Anti-floating structure of overlapped hollow floor with exposed bottom surface and construction method of anti-floating structure
By using anti-floating rods and pulling bolts in the exposed overlapping anti-floating structure of the bottom surface of the hollow floor cover, combined with the reaction force of the pad and support, the problems of floating and elevation control of the hollow floor cover are solved, and the construction process is realized Improved stability and efficiency.
Patent Information
- Application Number
- CN202411114396.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-12-06
AI Technical Summary
Hollow floors float up due to their low weight during construction, traditional anti-floating measures are difficult to effectively solve, and the elevation control of hollow components is difficult, which affects the construction quality and efficiency.
It adopts an exposed overlapping anti-floating structure on the bottom surface, including cavity members, cast-in-place dense rib beams, top reinforcement layer, formwork, support members, pads, anti-floating rods and pulling bolts. It is tightened by anti-floating rods and formwork. Combining the pad and support, the reaction force is transmitted, the buoyancy is offset, and the beard tendon is connected to the cast-in-place dense rib beam to ensure the stability of the position of the cavity member.
It effectively offsets the buoyancy and lateral displacement of the cavity components, ensures consistency of elevation, simplifies the construction process, shortens the construction period and reduces costs, and is in line with the concept of green construction.
Smart Images

Figure CN119083642A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of hollow floor construction, and particularly relates to an anti-floating structure of a bottom-exposed laminated hollow floor and a construction method thereof. Background Art
[0002] As a form of prefabrication, hollow floor slabs are widely used in large-span buildings. Their advantages include reducing the weight of the floor slab, reducing the amount of steel bars, simple construction, shortened construction, the bottom of the cavity component and the bottom of the dense-ribbed beam are at the same height, and there is no secondary beam under the slab. They have good architectural space effects and good economic benefits. During the pouring process of the hollow floor slab, the cavity components float due to their low weight, affecting the construction quality. The traditional anti-floating method is to use iron wire to tie the top steel bars to the formwork scaffolding, and after the construction is completed, the iron wire is cut and processed. However, the iron wire binding cannot guarantee the anti-floating effect and cannot effectively solve the floating problem of the hollow floor slab; and during the pouring process, the cavity components are also prone to lateral displacement, affecting the pouring effect.
[0003] In addition, in existing hollow floor slabs, a bottom layer of steel bars is usually arranged between the cavity components and the formwork. However, it is difficult to control the height of the bottom layer of steel bars, and different heights are prone to occur at different positions. In order to meet the placement elevation of the cavity components, it is usually necessary to set pads on the bottom layer of steel bars. The elevation control is laborious and prone to errors. Summary of the invention
[0004] The purpose of the present invention is to provide an anti-floating structure of a composite hollow floor with exposed bottom surface and a construction method thereof, so as to solve the problems in the above-mentioned background technology that the anti-floating structure is difficult to rotate, the anti-floating and anti-lateral movement measures are complicated, and the elevation of the cavity components is difficult to control.
[0005] To achieve the above object, the present invention provides the following technical solutions: An anti-floating structure for a composite hollow floor with exposed bottom surface, comprising a cavity member, a cast-in-place dense-ribbed beam, a top steel bar layer, a formwork, a supporting member, a pad, an anti-floating rod and tension bolts; the cavity members are arranged at intervals; the cast-in-place dense-ribbed beam is arranged between two adjacent cavity members; the top steel bar layer is arranged on the top surface of the cavity member; the formwork is arranged at the bottom of the hollow floor; the supporting member is arranged on the top surface of the cavity member; the pad is arranged on the top of the supporting member, and its top surface is flush with the top surface of the hollow floor after construction is completed; the anti-floating rod is arranged on the top of the pad; the tension bolts are arranged corresponding to the cast-in-place dense-ribbed beam, and the top and bottom of the beam are respectively tied and fixed to the anti-floating rod and the formwork.
[0006] Furthermore, the pad is a concrete pad and is connected to the supporting member by binding.
[0007] Furthermore, the supporting member is a stirrup steel bar, and is tied and connected to the top steel bar layer.
[0008] Furthermore, the cavity components are arranged in a vertical and horizontal array, and their bottom surfaces are in contact with the template.
[0009] Furthermore, the anti-floating rod is a steel pipe structure, and the steel pipe structure is arranged along the transverse length of the hollow floor slab, and is arranged at intervals along the longitudinal length of the hollow floor slab corresponding to the cavity components.
[0010] Furthermore, the cast-in-place dense-rib beams are crisscrossed and beam reinforcements are arranged inside.
[0011] Furthermore, a support system is arranged at the bottom of the formwork; the support system includes a secondary keel, a main keel and a support rod; the secondary keels are arranged at intervals at the bottom of the formwork; the main keels are arranged at intervals at the bottom of the secondary keels and are perpendicular to the secondary keels; the top end of the support rod abuts against the main keel, and the bottom end is connected to the ground; the bottom of the tension bolt is connected to the keel.
[0012] Furthermore, the cavity component is a hollow cavity composed of a prefabricated reinforced concrete bottom plate, a high-strength aluminum plate side wall and a face plate.
[0013] Furthermore, beard bars are arranged at the end of the prefabricated reinforced concrete base plate, and the beard bars are tied and fixed to the beam reinforcement in the cast-in-place dense-ribbed beam.
[0014] A construction method for an anti-floating structure of a bottom-exposed composite hollow floor slab comprises the following steps: S1. Prefabricate and process each component according to the dimensions on the drawing and transport it to the construction site; S2. Set up support system and formwork; S3, positioning by laying out the lines; positioning the positions of the cast-in-place dense-rib beams and cavity components on the formwork; S4, tie the beam reinforcement in the cast-in-place dense-rib beam; S5, installing the cavity components, and connecting the cavity components with the beam reinforcement of the cast-in-place dense-rib beam by binding; S6, tie the top steel bar layer; S6. Install the supporting member and the cushion block; place the supporting member on the top of the cavity component, tie and fix the supporting member to the top steel bar layer, and then tie the cushion block to the top of the supporting member; S7. Install the anti-floating rod, and then lock and fix the anti-floating rod by tension bolts; S8, pouring concrete; S9. After the concrete pouring is completed and before the initial setting, remove the tension bolts and anti-floating rods; S10. Concrete surface maintenance.
[0015] The present invention has the following beneficial effects: 1. The present invention provides an anti-floating structure of a composite hollow floor with exposed bottom surface and a construction method thereof. An anti-floating rod is arranged on the top of the hollow floor. The anti-floating rod is tightened with the formwork by tension bolts, and the reaction force is transmitted to the cavity component through the pad and the supporting member, thereby offsetting the buoyancy generated during the pouring process and ensuring that the position of the effective cavity component remains unchanged.
[0016] 2. The present invention provides an anti-floating structure of a bottom-exposed composite hollow floor and a construction method thereof. After the construction is completed, the anti-floating rods and tension bolts can be quickly disassembled and recycled, which is in line with the concept of green construction.
[0017] 3. The present invention provides an anti-floating structure of a bottom-exposed composite hollow floor and a construction method thereof, which can achieve anti-floating positioning by adopting ordinary tension bolts, has fast installation speed, reliable force transmission, shortened construction period, and saved construction costs.
[0018] 4. The present invention provides an anti-floating structure of a hollow floor with exposed bottom surface and a construction method thereof. The bottom of the hollow component is set as a precast reinforced concrete bottom plate, and the precast reinforced concrete bottom plate is connected to the beam reinforcement of the cast-in-place dense-ribbed beam by means of beard bars, so that the hollow component obtains lateral anti-movement ability and ensures that its horizontal position is fixed.
[0019] 5. The present invention provides an anti-floating structure of a composite hollow floor with exposed bottom surface and a construction method thereof. The precast reinforced concrete bottom plate of the cavity components is exposed as the bottom surface of the hollow floor. During production, the cavity height can be controlled by controlling the thickness of the precast reinforced concrete bottom plate, so that all the cavity components are located at the same elevation. The operation is simple and the elevation control is accurate.
[0020] Attached picture says Figure 1 It is a schematic diagram of the overall structure of the anti-floating structure involved in the present invention.
[0021] In the figure: 1-cavity component, 2-cast-in-place dense-rib beam, 3-top steel bar layer, 4-formwork, 5-supporting member, 6-pad, 7-anti-floating rod, 8-tension bolt, 9-support system. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] like Figure 1As shown, the present invention provides an anti-floating structure of a bottom-exposed composite hollow floor, comprising a cavity member 1, a cast-in-place dense-ribbed beam 2, a top steel bar layer 3, a formwork 4, a supporting member 5, a cushion block 6, an anti-floating rod 7, a tension bolt 8 and a support system 9; the cavity members 1 are arranged at intervals; the cast-in-place dense-ribbed beam 2 is arranged between two adjacent cavity members 1; the top steel bar layer 3 is arranged on the top surface of the cavity member 1; the formwork 4 is arranged at the bottom of the hollow floor; the supporting member 5 is arranged on the top surface of the cavity member 1 and is tied and fixed with the top steel bar layer 3; the cushion block 6 is arranged on the top of the supporting member 5, and its top surface is flush with the top surface of the hollow floor after the construction is completed; the anti-floating rod 7 is arranged along the entire length of the hollow floor and is arranged on the top of the cushion block 6; the tension bolt 8 is arranged corresponding to the cast-in-place dense-ribbed beam, and its top passes through the anti-floating rod 7 and is fixed by a nut, and the top passes through the formwork 4 and is fixed by a nut; the support system 9 is arranged at the bottom of the formwork 4.
[0024] The anti-floating rod 7 is tightened with the formwork 4 by the tension bolts 8, and transmits the reaction force to the cavity component 1 through the pad 6 and the supporting member 5, thereby offsetting the buoyancy generated during the pouring process and ensuring that the position of the cavity component 1 remains unchanged.
[0025] A circle of frame beams is set along the edge of the hollow floor to enhance the overall strength.
[0026] The cavity component 1 is a hollow cavity composed of a prefabricated reinforced concrete bottom plate, a high-strength aluminum plate side wall and a panel. The cavity components 1 are arranged in a longitudinal and transverse array, and their bottom surfaces are in contact with the formwork 4. After the construction is completed, the prefabricated reinforced concrete bottom plate of the cavity component 1 is exposed as the bottom surface of the hollow floor. A sponge strip is set at the bottom edge of the cavity component 1.
[0027] The cast-in-place dense-rib beams 2 are crisscrossed, and beam reinforcement is arranged inside. Beard reinforcement is arranged at the end of the reinforced concrete prefabricated bottom plate, and the beard reinforcement is tied and fixed with the beam reinforcement in the cast-in-place dense-rib beams 2 to prevent the cavity component 1 from lateral movement.
[0028] The template 4 is a box structure with an open top surface.
[0029] The supporting member 5 is a stirrup steel bar.
[0030] The cushion block 6 is a concrete cushion block, a reserved hole is provided on the cushion block 6, a steel wire rope is arranged in the reserved hole, and the steel wire rope is tied and fixed to the supporting member 5.
[0031] The anti-floating rod 7 is a steel pipe structure, which is arranged along the transverse length of the hollow floor slab, and a plurality of anti-floating rods 7 are arranged at intervals along the longitudinal length of the hollow floor slab corresponding to the cavity components 1, so that each cavity component 1 is within the coverage of the anti-floating rod 7.
[0032] The support system 9 includes a secondary keel, a main keel and a support rod; the secondary keel is arranged at intervals at the bottom of the formwork 4; the main keel is arranged at intervals at the bottom of the secondary keel and is perpendicular to the secondary keel; the top end of the support rod abuts against the main keel and the bottom end is connected to the ground. Preferably, the support rod can adopt a disc-type scaffolding.
[0033] The bottom of the tension bolt 8 is connected to the main keel to ensure the tension strength.
[0034] A construction method of an anti-floating structure of a bottom-exposed composite hollow floor and a construction method thereof, comprising the following steps: S1. Prefabricate and process each component according to the dimensions on the drawing and transport it to the construction site; S2, set up the support system 9 and the formwork 4; build the support system 9 according to the elevation dimensions of the drawing, and then lay the formwork 4 on the support system 9; S3, laying out and positioning; marking the positions of the frame beam, cast-in-place dense rib beam 2 and cavity component 1 on the template 4; marking the opening positions of the tension bolts with red paint in the middle of the cast-in-place dense rib beam 2 according to the drawing size of the dense rib beam, completing the opening work, and pasting the anti-leakage sponge strip at the marked position of the corresponding cavity component 1; S4, tying the steel bars in the frame beam and the cast-in-place dense-ribbed beam 2; after the steel bars of the frame beam are tied, the steel bars of the cast-in-place dense-ribbed beam 2 are tied, and the joint position of the cast-in-place dense-ribbed beam 2 is set with a densified area as required, and a wooden wedge is set at the bottom of the beam steel bars. After the tying is completed, the dense-ribbed beam is adjusted according to the elastic line to make it regular; S5, install the cavity component 1; when installing the cavity component 1, it is necessary to slowly put it on the template 4 between the cast-in-place dense-rib beams 2, and then adjust its position, and limit it by wooden wedges to ensure that the spacing between the cavity components 1, between the cavity component 1 and the cast-in-place dense-rib beams 2, and between the cavity component 1 and the frame beam meets the requirements, and the bottom presses the anti-leakage sponge strip part, and is tied and connected with the beam reinforcement of the cast-in-place dense-rib beam 2 through the beard ribs at the bottom; S6. Tie the top steel bar layer 3; all the intersections of the top steel bar layer 3 should be tied firmly. When tying, all the fire wires should be folded toward the inside of the top plate. The steel bar overlaps should be tied firmly at the center and both ends. When tying, tie the short steel bars first, and then tie the long steel bars. S6, installing the supporting member 5 and the cushion block 6; placing the supporting member 5 on the top of the cavity member 1, tying and fixing the supporting member 5 to the top steel bar layer 3, and then tying the cushion block 6 to the top of the supporting member 5; S7, installing the anti-floating rod 7, and then locking and fixing the anti-floating rod 7 by means of the tension bolts 8; S8, pouring concrete; before pouring concrete, water the entire board surface of the cavity component 1 to fully moisten it; when pouring concrete, it is advisable to first pour the frame beam concrete, and then pour the cast-in-place dense rib beam 2 concrete. The concrete should be poured separately from the middle to the surroundings. Since the board thickness is relatively thin, it should be poured and formed at one time to reach the leveling design elevation; S9, after the concrete pouring is completed and before the initial setting, the tension bolts 8 and the anti-floating rods 7 are removed for easy turnover; S10. Fill the holes and vibrate locally to make it dense, promptly smooth and finish the damaged surface layer, and finally carry out concrete curing.
[0035] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An anti-floating structure of a bottom-exposed composite hollow floor, characterized in that: The invention comprises a cavity member (1), a cast-in-place dense-ribbed beam (2), a top steel bar layer (3), a formwork (4), a supporting member (5), a cushion block (6), an anti-floating rod (7) and tension bolts (8); the cavity members (1) are arranged at intervals; the cast-in-place dense-ribbed beam (2) is arranged between two adjacent cavity members (1); the top steel bar layer (3) is arranged on the top surface of the cavity member (1); the formwork (4) is arranged at the bottom of the hollow floor slab; the supporting member (5) is arranged on the top surface of the cavity member (1); the cushion block (6) is arranged on the top of the supporting member (5), and its top surface is flush with the top surface of the hollow floor slab after construction; the anti-floating rod (7) is arranged on the top of the cushion block (6); the tension bolts (8) are arranged corresponding to the cast-in-place dense-ribbed beam (2), and the top and bottom of the cushion block (6) are respectively tied and fixed to the anti-floating rod (7) and the formwork (4).
2. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: The cushion block (6) is a concrete cushion block and is tied and connected to the supporting member (5).
3. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: The supporting member (5) is a stirrup steel bar and is tied and connected to the top steel bar layer (3).
4. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: The cavity components (1) are arranged in a longitudinal and transverse array, and their bottom surfaces are in contact with the template (4).
5. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: The anti-floating rod (7) is a steel pipe structure, which is arranged along the transverse length of the hollow floor slab and is arranged at intervals along the longitudinal length of the hollow floor slab corresponding to the cavity component (1).
6. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: The cast-in-place dense-rib beams (2) are crisscrossed and have beam reinforcements arranged inside.
7. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: A support system (9) is arranged at the bottom of the template (4); the support system (9) comprises a secondary keel, a main keel and a support rod; the secondary keels are arranged at intervals at the bottom of the template (4); the main keels are arranged at intervals at the bottom of the secondary keels and are perpendicular to the secondary keels; the top end of the support rod abuts against the main keel and the bottom end is connected to the ground; the bottom of the tension bolt (8) is connected to the keel.
8. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 1, characterized in that: The cavity component (1) is a hollow cavity consisting of a prefabricated reinforced concrete bottom plate, high-strength aluminum plate side walls and a face plate.
9. The anti-floating structure of the bottom-exposed composite hollow floor according to claim 8, characterized in that: The end of the prefabricated reinforced concrete bottom plate is provided with beard bars, which are tied and fixed to the beam reinforcement in the cast-in-place dense-ribbed beam (2).
10. The construction method of the anti-floating structure of the bottom-exposed composite hollow floor according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Prefabricate and process each component according to the dimensions on the drawing and transport it to the construction site; S2, setting up the support system (9) and the formwork (4); S3, laying out the lines for positioning; marking the positions of the cast-in-place dense-rib beam (2) and the cavity component (1) on the formwork (4); S4, tying the beam reinforcement inside the cast-in-place dense-rib beam (2); S5, installing the cavity component (1), and connecting the cavity component (1) with the beam reinforcement of the cast-in-place dense-rib beam (2) by binding; S6, tie the top steel bar layer (3); S6, installing the supporting member (5) and the cushion block (6); placing the supporting member (5) on the top of the cavity component (1), tying the supporting member (5) and the top steel bar layer (3) together, and then tying the cushion block (6) to the top of the supporting member (5); S7, installing the anti-floating rod (7), and then locking and fixing the anti-floating rod (7) by means of the tension bolts (8); S8, pouring concrete; S9, after the concrete pouring is completed and before the initial setting, the tension bolts (8) and the anti-floating rods (7) are removed; S10. Concrete surface maintenance.