Construction method of steel connecting bridge crossing above road

By assembling the sidewalks on both sides of the road in sections and using slide rails to transport steel bridges, the traffic congestion and accident risks caused by conventional construction methods are solved, and the construction safety is not affected by the construction process. .

CN119083309AActive Publication Date: 2024-12-06CHINA CONSTR EIGHT ENG DIV CORP LTD

Patent Information

Application Number
CN202411164607.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-12-06
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

When constructing a steel bridge across the road, conventional methods require support below the road, resulting in motor vehicle lanes occupied and increased traffic congestion and accident risk.

Method used

The sidewalks on both sides of the road are assembled in sections, and the steel bridge is transported in sections through slide rails to form a complete bridge. Only support frames and slide rails are installed on both sides of the sidewalk to avoid the impact on the motor vehicle lanes.

Benefits of technology

It effectively avoids the impact of construction on motor vehicle lanes, reduces traffic congestion and accident risks, and improves traffic safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083309A_ABST
    Figure CN119083309A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method of a steel connecting bridge crossing over a road, which comprises the following steps of: S1, respectively arranging a support frame on sidewalks on two sides, and crossing a bridge frame between the two support frames; s2, a splicing platform is erected above any supporting frame and corresponds to the height position of the connecting bridge frame, and a sliding rail arranged in the length direction of the connecting bridge frame is installed on the upper surface of the connecting bridge frame; s3, the middle section of the steel connecting bridge is spliced on the splicing platform, and the middle section of the steel connecting bridge is conveyed to the connecting bridge frame through a sliding rail; and S4, the splicing platform is dismantled, the two side sections of the steel connecting bridge are spliced at the positions of the supporting frames on the two sides correspondingly and are in butt joint with the existing building, and the ends, away from the existing building, of the two side sections of the steel connecting bridge are connected to the two sides of the middle section of the steel connecting bridge. According to the construction method, the steel connecting bridges are spliced on the sidewalk in a segmented mode, the multiple sections of steel connecting bridges are combined after the steel connecting bridges are conveyed to the corresponding positions through the sliding rails, motor vehicle lanes are not affected in the construction process, and the influence of construction on urban traffic is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a construction method of a steel bridge spanning over a road. Background Art

[0002] In the prior art, when constructing a steel bridge across a road, the conventional method is to set up a temporary cradle above the road for loose assembly. When assembling the steel bridge, it is necessary to set up supports on the road below the steel bridge, which will occupy the motor vehicle lane, easily cause traffic congestion and increase the risk of traffic accidents. Summary of the invention

[0003] In order to solve the above problems, the present invention provides a construction method for a steel bridge across the road. The steel bridge can be assembled in sections on the sidewalks on both sides of the road, and after being transported to corresponding positions in sections by slide rails, multiple sections of the steel bridge can be combined to form a complete steel bridge. The present invention only needs to set up supports on both sides of the road, and will not affect the motor vehicle lane during the construction process.

[0004] The present invention provides a construction method of a steel bridge across a road.

[0005] The road includes a motor vehicle lane in the middle and sidewalks on both sides, and existing buildings are arranged on the relatively outer sides of the sidewalks. The steel bridge is connected between the existing buildings on both sides, and is characterized in that it includes the following steps:

[0006] S1. A support frame is provided on each of the sidewalks on both sides, a connecting bridge is connected between the tops of the two support frames, and the bottom of the connecting bridge is allowed to meet the normal driving conditions of the motor vehicle lane;

[0007] S2, setting up a splicing platform above any one of the support frames and at a height corresponding to the connecting bridge frame, and installing a slide rail arranged along the length direction of the connecting bridge frame on the upper surface of the connecting bridge frame;

[0008] S3, splicing on the splicing platform to form a middle section of the steel bridge, and transporting the middle section of the steel bridge to the bridge frame through the slide rail;

[0009] S4. Dismantle the splicing platform, and splice the two side sections of the steel bridge at the positions of the support frames on both sides, and respectively connect the two side sections of the steel bridge to the existing buildings, and respectively connect the ends of the two side sections of the steel bridge away from the existing buildings to the two sides of the middle section of the steel bridge to form a complete steel bridge.

[0010] A further improvement of the present invention is that after dismantling the splicing platform, scaffolds are respectively set up at the positions of the support frames on both sides, and then the two side sections of the steel bridge are spliced ​​on the scaffolds; after the splicing is completed, the scaffolds are dismantled.

[0011] A further improvement of the present invention is that the middle section of the steel bridge is divided into multiple sections. When executing step S3, the multiple sections are spliced ​​one by one and transported in sequence, and during the transportation process, the adjacent sections are connected end to end to finally form the middle section of the steel bridge.

[0012] A further improvement of the present invention is that the slide rail uses a hydraulic sliding system.

[0013] A further improvement of the present invention is that when installing the support frame, two support columns are first supported, and after the support is completed, a support beam is set between the two support columns. When installing the connecting bridge frame, the bottom of the connecting bridge frame is connected to the top of the support column on the side relatively far away from the existing building.

[0014] A further improvement of the present invention is that, when installing the support frame, a wall support beam is arranged on one of the support columns close to the existing building, and the wall support beam is connected to the existing building.

[0015] The present invention discloses a construction method for a steel bridge across a road, which comprises assembling the steel bridge in sections on the sidewalks on both sides of the road, transporting the steel bridge in sections to corresponding positions by means of slide rails, and then combining multiple sections of the steel bridge to form a complete steel bridge. During the construction process, the motor vehicle lanes will not be affected, thereby avoiding the impact of the construction on urban traffic. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of step S1 of a construction method of a steel bridge across a road according to the present invention;

[0017] Figure 2 It is a schematic diagram of the middle section of the fifth steel bridge of the construction method of the steel bridge across the road of the present invention;

[0018] Figure 3 It is a schematic diagram of the middle section of the third steel bridge in the construction method of the steel bridge across the road of the present invention;

[0019] Figure 4 It is a schematic diagram of the middle section of a movable steel bridge in a construction method of a steel bridge across a road according to the present invention;

[0020] Figure 5 It is a schematic diagram of step S3 of a construction method of a steel bridge across a road according to the present invention;

[0021] In the figure: 1. Steel bridge frame; 2. Support frame; 3. Support column; 4. Support beam; 5. Motor vehicle lane; 6. Sidewalk; 7. Wall beam; 8. Slide rail; 9. Metro station; 10. Middle section of steel bridge; 11. Sections on both sides of steel bridge. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0023] like Figure 1 to Figure 5 As shown, a construction method of a steel bridge across a road, wherein the road includes a motor vehicle lane in the middle and sidewalks on both sides, and there are existing buildings on the outside of the sidewalks. The steel bridge is connected between the existing buildings on both sides, and comprises the following steps:

[0024] like Figure 1 As shown, step S1, a support frame 2 is respectively arranged on the sidewalks 6 on both sides, and a connecting bridge frame 1 is connected between the tops of the two support frames 2, so that the bottom of the connecting bridge frame 1 meets the normal driving of the motor vehicle lane;

[0025] Step S2, a steel bridge splicing platform is set up above any support frame 2 and at a height position corresponding to the bridge frame 1, and a slide rail 8 is installed on the upper surface of the bridge frame 1 along the length direction of the bridge frame;

[0026] like Figure 2 to Figure 4 As shown, step S3, splicing the steel bridge middle section 10 on the bridge splicing platform and transporting the steel bridge middle section 10 to the bridge frame through the slide rail 8;

[0027] Preferably, in this embodiment, the lap platform is connected to the bridge frame 1 .

[0028] like Figure 5 As shown, step S4, the splicing platform is removed, and the two side sections 11 of the steel bridge are respectively spliced ​​at the positions of the support frames 2 on both sides, and the two side sections 11 of the steel bridge are respectively connected to the existing buildings, and the ends of the two side sections 11 of the steel bridge away from the existing buildings are respectively connected to the two sides of the middle section 10 of the steel bridge to form a complete steel bridge.

[0029] like Figure 2 to Figure 4 As shown, the steel bridge middle section 10 can be divided into multiple sections. When installing the steel bridge middle section 10, the multiple sections are sequentially transported to the bridge frame middle section through the slide rails 8 and connected to form the steel bridge middle section 10.

[0030] Preferably, if Figure 2 to Figure 5 As shown, in this embodiment, the middle section 10 of the steel bridge is divided into the second section, the third section and the fifth section. After the fifth section is spliced, the fifth section is moved out of the splicing platform through the slide rail 8 and spliced ​​with the third section, and the fifth section and the third section are connected end to end, and then the second section is spliced ​​and moved in turn. The two side sections 11 of the steel bridge are divided into the first section and the sixth section. After the construction of the middle section 10 of the steel bridge is completed, the two ends are connected to the first section and the sixth section respectively.

[0031] Preferably, if Figure 5As shown, after the splicing platform is dismantled, scaffolds are firstly set up at the positions of the support frames 2 on both sides, and then the sections 11 on both sides of the steel bridge are spliced ​​on the scaffolds; after the splicing is completed, the scaffolds are dismantled.

[0032] Preferably, in this embodiment, the slide rail 8 adopts a hydraulic sliding system.

[0033] Preferably, if Figure 1 As shown, when installing the support frame 1, two support columns 3 are first supported, and after the support is completed, a support beam 4 is set between the two support columns 3. When executing step S3, the bottom of the bridge frame 1 is connected to the top of the support column 3 on the side relatively far away from the existing building.

[0034] Preferably, the support beam 4 in this embodiment is made of parallel steel pipes.

[0035] Preferably, if Figure 1 As shown, in this embodiment, a cushion block is further provided at the connection between the support column 3 and the connecting bridge frame 1 .

[0036] Preferably, if Figure 1 As shown, when the support frame 1 is installed, a supporting beam 7 is arranged on a supporting column 3 close to the existing building, and the supporting beam 7 is connected to the existing building.

[0037] Preferably, if Figure 1 to Figure 5 As shown, in this embodiment, a subway station 9 is arranged underground at the construction road. When the support columns 3 are arranged, the support positions of the support columns 3 should avoid the subway station 9.

[0038] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A construction method for a steel bridge across a road, wherein the road comprises a motor vehicle lane in the middle and sidewalks on both sides, and existing buildings are arranged on the relatively outer sides of the sidewalks, and the steel bridge is connected between the existing buildings on both sides, characterized in that: The following steps are involved: S1. A support frame is provided on each of the sidewalks on both sides, a connecting bridge is connected between the tops of the two support frames, and the bottom of the connecting bridge is allowed to meet the normal driving conditions of the motor vehicle lane; S2, setting up a splicing platform above any one of the support frames and at a height corresponding to the connecting bridge frame, and installing a slide rail arranged along the length direction of the connecting bridge frame on the upper surface of the connecting bridge frame; S3, splicing on the splicing platform to form a middle section of the steel bridge, and transporting the middle section of the steel bridge to the bridge frame through the slide rail; S4. Dismantle the splicing platform, and splice the two side sections of the steel bridge at the positions of the support frames on both sides, and respectively connect the two side sections of the steel bridge to the existing buildings, and respectively connect the ends of the two side sections of the steel bridge away from the existing buildings to the two sides of the middle section of the steel bridge to form a complete steel bridge.

2. A method for constructing a steel bridge across a road as claimed in claim 1, characterized in that: After the splicing platform is dismantled, scaffolds are respectively set up at the positions of the support frames on both sides, and then the two side sections of the steel bridge are spliced ​​on the scaffolds; after the splicing is completed, the scaffolds are dismantled.

3. A construction method for a steel bridge across a road as claimed in claim 1, characterized in that: The middle section of the steel bridge is divided into multiple sections. When the steel bridge executes step S3, the multiple sections are spliced ​​one by one and transported in sequence. During the transportation, the adjacent sections are connected end to end to finally form the middle section of the steel bridge.

4. A method for constructing a steel bridge across a road as claimed in claim 1, characterized in that: The slide rail uses a hydraulic sliding system.

5. The construction method of a steel bridge across a road as claimed in claim 1, characterized in that: When installing the support frame, two support columns are first supported. After the support is completed, a support beam is set between the two support columns. When installing the connecting bridge frame, the bottom of the connecting bridge frame is connected to the top of the support column on the side relatively far away from the existing building.

6. A method for constructing a steel bridge across a road as claimed in claim 5, characterized in that: When installing the support frame, a buttress beam is arranged on one of the support columns close to the existing building, and the buttress beam is connected to the existing building.

Citation Information

Patent Citations

  • Large-span butterfly space bent and twisted pipe truss and construction method thereof

    CN106049681A

  • Medium and large steel truss girder building construction method

    CN111648246A

  • Large-span steel structure corridor integral installation construction equipment and technology

    CN115182596A

  • Construction method of curve variable cross-section steel box girder crossing high-speed road section

    CN116752451A

  • Construction method of steel connecting bridge crossing road above subway

    CN119083308A

Cited By

  • Construction method of steel connecting bridge crossing road above subway

    CN119083308A

  • Construction method of steel continuous bridge across road above subway

    CN119083308B