Optimization control method and system for maximum demand power consumption of LF refining furnace

By collecting and analyzing the current and voltage signals of the LF refining furnace in real time, combined with the automatic load reduction control of the Smith estimated compensator, dynamically matching the load, the peak problem of the electric load of the LF refining furnace is solved, and the electricity cost reduction and Increased load utilization.

CN119093359APending Publication Date: 2024-12-06JIANGSU JINHENG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411262721.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The electricity load of LF refining furnaces in steel enterprises is spike and random, resulting in high electricity costs. The existing load control methods cannot dynamically match the actual process conditions, resulting in poor energy saving effects.

Method used

By collecting the current and voltage signals of the secondary side of the transformer in real time, calculating the actual demand, and using the Smith estimate compensator for automatic load reduction control. When the demand reaches the set upper or lower limit, control it, and dynamically adjust the load to achieve the demand. optimization.

Benefits of technology

Effectively control the electricity load, improve load utilization, reduce electricity costs, reduce production costs, and extend the service life of electricity equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093359A_ABST
    Figure CN119093359A_ABST
Patent Text Reader

Abstract

The invention provides an LF refining furnace maximum demand power consumption optimization control method and system, and the method comprises the steps: designing a demand prediction model, setting an upper limit or a lower limit according to the actual demand and a demand control value, carrying out the comparison, achieving the automatic execution or stop of load shedding control, carrying out the prediction compensation of the load shedding control through a Smith prediction compensator, and achieving the optimal control of the maximum demand power consumption of the LF refining furnace. The power utilization load of the LF refining furnace can be monitored in real time, the peak can be accurately predicted, and therefore the power utilization load can be effectively controlled, demand control is achieved, the load utilization rate is improved, enterprise demand electricity cost is reduced, investment is small, and benefits are large.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of iron and steel metallurgy, and in particular to a method and system for optimizing control of maximum power consumption of an LF refining furnace. Background Art

[0002] With the rapid development of my country's economy, the demand for electricity has steadily increased, and there is a gap in the power supply. The situation is very serious. Therefore, it is very important for power companies to make full use of existing power generation equipment, transmission and distribution lines, and save investment. At the same time, with the rise in raw materials, electricity prices are also rising, and the production costs of electricity-consuming enterprises have increased accordingly. Therefore, how to save electricity costs without affecting normal production is a goal actively pursued by industrial production enterprises. The power department usually charges large industrial electricity according to the basic electricity fee + kilowatt-hour electricity fee. The kilowatt-hour electricity fee is charged according to the actual electricity consumption, and the basic electricity fee is charged monthly according to the maximum demand power reported by the enterprise, so it is also called the demand electricity fee. When the actual power of the enterprise is lower than the reported demand power, the basic electricity fee is charged according to the reported demand. When the actual power exceeds the reported demand power, an additional punitive fee is added to the basic electricity fee.

[0003] In steel enterprises, the LF refining furnace is a major electricity consumer in the steelmaking production process, and its power consumption accounts for more than 30% of the total power consumption of the plant. During project construction, the design unit generally selects a larger capacity transformer and reserves more margin to ensure the normal power consumption of the LF furnace. Under normal circumstances, the power load rate of the LF furnace is not full, but there are a few special cases where the power load reaches a peak close to the installed capacity of the transformer. Since the peak time and peak power are highly random, in order to avoid punitive charges, enterprises usually choose to declare the maximum demand according to the installed capacity of the transformer, and they have to pay a higher demand electricity cost for this. If the power load of the LF refining furnace can be monitored in real time and the peak can be accurately predicted, the power load can be effectively controlled, the demand can be controlled, and the demand cost can be reduced.

[0004] The current load control method generally achieves load reduction by reducing the static load. The static load reduction is a fixed value and cannot be dynamically matched according to the actual process conditions. Setting the load reduction range too large may affect production, and setting the load reduction range too small will not have a significant energy-saving effect. There is a lot of room for optimization. Summary of the invention

[0005] The purpose of the present invention is to provide a method and system for optimizing the control of the maximum power consumption of an LF refining furnace, so as to solve the problem of realizing the control of the maximum power consumption of the LF furnace through an estimated compensation algorithm in the prior art, reasonably utilize electric energy, and reduce the demand electricity fee expenditure.

[0006] The present invention specifically adopts the following technical solutions:

[0007] According to a first aspect of the present invention, an embodiment of the present invention provides a method for optimizing control of maximum power consumption of a LF refining furnace, characterized in that it comprises the following steps:

[0008] Collect the secondary current and voltage signals of the transformer in real time, and cache the real-time current and voltage RMS data within a set time period;

[0009] Calculate the actual demand within the set time based on the real-time current and voltage RMS data:

[0010] Among them, t is the set duration value, I a ,I b ,I c , is the three-phase secondary current, U a , U b , U c is the three-phase secondary voltage, α is the power conversion factor;

[0011] When the actual demand M reaches the upper limit of the demand control value, automatic load reduction control is performed;

[0012] The Smith predictive compensator is used to predict and compensate the load shedding control, and its transfer function is as follows:

[0013]

[0014] Among them, Z is a discrete complex frequency domain operator, which is obtained by Z transforming the deviation between the set gear value and the actual gear value of the load shedding;

[0015] When the actual demand M value reaches the lower limit of the demand control value, the load reduction control is stopped and the set gear value before load reduction is restored.

[0016] According to a second aspect of the present invention, an embodiment of the present invention provides a LF refining furnace maximum demand power consumption optimization control system, characterized in that it includes:

[0017] Signal acquisition module, used to collect the secondary current and voltage signals of the transformer in real time;

[0018] Data cache module, used to cache real-time current and voltage effective value data within a set time period;

[0019] The actual demand calculation module is used to calculate the actual demand within a set time period based on the real-time current and voltage RMS data.

[0020] Among them, t is the set duration value, I a ,I b ,I c , is the three-phase secondary current, U a , Ub , U c is the three-phase secondary voltage, α is the power conversion factor;

[0021] A judgment module, used for comparing the actual demand M with the upper limit or lower limit set for the demand control value;

[0022] The load shedding control module is used to automatically perform load shedding control when the actual demand M reaches the upper limit set by the demand control value; when the actual demand M value reaches the lower limit set by the demand control value, the load shedding control is stopped and the set gear value before load shedding is restored;

[0023] The Smith predictive compensator module is used to predict and compensate for load reduction control. Its transfer function is as follows:

[0024]

[0025] Wherein, Z is a discrete complex frequency domain operator, which is obtained by Z transforming the deviation between the set gear value and the actual gear value of the load shedding.

[0026] On the other hand, an embodiment of the present invention also provides an electronic device, comprising a processor and a memory, wherein the memory stores a program that can be run on the processor, and is characterized in that when the program is executed by the processor, the steps of the above-mentioned LF refining furnace maximum demand power consumption optimization control method are implemented.

[0027] On the other hand, an embodiment of the present invention further provides a computer-readable storage medium storing at least one program, characterized in that the at least one program can be executed by at least one processor to implement the steps of the above-mentioned LF refining furnace maximum demand power consumption optimization control method.

[0028] Compared with the prior art, the present invention has the following beneficial effects:

[0029] (1) The use of advanced computer control technology balances the power load within the steel plant, reduces the maximum demand purchase volume, and improves load utilization.

[0030] (2) The improvement of load utilization reduces the investment in power construction, improves the economy and reliability of power grid operation, saves energy resources, and controls environmental quality.

[0031] (3) Reduce users’ basic electricity expenses and lower production costs.

[0032] (4) By reducing the load peak, the impact on primary equipment is reduced and the service life of electrical equipment is increased.

[0033] (5) The implementation requires little investment, has great benefits and broad market prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 This is a schematic flow chart of a method for optimizing control of maximum power consumption of a LF refining furnace according to Example 1 of the present invention;

[0035] Figure 2 This is a flow chart of the maximum power consumption optimization control program of the LF refining furnace according to Example 1 of the present invention;

[0036] Figure 3 This is a block diagram of the LF refining furnace maximum demand power consumption optimization control system of Example 2 of the present invention. DETAILED DESCRIPTION

[0037] In order to make the technical solution of the present invention more clearly understood, the technical solution of the present invention is further described in detail below according to specific embodiments and in combination with the accompanying drawings. Obviously, the following embodiments are only part of the embodiments of the present invention and do not constitute a limitation on the technical solution of the present invention. For those of ordinary skill in the art, other embodiments can also be obtained according to the embodiments of the present application without paying creative labor.

[0038] It should be noted that the order of steps described in the method embodiments in the following embodiments does not constitute a limitation on the technical solution of the present invention. For ordinary technicians in this field, without paying any creative labor, they can also reasonably adjust the order of certain steps according to the embodiments of the present application.

[0039] Example 1

[0040] This embodiment provides a method for optimizing the control of the maximum power consumption of a LF refining furnace. Figure 1 As shown, the following steps are included:

[0041] Step 101: collect the secondary current and voltage signals of the transformer in real time, and cache the real-time current and voltage effective value data within a set time period.

[0042] Specifically, a data acquisition system is established in a primary PLC programmable controller to collect the secondary current and voltage signals of the transformer in real time, and a data buffer area with a set length is established to cache the real-time current and voltage effective value data.

[0043] Specifically, the time length is set to 900 seconds in this embodiment, that is, the data buffer area caches the real-time current and voltage effective value data within the last 900 seconds.

[0044] Step 102: Design a demand forecast model to calculate the actual demand within a set time period based on real-time current and voltage effective value data.

[0045] Actual demand

[0046] Wherein, t is the set duration value, which is 900 in this embodiment, and the actual demand M in this embodiment is the total power of the LF furnace in the last 900 seconds. a ,I b ,I c , is the three-phase secondary current, U a , U b , U c is the three-phase secondary voltage, and α is the power conversion factor. In this embodiment, α is 0.65.

[0047] Step 103: During the production process, the actual demand M is compared with the upper limit set for the demand control value in real time. When the actual demand M reaches the upper limit set for the demand control value, automatic load reduction control is performed.

[0048] The demand control value is obtained through repeated tests based on process conditions, and is usually between 80% and 95% of the declared demand value. It is related to factors such as the load balance of the production site, load reduction lag time, and transformer performance. If the control value is too high, the actual demand value may exceed the declared value, resulting in punitive charges. If the control value is too low, the declared demand will not be fully utilized, resulting in a waste of basic electricity charges.

[0049] Step 104: During the load shedding control process, the Smith predictive compensator is used to perform predictive compensation for the load shedding control, and its compensation characteristic function is as follows:

[0050]

[0051] Wherein, Z is a discrete complex frequency domain operator, which is obtained by performing a Z transform on the deviation between the set gear value of the load shedding (represented by the set gear value of the current or impedance) and the actual gear value.

[0052] The object of load shedding control is the current set point or the impedance set point, and the initial position of load shedding control is the current set gear value fed back by the PLC system. The load shedding control method of the present invention can dynamically perform estimated compensation and adjust the set point of load shedding current or impedance, rather than the static load shedding mode of other schemes. When the upper limit of the demand control value is triggered, automatic load shedding is performed. In the case where the set gear value of the load shedding lags behind the actual gear value, the Smith predictive compensator is used to perform parallel estimated compensation for PID control, and the compensation characteristic function is controlled in parallel with the PID control parameters to achieve automatic load shedding compensation.

[0053] Step 105: During the load shedding process, the actual demand M is compared with the lower limit of the demand control value in real time. When the actual demand M reaches the lower limit of the demand control value, the load shedding control is stopped and the set gear value before the load shedding is restored.

[0054] The above-mentioned LF refining furnace maximum demand power consumption optimization control method may also include the following steps:

[0055] Step 106: During the load shedding process, a load shedding prompt is given on the HMI human-machine interface so that the operator can understand the equipment status in a timely manner.

[0056] Step 107: Inspect the secondary current and voltage transmitters monthly to ensure reliable operation of the demand control load shedding system.

[0057] like Figure 2 Shown is a flow chart of the automatic control program for dynamically adding slag-making material to the ladle refining furnace of this embodiment.

[0058] The LF refining furnace maximum demand power consumption optimization control method of this embodiment designs a demand forecast model, sets an upper limit or a lower limit according to the actual demand and the demand control value for comparison, realizes automatic execution or stop of load reduction control, and uses a Smith predictive compensator to perform predictive compensation for the load reduction control. It can monitor the power load of the LF refining furnace in real time and accurately predict the peak, so as to effectively control the power load, realize demand control, improve load utilization, reduce the enterprise's demand electricity cost, and achieve high benefits with low investment.

[0059] Example 2

[0060] This embodiment provides a LF refining furnace maximum demand power consumption optimization control system, such as Figure 3 As shown, including:

[0061] The signal acquisition module 21 is used to acquire the secondary current and voltage signals of the transformer in real time.

[0062] The signal acquisition module 21 is arranged in the data acquisition system of the first-level PLC programmable controller.

[0063] The data cache module 22 is used to cache the real-time current and voltage effective value data within a set time period.

[0064] The data cache module 22 has a data cache area with a set length. In this embodiment, the set length is 900 seconds, that is, the data cache module 22 caches the real-time current and voltage effective value data within the last 900 seconds.

[0065] The actual demand calculation module 23 is used to calculate the actual demand within a set time period based on the real-time current and voltage effective value data.

[0066] Wherein, t is the set duration value, which is 900 in this embodiment, and the actual demand M in this embodiment is the total power of the LF furnace in the last 900 seconds. a ,I b ,I c , is the three-phase secondary current, U a , U b , Uc is the three-phase secondary voltage, and α is the power conversion factor. In this embodiment, α is 0.65.

[0067] The judgment module 24 is used to compare the actual demand M with the set upper limit or the set lower limit of the demand control value.

[0068] The load reduction control module 25 is used to automatically reduce the load when the actual demand M reaches the upper limit of the demand control value during the production process; during the load reduction execution process, when the actual demand M value reaches the lower limit of the demand control value, stop the load reduction control and restore the set gear value before load reduction.

[0069] The Smith predictive compensator module 26 is used to perform predictive compensation for the load reduction control during the load reduction control process, and its compensation characteristic function is as follows:

[0070]

[0071] Wherein, Z is a discrete complex frequency domain operator, which is obtained by performing a Z transform on the deviation between the set gear value of the load shedding (represented by the set gear value of the current or impedance) and the actual gear value.

[0072] The object of load shedding control is the current set point or impedance set point, and the initial position of load shedding control is the current set gear value fed back by the PLC system. The load shedding control method of the present invention can dynamically perform estimated compensation and adjust the set point of load shedding current or impedance, rather than the static load shedding mode of other schemes. When the upper limit of the demand control value is triggered, automatic load shedding is performed. When there is a lag between the set gear value of the load shedding and the actual gear value, the Smith estimated compensator is used to control the designed compensation characteristic function and the PID control parameters in parallel to achieve automatic load shedding compensation.

[0073] Example 3

[0074] This embodiment provides an electronic device, including a processor and a memory, wherein the memory stores a program that can be run on the processor, and when the program is executed by the above-mentioned processor, the steps of the above-mentioned LF refining furnace maximum demand power consumption optimization control method are implemented.

[0075] The above program can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on the remote computer or server.

[0076] Example 4

[0077] This embodiment provides a computer-readable storage medium storing at least one program, and the at least one program can be executed by at least one processor to implement the steps of the above-mentioned LF refining furnace maximum demand power consumption optimization control method.

[0078] The above storage media include: U disk, mobile hard disk, read-only memory, random access memory, disk or optical disk and other media that can store program code and their combination. With the development of science and technology, the meaning of storage media may become more and more extensive and not limited to tangible media.

[0079] A production test was conducted with a LF furnace in a steel plant, and the comparison of the maximum demand data before and after the application of the method of the present invention is shown in Table 1:

[0080] Table 1 Maximum demand data comparison

[0081] month Application of the method of the present invention Maximum demand (kW) Control load (kW) Trial Month 1 no 20910 Trial Month 2 no 23917 Trial Month 3 no 21425 Test Month 4 no 20680 Test month 5 no 22573 Test month 6 yes 20988 21000 Test Month 7 yes 21035 21000 Test month 8 yes 21012 21000 Test month 9 yes 20913 21000 Test month 10 yes 20122 20000 Test month 11 yes 19981 20000 Test month 12 yes 20118 20000

[0082] From the data in the table above, it can be seen that before the application of the method of the present invention, the maximum demand per month was 23917 kW, which was 3237 kW higher than the minimum value, and the control space was large. After the application of the method of the present invention, the maximum demand was gradually controlled to about 20000 by setting the control load twice.

[0083] The maximum demand before and after the application of the method of the present invention is reduced from an average of 21901 kW to 20596 kW, a decrease of 1305 kW. Calculated at 40 yuan per kW, the annual electricity cost saving for each LF furnace is: 1305*40*12=626,000 yuan, which greatly reduces the electricity cost of the enterprise and has significant economic benefits.

[0084] Those skilled in the art can understand that the above-mentioned embodiments are specific embodiments for implementing the present invention. In addition to the above-mentioned embodiments, the present invention may also have other implementation modes; any technical solutions formed by equivalent replacement or equivalent transformation shall fall within the protection scope required by the present invention.

Claims

1. A method for optimizing the maximum power consumption of a LF refining furnace, characterized in that: The steps include: Collect the secondary current and voltage signals of the transformer in real time, and cache the real-time current and voltage RMS data for a set period of time; Calculate the actual demand within the set time based on the real-time current and voltage RMS data: Among them, t is the set duration value, I a ,I b ,I c , is the three-phase secondary current, U a , U b , U c is the three-phase secondary voltage, α is the power conversion factor; When the actual demand M reaches the upper limit of the demand control value, automatic load reduction control is performed; The Smith predictive compensator is used to predict and compensate the load reduction control. The compensation characteristic function is as follows: Among them, Z is a discrete complex frequency domain operator, which is obtained by Z-transforming the deviation between the set gear value and the actual gear value of the load shedding; When the actual demand M value reaches the lower limit of the demand control value, the load reduction control is stopped and the set gear value before load reduction is restored.

2. The LF refining furnace maximum demand power consumption optimization control method according to claim 1, characterized in that: t=900, set the duration in seconds.

3. The LF refining furnace maximum demand power consumption optimization control method according to claim 1, characterized in that: α=0.65。 4. A LF refining furnace maximum demand power consumption optimization control system, characterized in that: include: Signal acquisition module, used to collect the secondary current and voltage signals of the transformer in real time; Data cache module, used to cache real-time current and voltage RMS data for a set period of time; The actual demand calculation module is used to calculate the actual demand within a set time period based on the real-time current and voltage RMS data. Among them, t is the set duration value, I a ,I b ,I c , is the three-phase secondary current, U a , U b , U c is the three-phase secondary voltage, α is the power conversion factor; A judgment module, used for comparing the actual demand M with the upper limit or lower limit set for the demand control value; The load shedding control module is used to automatically perform load shedding control when the actual demand M reaches the upper limit set by the demand control value; when the actual demand M value reaches the lower limit set by the demand control value, the load shedding control is stopped and the set gear value before load shedding is restored; The Smith predictive compensator module is used to predict and compensate for load reduction control. The compensation characteristic function is as follows: Wherein, Z is a discrete complex frequency domain operator, which is obtained by Z transforming the deviation between the set gear value and the actual gear value of the load shedding.

5. The LF refining furnace maximum demand power consumption optimization control system according to claim 4, characterized in that: t=900, set the duration in seconds.

6. The LF refining furnace maximum demand power consumption optimization control system according to claim 4, characterized in that: α=0.65。 7. An electronic device comprising a processor and a memory, wherein the memory stores a program that can be run on the processor, characterized in that: When the program is executed by the processor, the steps of the LF refining furnace maximum demand power consumption optimization control method described in any one of claims 1-3 are implemented.

8. A computer-readable storage medium storing at least one program, characterized in that: The at least one program can be executed by at least one processor to implement the steps of the LF refining furnace maximum demand power consumption optimization control method as described in any one of claims 1-3.