Method and system for planning and evaluating new energy acceptance capability of transformer substation
Through the evaluation method of the new energy acceptance capacity planning of substations, a substation with access conditions is selected, the total social investment amount and power abandonment rate of the entire life cycle of different new energy access plans is calculated, and the optimal new energy installation planning scheme is determined, which solves the problem of low comprehensive utilization efficiency of power grid equipment and achieves the effect of effectively controlling the cost of the whole society.
Patent Information
- Application Number
- CN202411664639.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-03-28
AI Technical Summary
The existing technology is difficult to effectively improve the comprehensive utilization efficiency of power grid equipment and meet the local, nearby and low consumption requirements of new energy. Traditional power planning and access ideas are difficult to adapt to the demand for rapid growth of new energy.
A method for planning and evaluation of new energy acceptance capacity of substations is proposed. By selecting substations with access conditions, obtaining and normalizing the lifting and down load and new energy historical output data, calculating the total social investment amount and new energy power abandonment rate of different new energy access plans, and establishing an optimization function to determine the optimal new energy installation planning scheme.
It effectively controls the total cost of new energy access in the whole society, improves the comprehensive utilization efficiency of power grid equipment, and provides a more reasonable reference for new energy planning and grid landing point selection.