BIM model progress query method and system based on time segmentation
Through the BIM model progress query method based on time segmentation, the problem that traditional technology cannot intuitively display the progress of pumped storage engineering projects is solved, and detailed query and intuitive display of project progress is realized, which improves project management level and project construction speed.
Patent Information
- Application Number
- CN202411847762.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-03-28
AI Technical Summary
The traditional Gantt Chart method cannot meet the needs of pumped storage engineering project management, and cannot intuitively display the project construction situation and task status information at a certain point in time.
The BIM model progress query method based on time segmentation is adopted, and detailed query and intuitive display of project progress is achieved through the steps of selecting tasks, time segmentation, progress query and BIM model rendering.
It can intuitively display the project progress at the specified time points, vividly display the actual construction process, improve the project management level and project construction speed, and support project progress management and construction period optimization.