Basement settlement joint waterproof structure leakage repairing method

By controlling the grouting sequence and amount in the basement settlement joints, a composite waterproof structure is formed, which solves the problem of slurry grouting failure, enhances the waterproof performance, avoids the formation of cavity, and ensures the waterproof effect of the settlement joint.

CN119083510APending Publication Date: 2024-12-06KUNSHAN UNDERGROUND SPACE TECH RES INST CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411151556.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

During the structural settlement process of the existing basement settlement joint waterproofing system, the grouting amount of slurry often does not meet the standards or exceeds the standards, resulting in weak spots in the waterproof structure and cavity formation, and other slurry cannot be grouted after the slurry expands.

Method used

By evenly opening grouting holes on the buried water stop belt, inserting grouting tubes respectively, controlling the grouting sequence and amount of foamed silicate modified polyurethane, acrylic resin and polyurea, forming a composite waterproof structure. The polyurea grout liquid is injected into the cavity until it is filled with quick-drying cement and vinyl acetate to enhance waterproofing performance.

Benefits of technology

It effectively solves the problem of the grouting amount of slurry that does not meet the standard or exceed the standard, enhances the sealing of the waterproof structure, avoids the formation of cavity, and ensures the waterproof performance of the settlement joint.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083510A_ABST
    Figure CN119083510A_ABST
Patent Text Reader

Abstract

The invention provides a basement settlement joint waterproof structure leakage repairing method which comprises the steps that foaming type silicate modified polyurethane is injected into a cavity between a middle-buried water stop belt and a backfill soil layer through each first grouting pipe till the first target grout amount is reached, and after foaming of the foaming type silicate modified polyurethane begins, the foaming type silicate modified polyurethane is injected into a cavity between the middle-buried water stop belt and the backfill soil layer; acrylic resin is injected into a cavity between the middle-buried type water stop belt and the foaming type silicate modified polyurethane through each second grouting pipe to reach a second target grout amount, and after the foaming type silicate modified polyurethane and the acrylic resin are solidified, a plurality of water-swelling water stop strips are embedded into the settlement joint in the length direction of the middle-buried type water stop belt. And a third grouting pipe is arranged between every two adjacent water-swelling water stop strips, so that polyurea grouting liquid is injected into a cavity between the water-swelling water stop strips and the middle-buried type water stop belt to a third target grout amount. The problem that other grout cannot be grouted after the grout of the waterproof structure expands due to the fact that the grouting amount of the grout in the settlement joint does not reach the standard or exceeds the standard is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a method for repairing leakage of a basement settlement joint waterproof structure. Background Art

[0002] At present, most of the waterproofing systems for basement settlement joints use embedded rubber waterstop (or steel plate) waterstop, with filling materials added in the gaps. The cushion layer is not designed for deformation treatment, and the cushion layer concrete is poured at one time. The filling material under the waterstop in the bottom plate cannot be filled, causing the cushion layer to break during the structural settlement process, and the broken part becomes a shear fulcrum; the extension margin of the waterproof layer does not meet the deformation requirements and is torn, creating a quality risk of leakage.

[0003] The related technology on the amount of slurry to be injected for settlement joint leakage treatment is generally based on the workers' experience or stopped when the slurry gushes out. The injection amount often fails to meet or exceeds the standard, which can lead to weak points in the waterproof structure, formation of cavities, and inability to inject other slurry after the slurry expands. Summary of the invention

[0004] The invention provides a method for repairing leakage of a waterproof structure of a basement settlement joint, so as to solve the problem that the grouting amount of slurry for settlement joint leakage treatment is not up to standard or exceeds the standard, resulting in weak points in the waterproof structure, forming cavities, and other slurries cannot be grouted after the slurry expands.

[0005] The present invention provides a method for repairing leakage of a basement settlement joint waterproof structure, comprising:

[0006] Chisel rough on both sides of the settlement joint;

[0007] Multiple grouting holes are evenly opened on the embedded waterstop along the length direction of the embedded waterstop;

[0008] Inserting a plurality of first grouting pipes into a plurality of grouting holes respectively;

[0009] Injecting foamed silicate-modified polyurethane into the cavity between the buried waterstop and the backfill soil layer through each first grouting pipe to a first target slurry volume; wherein, after the first target slurry volume is reached, each first grouting pipe is replaced by a second grouting pipe;

[0010] After the foaming silicate modified polyurethane starts to foam, acrylic resin is injected into the cavity between the embedded waterstop and the foaming silicate modified polyurethane through each second grouting pipe to a second target slurry volume; wherein, after the second target slurry volume is reached, the second grouting pipe is cleared;

[0011] After the foamed silicate modified polyurethane and acrylic resin solidify, a plurality of water-expandable waterstop strips are embedded in the settlement joint along the length direction of the embedded waterstop strip; wherein a cavity is provided between the water-expandable waterstop strip and the embedded waterstop strip;

[0012] A third grouting pipe is arranged between two adjacent water-swellable waterstop strips, so as to inject polyurea grouting liquid into the cavity between the water-swellable waterstop strip and the embedded waterstop strip through the third grouting pipe to a third target slurry volume; wherein, after the third target slurry volume is reached, the third grouting pipe is cleared;

[0013] After the polyurea grouting liquid solidifies, quick-drying cement is applied to the surface of the water-expandable waterstop strip until it is flush with the plane where the bottom of the cavity formed after roughening is located;

[0014] After the quick-drying cement is dry, vinyl acetate is sprayed on the inner surface of the cavity formed after roughening to a target thickness, and a steel plate matching the cavity is covered after reaching the target thickness.

[0015] Optionally, the first target slurry volume Q1 is calculated according to the following formula:

[0016]

[0017] Among them, H is the distance between the buried waterstop and the backfill soil layer in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A1 is the volume correction coefficient of the cavity formed after roughening; B is the proportion of the foamed silicate modified polyurethane in the cavity after foaming; D is the foaming ratio of the foamed silicate modified polyurethane; C1 is the loss coefficient of the foamed silicate modified polyurethane slurry.

[0018] Optionally, the second target slurry amount Q2 is calculated according to the following formula:

[0019] Q2=H×L×W×A1×(1-B)×C2;

[0020] Among them, H is the distance between the buried waterstop and the backfill soil layer in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A1 is the volume correction coefficient of the cavity formed after roughening; B is the proportion of the foamed silicate modified polyurethane in the cavity after foaming; C2 is the loss coefficient of the acrylic resin slurry.

[0021] Optionally, the third target slurry amount Q3 is calculated according to the following formula:

[0022] Q3=h×L×W×A2×C3;

[0023] Wherein, h is the distance between the water-swellable waterstop strip and the embedded waterstop strip in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A2 is the volume correction coefficient of the cavity between the water-swellable waterstop strip and the embedded waterstop strip; C3 is the loss coefficient of the polyurea grouting fluid.

[0024] Optionally, the distance between two adjacent grouting holes is greater than or equal to 0.8 m and less than or equal to 1.0 m.

[0025] Optionally, the distance between the water-swellable waterstop strip and the embedded waterstop strip in a direction perpendicular to the ground is greater than or equal to 2 cm and less than or equal to 5 cm.

[0026] Optionally, the length of each of the water-swellable waterstop strips is greater than or equal to 50 cm and less than or equal to 80 cm.

[0027] Optionally, the thickness of the vinyl acetate sprayed on the inner surface of the cavity formed after roughening is greater than or equal to 3 mm and less than or equal to 6 mm.

[0028] Optionally, the grouting pressure of the foamed silicate-modified polyurethane is greater than or equal to 10 MPa and less than or equal to 20 MPa; the grouting pressure of the acrylic resin is greater than or equal to 5 MPa and less than or equal to 10 MPa.

[0029] Optionally, the grouting pressure of the polyurea grouting liquid is greater than or equal to 10 MPa and less than or equal to 20 MPa.

[0030] The invention provides a method for repairing leakage of a waterproof structure of a basement settlement joint. By controlling the grouting sequence and grouting amount of a foamed silicate modified polyurethane, an acrylic resin and a polyurea grouting liquid, the invention solves the problem that the grouting amount of the slurry for the settlement joint leakage treatment does not meet or exceeds the standard, resulting in weak points in the waterproof structure, the formation of cavities, and the inability to grout other slurries after the slurry expands. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A schematic flow chart of a method for repairing leakage of a basement settlement joint waterproof structure provided by an embodiment of the present invention;

[0033] Figure 2 A schematic diagram of an application scenario of a method for repairing leakage of a basement settlement joint waterproof structure provided by an embodiment of the present invention;

[0034] Figure 3 A schematic diagram of the positional relationship between the first grouting pipe and the third grouting pipe provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] As described in the background technology, the relevant technology for the amount of slurry grouting for settlement joint leakage treatment is generally based on the workers' experience or stopped when the slurry gushes out. The grouting amount often does not meet the standard or exceeds the standard, which will lead to weak points in the waterproof structure, cavity formation, and the inability to grout other slurry after the slurry expands.

[0037] Therefore, in order to solve the above problems, Figure 1 As shown, this embodiment provides a method for repairing leakage of a basement settlement joint waterproof structure, comprising:

[0038] Step 101, roughening both sides of the settlement joint.

[0039] In this step, the surface of the settlement joint is treated, and the two sides of the settlement joint are leveled and roughened. The size of the chiseled area must be the same as the size of the later water-stop steel plate to facilitate the later installation of the steel plate. Use a spatula to remove the original filler in the joint, use a vacuum cleaner to remove debris, remove the roughness and smooth the inner surface of the settlement joint, and use a vacuum cleaner again to remove the debris in the settlement joint.

[0040] Step 102, evenly opening a plurality of grouting holes on the embedded waterstop along the length direction of the embedded waterstop.

[0041] In order not to damage the original structure of the wall and prevent the steel bars from being knocked and new cracks from being generated, the present embodiment directly inserts the grouting pipe vertically into the settlement joint. On the one hand, this avoids damage to the structure caused by oblique drilling. On the other hand, after the grouting pipe is vertically inserted into the cavity, the slurry can be better diffused during grouting, making the slurry more evenly distributed after solidification.

[0042] Observe whether the original embedded waterstop in the settlement joint is damaged. The diffusion radius of the single-tube slurry in the small-duct grouting is generally 0.5m~1.0m. Taking into account the principle of overlapping slurry ranges, a grouting hole is set every 0.8m-1.0m in the embedded waterstop 5.

[0043] Step 103, inserting a plurality of first grouting pipes into a plurality of grouting holes respectively.

[0044] like Figure 2 and Figure 3As shown, the first grouting pipe 1 is inserted into the hole of the embedded waterstop 5, so that the grout outlet is flush with the surface of the embedded waterstop 5 away from the ground. According to the construction speed, the catalyst ratio of the foamable silicate modified polyurethane and the acrylic resin is controlled, the foaming time and the coagulation time are controlled, the foaming time of the foamable silicate modified polyurethane is controlled to be 20 to 30 minutes, the foaming time is controlled to be completed to be 20 to 30 minutes, and the coagulation time of the acrylic resin is controlled to be 20 to 30 minutes, so that the grouting of the foamable silicate modified polyurethane can be completed from the end of the grouting to the completion of the foaming, and the acrylic resin can complete the steps of filling the pores, bonding the structure and self-solidification during the time from the beginning of the foaming of the foamable silicate modified polyurethane to the completion of the coagulation, so as to form the first composite waterproof structure.

[0045] Step 104, injecting foamed silicate-modified polyurethane into the cavity between the buried waterstop and the backfill soil layer through each first grouting pipe to a first target slurry volume; wherein, after reaching the first target slurry volume, each first grouting pipe is replaced by a second grouting pipe.

[0046] Before injecting the foamable silicate modified polyurethane, inject the same foamable silicate modified polyurethane into a small container as a sample to determine the foaming time and solidification time of the foamable silicate modified polyurethane. Use a double-liquid grouting machine to control the grouting pressure of the foamable silicate modified polyurethane to 10MPa-20MPa to allow the slurry to fully diffuse.

[0047] Exemplarily, the first target slurry amount Q1 is calculated according to the following formula:

[0048]

[0049] Among them, Figure 2 and Figure 3 As shown, H is the distance between the buried waterstop 5 and the backfill soil layer 8 in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A1 is the volume correction coefficient of the cavity formed after roughening, and the value range is 1.1-1.5; the cavity formed after roughening may be an irregular rectangular parallelepiped, which is determined according to the construction time of the building, soil layer information, environmental conditions, building materials and other conditions; B is the proportion of the foamed silicate modified polyurethane in the cavity after foaming, and the value range is 0.7-0.8, and the remaining space is filled with acrylic resin. Because acrylic resin has to play a filling and bonding role, the reserved space is not easy to be too small; D is the foaming ratio of the foamed silicate modified polyurethane, which is generally 20-35 times; C1 is the loss coefficient of the foamed silicate modified polyurethane slurry, and the value range is 1.1-1.4.

[0050] Step 105, after the foaming silicate modified polyurethane starts to foam, inject acrylic resin into the cavity between the embedded waterstop and the foaming silicate modified polyurethane through each second grouting pipe to a second target slurry volume; wherein, after the second target slurry volume is reached, clear the second grouting pipe.

[0051] After the first grouting pipe 1 is completed, it is quickly pulled out, and the second grouting pipe 2 is inserted into the original grouting hole. The double-liquid grouting machine is cleaned. Before injecting acrylic resin, the same proportion of acrylic resin is injected into a small container as a sample to determine the starting and completing solidification time of the acrylic resin. The double-liquid grouting machine is also used, and the acrylic resin grouting pressure is maintained at 5MPa-10MPa.

[0052] After the foamable silicate-modified polyurethane of the sample begins to foam, the foamable silicate-modified polyurethane in the cavity also begins to foam. At this time, the pre-mixed acrylic resin is injected to ensure that the acrylic resin can evenly cover the foaming foamable silicate-modified polyurethane. During the foaming process of the foamable silicate-modified polyurethane, the uneven surface will prompt the acrylic resin to flow around and automatically fill in unevenness, tiny pores, gaps in bonding areas and other problem areas, thereby playing a role of filling and bonding.

[0053] Pull out the second grouting pipe 2, observe the foamed silicate modified polyurethane sample and the acrylic resin sample, and wait until they are completely solidified, indicating that the foamed silicate modified polyurethane and the acrylic resin in the cavity under the buried waterstop 5 have also been completely solidified, and a mixture 6 of the foamed silicate modified polyurethane grouting material and the acrylic resin elastic water blocking material is obtained, and the first composite waterproof structure is completely formed.

[0054] Exemplarily, the second target slurry amount Q2 is calculated according to the following formula:

[0055] Q2=H×L×W×A1×(1-B)×C2.

[0056] Wherein, C2 is the loss coefficient of acrylic resin slurry, and its value range is 1.1 to 1.4.

[0057] Step 106, after the foamed silicate modified polyurethane and acrylic resin are solidified, a plurality of water-swellable waterstop strips are embedded into the settlement joints along the length direction of the embedded waterstop strip; wherein a cavity is provided between the water-swellable waterstop strips and the embedded waterstop strip.

[0058] The distance between the water-swellable waterstop strip 4 and the embedded waterstop strip 5 in a direction perpendicular to the ground is greater than or equal to 2 cm and less than or equal to 5 cm.

[0059] A cavity with a height h needs to be left between the water-swellable waterstop strip 4 and the embedded waterstop strip 5. Since the polyurea grouting liquid has a high viscosity and is viscous, the slurry spreading radius is small. The water-swellable waterstop strip 5 is divided into several sections of 50 to 80 cm and embedded in the settlement joint. When embedded, a third grouting pipe 3 is set at the connection of each section, and the slurry outlet is flush with the bottom surface of the waterstop strip. The excess water-swellable waterstop strip 4 that is higher than the plane is cut off, and the water-swellable waterstop strip 4 is compacted with a rubber hammer.

[0060] Step 107, a third grouting pipe is set between two adjacent water-swellable waterstop strips to inject polyurea grouting liquid into the cavity between the water-swellable waterstop strip and the embedded waterstop belt through the third grouting pipe to a third target slurry volume; wherein, after the third target slurry volume is reached, the third grouting pipe is cleared.

[0061] Prepare a single-component grouting machine and a single-component polyurea with a preparation quantity of Q3. The grouting pressure of the polyurea slurry is 10MPa-20MPa. Also, put part of the polyurea into a container aside for observation. Inject polyurea from the third grouting pipe 3. When the current grouting pressure cannot continue grouting, stop and pull out the third grouting pipe 3.

[0062] Exemplarily, the third target slurry amount Q3 is calculated according to the following formula:

[0063] Q3=h×L×W×A2×C3.

[0064] Among them, h is the distance between the water-swellable waterstop strip 4 and the embedded waterstop strip 5 in the direction perpendicular to the ground; A2 is the volume correction coefficient of the cavity between the water-swellable waterstop strip 4 and the embedded waterstop strip 5, and its value range is 0.8~1.2. When the water-swellable waterstop strip 4 is embedded in the seam, the surface will appear uneven and there will be gaps on the contact surface. The damage of the embedded waterstop strip 5 and the filling of the cavity below will also cause the surface of the waterstop strip to be uneven, so the reserved space will float up and down; C3 is the loss coefficient of the polyurea grouting liquid, and its value range is 1.2~1.5.

[0065] Step 108, after the polyurea grouting liquid solidifies, quick-drying cement is applied to the surface of the water-swellable waterstop strip until it is flush with the plane where the bottom of the cavity formed after roughening is located.

[0066] Step 109, after the quick-drying cement is dried, vinyl acetate is sprayed on the inner surface of the cavity formed after roughening to a target thickness, and a steel plate matching the cavity is covered after reaching the target thickness.

[0067] After the quick-drying cement is dry, vinyl acetate is sprayed on the roughened surface to form a waterproof coating layer 7. The spray thickness of the waterproof coating layer 7 (vinyl acetate) is 3-6 mm. During construction, an overall quick spraying is first performed to fully cover the seam surface and the roughened surfaces on both sides of the seam. Then, a second spraying is performed on the vacant places and weak positions to ensure that the thickness of the vinyl acetate is within a normal range.

[0068] The method for repairing leakage of the waterproof structure of basement settlement joints provided in this embodiment controls the grouting sequence and grouting amount of the foamed silicate modified polyurethane, acrylic resin and polyurea grouting liquid, so as to solve the problem that the grouting amount of the slurry for settlement joint leakage treatment does not meet the standard or exceeds the standard, resulting in weak points in the waterproof structure, cavity formation, and other slurries cannot be grouted after the slurry expands.

[0069] The present invention has been described in detail above in conjunction with specific implementations and exemplary examples, but these descriptions cannot be understood as limiting the present invention. Those skilled in the art understand that, without departing from the spirit and scope of the present invention, a variety of equivalent substitutions, modifications or improvements may be made to the technical solution of the present invention and its implementation methods, all of which fall within the scope of the present invention. The scope of protection of the present invention shall be subject to the attached claims.

Claims

1. A method for repairing leakage of a basement settlement joint waterproof structure, characterized in that: include: Chisel rough on both sides of the settlement joint; Multiple grouting holes are evenly opened on the embedded waterstop along the length direction of the embedded waterstop; Inserting a plurality of first grouting pipes into a plurality of grouting holes respectively; Injecting foamed silicate-modified polyurethane into the cavity between the buried waterstop and the backfill soil layer through each first grouting pipe to a first target slurry volume; wherein, after the first target slurry volume is reached, each first grouting pipe is replaced by a second grouting pipe; After the foaming silicate modified polyurethane starts to foam, acrylic resin is injected into the cavity between the embedded waterstop and the foaming silicate modified polyurethane through each second grouting pipe to a second target slurry volume; wherein, after the second target slurry volume is reached, the second grouting pipe is cleared; After the foamed silicate modified polyurethane and acrylic resin solidify, a plurality of water-expandable waterstop strips are embedded in the settlement joint along the length direction of the embedded waterstop strip; wherein a cavity is provided between the water-expandable waterstop strip and the embedded waterstop strip; A third grouting pipe is arranged between two adjacent water-swellable waterstop strips, so as to inject polyurea grouting liquid into the cavity between the water-swellable waterstop strip and the embedded waterstop strip through the third grouting pipe to a third target slurry volume; wherein, after the third target slurry volume is reached, the third grouting pipe is cleared; After the polyurea grouting liquid solidifies, quick-drying cement is applied to the surface of the water-expandable waterstop strip until it is flush with the plane where the bottom of the cavity formed after roughening is located; After the quick-drying cement is dry, vinyl acetate is sprayed on the inner surface of the cavity formed after roughening to a target thickness, and a steel plate matching the cavity is covered after reaching the target thickness.

2. The method for repairing leakage of a basement settlement joint waterproof structure according to claim 1, characterized in that: The first target slurry volume Q1 is calculated according to the following formula: Among them, H is the distance between the buried waterstop and the backfill soil layer in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A1 is the volume correction coefficient of the cavity formed after roughening; B is the proportion of the foamed silicate modified polyurethane in the cavity after foaming; D is the foaming ratio of the foamed silicate modified polyurethane; C1 is the loss coefficient of the foamed silicate modified polyurethane slurry.

3. The method for repairing leakage of a basement settlement joint waterproof structure according to claim 1, characterized in that: The second target slurry volume Q2 is calculated according to the following formula: Q2=H×L×W×A1×(1-B)×C2; Among them, H is the distance between the buried waterstop and the backfill soil layer in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A1 is the volume correction coefficient of the cavity formed after roughening; B is the proportion of the foamed silicate modified polyurethane in the cavity after foaming; C2 is the loss coefficient of the acrylic resin slurry.

4. The method for repairing leakage of a basement settlement joint waterproof structure according to claim 1, characterized in that: The third target slurry volume Q3 is calculated according to the following formula: Q3=h×L×W×A2×C3; Wherein, h is the distance between the water-swellable waterstop strip and the embedded waterstop strip in the direction perpendicular to the ground; L and W are the length and width of the settlement joint respectively; A2 is the volume correction coefficient of the cavity between the water-swellable waterstop strip and the embedded waterstop strip; C3 is the loss coefficient of the polyurea grouting fluid.

5. The method for repairing leakage of a waterproof structure of a basement settlement joint according to claim 1, characterized in that: The distance between two adjacent grouting holes is greater than or equal to 0.8m and less than or equal to 1.0m.

6. The method for repairing leakage of a waterproof structure of a basement settlement joint according to claim 1, characterized in that: The distance between the water-expandable waterstop strip and the embedded waterstop strip in a direction perpendicular to the ground is greater than or equal to 2 cm and less than or equal to 5 cm.

7. The method for repairing leakage of a basement settlement joint waterproof structure according to claim 1, characterized in that: The length of each water-swellable waterstop strip is greater than or equal to 50 cm and less than or equal to 80 cm.

8. The method for repairing leakage of a basement settlement joint waterproof structure according to claim 1, characterized in that: The thickness of the vinyl acetate sprayed on the inner surface of the cavity formed after roughening is greater than or equal to 3 mm and less than or equal to 6 mm.

9. The method for repairing leakage of a waterproof structure of a basement settlement joint according to claim 1, characterized in that: The grouting pressure of the foamed silicate modified polyurethane is greater than or equal to 10MPa and less than or equal to 20MPa; the grouting pressure of the acrylic resin is greater than or equal to 5MPa and less than or equal to 10MPa.

10. The method for repairing leakage of a basement settlement joint waterproof structure according to claim 1, characterized in that: The grouting pressure of the polyurea grouting fluid is greater than or equal to 10MPa and less than or equal to 20MPa.

Citation Information

Cited By

  • Underground engineering waterproof layer sequential grouting method based on seepage path development form

    CN119640865A