BIM model progress query method and system based on time segmentation

Through the BIM model progress query method based on time segmentation, the problem that traditional technology cannot intuitively display the progress of pumped storage engineering projects is solved, and detailed query and intuitive display of project progress is realized, which improves project management level and project construction speed.

CN119721976APending Publication Date: 2025-03-28ENERGY STORAGE RES INST OF CHINA SOUTHERN POWER GRID PEAK-FREQUENCY MODULATION POWER GENERATION CO LTD
0 Cites 0 Cited by

Patent Information

Application Number
CN202411847762.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The traditional Gantt Chart method cannot meet the needs of pumped storage engineering project management, and cannot intuitively display the project construction situation and task status information at a certain point in time.

Method used

The BIM model progress query method based on time segmentation is adopted, and detailed query and intuitive display of project progress is achieved through the steps of selecting tasks, time segmentation, progress query and BIM model rendering.

Benefits of technology

It can intuitively display the project progress at the specified time points, vividly display the actual construction process, improve the project management level and project construction speed, and support project progress management and construction period optimization.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a BIM model progress query method and system based on time segmentation, and belongs to the technical field of construction. The query method comprises the steps of selecting a task to be checked, performing time segmentation according to the starting and ending time of the task, performing progress query according to time points, and performing BIM model rendering according to the progress. Task state information at a certain time point can be checked, the project progress condition at the specified time point can be visually reflected through the system, and the actual construction process condition is vividly displayed; according to the invention, time segmentation is carried out according to the starting and ending time of the task, the progress of the task is inquired according to the time point, and the progress information of the task is vividly displayed through the BIM model, so that the project management level of the pumped storage project is further improved, the project construction speed is accelerated, and support is provided for project progress management and construction period optimization of the pumped storage project.
Need to check novelty before this filing date? Find Prior Art