Karst cave treatment method and system in karst geology foundation pile construction
By drilling injection holes on the rock layer, injecting solid filler into the cave and forming an annular isolation cavity, and then injecting liquid filler, the problems of high cost of cave treatment and complex construction in the existing technology are solved, and efficient and economical cave reinforcement effect is achieved.
Patent Information
- Application Number
- CN202510039212.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-10
- Publication Date
- 2025-03-25
AI Technical Summary
When handling caves during karst geological foundation pile construction, there are problems such as difficult, high cost and complex construction. Especially when encountering beaded caves, small diameter steel casings need to be added to further increase costs.
A number of injection holes are drilled in the area corresponding to the cave on the rock formation, and solid filling materials are injected into the cave through these injection holes, and the filling materials are diffused through impact operations to form an annular isolation cavity. Subsequently, a liquid filler is injected into the cave in the annular isolation cavity until it is filled.
Through this method, the reinforcement area and engineering volume are reduced, the filling material is saved, the cost is reduced, and the compactness and support stability of the annular isolation cavity are improved. Compared with the follow-up treatment method of the cartridge, it has significant cost, construction period and safety advantages.