Optimization method for capacity market clearing mechanism in new energy power system
Through the double-layer optimization model and the non-sequential Monte Carlo method, the backup margin is adjusted in combination with the dichotomy method, and the capacity market clearance mechanism is optimized, the problem of insufficient reliability of the power system during new energy access is solved, and the power system is realized The balance of economy and reliability and the transformation of energy structure.
Patent Information
- Application Number
- CN202411094075.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-12-06
AI Technical Summary
Large-scale access to new energy brings challenges to the stable operation of the power system. The existing capacity market clearance mechanism is insufficient in improving system reliability, especially when high proportion of new energy access.
Using a two-layer optimization model, the upper-level model that minimizes the cost of system procurement capacity and the lower-level model that evaluates the reliability of the system by combining the dichotomous method, adjusts the system backup margin, optimizes the capacity market clearance mechanism, and ensures power The system meets the balance of economy and reliability.
The power system has been achieved stable operation under high-tech penetration rate, reduced the electricity bill burden of consumers, improved market operation efficiency, optimized resource allocation, significantly reduced system operation costs, and promoted the transformation and sustainability of the energy structure. develop.
Smart Images

Figure CN119093375A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of capacity market, and in particular to a method for optimizing a capacity market clearing mechanism in a new energy power system. Background Art
[0002] Deepening the reform of the power industry and building a modern power system dominated by new energy, my country's power industry reform has made remarkable progress based on international experience and combined with its national conditions, and the reform results have begun to benefit the society widely. As the dominant position of new energy in the power system is gradually established, the domestic new energy installed capacity has increased rapidly, and the development of energy storage power stations has also accelerated, aiming to improve the utilization rate of new energy.
[0003] However, the large-scale access of new energy has brought challenges to the stable operation of the power system, such as insufficient power generation capacity, increased risks and reduced system reliability. At present, there is a general lack of effective capacity compensation mechanisms in China, which further exacerbates the risks of power system operation. Therefore, it is particularly urgent to establish an electricity market mechanism that can adapt to the rapid development of new energy. This requires ensuring the adequacy of power generation capacity through reasonable capacity compensation and ensuring the security of energy supply during the construction of new power systems.
[0004] As an effective mechanism to ensure the adequacy of power generation capacity, the capacity market has been implemented in many countries around the world and has achieved good results. The market clearing model is a key factor affecting the effectiveness of the capacity market. Foreign countries have conducted research on the capacity market earlier and proposed a variety of clearing models, including models with deep participation of energy storage resources, models considering flexible demand, and models for distributed power systems. These models provide certain reference value for my country, but due to the differences in the characteristics of domestic and foreign power systems, they cannot fully meet the construction needs of my country's new power system.
[0005] Based on the experience of foreign countries, China has also conducted in-depth research and proposed a new capacity market mechanism that adapts to the development of clean energy and takes into account the potential impact of spot electricity trading, as well as a new capacity market mechanism that takes into account the multi-objective regulation of energy development constraints such as capacity resource structure. Although these studies have fully considered the characteristics of my country's power system, the current research on clearing models is not in-depth enough, especially in the research on system reliability issues when a high proportion of new energy is connected to the new power system.
[0006] Therefore, further research and innovation are needed to address the shortcomings of existing mechanisms in terms of new energy access and power system reliability. Summary of the invention
[0007] In view of the shortcomings of the existing technology, the present invention provides an optimization method for the capacity market clearing mechanism in a new energy power system. Through a two-layer optimization model, the spot market operation and new energy development are comprehensively considered to achieve a balance between energy structure transformation and the economy and reliability of the power system.
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for optimizing the capacity market clearing mechanism in a new energy power system, comprising the following steps:
[0009] A two-layer optimization model is constructed, in which the upper layer model aims to minimize the system procurement capacity cost, and the lower layer model uses the non-sequential Monte Carlo method to evaluate system reliability;
[0010] In the upper model, the objective function is defined to minimize the system procurement capacity cost as follows:
[0011]
[0012] Among them, N Z Indicates the total number of power partitions in the system, a i,j represents the price of the i-th traditional generator set in the j-th zone, a m,j represents the price of the mth energy storage power station in the jth zone, G i,j and P m,j Respectively represent the available capacity reported by the i-th traditional generator set and the m-th energy storage power station in the j-th zone, θ j and γ j They represent the set of traditional generators and energy storage power stations in the jth zone respectively;
[0013] The dichotomy method is used to adjust the system reserve margin value to find the solution that achieves the best economy while meeting system reliability.
[0014] Utilize the optimization model output to optimize the clearing mechanism.
[0015] Preferably, the method further includes constraints in the two-layer optimization model, and the specific steps include:
[0016] Implement capacity constraints on traditional generators and energy storage plants, where the effective capacity of traditional generators is calculated by taking into account the unavailability rate, and the effective capacity of energy storage plants is determined by calculating their maximum charging and discharging capabilities within a set operating time;
[0017] Set capacity balancing constraints to ensure that at any given moment, the total generation capacity of the system plus the credible capacity of renewable energy and the transmission power of the tie lines meets or exceeds the maximum system load of the delivery year plus a certain system reserve margin;
[0018] The load loss expectation is set as the reliability index to evaluate the load loss probability of the system under the predetermined backup margin.
[0019] Preferably, the capacity constraint of the conventional generator set is expressed by the following formula:
[0020]
[0021] in, Represents the effective capacity of the traditional generator set, G′ i,j is the rated capacity of the traditional generator set, FOR i,j is the unavailability rate of traditional generator sets;
[0022] The capacity constraint of the energy storage power station is expressed by the following formula:
[0023]
[0024] Among them, CF m is the effective capacity coefficient of the energy storage power station, It represents the effective capacity of the energy storage power station. ESP and ECP are the discharge and charge of the energy storage power station during peak hours. When the charge is not less than the discharge, the effective capacity is zero. P′ m is the installed capacity of the energy storage power station, NHP is the duration of the system load peak period, FOR m,j is the unavailability rate of the energy storage power station.
[0025] Preferably, the capacity balance constraint is expressed by the following formula:
[0026]
[0027]
[0028] in, is the maximum system load in the delivery year, IRM is the system reserve margin, y l is the transmission power of the lth tie line, is the power limit of the lth transmission line, R j is the credible capacity of the new energy in the jth zone, EX j is the set of contact lines in the jth zone.
[0029] Preferably, the step of using the non-sequential Monte Carlo method to evaluate system reliability includes:
[0030] In the non-sequential Monte Carlo simulation, the load loss of the system at different time points is estimated, and the load loss of the system at time t during the kth sampling is calculated using the following model:
[0031]
[0032] 0≤ΔL j,k,t ≤L j,t
[0033]
[0034] Where, ΔC k,t Indicates the amount of load loss of the system at time t during the kth sampling, ΔL j,k,t represents the load loss in the jth zone at time t, δ is the new energy prediction error, and v i is the set of new energy stations in the jth zone, R e,j,k,t is the output of the e-th renewable energy station at time t during the k-th sampling, L j,t is the load of the jth zone at time t, G i,j,k,t is the output of the winning unit in the jth zone at time t during the kth sampling, y l,k,t is the exchange power of the lth tie line at the kth sampling time, G i,j,k,t is the minimum output of the unit, and are the discharge and charging power of the mth winning energy storage power station at the kth sampling time t, respectively, i,j,k,t and x l,k,t are the states of the group and line at the kth sampling time, represented by 0 and 1 variables;
[0035] The Monte Carlo method is used to evaluate the system's load loss expectation. The specific calculation is as follows:
[0036]
[0037] Among them, K is the total number of samples, N T is the simulation time, represents the probability weight of the kth sampling at time t;
[0038] According to the simulation results, the system's reserve margin and related operating parameters are adjusted and optimized.
[0039] Preferably, the method further comprises using a chance constraint model to handle the introduction of random variables to ensure that the system reliability is within a predetermined confidence level, and the specific steps include:
[0040] Evaluate the impact of prediction errors caused by random variables on system operation, where the prediction errors involve the output uncertainty of new energy sources;
[0041] Define the chance constraint model to ensure that the probability that the system load meets the conditions is greater than or equal to the set confidence level π through the following chance constraints:
[0042] Pr(G+∑R e,j,k,t +δ-Lj,t +ΔL j,k,t =0)≥π
[0043] Among them, G represents the total power generation, R e,j,k,t represents the output of the e-th renewable energy station at time t during the k-th sampling, δ represents the prediction error, and L j,t represents the load demand of the jth zone at time t, ΔL j,k,t It represents the load loss of the jth zone at time t under given conditions;
[0044] Use random simulation methods to sample a sufficient number of random variables, calculate the output of each sample and verify whether the chance constraints are met;
[0045] Adjust system parameters or reserve margin according to the sampling results to ensure that the system reliability is within the acceptable risk range and achieves the optimal state of economic operation.
[0046] Preferably, the steps of sampling a sufficient number of random variables using a random simulation method, calculating the output of each sampling and verifying whether the chance constraint condition is satisfied include:
[0047] Generate a sufficient number of random samples of the prediction error δ, each sample representing a possible state of the system;
[0048] For each random sample, the load satisfaction of the system in this state is calculated. The specific expression is as follows:
[0049]
[0050] Among them, G represents the total power generation, R e,j,k,t represents the output of the new energy station at time t, δ sa is the prediction error of random sampling, L j,t is the regional load, ΔL j,k,t is the load loss, M is a large number, d t (sa) is a binary variable indicating whether the sample meets the loading;
[0051] Count the number of samples that meet the chance constraint condition and ensure that the ratio of the number of samples to the total number of samples is greater than or equal to the preset confidence level π;
[0052] If the probability of meeting the condition is lower than π, adjust the system reserve margin or other relevant parameters, and repeat the above steps until the preset confidence level is reached or exceeded.
[0053] Preferably, the step of applying the dichotomy method to adjust the system reserve margin value comprises:
[0054] Set initial upper and lower limits for reserve margin;
[0055] Calculate the median value of the current reserve margin as the reserve margin parameter for system model input;
[0056] Run a two-level optimization model using the median reserve margin to solve the market clearing problem and evaluate the system reliability at this reserve margin value, as assessed by load loss expectancy;
[0057] Based on the evaluation results, check whether the predetermined system reliability standards are met:
[0058] If the current expected value of load loss is less than or equal to the set standard, the reserve margin value can be reduced, and the upper limit of the reserve margin is adjusted to the current median value;
[0059] If the current expected value of load loss is greater than the set standard, the reserve margin value needs to be increased, and the lower limit of the reserve margin is adjusted to the current median value;
[0060] Repeat the steps until the difference between the upper limit and the lower limit of the reserve margin is less than the preset accuracy threshold, which is the reserve margin value that meets the reliability requirements and is economically optimal.
[0061] The present invention also provides an optimization device for a capacity market clearing mechanism in a new energy power system, comprising:
[0062] Data acquisition module, used to obtain the operation data and market parameters of the power system;
[0063] The optimization calculation module is used to perform calculations of the two-level optimization model, including capacity market clearing and system reliability assessment;
[0064] The control module is used to adjust the system operating parameters according to the optimization calculation results to achieve market clearing and reliability control;
[0065] Display module, used to show optimization results and system status.
[0066] The present invention also provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the above method is implemented.
[0067] The present invention also provides a storage medium on which a computer program is stored. When the computer program is executed by a processor, the method described above is implemented.
[0068] The present invention provides a method for optimizing the capacity market clearing mechanism in a new energy power system. It has the following beneficial effects:
[0069] 1. The present invention minimizes the cost of purchasing capacity in the power system by constructing a two-level optimization model. This approach enables the market to operate at the lowest cost while meeting basic power demand, thereby directly reducing the burden of electricity bills on consumers. In addition, the optimization model also takes into account the cost and availability of different energy sources, ensuring that cost efficiency can be maximized under various market conditions.
[0070] 2. The present invention uses the non-sequential Monte Carlo method to evaluate system reliability, which can effectively predict and manage potential risks caused by the volatility of renewable energy. By accurately calculating the system load loss under various operating conditions, the method helps operators to adjust the reserve margin and power generation strategy in a timely manner, thereby ensuring the stable operation of the power system under high renewable energy penetration conditions.
[0071] 3. The present invention provides a flexible strategy for responding to market changes and environmental changes by dynamically adjusting the system reserve margin through a dichotomy method. This adjustment method allows the system to respond based on real-time market data and forecast information while maintaining economy and reliability. This not only improves the system's response speed, but also increases its adaptability to future uncertainties.
[0072] 4. The optimization method of the capacity market clearing mechanism in the new energy power system proposed in the present invention effectively integrates the spot market operation and the development of new energy through an innovative two-layer optimization model, and achieves a balance between the economy and reliability of the power system. This method not only improves the efficiency of market operation and optimizes resource allocation, but also significantly reduces the system operation cost. At the same time, by embedding energy structure constraints, it promotes the transformation of the energy structure, enhances the reliability of the system, and reflects the external economic value of new energy such as cleanliness and low carbon. In addition, the flexibility and adaptability of the invention enable it to meet the ever-changing market needs, support the realization of national energy policy goals, and help increase the proportion of clean energy in the entire power system and promote the sustainable development of energy. BRIEF DESCRIPTION OF THE DRAWINGS
[0073] Figure 1 It is a schematic diagram of the method flow of the present invention;
[0074] Figure 2 Solving the schematic diagram for the model of the present invention;
[0075] Figure 3 A flowchart for solving the dichotomy method of the present invention;
[0076] Figure 4 A schematic diagram of a modified IEEE 24-node system grid according to an embodiment of the present invention;
[0077] Figure 5 Graphs showing market clearing results in two scenarios according to an embodiment of the present invention;
[0078] Figure 6 It is a schematic diagram of the structure of the device of the present invention;
[0079] Figure 7 It is a schematic diagram of the computer device structure of the present invention.
[0080] Among them, 100, data acquisition module; 200, optimization calculation module; 300, control module; 400, display module; 40, computer equipment; 41, processor; 42, memory; 43, storage medium. DETAILED DESCRIPTION
[0081] The following will be combined with the drawings in the specification of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0082] Please see attached Figure 1 The embodiment of the present invention provides a method for optimizing the capacity market clearing mechanism in a new energy power system, comprising the following steps:
[0083] S1. Constructing a two-layer optimization model
[0084] In this invention, the key step is to construct a two-level optimization model for capacity market clearing in renewable energy power systems. This model is designed to achieve the optimal balance between economic benefits and system reliability through two levels of calculation. The upper model focuses on minimizing the system's procurement capacity cost, while the lower model uses a non-sequential Monte Carlo method to evaluate and ensure system reliability, especially in the context of large-scale access to renewable energy resources.
[0085] In this embodiment, the upper optimization model integrates the data of all power generation units and energy storage facilities participating in the market, including their bids and available capacities. The objective function is in the following form, which is used to guide market clearing decisions:
[0086]
[0087] Among them, N Z Indicates the total number of power partitions in the system, a i,j represents the price of the i-th traditional generator set in the j-th zone, a m,j represents the price of the mth energy storage power station in the jth zone, G i,j and P m,j Respectively represent the available capacity reported by the i-th traditional generator set and the m-th energy storage power station in the j-th zone, θ j and γ jThey represent the collection of traditional generating units and energy storage power stations in the jth zone respectively.
[0088] The constraints include:
[0089] (1) Generator capacity constraints
[0090] The capacity that a generator set can declare in the market shall not exceed its maximum effective capacity, that is, its unavailability rate is taken into account on the basis of the rated capacity, which can be expressed by formula (2) and formula (3).
[0091]
[0092]
[0093] in, Represents the effective capacity of the traditional generator set; G′ i,j is the rated capacity of the traditional generator set; i,j is the unavailability rate of traditional generator sets.
[0094] (2) Energy storage capacity constraints
[0095] Energy storage power stations usually have two rated capacities: power and energy. The power rated capacity is expressed in MW, and the energy rated capacity is expressed in MWh. This patent uses the power rated capacity of the energy storage power station. The effective capacity support of energy storage is usually between 2 and 4 hours.
[0096]
[0097] Among them, CF m is the effective capacity factor of the energy storage power station; Represents the effective capacity of the energy storage power station; ESP and ECP are the discharge and charge amounts of the energy storage power station during peak hours, respectively. When the charge amount is not less than the discharge amount, the effective capacity is zero; P′ m is the installed capacity of the energy storage power station; NHP is the duration of the system load peak period, which is usually 8 hours in China; FOR m,j is the unavailability rate of the energy storage power station.
[0098] Therefore, the capacity constraint of the energy storage power station can be expressed as:
[0099]
[0100] (3) Capacity balance constraints
[0101]
[0102] in, is the maximum system load in the delivery year; IRM is the system reserve margin; y lis the transmission power of the lth tie line; is the power limit of the lth transmission line; R j is the credible capacity of new energy in the jth zone; EX j is the set of contact lines in the jth zone.
[0103] (4) Reliability constraints
[0104] The core goal of the capacity market is to ensure system reliability. The present invention uses Loss Of Load Expectation (LOLE) as a reliability indicator to constrain system reliability.
[0105] LOLE(IRM)≤β (9)
[0107] Among them, β is the set reliability standard.
[0108] The model solving process constructed in this embodiment is provided below:
[0109] It can be observed from the model that, except for the reliability constraint, the objective function and other constraints are linear. However, the introduction of reliability constraints increases the difficulty of solving the model, so an in-depth analysis of the reliability constraints is required. Among the many reliability assessment methods, the non-sequential Monte Carlo method is particularly suitable for reliability assessment of large-scale power systems because of its simple model, small memory usage, and relatively small amount of raw data required. This embodiment chooses to use the non-sequential Monte Carlo method to evaluate the system reliability. The details are as follows:
[0110] (1) The non-sequential Monte Carlo method calculates the load loss of the system at time t in the kth sampling, which can be carried out through the following model:
[0111]
[0112]
[0113] 0≤ΔL j,k,t ≤L j,t (14)
[0115]
[0116] Where, ΔC k,t Indicates the amount of load loss of the system at time t during the kth sampling; ΔL j,k,t represents the load loss in the jth zone at time t; δ is the new energy prediction error; ν i is the collection of new energy stations in the jth zone; R e,j,k,t is the output of the e-th new energy station at time t during the k-th sampling; Lj,t is the load of the jth zone at time t; G i,j,k,t is the output of the winning unit in the jth zone at time t during the kth sampling; y l,k,t is the exchange power of the lth tie line at the kth sampling time; G i,j,k,t is the minimum output of the unit; and are the discharge and charging power of the mth winning energy storage power station at the kth sampling time t; i,j,k,t and x l,k,t They are the states of the group and line at the kth sampling time, represented by 0 and 1 variables.
[0117] During the k-th sampling system evaluation, the calculation model aims to minimize the amount of load loss and meet constraints such as power balance and unit characteristics.
[0118] It can be seen that the prediction error of renewable energy is taken into account in the constraint of equation (11). In a power system containing a large amount of renewable energy, such as wind power and photovoltaic power, the output of these energy sources is highly dependent on climate conditions, so their prediction errors are regarded as important random variables. Although the introduction of this randomness increases the complexity of the model solution, it is crucial for accurately evaluating the performance of the system under different conditions.
[0119] Considering that the capacity market is a forward market, its accuracy requirements are relatively low compared to real-time scheduling. Therefore, in this embodiment, equation (11) is relaxed to the opportunity constraint shown in equation (16), that is, the constraint may not be satisfied in some extreme cases, but the probability of occurrence of such extreme cases should be less than a certain confidence level, that is, it is converted into an opportunity constraint model. Although the introduction of such an opportunity constraint may slow down the solution speed, it can effectively increase the robustness of the model in the face of uncertainty.
[0120] Pr(G+∑R e,j,k,t +δ-L j,t +ΔL j,k,t =0)≥π (16)
[0121] Inspired by the solution process of the random simulation method, we can perform N random variables according to their distribution law. sa The sampling value of the sa-th sampling is recorded as δ sa When the sampling number is large enough, the chance constraint can be replaced by the following mixed integer linear constraint.
[0122]
[0123] Where M is a sufficiently large positive number; d t (sa) is a variable of 0 or 1. tWhen (sa) = 1, equation (17) holds. t It does not hold when (sa) = 0. From the constraints of formula (18), we can see that for all N sa Group sampling value, formula (18) holds for at least N sa This is equivalent to constraint condition (16).
[0124] At the same time, the operating constraints of energy storage should also be met, mainly including charging, discharging constraints and state of charge constraints, which will not be explained in detail here.
[0125] (2) Reliability calculation:
[0126]
[0127] Among them, K is the total number of sampling times; N T is the simulation time, Represents the probability weight of the kth sampling at time t.
[0128] Therefore, the model can be decomposed into two sub-problems, and the optimal solution can be obtained by alternating iterations, namely, sub-problem 1 consisting of equations (1) to (9) and sub-problem 2 consisting of equations (10) to (20).
[0129] Therefore, for a given IRM value IRM*, sub-problem 1 is to find the optimal clearing capacity. By solving the above sub-problem 1, the optimal clearing capacity P can be obtained. i,j * and G m,j * Then, sub-problem 2 is based on the optimal solution of sub-problem 1 (i.e., P i,j * and G m,j * ) to calculate the reliability index of the system. That is, substitute the optimal solution of subproblem 1 into constraint equations (11) to (13) to obtain the optimal solution of subproblem 2 ΔC k,t * , and further calculate the reliability index LOLE at this time through equations (21) and (22) * .
[0130] Therefore, the upper and lower layers of the above model are connected through the variable IRM. Figure 2 As shown in the figure, according to the model principle diagram, solving the model is to find an optimal IRM value so as to achieve economic optimality while satisfying system reliability.
[0131] S2. Use the dichotomy method to adjust the system reserve margin
[0132] In order to optimize economic efficiency while ensuring the reliability of the power system, the present invention adopts a dichotomy method to adjust the system reserve margin (IRM). This method allows the system to minimize costs while meeting predetermined reliability standards. By systematically adjusting the upper and lower limits of the IRM, the optimal balance between economy and reliability can be accurately found.
[0133] like Figure 3 As shown, first, the upper limit UB and the lower limit LB of the IRM value are set so that IRM is equal to the middle value of UB and LB, and then the reliability index LOLE is calculated according to the above decomposition algorithm.
[0134] If LOLE can reach the set index value, then the value of UB will be reduced, that is, IRM will be reduced, so that less capacity can be cleared while meeting the system reliability index, thereby reducing costs; otherwise, the value of LB will be increased to meet the system reliability.
[0135] Continue to iterate until the difference between UB and LB is less than the given precision ∈. The value at this time is the optimal clearing capacity under the premise of meeting the system reliability index, that is, the minimum capacity cost.
[0136] In this embodiment, the final IRM value will be used for system operation to ensure the long-term stability and economic efficiency of the power market. This precise IRM adjustment method not only improves the economic efficiency of the power system, but also enhances its adaptability to future uncertainties, especially in the context of large-scale access to new energy resources. Through this strategy, cost and reliability can be effectively balanced and the overall performance of the power system can be optimized.
[0137] S3. Use the optimization model output to optimize the clearing mechanism
[0138] After completing the binary adjustment of the system reserve margin, the next step is to use the output of the two-level optimization model to optimize the market clearing mechanism. The optimal IRM value and other model parameters calculated previously are directly applied to ensure that the power market is not only economically efficient but also meets reliability requirements. The optimized clearing mechanism will determine which generators and energy storage devices should be activated and their respective operating levels to meet the predetermined power demand.
[0139] In this example, all the output data of the model are first integrated, including the optimal generation and storage configuration in each power partition. Based on this data, the system will calculate the specific scheduling plan for each device, including the start-up time, operating level, and expected operating time. This process not only relies on the principle of cost minimization, but also includes strict requirements for system reliability.
[0140] The optimization of the clearing mechanism also involves the adjustment of market prices. Based on the optimization results, market operators can adjust electricity prices to reflect the market supply and demand status, operating costs, and risks related to system reliability. Such price adjustments help motivate investors and operators to optimize their equipment configuration and operating strategies, thereby further improving the overall efficiency and reliability of the market.
[0141] Example:
[0142] This example uses an improved version of the IEEE RTS-24 node system for case analysis. The simulated power system includes 17 nodes, all of which have capacity requirements, such as Figure 4 As shown. The capacity resources in the system include coal-fired power, hydropower, wind power and solar power generation, and their original single-unit capacity is 280, 300, 850 and 950 MW respectively. At the same time, the credible capacity conversion coefficient of wind power and solar power generation is approximately 0.3. Assuming that the owner of each capacity resource basically simulates its bidding behavior according to the rule of "average fixed cost plus up and down fluctuations", the spot market continues to adopt the centralized clearing model based on node electricity prices mentioned earlier, and assumes that market participants quote based on their variable costs. It is assumed that the cost of coal-fired power generation is approximately 0.45 yuan / (kilowatt-hour), and the cost of other types of clean energy generation is approximately zero.
[0143] In order to clearly show the impact of structural constraints and whether the spot market operation is included in the capacity market clearing on the clearing results, market results were calculated considering the spot market operation, the capacity market operation alone, and the presence or absence of energy structure constraints. The results are shown in Table 1.
[0144] Table 1 Capacity market operation results under differentiated scenario configurations
[0145]
[0146] It can be observed from Table 1 that, under the condition of energy structure constraints, the total cost of independent operation of the capacity market (US$181.9 million) exceeds the total cost of taking spot market operation into consideration (US$181.7 million). When the spot market operation is taken into account, compared with not setting energy structure constraints, the operation cost of adding energy structure constraints will increase from US$171.6 million to US$181.7 million, that is, the addition of structural constraints will increase the total cost of market operation by US$10.1 million. This is mainly because there is a difference in construction cost between clean energy and traditional energy. In order to meet the embedded capacity structure constraints, some units with low economic efficiency must be started, which will lead to an increase in total cost, that is, a decrease in economic efficiency. Based on the simulation results, the following preliminary conclusions can be drawn: ① After considering the operation of the spot market, the capacity market can reduce costs to a certain extent; ② Adding energy structure constraints may lead to an increase in market operation costs. Under the current cost environment, the operation cost after setting constraints is higher than that without structural constraints.
[0147] In order to more intuitively demonstrate the impact of taking spot electricity trading factors into consideration on the results of capacity market operation, the spot market operation and the independent capacity market operation are simulated under the same energy structure constraints. The simulation results are shown in Figure 5 middle.
[0148] The observation results show that when the spot market operation is taken into account, the winning capacity of unit No. 8 is about 80 MW, which is about 94% lower than the winning capacity when the capacity market operates alone, and its construction cost is also reduced from 840,000 US dollars to 48,000 US dollars; while the winning capacity of unit No. 25 in the two cases is 480 MW and 510 MW, respectively, and the corresponding construction costs are 290,000 US dollars and 300,000 US dollars. The reason for the change in the winning capacity is that unit No. 8 is a solar power generation equipment with high fixed costs and near-zero operating costs, while unit No. 25 is a coal-fired power generation equipment with relatively low fixed costs and high operating costs. After considering the centralized clearing of the spot market operation, a new set of installed capacity combinations will be formed. In this example, this is manifested as reducing the installed capacity of coal-fired power units and increasing the installed capacity of solar power generation equipment. This result shows that incorporating spot electricity energy trading factors into the capacity market can more effectively reflect the capacity value of clean energy equipment and highlight the external economic value of clean energy in promoting the transformation of energy structure, such as clean and low-carbon.
[0149] The optimization device for the capacity market clearing mechanism in the new energy power system described below and the optimization method for the capacity market clearing mechanism in the new energy power system described above can be referenced to each other.
[0150] Please refer to the attached Figure 6The present invention also provides an optimization device for a capacity market clearing mechanism in a new energy power system, comprising:
[0151] The data acquisition module 100 is used to obtain the operation data and market parameters of the power system;
[0152] An optimization calculation module 200 for performing calculations of a two-tier optimization model, including capacity market clearing and system reliability assessment;
[0153] Control module 300, used to adjust system operating parameters according to the optimization calculation results to achieve market clearing and reliability control;
[0154] The display module 400 is used to display the optimization results and system status.
[0155] The device of this embodiment can be used to execute the above method embodiment, and its principles and technical effects are similar, which will not be repeated here.
[0156] Please see attached Figure 7 The present invention further provides a computer device 40, comprising: a processor 41 and a memory 42, wherein the memory 42 stores a computer program executable by the processor, and when the computer program is executed by the processor, the above method is executed.
[0157] The present invention further provides a storage medium 43 on which a computer program is stored. When the computer program is run by the processor 41, the above method is executed.
[0158] Among them, the storage medium 43 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable red-only memory (PROM), read-only memory (ROM), magnetic storage, flash memory, disk or optical disk.
[0159] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for optimizing the capacity market clearing mechanism in a new energy power system, characterized in that: The following steps are involved: A two-layer optimization model is constructed, in which the upper layer model aims to minimize the system procurement capacity cost, and the lower layer model uses the non-sequential Monte Carlo method to evaluate system reliability; In the upper model, the objective function is defined to minimize the system procurement capacity cost as follows: Among them, N Z Indicates the total number of power partitions in the system, a i,j represents the price of the i-th traditional generator set in the j-th zone, a m,j represents the price of the mth energy storage power station in the jth zone, G i,j and P m,j Respectively represent the available capacity reported by the i-th traditional generator set and the m-th energy storage power station in the j-th zone, θ j and γ j They represent the set of traditional generators and energy storage power stations in the jth zone respectively; The dichotomy method is used to adjust the system reserve margin value to find the solution that achieves the best economy while meeting system reliability. Utilize the optimization model output to optimize the clearing mechanism.
2. The optimization method of the capacity market clearing mechanism in the new energy power system according to claim 1 is characterized in that: The method also includes constraining conditions in a two-layer optimization model, and the specific steps include: Implement capacity constraints on traditional generators and energy storage plants, where the effective capacity of traditional generators is calculated by taking into account the unavailability rate, and the effective capacity of energy storage plants is determined by calculating their maximum charging and discharging capabilities within a set operating time; Set capacity balancing constraints to ensure that at any given moment, the total generation capacity of the system plus the credible capacity of renewable energy and the transmission power of the tie lines meets or exceeds the maximum system load of the delivery year plus a certain system reserve margin; The load loss expectation is set as the reliability index to evaluate the load loss probability of the system under the predetermined backup margin.
3. The optimization method of the capacity market clearing mechanism in the new energy power system according to claim 2 is characterized in that: The capacity constraint of the traditional generator set is expressed by the following formula: in, Represents the effective capacity of the traditional generator set, G′ i,j is the rated capacity of the traditional generator set, FOR i,j is the unavailability rate of traditional generator sets; The capacity constraint of the energy storage power station is expressed by the following formula: Among them, CF m is the effective capacity coefficient of the energy storage power station, It represents the effective capacity of the energy storage power station. ESP and ECP are the discharge and charge of the energy storage power station during peak hours. When the charge is not less than the discharge, the effective capacity is zero. P′ m is the installed capacity of the energy storage power station, NHP is the duration of the system load peak period, FOR m,j is the unavailability rate of the energy storage power station.
4. The optimization method of the capacity market clearing mechanism in the new energy power system according to claim 2 is characterized in that: The capacity balance constraint is expressed by the following formula: in, is the maximum system load in the delivery year, IRM is the system reserve margin, y l is the transmission power of the lth tie line, is the power limit of the lth transmission line, R j is the credible capacity of the new energy in the jth zone, EX j is the set of contact lines in the jth zone.
5. The method for optimizing the capacity market clearing mechanism in a new energy power system according to claim 1, characterized in that: The steps of using the non-sequential Monte Carlo method to evaluate system reliability include: In the non-sequential Monte Carlo simulation, the load loss of the system at different time points is estimated, and the load loss of the system at time t during the kth sampling is calculated using the following model: 0≤ΔL j,k,t ≤L j,t Where, ΔC k,t Indicates the amount of load loss of the system at time t during the kth sampling, ΔL j,k,t represents the load loss in the jth zone at time t, δ is the new energy prediction error, and v i is the set of new energy stations in the jth zone, R e,j,k,t is the output of the e-th renewable energy station at time t during the k-th sampling, L j,t is the load of the jth zone at time t, G i,j,k,t is the output of the winning unit in the jth zone at time t during the kth sampling, y l,k,t is the exchange power of the lth tie line at the kth sampling time, G i,j,k,t is the minimum output of the unit, and are the discharge and charging power of the mth winning energy storage power station at the kth sampling time t, respectively, i,j,k,t and x l,k,t are the states of the group and line at the kth sampling time, represented by 0 and 1 variables; The Monte Carlo method is used to evaluate the system's load loss expectation. The specific calculation is as follows: Among them, K is the total number of samples, N T is the simulation time, represents the probability weight of the kth sampling at time t; According to the simulation results, the system's reserve margin and related operating parameters are adjusted and optimized.
6. The method for optimizing the capacity market clearing mechanism in a new energy power system according to claim 1, characterized in that: The method also includes using a chance constraint model to handle the introduction of random variables to ensure that the system reliability is within a predetermined confidence level. The specific steps include: Evaluate the impact of prediction errors caused by random variables on system operation, where the prediction errors involve the output uncertainty of new energy sources; Define the chance constraint model to ensure that the probability that the system load meets the conditions is greater than or equal to the set confidence level π through the following chance constraints: Pr(G+∑R e,j,k,t +δ-L j,t +ΔL j,,k,t =0)≥π Among them, G represents the total power generation, R e,j,k,t represents the output of the e-th renewable energy station at time t during the k-th sampling, δ represents the prediction error, and L j,t represents the load demand of the jth zone at time t, ΔL j,k,t It represents the load loss of the jth zone at time t under given conditions; Use random simulation methods to sample a sufficient number of random variables, calculate the output of each sample and verify whether the chance constraints are met; Adjust system parameters or reserve margin according to the sampling results to ensure that the system reliability is within the acceptable risk range and achieves the optimal state of economic operation.
7. The method for optimizing the capacity market clearing mechanism in a new energy power system according to claim 6, characterized in that: The steps of sampling a sufficient number of random variables using a random simulation method, calculating the output of each sampling and verifying whether the chance constraint condition is satisfied include: Generate a sufficient number of random samples of the prediction error δ, each sample representing a possible state of the system; For each random sample, the load satisfaction of the system in this state is calculated. The specific expression is as follows: Among them, G represents the total power generation, R e,j,k,t represents the output of the new energy station at time t, δ sa is the prediction error of random sampling, L j,t is the regional load, ΔL j,k,t is the load loss, M is a large number, d t (sa) is a binary variable indicating whether the sample meets the loading; Count the number of samples that meet the chance constraint condition and ensure that the ratio of the number of samples to the total number of samples is greater than or equal to the preset confidence level π; If the probability of meeting the condition is lower than π, adjust the system reserve margin or other relevant parameters, and repeat the above steps until the preset confidence level is reached or exceeded.
8. The method for optimizing the capacity market clearing mechanism in a new energy power system according to claim 1, characterized in that: The step of applying the dichotomy method to adjust the system reserve margin value comprises: Set initial upper and lower limits for reserve margin; Calculate the median value of the current reserve margin as the reserve margin parameter for system model input; Run a two-level optimization model using the median reserve margin to solve the market clearing problem and evaluate the system reliability at this reserve margin value, as assessed by load loss expectancy; Based on the evaluation results, check whether the predetermined system reliability standards are met: If the current expected value of load loss is less than or equal to the set standard, the reserve margin value can be reduced, and the upper limit of the reserve margin is adjusted to the current median value; If the current expected value of load loss is greater than the set standard, the reserve margin value needs to be increased, and the lower limit of the reserve margin is adjusted to the current median value; Repeat the steps until the difference between the upper limit and the lower limit of the reserve margin is less than the preset accuracy threshold, which is the reserve margin value that meets the reliability requirements and is economically optimal.
9. An optimization device for a capacity market clearing mechanism in a new energy power system, used to implement the method according to any one of claims 1 to 8, characterized in that: include: Data acquisition module, used to obtain the operation data and market parameters of the power system; The optimization calculation module is used to perform calculations of the two-level optimization model, including capacity market clearing and system reliability assessment; The control module is used to adjust the system operating parameters according to the optimization calculation results to achieve market clearing and reliability control; Display module, used to show optimization results and system status.
10. A storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 8 is implemented.