Novel intelligent weak current engineering detection device

By designing structures such as feeding racks and arc-shaped inflatable racks, the problems of inaccurate and unstable equipment detection in existing weak-current engineering detection devices are solved, and accurate and stable detection operations and efficient switching are achieved, meeting daily use needs.

CN119104819AInactive Publication Date: 2024-12-10XUZHOU XINCHUANGTONG IOT TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411371208.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2024-12-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to structural limitations of existing weak current engineering testing devices, the equipment needs to be loaded and unloaded manually during inspection, and the position offset is inaccurate, resulting in inaccurate detection, unable to achieve efficient and stable continuous intelligent detection, and cannot perform accurate tightening operations. Unable to meet daily usage requirements.

Method used

An intelligent weak current engineering detection device including a loading rack, a first material seat, a second material seat, a limit strip, a curved inflatable rack and other components is designed, through a sliding base, a limit slider, a damping groove, The arc-shaped inflatable frame and other structures realize the precise docking and switching of loading and unloading operations of the equipment, and improve detection efficiency and stability through electric push rods and inflatable pump machines.

Benefits of technology

It realizes accurate and stable docking of the equipment during inspection and efficient switching of loading and unloading operations, improves the continuity and accuracy of inspection, enhances the use effect and overall stability of the equipment, and meets daily use needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119104819A_ABST
    Figure CN119104819A_ABST
Patent Text Reader

Abstract

The invention discloses a novel intelligent weak current engineering detection device, and relates to the technical field of weak current engineering detection, and the technical scheme is characterized in that the novel intelligent weak current engineering detection device comprises a feeding frame, the center of the surface of the feeding frame is movably connected with a first material seat, the back of the first material seat is fixedly connected with a second material seat, and the first material seat and the second material seat are the same in structure; a limiting straight strip is arranged on the inner wall of the feeding frame, positioning arc frames are fixedly connected to the two ends of the limiting straight strip, and a limiting arc strip is arranged in the center of the limiting straight strip. By means of the feeding frame, the first material base, the second material base, the limiting straight strip, the positioning arc frame, the limiting arc strip, the side limiting sliding groove, the first rail frame and the second rail frame, when intelligent weak current engineering detection is conducted on equipment, more accurate and stable butt-joint feeding and discharging operation can be conducted on weak-point equipment, and in the actual using process, the labor intensity of workers is lowered, and the working efficiency is improved. A worker firstly puts weak current equipment needing to be detected into the first material base.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of weak current engineering detection, and more specifically, to a novel intelligent weak current engineering detection device. Background Art

[0002] Weak current engineering is a classification of power application. Power application can be divided into strong current and weak current according to the strength of power transmission. It mainly provides electric energy to people and converts electric energy into other energy, such as air conditioning, lighting, power, etc. When realizing the functional integration of various systems, the integration mode is selected, the network communication protocol is determined, the corresponding hardware equipment is used to physically connect the systems together, and an interoperable network operating system is installed. The final work is to develop the corresponding application software, connect the systems logically together, and provide a unified human-computer operation interface for the entire integrated system. This is software interface integration. In short, system integration is a highly technical system engineering. To truly integrate a building's weak current system, it requires not only weak current engineers to understand the functions and technical parameters of each weak current system product, but also to understand the functions and technical parameters of each weak current system product. In addition to having a deep grasp of numbers, construction, installation, and debugging, they also need to have a comprehensive understanding of the building's water supply and drainage system, power supply and distribution system, ventilation and air-conditioning system, lighting system, elevator system, etc. At the same time, since the building's weak-current system involves communications, computers, control, and display and other modern high-tech technologies with high technical content and very fast updating and development, the specific implementation of system integration requires the support and cooperation of professional and technical personnel from all aspects in solving many highly technical details. People are accustomed to calling weak-current technology weak-current technology. It can be seen that the basic meaning of intelligent building weak-current technology is still the original weak-current technology, but with the rapid development of modern weak-current high-tech, the weak-current technology in intelligent buildings is being used more and more widely, and the degree of application of weak-current technology determines the degree of intelligence of intelligent buildings.

[0003] For example, the patent document with the announcement number CN 115184708 A discloses a device for intelligent detection of weak current engineering. It includes a detection platform, a loading tray and a supporting side frame fixedly installed on the detection platform, an electromagnetic interference source is located on a hanger movably installed on the supporting side frame, and a vibration detection component is located in the middle of the upper plate of the supporting side frame, and the vibration amplitude of the weak current engineering equipment is detected by the vibration detection component. The device for intelligent detection of weak current engineering provided by the present invention places the video player, music player, electric meter and other equipment in the weak current engineering to be detected on the loading tray, turns on the electromagnetic interference source to perform anti-interference detection on the weak current engineering equipment, and observes whether the equipment cannot work or works abnormally, is seriously damaged, etc., so as to determine whether the anti-interference of the weak current engineering equipment is qualified.

[0004] However, due to the limitation of its own structure, this structure can only perform manual loading and unloading operations on weak-current equipment, which makes it inconvenient for the equipment to detect weak-current equipment. There are also technical problems such as inaccurate detection due to inaccurate position offset, and it is impossible to achieve more efficient, stable, continuous and intelligent weak-current engineering detection operations. At the same time, it is impossible to perform more accurate and stable positioning and fixing detection operations on weak-current equipment during detection. Subsequent weak-current engineering detection may also have error problems due to the instability of the equipment. In addition, the equipment is unable to perform accurate tightening operations on the equipment at the detection position, and cannot meet daily usage needs.

[0005] Therefore, in order to solve the above technical problems, the present application proposes a new type of intelligent weak current engineering detection device. Summary of the invention

[0006] Due to the limitation of its own structure, the existing structure can only perform manual loading and unloading operations of weak-current equipment, which makes it inconvenient for the equipment to detect weak-current equipment. There are also technical problems such as inaccurate detection due to inaccurate position offset, and it is impossible to achieve more efficient, stable, continuous and intelligent weak-current engineering detection operations. At the same time, it is impossible to perform more accurate and stable positioning and fixing detection operations when detecting weak-current equipment. Subsequent weak-current engineering detection may also have error problems due to the instability of the equipment. In addition, the equipment is unable to perform accurate fastening operations on the equipment at the detection position, and cannot meet daily use needs. In view of the shortcomings of the prior art, the purpose of the present invention is to provide a novel intelligent weak-current engineering detection device.

[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: comprising a loading rack, wherein a first material seat is movably connected to the center of the surface of the loading rack, a second material seat is fixedly connected to the back of the first material seat, the first material seat and the second material seat have the same structure, a limiting straight bar is arranged on the inner wall of the loading rack, both ends of the limiting straight bar are fixedly connected to positioning arc frames, a limiting arc bar is arranged in the center of the limiting straight bar, and side limiting sliding grooves are provided in the centers of the limiting straight bar and the limiting arc bar, a first rail frame is fixedly connected to one side of the loading rack, and a second rail frame is fixedly connected to the other side of the loading rack;

[0008] An arc-shaped inflatable frame, wherein both sides of the center of the surface of the loading frame are fixedly connected with an arc-shaped inflatable frame, the front and rear ends of the arc-shaped inflatable frame are fixedly connected with an arc-shaped telescopic frame, the side of the arc-shaped telescopic frame is fixedly connected with an arc-shaped limit frame, the top of the arc-shaped inflatable frame is fixedly connected with a top frame, the surface of the top frame is fixedly connected with a lifting sleeve, and an electric push rod is arranged on the top of the lifting sleeve.

[0009] Preferably, the interior of the lifting sleeve is movably connected to a lifting seat via an electric push rod, the four bottom corners of the lifting seat are fixedly connected to detection brackets, the sides of the detection bracket are provided with mounting buckles, and the bottom end of the detection bracket is fixedly connected to a top rubber pad.

[0010] Preferably, an air pump is provided on the side of the arc-shaped air-filled frame, and a dustproof grid is fixedly connected to one side of the air pump.

[0011] Preferably, telescopic airbags are provided on both sides of the arc-shaped inflatable frame, a fitting top strip is provided at one end of the telescopic airbag, a limiting groove is provided inside the arc-shaped limiting frame, and the fitting top strip and the limiting groove are matched with each other.

[0012] Preferably, damping grooves are provided inside the first rail frame and the second rail frame, and damping inner pads are provided on inner walls of the damping grooves.

[0013] Preferably, the bottom end of the first material seat is fixedly connected to a sliding base, and the bottom end of the sliding base is fixedly connected to a limited bottom sliding block.

[0014] Preferably, two sides of the sliding base are fixedly connected with limited side sliding blocks, and one end of the limited side sliding block is provided with a damping pad.

[0015] Preferably, positioning ring seats are provided at both ends of the inner wall of the first material seat, and an isolation inner film is provided on the inner wall of the first material seat.

[0016] Preferably, a sliding groove is provided inside the loading rack, and a bottom limiting sliding groove is provided on the inner bottom wall of the sliding groove.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1. In the present invention, through the loading rack, the first material seat, the second material seat, the limit straight bar, the positioning arc rack, the limit arc bar, the side limit slide groove, the first rail rack, the second rail rack, the damping groove, the damping inner pad, the sliding base, the limit bottom slider, the limit side slider, the damping pad, the positioning ring seat, the isolation inner film, the sliding groove and the bottom limit slide groove, the equipment can perform more accurate and stable docking and loading and unloading operations on the weak point equipment when performing intelligent weak current engineering detection. In actual use, the staff first puts the weak current equipment to be detected into the interior of the first material seat. The interior of the first material seat can be positioned for detection through the positioning ring seat, and the isolation inner film can be used to isolate external interference during detection. Then, the first material seat is pushed as a whole to the surface center of the loading rack, and the use detection operation of the weak current equipment is performed at the surface center of the loading rack. During the detection process, another group of weak current equipment is placed in the interior of the second material seat. After the detection is completed, the first material seat and the second material seat can be pushed on the loading rack. The camming mechanism can be used to move the load bearings of the load carrier to the support frame when the load carrier is in a state of being moved and moved.

[0019] 2. In the present invention, the overall use effect of the equipment is further improved through the loading rack, the first material seat, the second material seat, the arc-shaped inflatable rack, the arc-shaped telescopic rack, the arc-shaped limit frame, the top rack, the lifting sleeve seat, the electric push rod, the lifting seat, the detection bracket, the installation buckle, the top rubber pad, the inflation pump, the dust-proof mesh frame, the telescopic airbag, the fitting top strip and the limit groove. In the daily use process, when the first material seat and the second material seat are at the center of the surface of the loading rack for rapid switching back and forth for loading and unloading detection, the electric push rod on the top of the lifting sleeve seat can be adaptively started to drive the lifting seat and the detection bracket inside the lifting sleeve seat to adaptively extend into the first material seat or the second material seat under the limit of the top rack. At this time, the intelligent weak current engineering detection equipment only needs to be fixed and installed through the installation buckle on the detection bracket to realize the weak current equipment. All-round rapid detection operation, the top rubber pad at the bottom of the detection bracket can be adaptively docked and limited with the inner bottom wall of the first material seat and the second material seat. At the same time, when the first material seat and the second material seat are switched back and forth for loading and unloading, the air pump on the side of the arc-shaped inflatable frame can also be adaptively started to filter and inhale from the dustproof mesh frame, and inflate the telescopic air bags on both sides of the arc-shaped inflatable frame, so that it drives the fitting top strip at one end to perform adaptive telescopic operation from the limiting groove of the arc-shaped limit frame, so as to quickly dock and tighten the front and back of the first material seat and the second material seat at both ends of the surface of the loading rack, and cooperate with the arc-shaped inflatable frame, the arc-shaped telescopic frame and the arc-shaped limit frame to form a double-layer isolation and protection structure for weak current equipment, thereby improving the effect of subsequent detection and reflecting the comprehensiveness of the equipment design. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0021] Figure 1 It is a schematic diagram of the structure of the present invention;

[0022] Figure 2 It is a schematic diagram of the overall structure of the loading rack in the present invention;

[0023] Figure 3 It is a schematic diagram of the overall structure of the second rail frame in the present invention;

[0024] Figure 4 It is a schematic diagram of the overall structure of the first material holder in the present invention;

[0025] Figure 5 The overall structural diagram of the lifting sleeve in the present invention is

[0026] Figure 6 It is a schematic diagram of the overall structure of the arc-shaped inflatable frame in the present invention;

[0027] Figure 7 For the present invention Figure 1 A schematic diagram of the structure at the center

[0028] Figure 8 For the present invention Figure 1 A magnified schematic diagram of the structure at point B in the middle.

[0029] 1. Material loading rack; 2. First material seat; 3. Second material seat; 4. Limiting straight bar; 5. Positioning arc frame; 6. Limiting arc bar; 7. Side limiting slide groove; 8. First rail frame; 9. Second rail frame; 10. Arc-shaped inflatable frame; 11. Arc-shaped telescopic frame; 12. Arc-shaped limiting frame; 13. Top frame; 14. Lifting sleeve seat; 15. Electric push rod; 16. Lifting seat; 17. Detection bracket; 18. Installation buckle; 19. Top rubber pad; 20. Inflatable pump; 21. Dustproof mesh frame; 22. Telescopic airbag; 23. Fitting top strip; 24. Limiting groove; 25. Damping groove; 26. Damping inner pad; 27. Sliding base; 28. Limiting bottom slider; 29. ​​Limiting side slider; 30. Damping pad; 31. Positioning ring seat; 32. Isolation inner membrane; 33. Sliding groove; 34. Bottom limiting slide groove. DETAILED DESCRIPTION

[0030] like Figure 1-8As shown, the present invention provides a novel intelligent weak current engineering detection device, including a loading rack 1, a first material seat 2 is movably connected to the center of the surface of the loading rack 1, a second material seat 3 is fixedly connected to the back of the first material seat 2, the first material seat 2 and the second material seat 3 have the same structure, a limiting straight bar 4 is arranged on the inner wall of the loading rack 1, both ends of the limiting straight bar 4 are fixedly connected to positioning arc frames 5, a limiting arc bar 6 is arranged in the center of the limiting straight bar 4, and side limiting sliding grooves 7 are provided in the centers of the limiting straight bar 4 and the limiting arc bar 6, a first rail frame 8 is fixedly connected to one side of the loading rack 1, and a second rail frame 9 is fixedly connected to the other side of the loading rack 1, and damping grooves 25 are provided inside the first rail frame 8 and the second rail frame 9, and the damping grooves 25 are provided inside The wall is provided with a damping inner pad 26, the bottom end of the first material seat 2 is fixedly connected with a sliding base 27, the bottom end of the sliding base 27 is fixedly connected with a limited bottom slider 28, both sides of the sliding base 27 are fixedly connected with limited side sliders 29, and one end of the limited side slider 29 is provided with a damping pad 30, positioning ring seats 31 are provided at both ends of the inner wall of the first material seat 2, and an isolation inner film 32 is provided on the inner wall of the first material seat 2. A sliding groove 33 is provided inside the loading rack 1, and a bottom limiting sliding groove 34 is provided on the inner bottom wall of the sliding groove 33. The weak current equipment to be tested is placed inside the first material seat 2, and the inside of the first material seat 2 can be positioned for detection through the positioning ring seat 31, and the isolation inner film 32 is used to prevent external interference during detection. Isolate, then push the first material seat 2 as a whole to the center of the surface of the loading rack 1, and perform the use detection operation of the weak current equipment at the center of the surface of the loading rack 1. During the detection process, put another set of weak current equipment into the second material seat 3. After the detection is completed, the first material seat 2 and the second material seat 3 can be switched and moved at the center of the surface of the loading rack 1 by pushing the second material seat 3, thereby realizing efficient switching and loading and unloading operations of the weak current equipment inside the first material seat 2 and the second material seat 3, and when the first material seat 2 and the second material seat 3 are switched and loaded on the surface of the loading rack 1, their respective bottoms can be moved in the sliding groove 33 and the bottom limiting slide groove of the loading rack 1 through the sliding base 27 and the limiting bottom sliding block 28. 34, and at the same time, the limiting side sliders 29 fixed on both sides of the sliding base 27 can perform limiting sliding at the side limiting slide grooves 7 of the limiting straight bars 4 and the limiting arc bars 6 on both sides of the inner wall of the loading rack 1, and then the damping pad 30 at one end of the limiting side slider 29 can perform damping limiting operation on the inner walls of the damping grooves 25 of the first rail frame 8 and the second rail frame 9 on both sides of the loading rack 1 through the damping inner pad 26, and the positioning arc frames 5 at both ends of the limiting straight bar 4 can perform positioning docking operations on the first material seat 2 and the second material seat 3, thereby ensuring the precise stability of the first material seat 2 and the second material seat 3 when switching loading and unloading detection on the surface of the loading rack 1, and performing more efficient and stable intelligent weak current engineering continuity detection operations.

[0031] The arc-shaped inflatable frame 10 is fixedly connected to both sides of the center of the surface of the loading frame 1, the front and rear ends of the arc-shaped inflatable frame 10 are fixedly connected to the arc-shaped telescopic frame 11, the side of the arc-shaped telescopic frame 11 is fixedly connected to the arc-shaped limit frame 12, the top of the arc-shaped inflatable frame 10 is fixedly connected to the top frame 13, the surface of the top frame 13 is fixedly connected to the lifting sleeve 14, the top of the lifting sleeve 14 is provided with an electric push rod 15, the inside of the lifting sleeve 14 is movably connected to the lifting seat 16 through the electric push rod 15, the bottom four corners of the lifting seat 16 are fixedly connected to the detection bracket 17, and the side of the detection bracket 17 is provided with a mounting buckle 18 The bottom end of the detection bracket 17 is fixedly connected with a top rubber pad 19, an air pump 20 is arranged on the side of the arc-shaped inflatable frame 10, and a dustproof mesh frame 21 is fixedly connected to one side of the air pump 20. Both sides of the interior of the arc-shaped inflatable frame 10 are provided with telescopic air bags 22, and one end of the telescopic air bag 22 is provided with a fitting top strip 23. A limited groove 24 is provided inside the arc-shaped limit frame 12, and the fitting top strip 23 and the limited groove 24 are adapted to each other. In daily use, when the first material seat 2 and the second material seat 3 are at the center of the surface of the loading rack 1, the lifting sleeve seat can be adaptively started for rapid switching back and forth for loading and unloading detection. The electric push rod 15 at the top of 14 drives the lifting seat 16 and the detection bracket 17 inside the lifting sleeve 14 to adaptably extend into the first material seat 2 or the second material seat 3 under the limit of the top frame 13. At this time, the intelligent weak current engineering detection equipment only needs to be fixed and installed through the installation buckle 18 on the detection bracket 17 to realize the comprehensive and rapid detection operation of the weak current equipment. The top rubber pad 19 at the bottom end of the detection bracket 17 can be adaptively docked and limited with the inner bottom wall of the first material seat 2 and the second material seat 3. At the same time, when the first material seat 2 and the second material seat 3 are switched back and forth for loading and unloading, they can also be adapted. The air pump 20 on the side of the arc-shaped inflatable frame 10 is started to filter and inhale air from the dustproof mesh frame 21, and the telescopic air bags 22 on both sides of the arc-shaped inflatable frame 10 are inflated, so that the fitting top strip 23 at one end is adaptively telescoped from the limiting groove 24 of the arc-shaped limiting frame 12, so as to quickly connect and fasten the front and back of the first material seat 2 and the second material seat 3 at both ends of the surface of the loading rack 1, and cooperate with the arc-shaped inflatable frame 10, the arc-shaped telescopic frame 11 and the arc-shaped limiting frame 12 to form a double-layer isolation and protection structure for weak current equipment, thereby improving the effect of subsequent detection.

[0032] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any ordinary technician in the industry can smoothly implement the present invention as shown in the drawings and described above. However, any equivalent changes, modifications and evolutions made by technicians familiar with the profession without departing from the scope of the technical solution of the present invention using the technical content disclosed above are all equivalent embodiments of the present invention. At the same time, any equivalent changes, modifications and evolutions made to the above embodiments based on the essential technology of the present invention are still within the protection scope of the technical solution of the present invention.

Claims

1. A new type of intelligent weak current engineering detection device, characterized by: The invention comprises a loading rack (1), wherein a first material seat (2) is movably connected to the center of the surface of the loading rack (1), a second material seat (3) is fixedly connected to the back of the first material seat (2), the first material seat (2) and the second material seat (3) have the same structure, a limiting straight bar (4) is arranged on the inner wall of the loading rack (1), both ends of the limiting straight bar (4) are fixedly connected to positioning arc frames (5), a limiting arc bar (6) is arranged at the center of the limiting straight bar (4), and side limiting sliding grooves (7) are provided at the centers of the limiting straight bar (4) and the limiting arc bar (6), a first rail frame (8) is fixedly connected to one side of the loading rack (1), and a second rail frame (9) is fixedly connected to the other side of the loading rack (1); The arc-shaped inflatable frame (10) is fixedly connected to the arc-shaped inflatable frame (10) on both sides of the center of the surface of the loading frame (1), the front and rear ends of the arc-shaped inflatable frame (10) are fixedly connected to the arc-shaped telescopic frame (11), the side of the arc-shaped telescopic frame (11) is fixedly connected to the arc-shaped limit frame (12), the top of the arc-shaped inflatable frame (10) is fixedly connected to the top frame (13), the surface of the top frame (13) is fixedly connected to the lifting sleeve (14), and the top of the lifting sleeve (14) is provided with an electric push rod (15).

2. According to claim 1, a novel intelligent weak current engineering detection device is characterized by: The interior of the lifting sleeve (14) is movably connected to a lifting seat (16) via an electric push rod (15); the four bottom corners of the lifting seat (16) are fixedly connected to a detection bracket (17); a mounting buckle (18) is provided on the side of the detection bracket (17); and a top rubber pad (19) is fixedly connected to the bottom end of the detection bracket (17).

3. According to claim 1, a novel intelligent weak current engineering detection device is characterized by: An air pump (20) is arranged on the side of the arc-shaped air-filled frame (10), and a dustproof net frame (21) is fixedly connected to one side of the air pump (20).

4. According to claim 1, a novel intelligent weak current engineering detection device is characterized by: Both sides of the arc-shaped inflatable frame (10) are provided with telescopic air bags (22), one end of the telescopic air bag (22) is provided with a fitting top strip (23), and a limiting groove (24) is provided inside the arc-shaped limiting frame (12), and the fitting top strip (23) and the limiting groove (24) are adapted to each other.

5. According to claim 1, a novel intelligent weak current engineering detection device is characterized by: A damping groove (25) is provided inside the first rail frame (8) and the second rail frame (9), and a damping inner pad (26) is provided on the inner wall of the damping groove (25).

6. A novel intelligent weak current engineering detection device according to claim 1, characterized in that: The bottom end of the first material seat (2) is fixedly connected to a sliding base (27), and the bottom end of the sliding base (27) is fixedly connected to a limited bottom sliding block (28).

7. A novel intelligent weak current engineering detection device according to claim 6, characterized in that: The two sides of the sliding base (27) are fixedly connected with limited side sliders (29), and one end of the limited side slider (29) is provided with a damping pad (30).

8. The novel intelligent weak current engineering detection device according to claim 1 is characterized by: Positioning ring seats (31) are provided at both ends of the inner wall of the first material seat (2), and an isolation inner membrane (32) is provided on the inner wall of the first material seat (2).

9. The novel intelligent weak current engineering detection device according to claim 1 is characterized by: A sliding groove (33) is provided inside the loading rack (1), and a bottom limiting sliding groove (34) is provided on the inner bottom wall of the sliding groove (33).