Power station gate opening monitoring method and system applied to hydropower dispatching operations
By integrating information on gate design standards, life status, water level changes and power generation tasks, the gate risk opening database is used to perform risk quantitative calculations, which solves the problem of misjudgment of gate opening monitoring in the existing technology, achieves more accurate and real-time monitoring effects, and improves the safety and efficiency of hydropower stations.
Patent Information
- Application Number
- CN202510076922.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-17
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2045-01-17
AI Technical Summary
The existing power station gate opening monitoring methods fail to fully consider the dynamic changes of the gate in actual operation, such as the water level change interval, power generation task volume and the life status of the gate, resulting in misjudgment of the monitoring results.
By collecting the design standards and life status information of the gate, obtaining the water level change interval and power generation task volume, determining the expected operating opening degree, using the gate risk opening database for quantitative calculation, obtaining the degree of risk abnormality of the gate, and visually displaying it.
It improves the accuracy and real-timeness of gate opening monitoring, can more comprehensively reflect the actual operating status of gates, reduce misjudgments, and improves the safety and efficiency of hydropower stations.