Power grid cooperative operation method, device and equipment based on privacy protection and storage medium

By receiving feasible domain information from each industrial park, determining the scheduling power requirements, and calculating the shared cost, the problem of privacy data leakage in traditional power grid scheduling methods is solved, and the power grid coordinated operation is realized under the conditions of privacy protection, improving security.

CN119742863APending Publication Date: 2025-04-01ORDOS MULTI-ENERGY COMPLEMENTARY ENERGY CO LTD +1
0 Cites 0 Cited by

Patent Information

Application Number
CN202411782459.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-05
Publication Date
2025-04-01

AI Technical Summary

Technical Problem

When the traditional power grid scheduling method realizes the coordinated operation of the power grid, it is easy to leak the privacy data of the industrial park, resulting in the leakage of privacy information and security issues.

Method used

By receiving feasible domain information at the target moment sent by each industrial park, the scheduling power requirements at each industrial park are determined, and the shared costs of each industrial park are calculated based on non-private information interaction to avoid the leakage of private information.

Benefits of technology

It realizes the coordinated operation of power grids in multiple industrial parks under the conditions of protecting privacy, improves the security of private data, and avoids the leakage of privacy information in various industrial parks.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention provides a power grid cooperative operation method, device and equipment based on privacy protection, and a storage medium. The method comprises the following steps: receiving feasible region information of a target moment sent by each industrial park end; based on the feasible region information of the target moment, determining a scheduling power demand corresponding to each industrial park end, and sending the scheduling power demand corresponding to each industrial park end to each industrial park end; receiving auxiliary service information of a target moment sent by each industrial park end; and according to the peak regulation auxiliary service revenue information and the power supply correction output information at the target moment, calculating the allocated cost of each industrial park, and sending the allocated cost to each industrial park end, so that each industrial park end schedules internal power supply output according to the corresponding allocated cost. According to the embodiment provided by the invention, leakage of privacy information of each industrial park is avoided, and the security of privacy data is improved.