Virtual AC power transmission network construction method and system for power grid MTDC
By building a virtual node center star topology and optimizing virtual impedance parameters, the power regulation lag problem of multi-terminal DC transmission system in dynamic scenarios is solved, fast response and efficient power distribution are achieved, system stability and reliability are improved, loss calculations are simplified, and loss calculations are employed, and good scalability is achieved.
Patent Information
- Application Number
- CN202510953311.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-10
- Publication Date
- 2025-08-19
AI Technical Summary
In dynamic scenarios, existing multi-terminal DC transmission systems have power outage problems caused by power regulation lag and communication interruption. Especially when new energy output suddenly changes or load changes suddenly, the MMC-MTDC system under the traditional master-slave control architecture is difficult to respond quickly.
Build a virtual node center star (VNCS) topology, optimize virtual impedance parameters by introducing virtual node o and virtual line reactance xio, realize efficient coordination and dynamic allocation of multi-terminal power, use the allocation coefficient kj to dynamically optimize the remaining capacity, build an ideal transformer to match voltage, and form a virtual AC transmission network.
Implement power adaptive adjustment of multi-end flexible straight systems within the millisecond time scale, quickly respond to dynamic scenarios, improve system stability and reliability, simplify loss calculation, reduce equipment loss and maintenance costs, and have good scalability.