A landscape platform type seawall revetment structure and its construction method

By combining a permeable floating platform with a slope-adhesive structure, the design of the seawall revetment has solved the problems of the large impact of existing seawall revetment structures on the marine environment and the high construction cost. It has achieved a safe and reliable seawall revetment structure that also functions as a floating landscape platform and protects the tidal flat ecosystem.

CN119956721BActive Publication Date: 2026-04-03CCCC THIRD HARBOR CONSULTANTS
View PDF 5 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-03-05
Publication Date
2026-04-03

AI Technical Summary

Technical Problem

While ensuring safety and reliability, existing seawall revetment structures are difficult to reduce the impact on the marine environment, are not conducive to the protection of the seawall and tidal flat ecosystem, and have high construction costs.

Method used

The seawall revetment design combines a permeable floating platform with a slope-mounted structure. By combining the permeable floating platform with the slope-mounted structure, a landscape platform-type seawall revetment structure is formed. It is fixed by cast-in-place pile foundations, and drainage holes are set on the wave wall to reduce the impact on the marine environment.

Benefits of technology

This approach achieves the goals of minimizing the impact on the marine environment, protecting the tidal flat ecosystem, expanding water space, reducing construction costs, and improving the environment, all while ensuring structural safety and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119956721B_ABST
    Figure CN119956721B_ABST
Patent Text Reader

Abstract

This invention discloses a landscape platform-type seawall revetment structure and its construction method. The seawall revetment structure includes a slope-supporting structure, pile foundations, and a permeable floating platform. The permeable floating platform is located on the front side of the slope-supporting structure and abuts against it. By utilizing the slope-supporting structure as the seawall revetment structure and combining the floating platform and the seawall revetment, the revetment functions as both a water-based landscape platform and a seawall revetment while ensuring structural safety, thus improving the single-function nature of the seawall revetment. The construction method of the seawall revetment structure involves steps such as preliminary calculations, pile foundation construction, permeable floating platform construction, and backfilling. The slope-supporting structure and the permeable floating platform structure jointly bear the horizontal force of the seawall behind, effectively reducing land acquisition. This invention, through the landscape platform-type seawall revetment structure and its construction method, expands the water space while ensuring structural safety and reliability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of revetment engineering technology, specifically to a landscape platform type seawall revetment structure and its construction method. Background Technology

[0002] As an important component of the connection between land and water, seawalls and revetments are widely used in water conservancy and water transport projects. In recent years, with the development of coastal cities, more and more projects need to build or reinforce seawalls and revetments in urban coastal areas. However, the construction of seawalls and revetments in coastal cities is often limited by factors such as sea area use, land use, water depth at the front, geological conditions, construction site, and surrounding environment.

[0003] The existing coastal side of the city's seawall is mostly made of vertical concrete retaining walls. Considering the treatment, wave-blocking effect, road-embankment combination type and impact on the marine environment, the seawall revetment structure generally adopts solid concrete retaining walls. Solid concrete retaining wall structures have better overall stability and are easier to construct, but they have a greater impact on the marine environment and involve the issue of seawall reclamation, which is not conducive to the protection of the seawall tidal flat ecosystem, and the investment is relatively high.

[0004] Chinese Patent CN214194363U (publication date: September 14, 2021) discloses a seawall reinforcement and landscape platform structure that also functions as a garage. It includes an existing seawall top and an existing concrete cantilever retaining wall facing the water. A raised concrete wave-breaking wall is installed on the water-facing side of the existing concrete cantilever retaining wall. This raised concrete wave-breaking wall has a reinforced concrete foundation and several first concrete columns. Several second concrete columns are installed on the side of the existing seawall top away from the existing concrete cantilever retaining wall. A viewing platform is provided on the first concrete columns, second concrete columns, and raised concrete wave-breaking wall. The space between the viewing platform and the existing seawall top forms a garage. By making reasonable use of the existing revetment, the wave-resistance strength and height of the existing concrete cantilever retaining wall are increased through the modification and addition of the raised concrete wave-breaking wall, reinforced concrete foundation, and several first concrete columns. Simultaneously, the added several second concrete columns, together with the several first concrete columns and the raised concrete wave-breaking wall, support the viewing platform. The gap between the raised viewing platform and the old embankment top was used to create a parking garage, which greatly alleviated the parking difficulties for visitors.

[0005] Chinese Patent CN107142893A (publication date: September 8, 2017) discloses a riverbank protection structure, including a river channel, a slope protection on one side of the river channel, a landscape platform on the slope protection, and a first masonry retaining wall on the other side of the river channel. Stone ballast is backfilled between the first masonry retaining wall and the land, and a concrete base slab is laid on the stone ballast, with the concrete base slab inclined towards the side closer to the land. The higher side of the concrete base slab connects to the top of the first masonry retaining wall, and a second masonry retaining wall is located on the lower side, forming a water diversion channel. This invention provides a riverbank protection structure that considers nature and harmony, embodies ecological nature in water management, avoids channelization and over-treatment of the river channel, and achieves multiple functions.

[0006] Chinese Patent CN206189340U (publication date: May 24, 2017) discloses an ecological revetment renovation structure for a masonry retaining wall, comprising: an existing revetment substructure including a front row of piles, a rear row of piles, a retaining wall base plate fixed to the top of the front and rear piles, and a retaining wall body demolished to the design elevation on the retaining wall base plate; a wall capping on the front edge of the top surface of the retaining wall body; a waterfront platform on the top surface of the retaining wall body and located behind the wall capping; a flood control channel on the top of the riverbank slope; a sloping green belt on the riverbank slope between the waterfront platform and the flood control channel; and a biofilm laid on the ground in front of the waterfront platform. This utility model has advantages such as safety and durability, beautiful ecological landscape, environmental protection and energy saving, low renovation cost, low implementation difficulty, and convenient maintenance.

[0007] Based on the above, it is clear that while existing technologies have proposed modifications to revetment structures, their research focuses primarily on how to implement ecological revetment in river engineering and how to develop ecological modification schemes based on existing revetment structures. They do not effectively address how to reduce the encroachment on the marine environment and mitigate the impact on the seawall and tidal flat ecosystem while ensuring the safety and reliability of the seawall revetment structure. Therefore, there is an urgent need for a new type of revetment structure that is easy to construct, structurally reliable, expands the water space, and combines the functions of a waterscape platform and seawall revetment. Summary of the Invention

[0008] To address the above technical problems, this invention provides a landscape platform type seawall revetment structure and its construction method.

[0009] A landscape platform type seawall revetment structure includes a slope-mounted structure, a permeable floating platform, and pile foundations. The slope-mounted structure is located in front of the existing retaining wall, and the permeable floating platform is located in front of the slope-mounted structure and abuts against it. The upper surface of the permeable floating platform is flush with the upper surface of the existing retaining wall. Pile foundations are installed below both the permeable floating platform and the slope-mounted structure.

[0010] The open-type floating platform includes longitudinal beams, transverse beams, panels, and wave-breaking walls; longitudinal beams and transverse beams are installed at the upper end of the slope-supporting structure, and panels are installed on the longitudinal beams and transverse beams, with wave-breaking walls installed above the ends of the panels away from the slope-supporting structure.

[0011] The pile foundation includes slope-adhesive structure pile foundation and water platform pile foundation; the slope-adhesive structure pile foundation is located below the slope-adhesive structure; the water platform pile foundation is located below the crossbeam.

[0012] Furthermore, landscape paving is laid on the permeable water platform.

[0013] Furthermore, the pile foundation adopts cast-in-place piles, and the spacing between adjacent pile foundations is 2-4m.

[0014] Furthermore, the panel has a permeable structure, which can effectively reduce and dissipate waves in the face of extreme weather conditions.

[0015] Furthermore, a landscape railing is installed above the wave-breaking wall; and drainage holes are installed above the landscape paving on the wave-breaking wall.

[0016] Furthermore, there is an existing mud surface in front of the existing retaining wall, and the pile foundation is buried below the plane of the existing mud surface.

[0017] Furthermore, the slope-adhesive structure includes a main structure and a supporting structure. The cross-section of the main structure is "L"-shaped, and the main structure is fitted into the supporting structure.

[0018] Furthermore, the main structure includes long columns and short beams; the side of the long columns is in close contact with the existing retaining wall, the cross-section of the long columns is trapezoidal, the upper end supports the longitudinal beams, and the lower end is connected to the short beams; the lower end of the short beams is provided with slope-adhesive structural pile foundations.

[0019] The lower end of the support structure is located on the short beam, and the upper end of the support structure is flush with the upper end of the main structure and abuts against the crossbeam.

[0020] A construction method for a landscape platform type seawall revetment structure includes the following steps:

[0021] Step S1: Preliminary calculations. Based on current specifications, perform structural stability and strength calculations to determine the dimensions of each component of the open-type floating platform, the dimensions of the slope-fitting structure, and the dimensions of the pile foundation.

[0022] Step S2: Pile foundation construction. Based on the pile foundation locations, the layout areas for the slope-supported structure pile foundation and the water platform pile foundation are determined. The foundation pit is excavated, and the site is leveled according to the current mud surface elevation. The cast-in-place piles are then constructed.

[0023] Step S3: Construction of the permeable water platform and slope-adhesive structure. After the pile foundation is constructed, the permeable water platform and slope-adhesive structure are cast in place on top of the pile foundation according to the dimensions determined in step S1, so that the permeable water platform, slope-adhesive structure and pile foundation are firmly connected together.

[0024] Step S4: Backfill the excavated foundation pit with soil to complete the construction of the viewing platform type seawall revetment structure.

[0025] Furthermore, step S1 includes the following steps:

[0026] Step S1.1: Perform structural stability and strength calculations according to the current specifications for revetment, and determine the dimensions of the slope-attached structure and the pile type, pile diameter, pile spacing, and pile length of the slope-attached structure pile foundation;

[0027] Step S1.2: Perform structural stability and strength calculations according to the current specifications for open-type floating platforms, determine the dimensions of the longitudinal beams, transverse beams and panels of the floating platform, determine the spacing between the longitudinal beams and transverse beams, and determine the pile type, pile diameter, pile spacing and pile length of the floating platform pile foundation.

[0028] Compared with the prior art, the advantages and effects of the present invention are as follows:

[0029] 1. A landscape platform type seawall revetment structure, which combines a water platform and a seawall revetment, ensuring structural safety and reliability while enabling the revetment to function as both a water landscape platform and a seawall revetment, improving the single function of the seawall revetment and fully utilizing the seawall revetment to create a good and comfortable environment.

[0030] 2. A landscape platform type seawall revetment structure, which achieves the technical effect of reducing the impact of the revetment on the marine environment, protecting the tidal flat system, and promoting the ecological restoration of the tidal flat through a combination of a permeable water platform and a slope-adhering structure.

[0031] 3. A construction method for a landscape platform type seawall revetment structure, wherein a slope-adhesive structure is set at the rear edge of a permeable platform on the water, and the slope-adhesive structure is used as the seawall revetment structure. At the same time, the permeable platform structure on the water shares the horizontal force of the seawall behind it, which greatly reduces land acquisition, avoids the problem of using the sea at sea, is convenient to construct, has a reliable structure, expands the water space, and improves the environment.

[0032] The above description is only an overview of the technical solution of this application. In order to better understand the technical means of this application and implement it in accordance with the contents of the specification, and to make the above and other objects, features and advantages of this application more obvious and understandable, the preferred embodiments of this application are described in detail below with reference to the accompanying drawings.

[0033] The above and other objects, advantages and features of this application will become more apparent to those skilled in the art from the following detailed description of specific embodiments in conjunction with the accompanying drawings. Attached Figure Description

[0034] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. In all drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn to scale.

[0035] in:

[0036] Figure 1 A cross-sectional view of a landscape platform-type seawall revetment structure;

[0037] Figure 2 This is a flowchart illustrating the construction method of a landscape platform-type seawall revetment structure.

[0038] Explanation of reference numerals in the attached drawings: 1-Cast-in pile; 2-Existing mud surface; 3-Longitudinal beam; 4-Landscape paving; 5-Panel; 6-Horizontal beam; 7-Slope-supporting structure; 8-Wave wall; 9-Existing retaining wall; 10-Drainage hole. Detailed Implementation

[0039] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. In the following description, specific details such as specific configurations and components are provided merely to help fully understand the embodiments of this application. Therefore, those skilled in the art should understand that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of this application. In addition, for clarity and brevity, descriptions of known functions and structures are omitted in the embodiments.

[0040] It should be understood that the phrase "an embodiment" or "this embodiment" throughout the specification means that a specific feature, structure, or characteristic related to the embodiment is included in at least one embodiment of this application. Therefore, "an embodiment" or "this embodiment" appearing throughout the specification does not necessarily refer to the same embodiment. Furthermore, these specific features, structures, or characteristics can be combined in any suitable manner in one or more embodiments.

[0041] Furthermore, reference numerals and / or letters may be repeated in different examples within this application. Such repetition is for the purpose of simplification and clarity and does not in itself indicate a relationship between the various embodiments and / or settings discussed.

[0042] In this article, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can mean: A exists alone, B exists alone, and A and B exist simultaneously. The term " / and" in this article describes another type of relationship between related objects, indicating that two relationships can exist. For example, A / and B can mean: A exists alone, and A and B exist alone. In addition, the character " / " in this article generally indicates that the related objects before and after it are in an "or" relationship.

[0043] In this article, the term "at least one" is merely a description of the relationship between related objects, indicating that there can be three relationships. For example, "at least one of A and B" can mean: A exists alone, A and B exist simultaneously, or B exists alone.

[0044] It should also be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion.

[0045] Example 1

[0046] This embodiment is a landscape platform type seawall revetment structure.

[0047] Please refer to Figure 1A landscape platform type seawall revetment structure includes a slope-mounted structure 7, pile foundations 1, and a permeable floating platform. The slope-mounted structure 7 is located in front of the existing retaining wall 9, and the permeable floating platform is located in front of the slope-mounted structure 7 and abuts against it. The upper surface of the permeable floating platform is flush with the upper surface of the existing retaining wall 9. The pile foundation 1 is installed below the permeable floating platform. The permeable floating platform includes the slope-mounted structure 7, longitudinal beams 3, transverse beams 6, a panel 5, and a wave-breaking wall 8. The slope-mounted structure 7 is installed in front of the existing retaining wall 9. The longitudinal beams 3 and transverse beams 6 are installed at the upper end of the slope-mounted structure 7. The panel 5 is installed on the longitudinal beams 3 and transverse beams 6. The wave-breaking wall 8 is installed above the end of the panel 5 away from the slope-mounted structure 7.

[0048] The technical effect of this embodiment is that by combining the floating platform and the seawall revetment, the revetment can serve as both a floating landscape platform and a seawall revetment, while ensuring structural safety and reliability. This improves the single function of the seawall revetment and makes full use of the seawall revetment to create a good and comfortable environment.

[0049] Example 2

[0050] Based on Example 1, this example further designs a landscape platform type seawall revetment structure.

[0051] The pile foundation 1 includes a slope-adhesive structure pile foundation and a floating platform pile foundation; the slope-adhesive structure pile foundation is located below the slope-adhesive structure 7; the floating platform pile foundation is located below the crossbeam 6.

[0052] Furthermore, landscape paving 4 is laid on the permeable water platform.

[0053] Furthermore, the pile foundation 1 is a cast-in-place pile with a diameter of 75-85cm and a spacing of 2-4m between adjacent pile foundations.

[0054] Furthermore, the panel 5 has a permeable structure, which can effectively reduce and dissipate waves in the face of extreme weather conditions.

[0055] Furthermore, a landscape railing is installed above the wave-breaking wall 8; a drainage hole 10 is installed above the landscape paving 4 on the wave-breaking wall 8, and the distance between the drainage hole 10 and the existing mud surface 2 is not less than 3.9m. Under normal circumstances, this can ensure that the wave-breaking wall 8 can effectively block the impact of sea waves, and in severe weather, the water on the landscape paving can be quickly drained from the drainage hole.

[0056] Furthermore, there is an existing mud surface 2 in front of the existing retaining wall 9, and the pile foundation 1 is buried below the plane of the existing mud surface 2.

[0057] Furthermore, the longitudinal beam 3, the transverse beam 6, and the panel 5 are all made of cast-in-place reinforced concrete. The longitudinal beam 3 is 110 mm high, the transverse beam 6 is 120 mm high, and the panel 5 is 35 mm thick.

[0058] Furthermore, the distance between the slope-adhering structure 7 and the existing mud surface 2 is not less than 0.5m. The slope-adhering structure 7 adopts a cast-in-place reinforced concrete structure, including a main structure and a supporting structure. The cross-section of the main structure is "L" shaped, and the main structure is fitted into the supporting structure.

[0059] Furthermore, the main structure includes a long column and a short beam; the side of the long column is in close contact with the existing retaining wall 9, the cross-section of the long column is trapezoidal, the upper end supports the longitudinal beam 3, and the lower end is connected to the short beam; the lower end of the short beam is provided with a slope-adhesive structure pile foundation.

[0060] The lower end of the support structure is located on the short beam, and the upper end of the support structure is flush with the upper end of the main structure and abuts against the crossbeam 6.

[0061] The technical advantages of this embodiment are as follows: A slope-supporting structure is set at the rear edge of the open-air platform on the water. The slope-supporting structure is used as a seawall revetment structure. At the same time, the open-air platform structure on the water shares the horizontal force of the seawall behind it, which greatly reduces the land acquisition, avoids the problem of using the sea at sea, is convenient to construct, has a reliable structure, expands the water space, and improves the environment.

[0062] Example 3

[0063] Based on Examples 1-2, this example introduces a construction method for a landscape platform type seawall revetment structure.

[0064] Please refer to Figure 2 A construction method for a landscape platform type seawall revetment structure includes the following steps:

[0065] Step S1: Preliminary calculations. Based on current specifications, structural stability and strength calculations are performed to determine the dimensions of each component of the open-type floating platform and the dimensions of pile foundation 1.

[0066] Step S2, Pile Foundation 1 Construction: Based on the location of Pile Foundation 1, the layout area of ​​the slope-supported structure pile foundation and the water platform pile foundation is determined. The foundation pit is excavated. The site is leveled according to the current mud surface 2 elevation. The cast-in-place piles are then constructed.

[0067] Step S3: Construction of the permeable water platform and slope-adhesive structure. After the pile foundation 1 is constructed, the permeable water platform and slope-adhesive structure are cast in place on top of the pile foundation 1 according to the dimensions determined in step S1, so that the permeable water platform and slope-adhesive structure are firmly connected to the pile foundation 1.

[0068] Step S4: Backfill the excavated foundation pit with soil to complete the construction of the viewing platform type seawall revetment structure.

[0069] Furthermore, step S1 includes the following steps:

[0070] Step S1.1: Perform structural stability and strength calculations according to the current specifications for revetment, and determine the dimensions of the slope-attached structure and the pile type, pile diameter, pile spacing, and pile length of the slope-attached structure pile foundation;

[0071] Step S1.2: Perform structural stability and strength calculations according to the current specifications for open-type floating platforms, determine the dimensions of the longitudinal beams 3, transverse beams 6 and panel 5 of the floating platform, determine the spacing between the longitudinal beams 3 and transverse beams 6, and determine the pile type, pile diameter, pile spacing and pile length of the floating platform pile foundation.

[0072] The technical effect of this embodiment is that a slope-supporting structure is set at the rear edge of the open-air platform. The dimensions of the pile foundation of the slope-supporting structure and the pile foundation of the platform are calculated separately. This allows the slope-supporting structure to be better integrated with the open-air platform structure as a seawall revetment structure, so that they can jointly bear the horizontal force of the seawall behind and fully ensure the structural safety.

[0073] In summary, by setting up a slope-supporting structure along the rear edge of the open-air platform, and using the slope-supporting structure as a seawall revetment structure, while simultaneously utilizing the open-air platform structure to jointly bear the horizontal force of the seawall behind, the land acquisition is greatly reduced, the problem of using the sea area at sea is avoided, construction is convenient, the structure is reliable, and the water space is expanded. This invention is original and innovative.

[0074] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A landscape platform type seawall revetment structure, characterized in that, It includes a slope-mounted structure (7), a permeable water platform, and pile foundations (1); the slope-mounted structure (7) is located in front of the existing retaining wall (9), the permeable water platform is located in front of the slope-mounted structure (7) and abuts against the slope-mounted structure (7), and the upper surface of the permeable water platform is flush with the upper surface of the existing retaining wall (9); pile foundations (1) are set below the permeable water platform and the slope-mounted structure (7). The open-type floating platform includes longitudinal beams (3), transverse beams (6), panels (5) and wave-breaking walls (8); the longitudinal beams (3) and transverse beams (6) are set above the slope structure (7), and the panels (5) are installed above the longitudinal beams (3) and transverse beams (6), and the wave-breaking walls (8) are set above the ends of the panels (5) away from the slope structure (7). The pile foundation (1) includes a slope-supporting structure pile foundation and a water platform pile foundation; the slope-supporting structure pile foundation is located below the slope-supporting structure (7); the water platform pile foundation is located below the crossbeam (6); The slope-adhesive structure (7) includes a main structure and a supporting structure. The cross-section of the main structure is "L" shaped, and the main structure is fitted with the supporting structure. The main structure includes long columns and short beams; the side of the long columns is in close contact with the existing retaining wall (9), the cross section of the long columns is trapezoidal, the upper end supports the longitudinal beam (3), and the lower end is connected to the short beam; the lower end of the short beam is provided with a slope-adhesive structure pile foundation; The lower end of the support structure is located on the short beam, and the upper end of the support structure is flush with the upper end of the main structure and abuts against the crossbeam (6).

2. The landscape platform type seawall revetment structure according to claim 1, characterized in that, Landscape paving is laid on the permeable water platform (4).

3. According to claim 2, a landscape platform type seawall revetment structure is provided above the wave-breaking wall (8), with a landscape railing.

4. The landscape platform type seawall revetment structure according to claim 3, characterized in that, The wave-breaking wall (8) has drainage holes (10) above the landscape paving (4).

5. A construction method for a landscape platform type seawall revetment structure as described in any one of claims 1-4, characterized in that, Includes the following steps: Step S1: Preliminary calculations. Based on current specifications, structural stability and strength calculations are performed to determine the dimensions of each component of the open-type water platform and the dimensions of the pile foundation (1). Step S2, Pile foundation (1) construction: According to the location of pile foundation (1), the layout area of ​​the slope-adhesive structure pile foundation and the water platform pile foundation is determined respectively. The foundation pit is excavated. The site is leveled according to the current mud surface (2) elevation. The cast-in-place piles are generated. Step S3, construction of the permeable water platform and the slope structure: After the pile foundation (1) is constructed, the permeable water platform and the slope structure are cast in place above the pile foundation (1) according to the dimensions determined in step S1, so that the permeable water platform and the slope structure are firmly connected to the pile foundation (1). Step S4: Backfill the excavated foundation pit with soil to complete the construction of the viewing platform type seawall revetment structure.

6. The construction method of a landscape platform type seawall revetment structure according to claim 5, characterized in that, Step S1 includes the following steps: Step S1.1: Perform structural stability and strength calculations according to the current specifications for revetment, and determine the dimensions of the slope-attached structure and the pile type, pile diameter, pile spacing, and pile length of the slope-attached structure pile foundation; Step S1.2: Perform structural stability and strength calculations according to the current specifications for open-type floating platforms, determine the dimensions of the longitudinal beams (3), transverse beams (6) and panels (5) of the floating platform, determine the spacing between the longitudinal beams (3) and transverse beams (6), and determine the pile type, pile diameter, pile spacing and pile length of the floating platform pile foundation.

Citation Information

Patent Citations

  • River channel revetment structure

    CN107142893A

  • Structure is reformed transform to ecologization shore protection that grouts a stone barricade

    CN206189340U

  • Seawall reinforced landscape platform structure with garage function

    CN214194363U

  • Overhead wave-dissipation viewing platform structure

    CN103758080A

  • Assembled high pile bearing platform revetment structure and construction method

    CN107059774A