Calculation power configuration method and device based on resource demand prediction, equipment, medium and product
By using resource demand prediction model and BKD tree index in multi-core heterogeneous computing clusters and combining with gray wolf optimization algorithms, the problem of low computing power configuration accuracy in the existing technology is solved, and more efficient resource utilization and computing performance is achieved.
Patent Information
- Application Number
- CN202411893373.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-20
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-12-20
AI Technical Summary
The accuracy of computing power configuration in the prior art in multi-core heterogeneous computing cluster is low, and other influencing factors other than GPUs are not effectively considered.
Through a resource demand prediction method, the pre-trained resource demand prediction model is inputted using historical performance data and historical log data to predict the execution time of the task, and a BKD tree index is constructed to determine the local and global computing power configuration. Combined with the Gray Wolf optimization algorithm, optimize computing power configuration to improve accuracy.
The computing power configuration accuracy of multi-core heterogeneous computing power clusters is improved, and resource utilization and computing efficiency are improved by more accurately predicting task execution time and optimizing resource utilization.