Method for intelligently generating project cost commission scheme

Through the intelligent generation system, the project cost commission solution is automatically generated, which solves the inefficiency and talent loss caused by diversified participants, and improves work quality and efficiency, ensuring that the project is completed on time and in quality and is fair in commission.

CN119067330APending Publication Date: 2024-12-03SICHUAN YEMA TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310629979.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-31
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The diverse participants in the project cost process make it difficult to improve work efficiency and quality for commission design, and the problem of talent loss is serious, which in turn affects project efficiency and corporate revenue.

Method used

Adopt an intelligent generation system, determine the commission amount through the project general manager, the project team leader sets the work content and duration, the staff independently selects tasks, generates efficiency and quality points of the intelligent system, and automatically calculates the commission plan to ensure that the project is completed on time and allocates reasonably Commission.

Benefits of technology

It improves the interest selection and efficiency of staff, retains talents, ensures efficient completion of projects and fair commissions, reduces the work intensity of financial personnel, and improves the overall work quality and efficiency.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a method for intelligently generating a project cost commission scheme, and relates to the technical field of project cost. The invention relates to an intelligent generation system. A method for intelligently generating a commission scheme through the intelligent generation system comprises the following specific steps. The method comprises the following steps: S1, a project general principal selects required project groups according to project characteristics, determines commission amounts of the project groups by taking project income as a cardinal number, and inputs the commission amounts into an intelligent generation system through an operation end; s2, after receiving the work content of the group project at the operation end of the intelligent generation system, a project group manager selects specific work needing to be carried out in the intelligent generation system according to the content; and S3, the project group manager sets completion time for each specific work through the intelligent generation system. According to the method, the commission scheme is generated, the requirement for selection of interested content by workers can be met, the working efficiency and the working quality are improved, talents can be well reserved, and meanwhile it can be guaranteed that the whole project can be efficiently completed with a constant value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of engineering cost, and in particular relates to a method for intelligently generating an engineering cost commission scheme. Background Art

[0002] Project cost refers to the construction price of a project, which reflects all the expenses required for the construction of a project. The project can be specifically a house, road, bridge, etc. The technical personnel conduct an audit of the project cost based on the audit project documents to understand and supervise the actual situation of the project implementation and the total cost of the project; In the process of engineering cost calculation, different specific projects require different engineering cost preparation, including at least investment estimation, engineering budget preparation group, engineering budget preparation group, engineering settlement preparation group, bidding control price preparation group, settlement review group, outsourcing bidding project group and full-process cost consulting project group, etc. Because there are many project participants in engineering cost calculation, the commission of the participants needs to be calculated manually by financial personnel, which is troublesome to operate and has the following shortcomings: 1. Because there are many people involved in engineering cost, and different people are good at different fields, it is difficult for talents in some related fields to get projects they are interested in. The inability to obtain projects will also lead to a decrease in commissions (caused by the reduction in the quality of project completion), which indirectly leads to the loss of talents; 2. In the existing engineering cost, the commission is only related to whether the task is completed or not. With this setting, the overall process of engineering cost is inefficient, which leads to the overall inefficiency of the project and indirectly causes a decrease in corporate revenue; Therefore, it is necessary to improve the prior art to solve the above-mentioned technical problems. Summary of the invention

[0003] The purpose of the present invention is to provide a method for intelligently generating a commission plan for engineering cost. By using this method to generate a commission plan, the staff's selection of content of interest can be satisfied, which indirectly improves work efficiency and work quality, and will retain talents well. At the same time, it can ensure that the entire project can be completed efficiently and at a value-preserving level, solving the problem that the design of the existing commission plan for engineering cost is difficult to improve work efficiency, ensure work quality and achieve talent retention.

[0004] In order to solve the above technical problems, the present invention is achieved through the following technical solutions: The present invention is a method for intelligently generating a commission scheme for engineering cost, including an intelligent generation system. The specific steps of the method for intelligently generating a commission scheme by the intelligent generation system are as follows: S1: The project manager selects the required project team based on the project characteristics, determines the commission amount of each project team based on the project revenue, and inputs each commission amount into the intelligent generation system through the operation terminal; S2: After receiving the group project work content at the operation end of the intelligent generation system, the project leader selects the specific work to be performed in the intelligent generation system according to the content; S3: The project leader sets the completion time for each specific task through the intelligent generation system; S4: After the project team members have checked the specific work content through the intelligent generation system, they can choose the specific work independently; S5: After completing the work, the project team staff submits the work content to the intelligent generation system. The intelligent generation system automatically generates an efficiency score A based on the volume of the submitted content and compares it with the standard data in the database; S6: The project team leader receives the work content submitted by the project team members through the intelligent generation system and reviews it. On the premise that the work content meets the requirements, the leader scores the quality of the work content. The intelligent generation system stores the quality score B; S7: When all specific work contents of the project team are completed, the project team leader confirms the completion of the work in the intelligent generation system. The intelligent generation system automatically generates an efficiency score C for the project team leader based on the total amount of completed content and after comparing it with the standard data in the database; S8: The project manager receives the work content submitted by the project team leader through the intelligent generation system and reviews it. On the premise that the work content meets the requirements, the manager scores the quality of the work content. The intelligent generation system stores the quality score D. S9: When the project manager determines through the intelligent generation system that the project team has completed the assigned tasks, the intelligent generation system automatically generates a commission plan and sends it to the corresponding personnel.

[0005] Furthermore, the project team in step S1 at least includes investment estimation, engineering budget preparation group, engineering budget preparation group, engineering settlement preparation group, bidding control price preparation group, settlement review group, outsourcing bidding project group and full-process cost consulting project group.

[0006] Furthermore, when the completion time of a specific work is longer than the time specified in step S3, the efficiency score A and the quality score B of the project team staff who completes the specific work are automatically stored as 0 by the intelligent production system.

[0007] Furthermore, for the same specific work in step S2, the project team leader can set at least one work quota.

[0008] Furthermore, the content volume determination criteria in step S5 and step S7 are the byte volume.

[0009] Furthermore, the database is a cloud storage module, and the standard data in the database includes byte amount threshold classification and time threshold classification, and the efficiency score is assigned by a combination of the two thresholds.

[0010] Furthermore, in step S6 and step S8, when the work content does not meet the requirements and is returned, the time required to complete it again after the return is added to the original work time.

[0011] Furthermore, under the premise that the commission of the project team is S, the commission of the project team staff is N=S*(A1+B1) / (A1+B1+A2+B2...+A n +B n +C+D), the commission of the project leader is N'=S*(C+D) / (A1+B1+A2+B2...+A n +B n +C+D).

[0012] Furthermore, the intelligent generation system is installed through at least one device among a PC, a tablet and a mobile phone.

[0013] Furthermore, in step S1, the project manager needs to at least store the project work content, basic project information and collected project materials into the intelligent generation system.

[0014] The present invention has the following beneficial effects: In the present invention, after the project team leader selects the specific work to be performed in the intelligent generation system, the project team staff can check it through the intelligent generation system. After checking, the project team staff can independently choose the projects they are good at to participate in. This setting method can, on the one hand, make full use of resources and realize the value of staff, thereby retaining talents. On the other hand, some interested staff can also join in, realize the mentoring of new staff, and improve the work ability of staff. Finally, the autonomous selection method can also reduce the boredom of staff caused by long-term work in a certain job.

[0015] In the present invention, the efficiency points are generated by an intelligent generation system, and the quality points are generated for the project team leader and the project manager. This can effectively improve the project completion efficiency while ensuring the project quality, improve efficiency, effectively avoid work delays, and also avoid unequal commission distribution due to staff members holding too many projects. Implementation

[0016] The technical solutions in the embodiments of the present invention will be described clearly and completely below.

[0017] The present invention is a method for intelligently generating a project cost commission scheme, including an intelligent generation system, which is mounted on at least one device among a PC, a tablet and a mobile phone. The construction of the intelligent generation system includes hardware and software. Since the principle of the intelligent generation system is described in the steps of the following method, it can be realized by the existing technology, so it will not be repeated here; The specific steps of the method for intelligently generating a commission plan through an intelligent generation system are as follows; S1: The project manager selects the required project team according to the project characteristics, and determines the commission amount of each project team based on the project income, and inputs each commission amount into the intelligent generation system through the operation terminal. In order to facilitate the better and full implementation of the project, the project manager also needs to store at least the project work content, basic project information and collected project materials into the intelligent generation system to facilitate the subsequent work needs of the staff; The project team shall at least include the investment estimation, engineering budget preparation team, engineering budget preparation team, engineering settlement preparation team, bidding control price preparation team, settlement review team, outsourcing bidding project team and full-process cost consulting project team; S2: After receiving the group project work content at the operation end of the intelligent generation system, the project team leader selects the specific work to be performed in the intelligent generation system according to the content. The specific work type is designed according to different project teams. For example, the specific work of the resource estimation and engineering budget preparation team includes data collection, cost preparation, report preparation, printing and archiving, etc. For the same specific work, the project team leader can set at least one work quota. If there are multiple work quotas, they can be divided into different groups. The volume and quality of the divided work can be judged by efficiency and quality points respectively. S3: The project leader sets the completion time for each specific task through the intelligent generation system to ensure the timely completion of the project progress. When two specific tasks are in a causal relationship, the intelligent generation system can link the two specific tasks together, and the total duration is the completion time set by the project leader, and then judge them separately according to the completion time of each task; When the completion time of a specific task is longer than the time specified in step S3, the efficiency score A and quality score B of the project team member who completed the specific task are automatically stored as 0 by the intelligent production system, thereby serving as a penalty mechanism to avoid project delays; S4: After the project team members have checked the specific work content through the intelligent generation system, they can choose the specific work independently; S5: After completing their work, the project team members submit their work content to the intelligent generation system. The intelligent generation system automatically generates an efficiency score A based on the volume of the submitted content and compares it with the standard data in the database. The volume judgment standard is the number of bytes. The database is a cloud storage module. The standard data in the database includes byte threshold classification and time threshold classification, and the efficiency score is assigned by combining the two thresholds. The intelligent generation system will first search in the byte threshold classification according to the volume of the specific work to determine which byte threshold the specific work belongs to. Then, the intelligent generation system will search for the time threshold classification that meets the byte threshold and finally determine the efficiency score. The specific efficiency score under a certain byte volume threshold and time threshold can be given a standard value, and then the intelligent generation system automatically generates based on the standard value, or it can be automatically set by the project team leader; S6: The project team leader receives the work content submitted by the project team members through the intelligent generation system and reviews it. On the premise that the work content meets the requirements, the leader scores the quality of the work content. The intelligent generation system stores the quality score B; When the work content does not meet the requirements and is returned, the time it takes to complete it again after the return is added to the original work time. For example, if the time taken for the first submission is t1 and the time taken for the return and resubmission is t2, the intelligent generation system will search based on t1+t2 when classifying the time threshold. S7: When all specific work contents of the project team are completed, the project team leader confirms the completion of the work in the intelligent generation system. The intelligent generation system automatically generates an efficiency score C for the project team leader based on the total amount of the completed content and compares it with the standard data in the database. The volume judgment standard is the number of bytes; S8: The project manager receives the work content submitted by the project team leader through the intelligent generation system and reviews it. On the premise that the work content meets the requirements, the manager scores the quality of the work content. The intelligent generation system stores the quality score D. S9: When the project manager determines through the intelligent generation system that the project team has completed the assigned tasks, the intelligent generation system automatically generates a commission plan and sends it to the corresponding personnel. The financial staff does not need to perform manual calculations and the system is highly flexible. This reduces the workload of the financial staff and improves their work enthusiasm. Under the premise that the commission of the project team is S, the commission of the project team staff is N=S*(A1+B1) / (A1+B1+A2+B2...+A n +B n +C+D), the commission of the project leader is N'=S*(C+D) / (A1+B1+A2+B2...+A n +B n +C+D).

[0018] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments, any equivalent replacement of some of the technical features therein, and any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.

Claims

1. A method for intelligently generating a project cost commission scheme, comprising an intelligent generation system, characterized in that: The specific steps of the method for intelligently generating a commission plan through an intelligent generation system are as follows; S1: The project manager selects the required project team based on the project characteristics, determines the commission amount of each project team based on the project revenue, and inputs each commission amount into the intelligent generation system through the operation terminal; S2: After receiving the group project work content at the operation end of the intelligent generation system, the project leader selects the specific work to be performed in the intelligent generation system according to the content; S3: The project leader sets the completion time for each specific task through the intelligent generation system; S4: After the project team members have checked the specific work content through the intelligent generation system, they can choose the specific work independently; S5: After completing the work, the project team staff submits the work content to the intelligent generation system. The intelligent generation system automatically generates an efficiency score A based on the volume of the submitted content and compares it with the standard data in the database; S6: The project team leader receives the work content submitted by the project team members through the intelligent generation system and reviews it. On the premise that the work content meets the requirements, the leader scores the quality of the work content. The intelligent generation system stores the quality score B; S7: When all specific work contents of the project team are completed, the project team leader confirms the completion of the work in the intelligent generation system. The intelligent generation system automatically generates an efficiency score C for the project team leader based on the total amount of completed content and after comparing it with the standard data in the database; S8: The project manager receives the work content submitted by the project team leader through the intelligent generation system and reviews it. On the premise that the work content meets the requirements, the manager scores the quality of the work content. The intelligent generation system stores the quality score D. S9: When the project manager determines through the intelligent generation system that the project team has completed the assigned tasks, the intelligent generation system automatically generates a commission plan and sends it to the corresponding personnel.

2. The method for intelligently generating a construction cost commission scheme according to claim 1 is characterized in that: The project team in step S1 at least includes investment estimation, engineering budget preparation team, engineering budget preparation team, engineering settlement preparation team, bidding control price preparation team, settlement review team, outsourcing bidding project team and full-process cost consulting project team.

3. The method for intelligently generating a construction cost commission scheme according to claim 2, characterized in that: When the completion time of a specific task is longer than the time specified in step S3, the efficiency score A and quality score B of the project team member who completes the specific task are automatically stored as 0 by the intelligent production system.

4. The method for intelligently generating a construction cost commission scheme according to claim 3 is characterized in that: For the same specific work in step S2, the project team leader can set at least one work quota.

5. The method for intelligently generating a construction cost commission scheme according to claim 4 is characterized in that: The content volume determination standard in step S5 and step S7 is the byte volume.

6. The method for intelligently generating a construction cost commission scheme according to claim 5 is characterized in that: The database is a cloud storage module. The standard data in the database includes byte amount threshold classification and time threshold classification, and the efficiency score is assigned by the combination of the two thresholds.

7. The method for intelligently generating a construction cost commission scheme according to claim 6 is characterized in that: In step S6 and step S8, when the work content does not meet the requirements and is returned, the time required to complete it again after the return is added to the original work time.

8. A method for intelligently generating a construction cost commission scheme according to any one of claim 7, characterized in that: Under the premise that the commission of the project team is S, the commission of the project team staff is N=S*(A1+B1) / (A1+B1+A2+B2...+A n +B n +C+D), the commission of the project leader is N'=S*(C+D) / (A1+B1+A2+B2...+A n +B n +C+D).

9. The method for intelligently generating a construction cost commission scheme according to claim 1, characterized in that: The intelligent generation system is installed through at least one device among PC, tablet and mobile phone.

10. The method for intelligently generating a construction cost commission scheme according to claim 8 or 9, characterized in that: In step S1, the project manager needs to at least store the project work content, basic project information and collected project materials into the intelligent generation system.