Plain polder area optimization scheduling method giving consideration to waterlogging and external flood
By adopting dynamic pre-release, discharge limit, and discharge shutdown in the plain dike area, the problem of flooding and internal waterlogging risks during basin flooding is solved, and the safety control of water levels inside and outside the dike area is achieved, and the benefits of flood control and drainage are maximized. Avoid large-scale economic losses and security risks.
Patent Information
- Application Number
- CN202411563676.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-03
AI Technical Summary
The existing technology is difficult to take into account both internal drainage and external flood control in plain dikes, resulting in the coexistence of flood risk throughout the entire area and the flood risk in the dikes during basin floods, and there is a lack of effective optimization and scheduling methods.
Dynamic pre-release, emission limit, discharge shutdown and other measures are adopted, and the internal storage and storage stagnation functions of the dike area are reasonably arranged according to the relationship between the drainage risk within the dike area and the flood control risk in the basin. Through pre-release, emission limit, discharge shutdown and other measures, Control the risk of flooding in the basin, ensure that the water levels inside and outside the dike area are within a safe range, and avoid the risk of large-scale flooding or dam collapse.
On the premise of controlling the risk of flooding in the basin, alleviate the risk of flooding in the dike area, maximize the benefits of flood control and drainage in the basin and regional areas, avoid economic losses, and ensure safe flood control in the dike area and basin.
Smart Images

Figure CN119067326A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of safe dispatching of plain polder areas, and in particular to a method for optimizing dispatching of polder areas taking into account both internal waterlogging drainage and external flood control. Background Art
[0002] The polder area is an important means of flood control and drainage in low-lying plain areas. Many vast plain areas have highly developed river networks, low-lying terrain, and insufficient flood outlets. The polder area (including the urban encirclement) is an important means of solving flood control and drainage in local areas of the plain river network. The polder area forms a flood control closed circle by building embankments, gates, and pumps, which can prevent floods from the river outside the polder area on the one hand, and remove waterlogging inside the polder area on the other.
[0003] In the context of rapid social and economic development, the construction of a large number of polder areas has changed the natural storage and discharge characteristics of flood water in the basin. When encountering basin-wide floods, a large number of polder areas use pumping stations to concentrate water discharge to the river outside the polder. If the polder areas continue to drain water, the water level of the river outside the polder will rise rapidly, which may cause large-scale polder areas to overflow or breach the embankment, leading to basin-wide flood risks; if the polder areas stop draining water, the internal water level will rise, causing the risk of waterlogging in the polder areas.
[0004] Scientific dispatching of the polder area is one of the important measures to ensure the safety of flood control and drainage in the basin. Therefore, balancing the risks of internal flooding and external flood control in the polder area and seeking an optimized dispatching method that takes into account both internal drainage and external flood control in the polder area is particularly important for flood risk management in plain water network areas, and is also an urgent problem to be solved in the dispatching and management of flood control projects in the basin. Summary of the invention
[0005] In order to solve the problem that the conventional scheduling procedures currently adopted in the polder area may cause flood risks in the entire area when encountering basin-wide floods, the present invention provides a scientific scheduling method for the polder area, which takes into account both internal drainage and external flood control in the polder area. In the early stage of the flood, part of the storage capacity is freed up through pre-discharge measures. In the middle and late stages of the flood, based on the judgment of internal drainage and external flood control risks in the polder area, drainage limitation and suspension measures are taken to alleviate the waterlogging risk in the polder area as much as possible under the premise of controlling the risk of basin-wide floods.
[0006] The optimized dispatching method of the polder area proposed in the present invention comprehensively considers the relationship between the drainage of the polder area and the flood control of the basin. When the flood control risk outside the polder is low, the priority should be to ensure the safety of the drainage of the polder area; when the flood control risk outside the polder increases and is controllable, the flood control of the basin and the drainage safety of the polder area should be taken into account; when the flood control risk outside the polder is at a high risk stage, the priority should be to prevent the flood control risk of the basin. Through measures such as pre-discharge, limited discharge, and suspension of discharge, the reasonable dynamic allocation of the storage capacity of the polder area can be achieved, the basin-wide flood risk can be controlled, and the flood season can be safely passed.
[0007] The technical solution adopted by the present invention is: A method for optimizing the dispatching of plain polder areas taking into account both internal waterlogging and external flooding comprises the following steps: S1. Dynamic pre-discharge: Before the flood comes, pre-discharge is carried out within the forecast period according to the short-term meteorological forecast or hydrological forecast information to lower the water level inside the polder area and free up the storage capacity; dynamic pre-discharge is to try to maintain the water level in the polder area near the designed low water level h1 in the early stage of rainfall; in the face of complex water and rainfall situations, compared with one-time static pre-discharge, dynamic pre-discharge can implement multiple pre-discharges according to control conditions to improve the effectiveness of freeing up the storage capacity; There are two control conditions for dynamic pre-discharge: the water level inside the polder area is not lower than the minimum design water level h1, and the water level outside the polder area is not higher than the regional guaranteed water level h3. The minimum design water level h1 is determined based on the internal river network benefits demand and pump station head of the polder area; During the pre-discharge phase, the water level of the river outside the dike should be controlled not to exceed the regional guaranteed water level h3 to avoid artificial floods. At the same time, the dispatch of the discharge gate outside the basin should be fully combined to discharge the flood water out of the basin as soon as possible; S2. Efficient regulation and storage: Utilize the internal regulation and storage capacity of the polder area vacated by dynamic pre-discharge to absorb part of the rainfall in the middle of the flood, and maximize the peak-shaving and peak-shifting function of the polder regulation and storage; In the middle of a flood, when the external water level of the polder area exceeds the regional guaranteed water level h3 and the internal water level is lower than the designed drainage water level h2, drainage is stopped and the pre-discharge storage capacity of the polder area is used to absorb part of the rainfall; When the water level inside the polder area reaches the designed drainage water level h2, the polder area begins to gradually drain water according to the designed drainage scheduling rules; S3, double control and limited discharge: when the water level outside the dike rises close to the dike defense water level h5 and is expected to rise further, the pump station in the dike area will implement limited discharge measures according to the flood control situation of the river outside the dike. The water level inside the dike shall not be lower than the maximum allowable flood level h4, and the water level outside the dike area shall not exceed the defense water level h5 + safe water retaining height h0; There are two control conditions for double control and limited discharge: the water level of the river outside the polder area should not exceed the design water level h5 + safe water retaining height h0, and the maximum water level h4 allowed by the design should be maintained as much as possible inside the polder area; The maximum water level h4 allowed in the design of the dike is determined comprehensively based on the elevation of the protected objects in the dike area; the safe water retaining height h0 is recommended to be 30% to 60% of the safe excess height of the dike design; S4. Unified suspension of drainage: When the water level outside the dike rises to the regional dike defense water level h5 + safe water retaining height h0, and is expected to rise further, the dike area will be uniformly and comprehensively suspended to store flood water and not further increase the flood control pressure in the basin; suspension of drainage is an important means to ensure the overall flood control safety of the basin. Each sub-district and each protection area should adhere to the principle of basin flood control interests first and uniformly suspend drainage; S5. Orderly water withdrawal: In the later stage of flood, when the water level of the river outside the dike drops below the defense water level h5, the dike area will be drained and water will be withdrawn in an orderly manner.
[0008] The plain is relatively wide, and considering the uneven rainfall, pre-discharge, limited discharge, and suspension of discharge are implemented in zoning parameter control to ensure the interests of flood control and drainage in each zone. In response to various complex water and rainfall conditions, in order to ensure the coordination of characteristic water levels in each zone, it is not advisable to control too many zoning stations.
[0009] The beneficial effects of the present invention are: Aiming at the problem that some plain water network areas have many polder areas and encounter basin-wide floods, and the risk of floods in the whole region caused by concentrated drainage of polder areas, the present invention proposes a method for optimizing the scheduling of polder areas, adopts measures such as pre-discharge, limited drainage, and suspension of drainage, and reasonably arranges the functions of regulating and storing water in the polder areas according to the relationship between the drainage risk inside the polder areas and the flood control risk in the basin, controls the flood risk in the basin, and safely passes the flood season. Under the premise of controlling the flood risk in the basin, the risk of waterlogging in the polder areas is alleviated as much as possible, ensuring the maximization of the flood control and drainage benefits in the basin and region. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 is a flow chart of the present invention; Figure 2 This is a schematic diagram of the flood control and drainage layout of the polder area; Figure 3 It is a scheduling schematic diagram of the present invention. DETAILED DESCRIPTION
[0011] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0012] Taking a plain basin as an example, the revised flood control planning results of the basin proposed the design net rain process with different frequencies for different land types through design rainstorm analysis and design rain type selection; a one-dimensional hydrodynamic model of the basin was established, which integrated the factors such as the backbone river channel outside the polder, the polder area (including the city surround), weirs, gates, pumps, bridges, etc., and could truly reflect the evolution process of the flood in the plain river network; the polder area is the main flood control and drainage unit in the plain, and a plain basin has more than 1,500 polder areas, such as Figure 2 As shown in the figure, the embankment area is a closed flood control and drainage protection area formed by building embankments, setting up sluices and pumping stations to prevent floods from outside and drain water from inside; actual floods are selected to complete the calibration and verification of model parameters. The basin hydrodynamic model after calibration and verification can accurately simulate the hydrodynamic conditions of the basin river network.
[0013] like Figure 1 As shown, the present invention provides a method for optimizing the dispatching of plain polder areas taking into account both internal waterlogging and external flooding, comprising the following steps: S1, dynamic pre-release; Construct dynamic pre-discharge scheduling constraints in the polder area: During the forecast period, when the water level inside the dike is greater than h1, where h1 is 1.0m, and the water level outside the dike is less than h3, where h3 is 1.86m, the flood control outside the dike is at a risk-free stage, and the dike area implements pre-discharge scheduling and activates the pump station to discharge water to the river outside the dike; at the same time, the scheduling of the discharge gate outside the basin should be fully combined to discharge the waterlogged water out of the basin as soon as possible; during the pre-discharge stage, the water level of the river outside the dike does not exceed h3 to avoid artificial floods; S2, efficient regulation and storage; Constructing efficient storage and dispatching constraints in the polder area: In the early stage of flood, when the water level outside the dike is less than h3, the flood control outside the dike is in the risk-free stage, and the dike area implements the first step of dynamic pre-discharge; when the water level outside the dike is ≥ h3, the flood control outside the dike enters the low-risk stage, the dike area implements peak-shifting scheduling, stops pre-discharge, and uses the storage volume of the previous pre-discharge in the dike area to store flood water, giving full play to the peak-shaving and peak-shifting effect; when the water level inside the dike is ≥ h2, h2 takes the value of 1.46m, the drainage inside the dike enters the low-risk stage, the dike area implements conventional drainage scheduling, and activates the pump station to drain water to the river outside the dike; S3, dual control and emission limitation; Construct dual control and emission restriction dispatch constraint conditions in the polder area: In the middle of a flood, when the water level outside the dike is less than h5, h5 is taken as 2.70m, the dike area will be drained normally; when the water level outside the dike is ≥ h5, the flood control outside the dike is at a medium risk stage, the dike area will implement limited discharge scheduling, and some units of the pump station will stop discharging; in the limited discharge stage, the water level inside the dike is maintained at no less than h4, h4 is taken as 2.40m; limited discharge in the dike area is to alleviate the risk of waterlogging in the dike area as much as possible under the premise of ensuring the safety of flood control in the basin; S4, unified stop; During the flood peak period, when the water level outside the dike is ≥h5+h0, where h0 is 0.40m, flood control outside the dike is at a high-risk stage. In order to avoid large-scale risks of dike collapse and overflow, the dike area will implement a comprehensive drainage suspension; when the flood control risk outside the dike is at a high-risk stage, the focus should be on preventing flood risks in the basin.
[0014] S5, orderly water withdrawal; During the water retreat period, when the water level outside the dike is less than h5, the dike area will implement water retreat scheduling and activate the drainage pump station to drain water outside the dike until the water level inside the dike is less than h2.
[0015] The performance of the present invention is compared with the conventional dispatching procedures in the polder area, and the results are as follows: When the plain water network encounters a basin flood, the performance of the optimized dispatching rules of the polder area proposed by the present invention is compared with the original dispatching rules. The comparison results are shown in Figure 3It can be seen that when the optimized procedure is used for scheduling, the highest water level outside the plain river network is reduced from 3.68m to 3.13m, and the water level drops by 55cm. Under conventional scheduling, the peak water level of the plain water level is 3.68m, and a large number of embankment areas will be at risk of flooding and dike breaching, with heavy direct economic losses; under the optimized scheduling of the embankment area, the peak water level of the plain water level is 3.13m, and there will be no risk of flooding and dike breaching in the embankment area. Some embankment areas will experience 10-20cm of waterlogging, and the direct economic losses are relatively small.
[0016] In summary, the present invention optimizes the dispatching procedures of the polder area by combining the combination mode of the internal and external characteristic water levels of the polder area, combining measures such as pre-discharge, limited discharge, and suspension of discharge, and reasonably arranges the functions of regulation and storage within the polder area. Under the premise of controlling the risk of basin-wide floods, the risk of waterlogging in the polder area can be alleviated as much as possible, and the flood season can be safely passed. The optimized dispatching method can maximize the benefits of flood control and drainage in the basin and region.
[0017] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.
Claims
1. A method for optimizing the dispatching of plain polder areas taking into account both internal waterlogging and external flooding, characterized in that: The following steps are involved: S1. Dynamic pre-discharge: Before the flood comes, pre-discharge is carried out within the forecast period according to the short-term meteorological forecast or hydrological forecast information to lower the water level inside the embankment area and free up storage capacity; S2. Efficient regulation and storage: Utilize the internal regulation and storage capacity of the polder area vacated by dynamic pre-discharge to absorb part of the rainfall in the middle of the flood, and give full play to the peak-shaving and peak-shifting function of regulation and storage within the polder; S3, double control and limited discharge: when the water level outside the dike rises to the dike defense water level h5, the pump station in the dike area implements limited discharge measures, the water level inside the dike is not lower than the designed maximum allowable flood level h4, and the water level outside the dike area does not exceed the defense water level h5 + safe water retaining height h0; S4, unified suspension of drainage: when the water level outside the dike rises to the regional dike defense water level h5 + safe water retaining height h0, the dike area will stop drainage uniformly and comprehensively to store flood water without further increasing the flood control pressure in the basin; S5. Orderly water withdrawal: In the later stage of flood, when the water level of the river outside the dike drops below the defense water level, the dike area will be drained and water will be withdrawn in an orderly manner.
2. The method for optimizing the dispatching of plain polder areas taking into account both internal waterlogging and external flooding according to claim 1 is characterized in that: In step S1, the dynamic pre-discharge is to maintain the water level in the polder area near the designed low water level h1 as much as possible before rainfall; the dynamic pre-discharge has two control conditions: the water level inside the polder area is not lower than the minimum designed water level h1, and the water level outside the polder area does not exceed the regional guaranteed water level h3; the minimum designed water level h1 is determined comprehensively based on the benefit demand of the river network inside the polder area and the pump station head; in the pre-discharge stage, the water level of the river outside the polder area is controlled to not exceed the regional guaranteed water level h3.
3. The method for optimizing the dispatching of plain polder areas taking into account both internal waterlogging and external flooding according to claim 1, characterized in that: In step S2, in the middle of the flood, the external water level of the polder area exceeds the regional guaranteed water level h3, and the internal water level is lower than the designed drainage water level h2, so drainage is stopped and the polder area's pre-discharge storage volume is used to absorb part of the rainfall; when the internal water level of the polder area reaches the designed drainage water level h2, the polder area begins to gradually drain according to the designed drainage scheduling rules.
4. The method for optimizing the dispatching of plain polder areas taking into account both internal waterlogging and external flooding according to claim 1 is characterized in that: In step S3, the dual-control and limited discharge has two control conditions: the water level of the river channel outside the embankment area does not exceed the defense water level h5 + the safe water retaining height h0, and the interior of the embankment area tries to maintain the designed maximum allowable water level h4; the designed maximum allowable water level h4 inside the embankment is determined comprehensively based on the elevation of the protected objects inside the embankment area; the safe water retaining height h0 is 30% to 60% of the designed safe superheight of the embankment.
Citation Information
Patent Citations
Flood control and disaster reduction benefit evaluation method for joint dispatching of water engineering
CN113792975A
Method and system for optimizing polder area-polder external system stagnation relationship of plain water network
CN114528761A
Method for predicting water level of polder area of plain river network
CN116307189A
Flood control method for plain river network type drainage basin
CN117371711A
Pressure measurement unit
JP1980040920A
Cited By
Multi-strategy collaborative waterlogging treatment method suitable for multi-scene rainfall and used in urban and rural polder area with limited drainage
CN120471358A
Water conservancy dispatching control method and system in flood area
CN120806587A