Hydropower station intelligent management method and system
By using cloud data centers and intelligent management base stations in the intelligent management system of hydropower stations, combined with artificial intelligence algorithms and OPC UA protocol, the problems of insufficient data processing capabilities, lack of adaptability and excessive manual intervention in the existing technology are solved, and efficient and automated intelligent management of hydropower stations is achieved.
Patent Information
- Application Number
- CN202411777567.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-05
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-12-05
AI Technical Summary
The existing intelligent management technology of hydropower stations is unable to process large-scale real-time data, lacks adaptability, and relies on manual intervention, which increases operational costs and the probability of errors.
The cloud data center and intelligent management base station are adopted, and the data analysis model and the hydropower station intelligent management model are built using artificial intelligence algorithms. Data collection and processing are carried out through the OPC UA protocol to realize real-time data analysis and automatic execution of intelligent management strategies.
It improves the accuracy and timeliness of data analysis, enhances the adaptability and management efficiency of different hydropower stations, significantly reduces manual intervention, reduces operating costs and error rates, and makes the decision-making process more scientific and objective.