point C in the middle.
[0021] 101-support rod, 102-pulley, 103-support platform, 104-hydraulic cylinder, 105-support frame, 106-mounting plate, 107-fixed block, 108-clamp, 109-fixed plate, 110-through groove, 111-screw rod, 112-motor, 113-mounting groove, 114-mounting block, 115-slider, 116-limiting block, 117-limiting groove, 118-block, 119-mounting cylinder, 201-support rod, 202-bearing, 301-support leg, 302-mounting frame, 303-rotating roller, 304-roller. DETAILED DESCRIPTION
[0022] Embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be construed as limiting the present invention.
[0023] The first embodiment of the present application is:
[0024] See also Figure 1-Figure 3 , Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the groundwater drainage new well installation equipment of the present invention, Figure 2 yes Figure 1 The enlarged view of point A in the middle. Figure 3 yes Figure 1 Enlarged view of point B in the middle.
[0025] The present invention provides a new underground water drainage well installation device, comprising two support rods 101, two pulleys 102, a base 103 and an installation mechanism, wherein the installation mechanism comprises two hydraulic cylinders 104, an installation tube 119, two support frames 105, an installation plate 106, two clamping assemblies and two driving assemblies, wherein the clamping assembly comprises a connecting kit, a fixing block 107, a clamping plate 108, two fixing plates 109, two sliding blocks 115, four limiting blocks 116 and a clamping block 118, wherein the fixing plate 109 has a through groove 110 and two limiting grooves 117, wherein the connecting kit comprises two installation grooves 113 and two installation blocks 114, wherein the driving assembly comprises a motor 112 and a screw rod 111, and the above-mentioned scheme solves the problem in the prior art that the device is only suitable for horizontal installation of concrete pipes as new drainage wells, and manual installation is required when vertically installing concrete pipes, thereby increasing the work intensity of operators.
[0026] In this specific embodiment, the two pulleys 102 are respectively arranged at one end of the two support rods 101, the two ends of the support platform 103 are respectively fixedly connected to the other end of the two support rods 101, the two limit grooves 117 are located in the through groove 110, the two hydraulic cylinders 104 are fixedly connected to the support platform 103, the mounting plate 106 is fixedly connected to the output ends of the two hydraulic cylinders 104, the two clamping assemblies are arranged at the two ends of the mounting plate 106, the two driving assemblies are arranged on the two support rods 101, the connecting kit is arranged between the fixing block 107 and the mounting plate 106, and the clamp The plate 108 is fixedly connected to the fixed block 107, the two fixed plates 109 are fixedly connected to the two ends of the clamping plate 108, the two sliders 115 are respectively located in the two through grooves 110, the four limit blocks 116 are respectively fixedly connected to the two sliders 115 and are respectively located in the four limit grooves 117, the clamping block 118 is fixedly connected to the lower part of the clamping plate 108, when installing the concrete pipe, the two clamping plates 108 clamp the concrete pipe and move the concrete pipe to an appropriate position, start the two hydraulic cylinders 104, the output ends of the two hydraulic cylinders 104 extend, and drive the two The clamping plate 108 moves downward, and the limit blocks 116 on both sides of the slider 115 slide in the limit groove 117, which plays an auxiliary guiding role in the movement of the two clamping plates 108. When the two clamping blocks 118 contact the position where the concrete pipe is connected, the two driving components are started at the same time, and the two driving components drive the four sliders 115 to move to both sides. Since the limit blocks 116 on both sides of the slider 115 are stuck in the limit groove 117 of the fixed plate 109, the clamping plate 108 moves with the slider 115. The two clamping plates 108 move to both sides, and the upper part of the clamping block 118 The surface has an inclination angle. When the two blocks 118 move to both sides, the concrete pipe slowly moves downward on the two blocks 118 along the inclination angle, and the distance between the concrete pipe and the pipe below slowly approaches. When the two blocks 118 are completely pulled out from under the concrete pipe, the concrete pipe will fall a short distance under the action of its own gravity, and the concrete pipe is docked. The process of installing the concrete pipe does not require manual operation by the operator, which reduces the difficulty of the operator's work. The two blocks 118 are made of high-strength steel and are connected to the clamping plate 108 by electric welding. This structure can support concrete pipes of larger mass.
[0027] The two mounting grooves 113 are respectively arranged at the two ends of the mounting plate 106, the two mounting blocks 114 are respectively fixedly connected to the two ends of the fixing block 107, and are slidably connected to the mounting plate 106, and are respectively located in the two mounting grooves 113, the motor 112 is fixedly connected to the support rod 101, the screw rod 111 is fixedly connected to the output end of the motor 112, and extends between the two support rods 101, the two sliders 115 are threadedly connected to the screw rod 111, the mounting cylinder 119 is fixedly connected to the mounting plate 106, and is located below the mounting plate 106, and the mounting mechanism also includes Two support frames 105, the two support frames 105 are respectively fixedly connected to the base 103 and the two support rods 101. When installing the concrete pipe, the two clamps 108 clamp the concrete pipe, and the installation cylinder 119 is stuck in the concrete pipe to ensure that the concrete pipe does not shake during the movement. The two support frames 105 share the stress borne by the base 103 and strengthen the structure of the device. The concrete pipe is moved to an appropriate position, and the two hydraulic cylinders 104 are started. The output ends of the two hydraulic cylinders 104 are extended and drive the two clamps 108 to move downward. The limit blocks on both sides of the slider 115 116 slides in the limiting groove 117, and plays an auxiliary guiding role in the movement of the two clamping plates 108. When the two clamping blocks 118 contact the position where the concrete pipe is connected, the two motors 112 are started at the same time, and the two motors 112 respectively drive the two screw rods 111 to rotate, and the two screw rods 111 drive the four sliders 115 to move to both sides. At the same time, the mounting block 114 located above the fixed block 107 moves in the mounting groove 113. In addition, the mounting block 114 and the mounting groove 113 play a connecting role. Since the limiting blocks 116 on both sides of the slider 115 clamp the fixed plate 107 9, so when the slider 115 moves, the clamping plate 108 moves with it, and the two clamping plates 108 move to both sides. The upper surface of the clamping block 118 has an inclination angle. When the two clamping blocks 118 move to both sides, the concrete pipe slowly moves downward on the two clamping blocks 118 along the inclination angle, and the distance between the concrete pipe and the pipe below slowly approaches. When the two clamping blocks 118 are completely pulled out from under the concrete pipe, the concrete pipe will fall a short distance under the action of its own gravity, and the concrete pipes are docked. The process of installing the concrete pipe does not require manual operation by the operator, which reduces the difficulty of the operator's work.
[0028] When the present invention is used to install a concrete pipe, the two clamps 108 clamp the concrete pipe, and the installation cylinder 119 is stuck in the concrete pipe to ensure that the concrete pipe does not shake during the movement. The two support frames 105 share the stress borne by the base 103, strengthen the structure of the device, move the concrete pipe to an appropriate position, start the two hydraulic cylinders 104, the output ends of the two hydraulic cylinders 104 extend, and drive the two clamps 108 to move downward, the limit blocks 116 on both sides of the slider 115 slide in the limit groove 117, and play an auxiliary guiding role in the movement of the two clamps 108. When the two clamping blocks 118 contact the position where the concrete pipe is connected, the two motors 112 are started at the same time, and the two motors 112 respectively drive the two screw rods 111 to rotate, and the two screw rods 111 drive the four sliders 115 to move to both sides, and at the same time When the two clamping blocks 118 move to both sides, the concrete pipe slowly moves downward on the two clamping blocks 118 along with the inclination angle, and the distance between the concrete pipe and the pipe below slowly approaches. When the two clamping blocks 118 are completely pulled out from under the concrete pipe, the concrete pipe will fall a short distance under the action of its own gravity, and the concrete pipe will be docked. The process of installing the concrete pipe does not require manual operation by the operator, which reduces the difficulty of the operator's work.
[0029] The second embodiment of the present application is:
[0030] See also Figure 4 , Figure 4 1 is a schematic diagram of the overall structure of the second embodiment of the groundwater drainage well installation equipment of the present invention. Based on the first embodiment, the groundwater drainage well installation equipment of this embodiment further includes four support mechanisms, which are arranged between the two support rods 101 and the two screw rods 111, and the support mechanisms include support rods 201 and bearings 202.
[0031] One end of the support rod 201 is fixedly connected to the support rod 101, the outer wall of the bearing 202 is fixedly connected to the other end of the support rod 201, and the inner wall of the bearing 202 is rotatably connected to the screw rod 111. The four bearings 202 and the four support rods 201 respectively support two of the screw rods 111 to ensure that the screw rods 111 will not be misplaced, thereby increasing the stability of the device.
[0032] The third embodiment of the present application is:
[0033] See also Figure 5-Figure 6 , Figure 5 It is a schematic diagram of the overall structure of the third embodiment of the groundwater drainage new well installation equipment of the present invention. Figure 6 yes Figure 5 Enlarged view of point C in the middle.
[0034] The present invention provides a new underground water drainage well installation device, which also includes four balancing mechanisms. The four balancing mechanisms are respectively arranged on the two support rods 101. The balancing mechanism includes a support leg 301 and a rotating assembly. The rotating assembly includes a mounting frame 302, a rotating roller 303 and a roller 304. The above-mentioned solution solves the problem that the device is difficult to maintain balance and is prone to tilting when moving.
[0035] One end of the support leg 301 is fixedly connected to the support rod 101, the rotating assembly is arranged at the other end of the support leg 301, the mounting frame 302 is fixedly connected to the support leg 301, the rotating roller 303 is rotationally connected to the mounting frame 302, the roller 304 is rotationally connected to the rotating roller 303 and is located in the mounting frame 302. When the device is moved, the four rollers 304 are in contact with the ground, and the four rollers 304 respectively rotate with the four rotating rollers 303 as the central axis, which plays an auxiliary balancing effect on the movement of the device, ensures that the device does not tilt when moving, and increases the stability of the device.
[0036] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.
Claims
1. A groundwater drainage new well installation device, comprising two support rods, two pulleys and a cap, wherein the two pulleys are respectively arranged at one end of the two support rods, and the two ends of the cap are respectively fixedly connected to the other ends of the two support rods, characterized in that: The cam is connected to the control stand by an axis, the axis of the control arm is connected to the control arm, and the axis of the control arm is connected to the control arm.
2. The groundwater drainage new well installation equipment according to claim 1, characterized in that: The connection kit includes two mounting grooves and two mounting blocks. The two mounting grooves are respectively arranged at the two ends of the mounting plate. The two mounting blocks are respectively fixedly connected to the two ends of the fixed block, and are slidably connected to the mounting plate, and are respectively located in the two mounting grooves.
3. The groundwater drainage new well installation equipment according to claim 1, characterized in that: The driving assembly includes a motor and a screw rod, wherein the motor is fixedly connected to the support rod, the screw rod is fixedly connected to the output end of the motor and extends between the two support rods, wherein the two sliders are threadedly connected to the screw rod.
4. The groundwater drainage new well installation equipment according to claim 1, characterized in that: The mounting mechanism further comprises a mounting tube, which is fixedly connected to the mounting plate and is located below the mounting plate.
5. The groundwater drainage new well installation equipment according to claim 1, characterized in that: The installation mechanism also includes two support frames, and the two support frames are fixedly connected to the support platform and the two support rods respectively.
6. The groundwater drainage new well installation equipment according to claim 3, characterized in that: The groundwater drainage new well installation equipment also includes four supporting mechanisms, and the four supporting mechanisms are arranged between the two support rods and the two screw rods.
7. The groundwater drainage new well installation equipment according to claim 6, characterized in that: The support mechanism includes a support rod and a bearing, one end of the support rod is fixedly connected to the support rod, the outer side wall of the bearing is fixedly connected to the other end of the support rod, and the inner side wall of the bearing is rotatably connected to the screw rod.
Citation Information
Patent Citations
Concrete pipeline mounting device
CN219408917U