Roadway floor heave prevention and control method
By performing hydraulic fracturing in the top slate rock layer above the tunnel, the problem of the tunnel bottom drum is solved, the mining stress of the tunnel is reduced, the overall stress state of the tunnel is improved, and the safe and efficient development of coal resources is achieved.
Patent Information
- Application Number
- CN202510273384.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-10
- Publication Date
- 2025-04-04
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The problem of tunnel bottom drum is serious in underground mining environments such as coal mines, resulting in underground transportation and ventilation obstacles, overall tunnel instability, difficult and costly management, affecting the safe and efficient development of coal resources.
By opening main drilling holes and branch holes in the top slab rock layer above the intended treatment tunnel, hydraulic fracturing is performed, the top slab fracturing layer is cut off, the tunnel is reduced to the mining stress and the bottom drum volume is reduced.
Effectively reduce the volume of the tunnel under the drum, reduce the impact of the tunnel by mining, improve the overall stress status of the tunnel, reduce the cost of governance, and improve the safe and efficient development capabilities of coal resources.