Prestressed concrete pipe pile and construction method thereof
By using a rebound pin mechanism and expansion bolt in the prestressed concrete pipe piles for quick connection, and grouting to form a concrete reinforcement head at the connection position, the problems of low construction efficiency and weak connection position strength in the prior art are solved, and the rapid extension and reinforcement effect are achieved.
Patent Information
- Application Number
- CN202510106182.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-23
- Publication Date
- 2025-03-25
AI Technical Summary
During construction, existing prestressed concrete pipe piles need to be extended between segments due to depth requirements, and traditional bolt connections take a long time and have weak strength, which affects construction efficiency and safety.
The rebound latch mechanism and expansion bolts are used for quick connection to achieve rapid connection and lengthening of prestressed concrete pipe piles, and the concrete reinforcement head reinforcement position is formed through grouting.
The rapid lengthening of prestressed concrete pipe piles is achieved, the construction efficiency is improved, and the operation inconvenience and weak strength in traditional connection methods are avoided. At the same time, the strength of the connection position is increased through the reinforcement head.