Block exploration economic workload calculation method and device, equipment and storage medium
By acquiring and analyzing the historical exploration data of the block and calculating future exploration data using prediction formulas, the problem of large errors in traditional methods is solved, and more accurate calculation of the economic workload of block exploration and investment time series prediction is achieved.
Patent Information
- Application Number
- CN202311321694.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-12
- Publication Date
- 2025-04-15
AI Technical Summary
The traditional method of calculating economic workload of block exploration takes the lower limit of reservoir size as the evaluation standard, which leads to large errors and makes it difficult to accurately judge the economic performance of block exploration.
By obtaining historical exploration data of the block to be predicted, including annual proven reserves, annual proven reserves for a single well and annual drilling number, use formulas (1) and formulas (2) to predict annual proven reserves for a single well in each year in the future, and calculate the economic workload of the block to be predicted.
This method not only determines the years of economic investment in exploration, but also predicts the time series of investment in block exploration economic work, improving the accuracy and availability of calculations.
Smart Images

Figure CN119831079A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of petroleum geological exploration, and in particular to a method, device, equipment and storage medium for calculating economic workload of block exploration. Background Art
[0002] Exploration and reserve increase has the characteristics of economic activities, and judging the economic feasibility of block exploration investment is the most important basis for exploration decision-making. The traditional method uses the lower limit of reservoir size as the evaluation standard, because the reservoir type and characteristics of the exploration object vary with different blocks and the degree of exploration and understanding, and the implementation is difficult and has large errors. Summary of the invention
[0003] The purpose of the present invention is to provide a method, device, equipment and storage medium for calculating the economic workload of block exploration to improve the above-mentioned problems.
[0004] In order to achieve the above objectives, the present application provides the following technical solutions:
[0005] On the one hand, an embodiment of the present application provides a method for calculating economic workload of block exploration, the method comprising:
[0006] Obtain exploration data of the block to be predicted in the historical time period, wherein the exploration data includes annual newly added proved reserves, annual newly added proved reserves of a single well, and annual drilling number;
[0007] Calculate the annual newly proved reserves of a single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted based on the annual newly proved reserves of the single well;
[0008] Calculate the corresponding annual newly proved reserves for each future year based on the newly proved reserves in the said year;
[0009] The exploration economic workload corresponding to the block to be predicted is calculated based on the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0010] Optionally, the annual newly added proved reserves of a single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted are calculated based on the annual newly added proved reserves of the single well, including:
[0011] Formula (1) is set as follows:
[0012] y t =ae bt (1)
[0013] In formula (1), y refers to the annual newly discovered reserves of a single well, t refers to the serial number corresponding to each year, a is the first coefficient, and b is the second coefficient;
[0014] According to the annual newly increased proved reserves of the single well and the formula (1), the values of the first coefficient and the second coefficient are calculated, and the annual newly increased proved reserves of the single well corresponding to each future year are predicted according to the values of the first coefficient and the second coefficient; and the deadline for stopping exploration of the block to be predicted is calculated according to the annual newly increased proved reserves of the single well corresponding to each future year.
[0015] Optionally, the annual newly added proved reserves corresponding to each future year are calculated based on the annual newly added proved reserves, including:
[0016] Formula (2) is set, and the formula (2) is:
[0017]
[0018] In formula (2), q t is the annual newly discovered reserves, k is the third coefficient, c is the fourth coefficient, and d is the fifth coefficient;
[0019] According to the annual newly added proved reserves and the formula (2), the values of the third coefficient, the fourth coefficient and the fifth coefficient are calculated, and the annual newly added proved reserves corresponding to each future year are predicted according to the values of the third coefficient, the fourth coefficient and the fifth coefficient.
[0020] Optionally, the exploration economic workload corresponding to the block to be predicted is calculated based on the annual newly-proven reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly-proven reserves corresponding to each future year, including:
[0021] Formula (3) is set as follows:
[0022]
[0023] In formula (3), L is the exploration economic workload corresponding to the block to be predicted, and n is the sequence number corresponding to the cut-off time;
[0024] The exploration economic workload corresponding to the block to be predicted is calculated based on the formula (3), the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0025] In a second aspect, an embodiment of the present application provides a device for calculating economic workload of block exploration, the device comprising an acquisition module, a first calculation module, a second calculation module and a third calculation module.
[0026] An acquisition module is used to acquire exploration data of the block to be predicted in a historical period, wherein the exploration data includes annual newly added proved reserves, annual newly added proved reserves of a single well, and annual drilling number;
[0027] The first calculation module is used to calculate the annual newly added proved reserves of the single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted according to the annual newly added proved reserves of the single well;
[0028] The second calculation module is used to calculate the annual newly added proved reserves corresponding to each future year according to the annual newly added proved reserves;
[0029] The third calculation module is used to calculate the exploration economic workload corresponding to the block to be predicted based on the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0030] Optionally, the first computing module includes:
[0031] The first setting unit is used to set formula (1), wherein formula (1) is:
[0032] y t =ae bt (1)
[0033] In formula (1), y refers to the annual newly discovered reserves of a single well, t refers to the serial number corresponding to each year, a is the first coefficient, and b is the second coefficient;
[0034] The first calculation unit is used to calculate the values of the first coefficient and the second coefficient according to the annual newly increased proved reserves of the single well and the formula (1), and predict the annual newly increased proved reserves of the single well corresponding to each future year according to the values of the first coefficient and the second coefficient; and calculate the deadline for stopping exploration of the block to be predicted according to the annual newly increased proved reserves of the single well corresponding to each future year.
[0035] Optionally, the second computing module includes:
[0036] The second setting unit is used to set formula (2), and the formula (2) is:
[0037]
[0038] In formula (2), q t is the annual newly discovered reserves, k is the third coefficient, c is the fourth coefficient, and d is the fifth coefficient;
[0039] The second calculation unit is used to calculate the values of the third coefficient, the fourth coefficient and the fifth coefficient according to the annual newly added proved reserves and the formula (2), and predict the annual newly added proved reserves corresponding to each future year according to the values of the third coefficient, the fourth coefficient and the fifth coefficient.
[0040] Optionally, the third computing module includes:
[0041] The third setting unit is used to set formula (3), wherein formula (3) is:
[0042]
[0043] In formula (3), L is the exploration economic workload corresponding to the block to be predicted, and n is the sequence number corresponding to the cut-off time;
[0044] The third calculation unit is used to calculate the exploration economic workload corresponding to the block to be predicted based on the formula (3), the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0045] In a third aspect, an embodiment of the present application provides a device for calculating economic workload of block exploration, the device comprising a memory and a processor. The memory is used to store a computer program; the processor is used to implement the steps of the above-mentioned method for calculating economic workload of block exploration when executing the computer program.
[0046] In a fourth aspect, an embodiment of the present application provides a storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned method for calculating the economic workload of block exploration are implemented.
[0047] The beneficial effects of the present invention are:
[0048] Based on the relationship between exploration workload and reserve increase scale, the present invention can not only determine the years of exploration economic investment, but also predict the time series of block exploration economic workload investment, which is intuitive, easy to use and effective.
[0049] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0051] Figure 1 It is a schematic diagram of the flow chart of the method for calculating the economic workload of block exploration described in an embodiment of the present invention;
[0052] Figure 2 It is a schematic diagram of the structure of the device for calculating the economic workload of block exploration described in an embodiment of the present invention;
[0053] Figure 3 It is a schematic diagram of the structure of the economic workload calculation device for block exploration described in an embodiment of the present invention. DETAILED DESCRIPTION
[0054] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0055] It should be noted that similar reference numerals or letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0056] Example 1
[0057] like Figure 1 As shown, this embodiment provides a method for calculating the economic workload of block exploration, which includes step S1, step S2, step S3 and step S4.
[0058] Step S1, obtaining exploration data of the block to be predicted in a historical period, wherein the exploration data includes annual newly added proved reserves, annual newly added proved reserves of a single well, and annual drilling number;
[0059] In this step, the historical time period can be customized by the user. In this embodiment, the historical time period is 2006-2013. The exploration data of the block to be predicted in the historical time period is shown in Table 1, where the annual newly added proved reserves of a single well is the ratio between the annual newly added proved reserves and the annual number of wells drilled;
[0060] Table 1
[0061] year Annual newly discovered reserves Annual newly discovered reserves of a single well Annual drilling number 2006 10255 100 103 2007 10649 92 116 2008 10281 84 122 2009 9387 80 117 2010 8213 78 105 2011 6956 74 94 2012 5746 72 80 2013 4657 70 67
[0062] Step S2, calculating the annual newly added proved reserves of the single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted based on the annual newly added proved reserves of the single well;
[0063] The specific implementation steps of this step include step S21 and step S22;
[0064] Step S21, set formula (1), the formula (1) is:
[0065] y t =ae bt (1)
[0066] In formula (1), y refers to the annual newly discovered reserves of a single well, t refers to the serial number corresponding to each year, a is the first coefficient, and b is the second coefficient;
[0067] In this step, t can be understood as t=1, 2, 3, 4, 5, 6, 7...n
[0068] Step S22, according to the annual newly increased proved reserves of the single well and the formula (1), calculate the values of the first coefficient and the second coefficient, and predict the annual newly increased proved reserves of the single well corresponding to each future year according to the values of the first coefficient and the second coefficient; and calculate the deadline for stopping exploration of the block to be predicted according to the annual newly increased proved reserves of the single well corresponding to each future year.
[0069] In this step, the exponential fitting method can be used to obtain the first coefficient and the second coefficient using Excel software, which are 121.41 and -0.088 respectively. Therefore, formula (1) is y t =121.41e (-0.088t) ;
[0070] According to the calculated formula (1), the annual newly added proved reserves of a single well corresponding to each future year can be calculated. In this step, the annual newly added proved reserves of a single well corresponding to the future years 2014-2027 are predicted using formula (1), as shown in Table 2.
[0071] At the same time, in this step, the deadline for stopping exploration of the block to be predicted is calculated according to the annual newly added proven reserves of the single well corresponding to each future year, which is specifically carried out through the following steps:
[0072] The annual newly added proved reserves of a single well corresponding to each future year are analyzed. When the annual newly added proved reserves of a single well corresponding to the future year is less than 150,000 tons / well, this year is used as the deadline for stopping exploration in the block to be predicted; by calculating that the annual newly added proved reserves of a single well after 2027 is less than 150,000 tons / well, it is considered that there is no need for exploration investment. Therefore, 2027 is used as the deadline for stopping exploration in the block to be predicted;
[0073] Step S3, calculating the annual newly added proved reserves corresponding to each future year according to the annual newly added proved reserves;
[0074] The specific implementation steps of this step include step S31 and step S32;
[0075] Step S31, set formula (2), the formula (2) is:
[0076]
[0077] In formula (2), q t is the annual newly discovered reserves, k is the third coefficient, c is the fourth coefficient, and d is the fifth coefficient;
[0078] Step S32: Calculate the values of the third coefficient, the fourth coefficient and the fifth coefficient according to the annual newly added proved reserves and the formula (2); and predict the annual newly added proved reserves corresponding to each future year according to the values of the third coefficient, the fourth coefficient and the fifth coefficient.
[0079] In this step, using Excel software, the values of the third coefficient, the fourth coefficient, and the fifth coefficient in formula (2) are 107112.473, 0.142, and 0.763 respectively, so the formula is The annual additional proved reserves corresponding to each future year are predicted by formula (2), as shown in Table 2;
[0080] Step S4, calculating the exploration economic workload corresponding to the block to be predicted based on the annual newly-proven reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly-proven reserves corresponding to each future year.
[0081] The specific implementation steps of this step include step S41 and step S42;
[0082] Step S41, set formula (3), the formula (3) is:
[0083]
[0084] In formula (3), L is the exploration economic workload corresponding to the block to be predicted, and n is the sequence number corresponding to the cut-off time;
[0085] Step S42, calculating the exploration economic workload corresponding to the block to be predicted based on the formula (3), the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0086] In this step, the exploration workload corresponding to each future year, that is, the number of wells drilled, can be determined by formula (3), as shown in Table 2. Then, the exploration workload corresponding to each future year is added together to obtain the exploration economic workload corresponding to the block to be predicted. Table 2 is as follows:
[0087] year Annual newly discovered reserves Annual newly discovered reserves of a single well Annual drilling number 2014 4196 50 83 2015 2940 46 64 2016 2303 42 55 2017 1793 39 46 2018 1389 35 39 2019 1072 32 33 2020 825 30 28 2021 633 27 23 2022 486 25 19 2023 372 23 16 2024 284 21 14 2025 217 19 11 2026 166 18 9 2027 127 16 8
[0088] Based on the relationship between exploration workload and reserve increase scale, this embodiment can not only determine the years of exploration economic investment, but also predict the time series of block exploration economic workload investment. It is intuitive, easy to use and effective.
[0089] Example 2
[0090] like Figure 2 As shown, this embodiment provides a device for calculating economic workload of block exploration, and the device includes an acquisition module 701, a first calculation module 702, a second calculation module 703 and a third calculation module 704.
[0091] The acquisition module 701 is used to acquire the exploration data of the block to be predicted in the historical time period, wherein the exploration data includes the annual newly added proved reserves, the annual newly added proved reserves of a single well and the annual number of wells drilled;
[0092] The first calculation module 702 is used to calculate the annual newly added proved reserves of a single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted based on the annual newly added proved reserves of the single well;
[0093] The second calculation module 703 is used to calculate the annual newly added proved reserves corresponding to each future year according to the annual newly added proved reserves;
[0094] The third calculation module 704 is used to calculate the exploration economic workload corresponding to the block to be predicted based on the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0095] In a specific implementation of the present disclosure, the first calculation module 702 further includes a first setting unit 7021 and a first calculation unit 7022 .
[0096] The first setting unit 7021 is used to set formula (1), and the formula (1) is:
[0097] y t =ae bt (1)
[0098] In formula (1), y refers to the annual newly discovered reserves of a single well, t refers to the serial number corresponding to each year, a is the first coefficient, and b is the second coefficient;
[0099] The first calculation unit 7022 is used to calculate the values of the first coefficient and the second coefficient according to the annual newly proved reserves of the single well and the formula (1), and predict the annual newly proved reserves of the single well corresponding to each future year according to the values of the first coefficient and the second coefficient; and calculate the deadline for stopping exploration of the block to be predicted according to the annual newly proved reserves of the single well corresponding to each future year.
[0100] In a specific implementation of the present disclosure, the second calculation module 703 further includes a second setting unit 7031 and a second calculation unit 7032 .
[0101] The second setting unit 7031 is used to set formula (2), and the formula (2) is:
[0102]
[0103] In formula (2), q t is the annual newly discovered reserves, k is the third coefficient, c is the fourth coefficient, and d is the fifth coefficient;
[0104] The second calculation unit 7032 is used to calculate the values of the third coefficient, the fourth coefficient and the fifth coefficient according to the annual newly added proved reserves and the formula (2), and predict the annual newly added proved reserves corresponding to each future year according to the values of the third coefficient, the fourth coefficient and the fifth coefficient.
[0105] In a specific implementation of the present disclosure, the third calculation module 704 further includes a third setting unit 7041 and a third calculation unit 7042 .
[0106] The third setting unit 7041 is used to set formula (3), and the formula (3) is:
[0107]
[0108] In formula (3), L is the exploration economic workload corresponding to the block to be predicted, and n is the sequence number corresponding to the cut-off time;
[0109] The third calculation unit 7042 is used to calculate the exploration economic workload corresponding to the block to be predicted based on the formula (3), the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
[0110] It should be noted that, regarding the device in the above embodiment, the specific manner in which each module performs the operation has been described in detail in the embodiment of the method, and will not be elaborated here.
[0111] Example 3
[0112] Corresponding to the above method embodiment, the embodiment of the present disclosure also provides a block exploration economic workload calculation device. The block exploration economic workload calculation device described below and the block exploration economic workload calculation method described above can be referenced to each other.
[0113] Figure 3 FIG. 8 is a block diagram of a block exploration economic workload calculation device 800 according to an exemplary embodiment. Figure 3 As shown, the block exploration economic workload calculation device 800 may include: a processor 801 and a memory 802. The block exploration economic workload calculation device 800 may also include one or more of a multimedia component 803, an I / O interface 804, and a communication component 805.
[0114] The processor 801 is used to control the overall operation of the block exploration economic workload calculation device 800 to complete all or part of the steps in the above-mentioned block exploration economic workload calculation method. The memory 802 is used to store various types of data to support the operation of the block exploration economic workload calculation device 800, and these data may include, for example, instructions for any application or method operating on the block exploration economic workload calculation device 800, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone, which is used to receive external audio signals. The received audio signal may be further stored in the memory 802 or sent via the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the block exploration economic workload calculation device 800 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.
[0115] In an exemplary embodiment, the block exploration economic workload calculation device 800 can be implemented by one or more application specific integrated circuits (Application Specific Integrated Circuit, referred to as ASIC), digital signal processors (Digital Signal Processing Device, referred to as DSP), digital signal processing devices (Digital Signal Processing Device, referred to as DSPD), programmable logic devices (Programmable Logic Device, referred to as PLD), field programmable gate arrays (Field Programmable Gate Array, referred to as FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned block exploration economic workload calculation method.
[0116] In another exemplary embodiment, a computer storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned method for calculating the economic workload of block exploration are implemented. For example, the computer storage medium can be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions can be executed by the processor 801 of the block exploration economic workload calculation device 800 to complete the above-mentioned method for calculating the economic workload of block exploration.
[0117] Example 4
[0118] Corresponding to the above method embodiment, the embodiment of the present disclosure further provides a storage medium. The storage medium described below and the method for calculating the economic workload of block exploration described above can refer to each other.
[0119] A storage medium stores a computer program, which, when executed by a processor, implements the steps of the method for calculating the economic workload of block exploration in the above method embodiment.
[0120] The storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other storage medium that can store program codes.
[0121] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. The method for calculating the economic workload of block exploration is characterized by: include: Obtain exploration data of the block to be predicted in the historical time period, wherein the exploration data includes annual newly added proved reserves, annual newly added proved reserves of a single well, and annual drilling number; Calculate the annual newly proved reserves of a single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted based on the annual newly proved reserves of the single well; Calculate the corresponding annual newly proved reserves for each future year based on the newly proved reserves in the said year; The exploration economic workload corresponding to the block to be predicted is calculated based on the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
2. The method for calculating economic workload of block exploration according to claim 1, characterized in that: The annual newly added proved reserves of a single well and the cut-off time for stopping exploration of the block to be predicted are calculated based on the annual newly added proved reserves of the single well in each future year, including: Formula (1) is set as follows: y t ae bt (1) In formula (1), y refers to the annual newly discovered reserves of a single well, t refers to the serial number corresponding to each year, a is the first coefficient, and b is the second coefficient; According to the annual newly increased proved reserves of the single well and the formula (1), the values of the first coefficient and the second coefficient are calculated, and the annual newly increased proved reserves of the single well corresponding to each future year are predicted according to the values of the first coefficient and the second coefficient; and the deadline for stopping exploration of the block to be predicted is calculated according to the annual newly increased proved reserves of the single well corresponding to each future year.
3. The method for calculating economic workload of block exploration according to claim 1, characterized in that: The corresponding annual additional proved reserves for each future year are calculated based on the annual additional proved reserves, including: Formula (2) is set, and the formula (2) is: In formula (2), q t is the annual newly discovered reserves, k is the third coefficient, c is the fourth coefficient, and d is the fifth coefficient; According to the annual newly added proved reserves and the formula (2), the values of the third coefficient, the fourth coefficient and the fifth coefficient are calculated, and the annual newly added proved reserves corresponding to each future year are predicted according to the values of the third coefficient, the fourth coefficient and the fifth coefficient.
4. The method for calculating economic workload of block exploration according to claim 1, characterized in that: The exploration economic workload corresponding to the block to be predicted is calculated based on the annual newly-proven reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted and the annual newly-proven reserves corresponding to each future year, including: Formula (3) is set, and the formula (3) is: In formula (3), L is the exploration economic workload corresponding to the block to be predicted, and n is the sequence number corresponding to the cut-off time; The exploration economic workload corresponding to the block to be predicted is calculated based on the formula (3), the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
5. Block exploration economic workload calculation device, characterized in that: include: An acquisition module is used to acquire exploration data of the block to be predicted in a historical period, wherein the exploration data includes annual newly added proved reserves, annual newly added proved reserves of a single well, and annual drilling number; The first calculation module is used to calculate the annual newly added proved reserves of the single well corresponding to each future year and the deadline for stopping exploration of the block to be predicted according to the annual newly added proved reserves of the single well; The second calculation module is used to calculate the annual newly added proved reserves corresponding to each future year according to the annual newly added proved reserves; The third calculation module is used to calculate the exploration economic workload corresponding to the block to be predicted based on the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
6. The device for calculating economic workload of block exploration according to claim 5, characterized in that: The first computing module includes: The first setting unit is used to set formula (1), wherein formula (1) is: y t ae bt (1) In formula (1), y refers to the annual newly discovered reserves of a single well, t refers to the serial number corresponding to each year, a is the first coefficient, and b is the second coefficient; The first calculation unit is used to calculate the values of the first coefficient and the second coefficient according to the annual newly increased proved reserves of the single well and the formula (1), and predict the annual newly increased proved reserves of the single well corresponding to each future year according to the values of the first coefficient and the second coefficient; and calculate the deadline for stopping exploration of the block to be predicted according to the annual newly increased proved reserves of the single well corresponding to each future year.
7. The device for calculating economic workload of block exploration according to claim 5, characterized in that: The second computing module includes: The second setting unit is used to set formula (2), and the formula (2) is: In formula (2), q t is the annual newly discovered reserves, k is the third coefficient, c is the fourth coefficient, and d is the fifth coefficient; The second calculation unit is used to calculate the values of the third coefficient, the fourth coefficient and the fifth coefficient according to the annual newly added proved reserves and the formula (2), and predict the annual newly added proved reserves corresponding to each future year according to the values of the third coefficient, the fourth coefficient and the fifth coefficient.
8. The device for calculating economic workload of block exploration according to claim 5, characterized in that: The third computing module includes: The third setting unit is used to set formula (3), wherein formula (3) is: In formula (3), L is the exploration economic workload corresponding to the block to be predicted, and n is the sequence number corresponding to the cut-off time; The third calculation unit is used to calculate the exploration economic workload corresponding to the block to be predicted based on the formula (3), the annual newly proved reserves of the single well corresponding to each future year, the deadline for stopping exploration of the block to be predicted, and the annual newly proved reserves corresponding to each future year.
9. Block exploration economic workload calculation device, characterized in that: include: Memory for storing computer programs; A processor, used to implement the steps of the method for calculating the economic workload of block exploration as claimed in any one of claims 1 to 4 when executing the computer program.
10. A storage medium, characterized in that: The storage medium stores a computer program, which, when executed by a processor, implements the steps of the method for calculating the economic workload of block exploration as claimed in any one of claims 1 to 4.
Citation Information
Patent Citations
A method for predicting oil and gas reserve growth of a complex rift basin
CN109426879A
Rapid economic evaluation method for zone based on multi-layer simultaneous detection
CN110322081A