Underground pipe gallery gap maintenance process

By designing a professional maintenance process for leaking water in the underground pipe corridor, including groove removal, grouting, filling water stop glue strips, sealing and on-site cleaning, the problem of leaking water in the underground pipe corridor is solved, significantly improving waterproof performance and construction efficiency.

CN119711565APending Publication Date: 2025-03-28甘肃省安装建设集团有限公司
0 Cites 0 Cited by

Patent Information

Application Number
CN202510000196.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The water leakage problem of underground pipe corridor gaps has affected the structural safety and functional operation. The existing treatment methods are not professional and targeted enough, making it difficult to effectively solve the water leakage problem between the gap between the wall casing and the pipeline and the outside of the wall casing.

Method used

A underground pipe corridor gap maintenance process is designed, including groove removal, grouting, filling water stop glue strips, sealing and on-site cleaning. By using appropriate tools and materials, the gap is fully filled and sealed, forming a second waterproof barrier.

Benefits of technology

It significantly improves the waterproof performance of the entire system, prevents moisture from penetrating into the interior of the underground pipe corridor, extends the duration of the waterproof effect, reduces maintenance frequency and cost, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to the technical field of underground pipe gallery gap maintenance, in particular to an underground pipe gallery gap maintenance technology which comprises the steps of groove removing, grouting, water stop rubber strip filling, blocking, field cleaning and the like, comprehensive sealing can be achieved by specifically repairing a gap between a wall bushing and a pipeline and the problem of water leakage on the outer side, and the service life of the wall bushing is prolonged. The waterproof performance of the whole system is remarkably improved, water is prevented from permeating into the underground pipe gallery, gaps can be effectively filled and reinforced through the technology, secondary leakage caused by material aging or structural change is prevented, and the duration time of the waterproof effect is prolonged.