Collaborative optimization scheduling method for multiple energy storage devices
By obtaining the economic cost data of energy storage equipment and optimizing the scheduling strategy using genetic algorithms, the complexity of coordinated scheduling of energy storage equipment in the power system is solved, and the total operating cost optimization and stability improvement of the system is achieved.
Patent Information
- Application Number
- CN202411210346.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-06
AI Technical Summary
With the increase in the penetration rate of renewable energy, efficient utilization and cost control of energy storage equipment in power systems have become challenges. Traditional power scheduling methods are difficult to adapt to the complex supply and demand balance and mutual influence between equipment. The collaborative optimization and scheduling of multiple energy storage equipment is complex. And multi-purpose.
A collaborative optimization scheduling method for multi-energy storage equipment is proposed. By obtaining the economic cost data of the equipment, building a collaborative optimization model and using genetic algorithms to establish a scheduling strategy, optimizing the total economic cost, and considering factors such as energy imbalance punishment cost and battery life.
The total operating cost of the system is optimized, taking into account the energy imbalance penalty cost and battery life, thereby improving the stability and economics of the system.
Smart Images

Figure CN119093420A_ABST
Abstract
Description
Background Art
[0002] With the rapid development of renewable energy, the proportion of clean energy such as wind energy and solar energy in the power system continues to increase. However, these renewable energy sources are characterized by randomness and intermittency, which poses new challenges to the stable operation of the power system. In order to cope with this problem, various types of energy storage devices (such as battery energy storage systems, superconducting energy storage systems, compressed air energy storage systems, etc.) have gradually been applied to the power system to balance supply and demand, reduce peak loads and fill valleys, and improve the frequency regulation capability of the system.
[0003] The coordinated optimization scheduling of multiple energy storage devices refers to the use of the characteristics of multiple energy storage devices in the power system, through reasonable scheduling strategies, to achieve the optimal allocation of energy in time and space to ensure the stability and economy of the system. The stability of the power system depends on the real-time balance of supply and demand. With the increase in the penetration rate of renewable energy, the uncertainty and volatility of the load in the system have increased significantly, and the traditional power scheduling method has been difficult to adapt to this complex situation. The introduction of energy storage technology provides new ideas for solving these problems, but the efficient utilization and cost control of energy storage equipment are still key issues that need to be solved. In addition, the scheduling of energy storage equipment also needs to consider multiple factors such as its charging and discharging efficiency, service life, mutual influence between equipment, and price fluctuations in the electricity market. This makes the coordinated optimization scheduling problem of multiple energy storage devices a complex multi-objective optimization problem. Summary of the invention
[0004] The main purpose of the present invention is to provide a method for collaborative optimization scheduling of multiple energy storage devices to effectively solve the above-mentioned problems mentioned in the background technology.
[0005] The technical solution of the present invention is as follows:
[0006] A multi-energy storage equipment collaborative optimization scheduling method is proposed, which includes the following steps:
[0007] S1. Obtaining economic cost data of all energy storage devices in the energy storage system, wherein the economic cost data includes equipment energy conversion cost, equipment maintenance cost, and energy imbalance penalty cost;
[0008] S2. Taking minimizing the total economic cost of all energy storage equipment as the optimization goal, construct a collaborative optimization model and set constraints;
[0009] S3. Establish a collaborative optimization scheduling strategy based on genetic algorithm and output the optimal scheduling strategy.
[0010] A further improvement of the present invention is that the specific content of S1 is: presetting the amount of time for collecting historical economic cost data, the amount of time includes the total amount of time T and the time step t, and obtaining a single time step t i Energy conversion cost of the equipment within Ct , Equipment maintenance cost C m , Energy imbalance penalty cost C b And build a mapping relationship and output C t (t i ), C m (t i ), C b (t i ).
[0011] A further improvement of the present invention is that the specific formula of the collaborative optimization model in S2 is:
[0012]
[0013] Among them, C is the total economic cost, and n is the total time step within the total time T.
[0014] A further improvement of the present invention is that the specific contents of the constraint conditions in S2 are: within a single time step, the total output power of all energy storage devices is numerically equal to the difference between the load demand and the power generation power of the energy storage system; the output power of a single energy storage device must be no less than the minimum charging power of the device and no more than the maximum discharge power of the device; the energy state of a single energy storage device must be no less than the minimum energy capacity allowed by the device during operation and no more than the maximum energy that the device can store.
[0015] A further improvement of the present invention is that S2 further includes: when the energy storage system is a battery energy storage system, constraining the battery life, the specific content of the constrained battery life is: time step t i+1 With t i The battery energy change is the product of the battery charge and discharge efficiency, the battery power and the time interval.
[0016] A further improvement of the present invention is that S3 comprises the following specific steps:
[0017] S31, initializing parameters, wherein the parameters include population size, preset crossover rate, adaptive mutation rate, current number of iterations, maximum number of iterations and convergence condition;
[0018] S32. Based on the constraint condition, randomly generate a population of size N, where the population includes N individuals, and each individual is a solution of the collaborative optimization model, that is, a scheduling strategy;
[0019] S33. According to the preset crossover rate and adaptive mutation rate, crossover and mutation operations are performed on the individuals in the population to generate a descendant population. At the end of each iteration, it is determined whether the current population meets the convergence condition. If so, the iteration is stopped and the optimal solution is output; otherwise, the iteration is continued to the maximum number of iterations and the optimal solution is output.
[0020] The technical effects of the present invention are as follows:
[0021] A collaborative optimization scheduling method for multiple energy storage devices is constructed. The present invention obtains the economic cost data of all energy storage devices in the energy storage system, including the equipment energy conversion cost, equipment maintenance cost, and energy imbalance penalty cost; takes minimizing the total economic cost of all energy storage devices as the optimization goal, constructs a collaborative optimization model and sets constraints; establishes a collaborative optimization scheduling strategy based on a genetic algorithm, and outputs the optimal scheduling strategy. Comprehensively considers factors such as energy imbalance penalty cost and battery life, thereby optimizing the total operating cost of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0023] Figure 1 A schematic diagram of a flow chart of a method for collaborative optimization and scheduling of multiple energy storage devices according to the present invention. DETAILED DESCRIPTION
[0024] The present invention aims to propose a method for collaborative optimization scheduling of multiple energy storage devices, by obtaining the economic cost data of all energy storage devices in the energy storage system, the economic cost data including equipment energy conversion cost, equipment maintenance cost, and energy imbalance penalty cost; taking minimizing the total economic cost of all energy storage devices as the optimization goal, constructing a collaborative optimization model and setting constraints; establishing a collaborative optimization scheduling strategy based on a genetic algorithm, and outputting the optimal scheduling strategy. Comprehensively considering factors such as energy imbalance penalty cost and battery life, thereby optimizing the total operating cost of the system.
[0025] Embodiment 1:
[0026] This embodiment proposes a method for coordinated optimization and scheduling of multiple energy storage devices, such as Figure 1 As shown, the specific steps include:
[0027] S1. Obtaining economic cost data of all energy storage devices in the energy storage system, wherein the economic cost data includes equipment energy conversion cost, equipment maintenance cost, and energy imbalance penalty cost;
[0028] S2. Taking minimizing the total economic cost of all energy storage equipment as the optimization goal, construct a collaborative optimization model and set constraints;
[0029] S3. Establish a collaborative optimization scheduling strategy based on genetic algorithm and output the optimal scheduling strategy.
[0030] In this embodiment, the equipment energy conversion cost refers to the cost incurred by the energy storage device during the charging or discharging process. The energy conversion cost is usually related to the energy conversion efficiency of the equipment. The lower the efficiency, the higher the conversion cost. These costs reflect the resources consumed by the equipment during the energy conversion process, such as the loss of electrical energy or the loss of thermal energy. The equipment maintenance cost refers to the cost incurred when the equipment needs to be maintained during operation. The maintenance cost may include regular inspections, replacement of parts, repair costs, etc. These costs are usually related to the intensity and frequency of use of the equipment. The more frequently it is used, the higher the maintenance cost may be. The energy imbalance penalty cost refers to the energy imbalance penalty cost generated when the energy supply and demand in the system do not match. This cost is usually used to constrain the imbalance of energy supply and demand in the system, to ensure that the energy storage system can effectively balance the supply and demand of electricity and maintain system stability.
[0031] In this embodiment, the specific content of S1 is: preset the amount of time for collecting historical economic cost data, the amount of time includes the total time T and the time step t, and obtain a single time step t respectively. i Energy conversion cost of the equipment within C t , Equipment maintenance cost C m , Energy imbalance penalty cost C b And build a mapping relationship and output C t (t i ), C m (t i ), C b (t i ).
[0032] In order to accurately collect these economic cost data, a historical data collection period is preset, including the total time and time step. In each time step, the energy conversion cost, equipment maintenance cost and energy imbalance penalty cost of the equipment are collected respectively. After these data are collected, the corresponding mapping relationship will be established, and the cost value of each time step will be output to provide data support for subsequent optimization scheduling.
[0033] In this embodiment, the specific formula of the collaborative optimization model in S2 is:
[0034]
[0035] Among them, C is the total economic cost, and n is the total time step within the total time T.
[0036] In this embodiment, the specific contents of the constraint conditions in S2 are: within a single time step, the total output power of all energy storage devices is numerically equal to the difference between the load demand and the power generation power of the energy storage system; the output power of a single energy storage device must be no less than the minimum charging power of the device and no more than the maximum discharge power of the device; the energy state of a single energy storage device must be no less than the minimum energy capacity allowed by the device during operation and no more than the maximum energy that the device can store.
[0037] In this embodiment, S2 further includes: when the energy storage system is a battery energy storage system, constraining the battery life, the specific content of the constraining the battery life is: time step t i+1 With t i The battery energy change is the product of the battery charge and discharge efficiency, the battery power and the time interval.
[0038] In this embodiment, S3 includes the following specific steps:
[0039] S31, initialization parameters, the parameters include population size, preset crossover rate, adaptive mutation rate, current number of iterations, maximum number of iterations and convergence conditions, these parameters determine the initial configuration of the algorithm and the behavior of the evolution process;
[0040] S32. Based on the constraint condition, randomly generate a population of size N, where the population includes N individuals, and each individual is a solution of the collaborative optimization model, that is, a scheduling strategy;
[0041] S33. According to the preset crossover rate and adaptive mutation rate, crossover and mutation operations are performed on the individuals in the population to generate a descendant population. At the end of each iteration, it is determined whether the current population meets the convergence condition. If so, the iteration is stopped and the optimal solution is output; otherwise, the iteration is continued to the maximum number of iterations and the optimal solution is output.
[0042] The crossover operation simulates the exchange of genetic information in nature, while the mutation operation introduces randomness to maintain population diversity and prevent falling into a local optimal solution. At the end of each iteration, it is determined whether the current population meets the convergence condition. If the condition is met, the algorithm stops and outputs the optimal solution. If not, the algorithm continues to iterate until the maximum number of iterations is reached, and finally outputs the current optimal solution.
[0043] Embodiment 2:
[0044] This embodiment provides an electronic device, including: a processor and a memory, wherein the memory stores a computer program that can be called by the processor; the processor executes the above-mentioned method for collaborative optimization scheduling of multiple energy storage devices by calling the computer program stored in the memory.
[0045] The electronic device may have relatively large differences due to different configurations or performances, and may include one or more processors (Central Processing Units, CPU) and one or more memories, wherein at least one computer program is stored in the memory, and the computer program is loaded and executed by the processor to implement a multi-energy storage device collaborative optimization scheduling method provided by the above method embodiment. The electronic device may also include other components for implementing device functions, for example, the electronic device may also have components such as a wired or wireless network interface and an input and output interface to input and output data. This embodiment will not be described in detail here.
[0046] Those skilled in the art know that the present invention can be implemented as a system, method or computer program product. Therefore, the present disclosure can be specifically implemented in the following forms, namely: it can be complete hardware, it can be complete software (including firmware, resident software, microcode, etc.), and it can also be a combination of hardware and software, which is generally referred to as "circuit", "module" or "system" herein. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable medium contains computer-readable program code.
[0047] Any combination of one or more computer-readable media may be used. A computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this document, a computer-readable storage medium may be any tangible medium containing or storing a program that may be used by or in conjunction with an instruction execution system, apparatus, or device.
[0048] The present invention is described with reference to flowcharts and block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process or block in the flowchart and block diagram, as well as the combination of processes and blocks in the flowchart or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowcharts. Figure 1 Process or multiple processes and boxes Figure 1A device that provides the functions specified in a block or multiple blocks.
[0049] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 Process or multiple processes and boxes Figure 1 The steps for the functions specified in one or more boxes.
[0050] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the enlightenment of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the protection of the present invention.
Claims
1. A method for collaborative optimization and scheduling of multiple energy storage devices, characterized in that: The specific steps include: S1. Obtaining economic cost data of all energy storage devices in the energy storage system, wherein the economic cost data includes equipment energy conversion cost, equipment maintenance cost, and energy imbalance penalty cost; S2. Taking minimizing the total economic cost of all energy storage equipment as the optimization goal, construct a collaborative optimization model and set constraints; S3. Establish a collaborative optimization scheduling strategy based on genetic algorithm and output the optimal scheduling strategy.
2. A method for collaborative optimization and scheduling of multiple energy storage devices according to claim 1, characterized in that: The specific content of S1 is: preset the time amount for collecting historical economic cost data, the time amount includes the total time T and the time step t, and obtain a single time step t respectively. i Energy conversion cost of the equipment within C t , Equipment maintenance cost C m , Energy imbalance penalty cost C b And build a mapping relationship and output C t (t i ), C m (t i ), C b (t i ).
3. A method for collaborative optimization and scheduling of multiple energy storage devices according to claim 2, characterized in that: The specific formula of the collaborative optimization model in S2 is: Among them, C is the total economic cost, and n is the total time step within the total time T.
4. A method for coordinated optimization and scheduling of multiple energy storage devices according to claim 3, characterized in that: The specific contents of the constraints in S2 are: within a single time step, the total output power of all energy storage devices is numerically equal to the difference between the load demand and the power generation power of the energy storage system; the output power of a single energy storage device must be no less than the minimum charging power of the device and no more than the maximum discharge power of the device; the energy state of a single energy storage device must be no less than the minimum energy capacity allowed by the device during operation and no more than the maximum energy that the device can store.
5. A method for collaborative optimization and scheduling of multiple energy storage devices according to claim 4, characterized in that: The S2 also includes: when the energy storage system is a battery energy storage system, constraining the battery life, the specific content of the constrained battery life is: time step t i+1 With t i The battery energy change is the product of the battery charge and discharge efficiency, the battery power and the time interval.
6. A method for collaborative optimization and scheduling of multiple energy storage devices according to claim 5, characterized in that: The S3 includes the following specific steps: S31, initializing parameters, wherein the parameters include population size, preset crossover rate, adaptive mutation rate, current number of iterations, maximum number of iterations and convergence condition; S32. Based on the constraint condition, randomly generate a population of size N, where the population includes N individuals, and each individual is a solution of the collaborative optimization model, that is, a scheduling strategy; S33, performing crossover and mutation operations on the individuals in the population according to a preset crossover rate and adaptive mutation rate to generate a progeny population, and at the end of each iteration, determining whether the current population meets the convergence condition, and if so, stopping the iteration and outputting the optimal solution; Otherwise, continue iterating until the maximum number of iterations and output the optimal solution.
Citation Information
Cited By
Collaborative optimization method and device considering flexible interconnection device and energy storage, and medium
CN121055318A