UHPC (Ultra High Performance Concrete) pouring connection method for built-in T-shaped steel joints of fabricated beam columns
Through the high-strength bolt connection, damping device and UHPC pouring method of the built-in T-steel nodes in the prefabricated beams and columns, the bearing capacity and seismic resistance problems of the concrete beam-column nodes in prefabricated buildings are solved, the construction process is simplified, the reliability and consistency of the nodes are improved, and it is suitable for the efficiency, environmental protection and safety needs of modern buildings.
Patent Information
- Application Number
- CN202511179782.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-22
- Publication Date
- 2025-09-19
- Estimated Expiration
- 2045-08-22
AI Technical Summary
In existing prefabricated buildings, the concrete beam-column node connection method is difficult to ensure bearing capacity, stiffness and seismic performance, and the construction is complex, with problems such as loose bolts and high welding operation requirements.
The prefabricated beam-column with built-in T-steel nodes is used, combined with high-strength bolt connections, damping devices and UHPC pouring. Concrete columns and composite beams are prefabricated through a mold mechanism, damping devices are set and mold grouting is performed at the connection to form a triple connection method.
It improves the strength, stiffness and seismic performance of the nodes, simplifies the construction process, reduces the requirements for technical level, reduces construction errors and subsequent maintenance costs, is suitable for factory production, ensures the reliability and consistency of node connections, and is suitable for the development trend of prefabricated buildings.