Risk assessment method for high-proportion new energy power system under extreme condition
By building a distribution network model and optimal load-cut current calculation of high-proportion new energy power system, combined with the AHP method, the problem of inability to accurately evaluate the risk of power system under extreme conditions in the existing technology is solved, and the new energy power system is realized The accurate risk assessment provides a reliable reference for power system scheduling.
Patent Information
- Application Number
- CN202411535491.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-06
AI Technical Summary
When the existing technology evaluates the operating risks under extreme conditions of high proportion of new energy power systems, it is impossible to accurately calculate the huge risks brought by low-probability events, resulting in inaccurate quantification of risks and ineffective response to the power system under severe weather and extreme weather conditions. Challenge for safe and stable operation.
The risk assessment method under extreme conditions of high proportion new energy power system is adopted to build a distribution network model by obtaining data such as wind and light output power, wind and light shutdown rate, line failure probability, etc., and calculate risk indicators based on the optimal load cutting current calculation and AHP method. , determine whether the meteorological conditions meet extreme standards and calculate the comprehensive risk value of the power system.
Achieve risk assessment of high-proportion new energy power systems under extreme conditions, can accurately determine whether the system is in extreme meteorological conditions, provide accurate risk assessment results, provide reference for power system scheduling and planning, and solve the problem that the existing technology cannot accurately Calculate extreme risks.
Smart Images

Figure CN119090282A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system risk assessment, and in particular to a risk assessment method under extreme conditions for a high-proportion new energy power system. Background Art
[0002] The operation of the power system contains certain uncertainties, which lead to operational risks of the power system. The access of a high proportion of new energy greatly increases the uncertainty of the power system and the operational risk, so it is necessary to make a quantitative assessment of the operational risk of the power system.
[0003] Typical renewable energy sources such as wind and solar are affected by climate and environmental factors, have strong uncertainty and are difficult to control artificially. The output of wind and solar is highly random and volatile in a short period of time. With the large-scale grid connection of wind and solar, the volatility and randomness of power system operation have increased. The climbing ability and output limit make it impossible for conventional units to quickly respond to the sudden increase or decrease in the output of wind and solar units, resulting in serious wind and solar abandonment and load loss in the power system. At the same time, under severe weather and extreme weather conditions, the failure rate of power system components increases, the volatility of wind and solar output increases, and it is more likely to cause large-scale power outages in new energy power systems. These problems pose great challenges to the safe and stable operation of the power system.
[0004] Therefore, in the context of large-scale renewable energy grid connection, the operational risk assessment of the power system should not only consider the impact of wind and solar fluctuation characteristics, but also make accurate and rapid assessments of the operational risks brought about by extreme conditions. The assessment results can provide a reference for the dispatch and planning of large-scale renewable energy grid connection power systems. In the current risk assessment of power systems containing renewable energy, it mainly relies on a large amount of historical information data, uses the Monte Carlo method for sampling, and conducts risk assessment by calculating the probability flow of the power system, and multiplies the probability by the consequence as a measure of risk value. This assessment method is more suitable for ordinary high-probability risks. The huge risks of low-probability events under extreme conditions such as severe weather such as heavy rain, typhoons, high temperatures, cold waves, sandstorms, etc. are easily regarded as medium and low risks in the risk quantification process, and cannot truly reflect the huge risks brought about by extreme events.
[0005] Based on this, it is necessary to develop a risk assessment method for high-proportion renewable energy power systems under extreme conditions. Summary of the invention
[0006] In view of the above-mentioned defects of the prior art, the present invention provides a risk assessment method for a high-proportion renewable energy power system under extreme conditions, so as to perform risk assessment on a high-proportion renewable energy power system under extreme conditions.
[0007] The risk assessment method for a high-proportion new energy power system under extreme conditions provided by the present invention comprises the following steps:
[0008] Obtain the operation data of the high-proportion new energy power system, and input the wind and solar power output, wind and solar power outage rate, line failure probability, and distribution network generator outage rate into the distribution network model to form a high-proportion new energy distribution network model;
[0009] When the meteorological conditions reach extreme conditions, the comprehensive risk number of the high-proportion new energy distribution network model is calculated according to the comprehensive risk calculation model. :
[0010] ;
[0011] In the formula, , , is the indicator weight, is the load shedding risk value of the power system under extreme conditions, For line risk, The risk of active output loss of wind, solar and generators.
[0012] Furthermore, the extreme condition judgment method includes:
[0013] Under different meteorological conditions, the load of each node is divided into three-level load, two-level load and one-level load. The load shedding process is to first cut off the three-level load, then the two-level load, and finally the one-level load.
[0014] Obtain the nodes in the distribution network under different meteorological conditions i When the load reaches the second-level load, the meteorological conditions of the power system have reached the extreme conditions standard, otherwise it has not been reached.
[0015] Furthermore, the meteorological conditions include sunny and windless, cloudy and windless, sunny and windy, heavy rain, strong wind, freezing rain, sandstorm, high temperature, cold wave, haze and solar eclipse.
[0016] Furthermore, the midpoint i The load loss is obtained according to the optimal load shedding flow calculation model, and the optimal load shedding flow calculation model is: ;
[0017] In the formula, is the number of system nodes, For distribution network nodes i Active load loss;
[0018] The constraints of the optimal load shedding flow calculation model include:
[0019] System power balance constraint: each node in the system should satisfy the balance between node injection power, outflow power and node load loss;
[0020] Load loss constraint: the system active and reactive load loss cannot exceed the maximum load of the node;
[0021] Generator output constraint: the generator output must be between its maximum output and minimum output;
[0022] Voltage amplitude constraint: the node voltage amplitude cannot exceed the upper and lower limits;
[0023] Line transmission capacity constraint: the line transmission capacity cannot exceed its maximum allowed transmission capacity.
[0024] Furthermore, the load shedding risk value of the power system under the extreme conditions is for:
[0025] ;
[0026] in, Nodes in the distribution network model The active load loss at Nodes in the distribution network model The active load at is the probability of active load loss occurring in actual sampling.
[0027] Furthermore, line risk for:
[0028] ;
[0029] In the formula, is the number of broken lines; is the total number of distribution network lines. If the system is disconnected, it is the sum of the lines of each subsystem; is the probability of line fault occurring in actual sampling;
[0030] Furthermore, there is a risk of loss of active power output from wind, solar and generators. for:
[0031] ;
[0032] In the formula, is the active power of the generator when it is shut down, is the active power of the wind turbine when it is shut down, is the active power of photovoltaic shutdown, is the probability of output loss occurring in actual sampling.
[0033] Furthermore, the indicator weight , and Calculated by AHP method.
[0034] Compared with the prior art, the present invention has the following technical effects:
[0035] The present invention obtains different risk indicators according to the impact of different meteorological conditions on the operating status of the distribution network and the component outage rate to calculate the risk of the new energy distribution network under extreme conditions, solving the problem that risk assessment based on probabilistic flow calculation cannot accurately calculate extreme risks.
[0036] The present invention calculates the load loss of the distribution network under different meteorological conditions according to the optimal load shedding flow calculation, determines whether the system is in extreme meteorological conditions, can accurately evaluate the risk status of a high-proportion new energy power system, and provide a reference for subsequent power system scheduling.
[0037] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a schematic diagram of a flow chart of a specific embodiment of the present invention;
[0039] Figure 2 It is a schematic diagram of the topological structure of an IEEE 33-node power distribution network according to a specific embodiment of the present invention;
[0040] Figure 3 It is a flow chart of Newton power flow calculation according to a specific embodiment of the present invention. DETAILED DESCRIPTION
[0041] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.
[0042] It should be noted that the illustrations provided in the following embodiments are only used to illustrate the basic concept of the present invention in a schematic manner, and thus the illustrations only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.
[0043] like Figure 1 As shown, in a specific embodiment, a risk assessment method under extreme conditions of a high-proportion new energy power system provided by the present invention is provided, comprising the following steps:
[0044] S1. Obtain the operating data of the high-proportion new energy power system, and input the wind and solar power output, wind and solar power outage rate, line failure probability, and distribution network generator outage rate into the distribution network model. The wind and solar power output is added to the corresponding nodes of the distribution network with generator data to form a high-proportion new energy distribution network model.
[0045] The change of wind speed in a wind farm cannot be determined, and its size is related to meteorological conditions. Therefore, this embodiment sets the average wind speed to obey the Weibull distribution based on historical data. In order to make the wind speed data generated by the wind farm probability model consistent with the actual wind speed under most meteorological conditions, this embodiment adopts a two-parameter Weibull model, and the parameters under different meteorological conditions are set to different values to obtain the wind power output probability. for:
[0046] ;
[0047] in, v The real-time wind speed received by the wind turbine; k is the shape parameter of Weibull distribution; c is the scale parameter of the Weibull distribution.
[0048] Actual random output of the fan P w Affected by the change of wind speed, the wind power output is:
[0049] ;
[0050] Although the intensity of light is also random, the intensity of light in a day approximately follows the Beta distribution. The intensity of light closely affects the output of the photovoltaic power plant, and thus the photovoltaic output probability is obtained. for:.
[0051] ;
[0052] Where: l is the light intensity; , are the shape parameters of the Beta distribution; is the Gramma function.
[0053] The actual random output of a photovoltaic power plant is affected by changes in light intensity, and its output power model is:
[0054] ;
[0055] Where: Indicates the light intensity at t Output power at the moment; Indicates that the photovoltaic power generation system t Surface temperature at the moment; represents the temperature coefficient; , and They respectively represent the light intensity, photovoltaic power generation system temperature and maximum output power under the standard test environment.
[0056] In this embodiment, the wind power and photovoltaic outage rates, line failure rates and generator outage rates in the distribution network model are calculated based on historical data, wherein the real-time states of the lines and generators are simulated using a two-state model, assuming that there are only two operating states, namely, operation and failure. The component failure rate and outage rate are calculated as follows:
[0057] ;
[0058] ;
[0059] In the formula, m For the m components, including wind power, photovoltaic, lines and generators, is the failure rate of components under different meteorological conditions, is the annual average failure rate of the component, Components for different weather conditions m The percentage of failures in the whole year, is the percentage of duration of different meteorological conditions in the annual statistical time. P m is the probability of component outage under different meteorological conditions.
[0060] This example uses the non-sequential Monte Carlo method to determine the system state based on the component outage rate. The component is set as a two-state model with two states: fault and outage. The components are independent of each other and do not affect each other. A uniform random number is selected between (0, 1) to simulate the system state.
[0061] ;
[0062] In the formula, Display element m The operating status of is a random number randomly drawn from (0, 1), is the probability of component outage, assuming that the system contains s components, the system status S for: .
[0063] Line outages under different meteorological conditions will cause changes in the topology of the power system, and in severe cases may even cause the system to be disconnected. At the same time, due to the randomness of line failures, the on-off status of each line is different, resulting in a different system structure, and the system structure needs to be re-judged.
[0064] The system topology is obtained based on the obtained line connection status. If the system is disconnected, the subsystem is traversed to obtain the number of subsystems and the nodes included in the subsystem, and it is determined whether the subsystem contains generators and wind power plants. If so, it continues to operate as an independent distribution network. Otherwise, it is regarded as a system that cannot obtain power supply and load shedding is performed.
[0065] In this embodiment, random sampling is performed based on the probability model and power model of wind and solar output and the outage probability model of the components to obtain the random power of wind power and photovoltaic output and the real-time status of the power system. Each random output of wind power and photovoltaic and the status of the power system components are respectively put into the distribution network. When a sufficient number of sampling times is reached, they are put into calculation again. Figure 2 Taking the IEEE 33-node distribution network shown as an example, wind and solar are respectively put into use at nodes 4 and 14 of the distribution network, and photovoltaics are put into use at nodes 21 and 29 of the distribution network.
[0066] S2. Determine whether the meteorological conditions have reached extreme conditions.
[0067] The meteorological conditions include clear and windless, cloudy and windless, clear and windy, rainstorm, gale, freezing rain, sandstorm, high temperature, cold wave, haze and solar eclipse. Under different meteorological conditions, due to the reduction of power generation capacity and the change of system topology, the system load is shelved to ensure the safe and stable operation of the power system.
[0068] According to the real-time status of the distribution network, in this embodiment, the Newton flow calculation of the optimal load shedding is performed with the minimum load loss as the objective function. According to the optimal load shedding flow calculation, the entire distribution network or each subsystem with power generation capacity obtained by decoupling is calculated to obtain the load shedding amount of the system.
[0069] In this embodiment, in a high-proportion new energy power system, the optimal load shedding flow calculation model is as follows:
[0070] Objective function: ;
[0071] In the formula, is the number of system nodes, For distribution network nodes iAccording to the load classification principle of the power system, the load of each node is divided into tertiary load, secondary load and primary load in the proportion of 80%, 15% and 5%. The load is cut off firstly, then the secondary load and finally the primary load.
[0072] The constraints of the power flow calculation are:
[0073] 1). System power balance constraint, each node in the system satisfies the balance of node injection power, outflow power and node load loss:
[0074] ;
[0075] In the formula, and Represents nodes i The active and reactive outputs of the generators, and Represents nodes i The active and reactive output of wind power, and Represents nodes i The active and reactive output of photovoltaic power, and Represents nodes i The active load loss and reactive load loss at and Represents nodes i The active load and reactive load at the location.
[0076] 2). Load loss constraint: the system active and reactive load loss cannot exceed the maximum load of the node:
[0077] ;
[0078] 3). Generator output constraint, the generator output must be between its maximum output and minimum output:
[0079] ;
[0080] 4). Voltage amplitude constraint, node voltage amplitude It cannot exceed the upper and lower limits. Generally, the upper limit of the node voltage per unit value is 1.05 and the lower limit is 0.95:
[0081] ;
[0082] 5). Line transmission capacity constraints: the line transmission capacity cannot exceed its maximum allowed transmission capacity:
[0083] ;
[0084] In the formula, and Line The active and reactive power transmitted, For Line The maximum allowed transmission capacity.
[0085] Obtaining the nodes in the distribution network under different meteorological conditions in the optimal load shedding flow calculation The amount of load loss is determined by whether the secondary load is lost to judge whether the meteorological conditions of the power system have reached the extreme condition standard. If so, it has been reached, otherwise it has not been reached.
[0086] S3. Comprehensive risk calculation steps under extreme conditions.
[0087] Risk assessment is to quantify the risk by combining the probability of risk occurrence and the severity of the risk after it occurs. The risk value is calculated by calculating the risk severity function:
[0088] ;
[0089] In the formula, For the operation mode, is the ith risk event, For running mode The risk value under For risk The probability of occurrence, for Risks in operation mode The severity of the consequences.
[0090] The risk calculation method for non-extreme conditions is the proportion of the load loss in the total load of the distribution network. The risk calculation of the power system under extreme conditions should not only consider the load loss of the system, but also consider the line fault conditions and the output loss of wind, solar and generators. Therefore, in this embodiment, under extreme conditions, the comprehensive risk value of the high-proportion new energy distribution network model is calculated according to the comprehensive risk calculation model. The comprehensive risk calculation model is:
[0091] ;
[0092] In the formula, , , is the weight of the three risk indicators. is the comprehensive risk value, is the load shedding risk value of the power system under extreme conditions, For line risk, The risk of active output loss of wind, solar and generators.
[0093] The load shedding risk value of the power system under the extreme conditions is for:
[0094] ;
[0095] in, Nodes in the distribution network model i The active load loss at Nodes in the distribution network model i The active load at Nodes in the system i The probability of load shedding occurring.
[0096] Line Risk The method for obtaining is: according to the line failure rate, the non-sequential Monte Carlo method is used to determine the on / off state of each line in the system and whether the system is disconnected or not, and the line risk is obtained. for:
[0097] ;
[0098] In the formula, is the number of broken lines, is the total number of distribution network lines. If the system is disconnected, it is the sum of the lines of each subsystem. is the probability of line fault occurring in actual sampling.
[0099] The non-sequential Monte Carlo method is used to judge the operating status of generators and grid-connected wind power and photovoltaic power at different nodes based on the wind and solar outage rate and generator failure rate, and the power generation loss risk is obtained. for:
[0100] ;
[0101] In the formula, The risk of active power loss of wind, solar and generators, is the active power of the generator when it is shut down, is the active power of the wind turbine when it is shut down, is the active power of photovoltaic shutdown, is the probability of output loss occurring in actual sampling.
[0102] In this embodiment, the indicator weight , and Calculated according to the existing AHP method, specifically including:
[0103] First, construct a third-order judgment matrix B , the matrix elements B ij according toi and j If the former is more important than the latter, the element value is 2; if both are equally important, the element value is 1; if the latter is more important than the former, the element value is 0. Then calculate the judgment matrix B Eigenvalues and consistency indices , the matrix B The characteristic value of is used as the indicator weight;
[0104] Finally, a consistency check is performed to calculate the random consistency index value of the matrix for: ;
[0105] In this embodiment, If the CR value is less than 0.1, the consistency test passes. If not, the judgment matrix element value needs to be adjusted and then analyzed.
[0106] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.
Claims
1. A risk assessment method for high-proportion renewable energy power systems under extreme conditions, characterized in that: The steps include: Obtain the operation data of the high-proportion new energy power system, and input the wind and solar power output, wind and solar power outage rate, line failure probability, and distribution network generator outage rate into the distribution network model to form a high-proportion new energy distribution network model; When the meteorological conditions reach extreme conditions, the comprehensive risk number of the high-proportion new energy distribution network model is calculated according to the comprehensive risk calculation model. : ; In the formula, , , is the indicator weight, is the load shedding risk value of the power system under extreme conditions, For line risk, There is a risk of active output loss for wind, solar and generators.
2. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 1 is characterized in that: The extreme condition judgment method comprises: Under different meteorological conditions, the load of each node is divided into three-level load, two-level load and one-level load. The load shedding process is to first cut off the three-level load, then the two-level load, and finally the one-level load. Obtain the nodes in the distribution network under different meteorological conditions i When the load reaches the second-level load, the meteorological conditions of the power system have reached the extreme conditions standard, otherwise it has not been reached.
3. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 2 is characterized in that: The meteorological conditions include sunny and windless, cloudy and windless, sunny and windy, heavy rain, strong wind, freezing rain, sandstorm, high temperature, cold wave, haze and solar eclipse.
4. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 2 is characterized in that: The midpoint i The load loss is obtained according to the optimal load shedding flow calculation model, and the optimal load shedding flow calculation model is: ; In the formula, is the number of system nodes, For distribution network nodes i Active load loss; The constraints of the optimal load shedding flow calculation model include: System power balance constraint: each node in the system should satisfy the balance between node injection power, outflow power and node load loss; Load loss constraint: the system active and reactive load loss cannot exceed the maximum load of the node; Generator output constraint: the generator output must be between its maximum output and minimum output; Voltage amplitude constraint: the node voltage amplitude cannot exceed the upper and lower limits; Line transmission capacity constraint: the line transmission capacity cannot exceed its maximum allowed transmission capacity.
5. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 1 is characterized in that: The load shedding risk value of the power system under the extreme conditions is for: ; in, Nodes in the distribution network model i The active load loss at Nodes in the distribution network model i The active load at is the probability of active load loss occurring in actual sampling.
6. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 1 is characterized in that: Line Risk for: ; In the formula, is the number of broken lines; is the total number of distribution network lines. If the system is disconnected, it is the sum of the lines of each subsystem; is the probability of line fault occurring in actual sampling.
7. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 1 is characterized in that: Risk of loss of active power output of wind, solar and generators for: ; In the formula, is the active power of the generator when it is shut down, is the active power of the wind turbine when it is shut down, is the active power of photovoltaic shutdown, is the probability of output loss occurring in actual sampling.
8. The risk assessment method under extreme conditions of a high proportion of new energy power system according to claim 1 is characterized in that: The weight of the indicators , and Calculated by AHP method.
