A method for automatically drawing domain network topology

Through an automatic graphing method of domain network topology, key nodes are screened using coverage coefficients, fault coefficients and disaster-affected coefficients to generate a simplified power grid domain network topology map, solving the scheduling decision accuracy problem caused by the complexity of existing power grid domain network topology maps, and achieving simplification of the graph and accuracy of decisions.

CN119089618BActive Publication Date: 2025-04-04南京蔚成科技有限公司
2 Cites 0 Cited by

Patent Information

Application Number
CN202411578559.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-11-07
Publication Date
2025-04-04
Estimated Expiration
2044-11-07

AI Technical Summary

Technical Problem

Due to the huge scale and complexity of existing power grid domain network topology, it is difficult to quickly understand and use, which affects the accuracy of scheduling decisions.

Method used

A method of automatic graphing of domain network topology is proposed. By obtaining the coverage coefficient, fault coefficient and disaster-affected coefficient of power grid equipment, calculating weight values ​​and important values, filtering out key nodes, and generating a simplified topology diagram of power grid domain network.

Benefits of technology

The simplification of the power grid domain network topology diagram is achieved, ensuring that the diagram can accurately reflect the actual status of the power grid, improve the understanding and use efficiency of dispatchers and operators, and ensure the accuracy of dispatch decisions.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The present invention discloses a method for automatically mapping a domain network topology, and specifically relates to the technical field of power grid topology maps. The method obtains the first important value of each power grid device contained in a target power grid area, as well as the corresponding coverage coefficient, failure coefficient and disaster impact coefficient, and finally obtains the second important value. The power grid devices are preliminarily screened according to the second important value to obtain preliminary power grid devices; a power grid domain network topology map is drawn according to the preliminary power grid devices as a first topology map, and the first topology map is simulated, and the nodes in the first topology map are screened according to the simulation results to obtain final important nodes; a power grid domain network topology map is generated according to the final important nodes as the final power grid domain network topology map. In this way, the nodes are reasonably simplified, so that the power grid domain network topology map can more accurately reflect the actual state of the power grid, so that dispatchers and operators can quickly understand and use it, thereby ensuring the accuracy of dispatching decisions.