A tailings mining control method and system

By constructing a tailings mining control system, collecting tailings physical characteristic data, marking high-variable areas, generating control commands and making real-time corrections, triggering working condition reconstruction, updating parameter sets, and generating conflict-free paths, the stability and efficiency problems of tailings mining control methods under dynamic working conditions are solved, and the system achieves stable and coordinated operation under complex working conditions.

CN121165430BActive Publication Date: 2026-06-30NANJING FUYIMING ENVIRONMENTAL PROTECTION NEW MATERIAL CO LTD
2 Cites 0 Cited by

Patent Information

Application Number
CN202511351518.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-09-22
Publication Date
2026-06-30
Estimated Expiration
2045-09-22

AI Technical Summary

Technical Problem

Existing tailings mining control methods lack parameter self-correction and multi-machine collaborative avoidance mechanisms under dynamic operating conditions, resulting in poor system stability, high operation interruption rate, and difficulty in guaranteeing overall efficiency.

Method used

By collecting physical property data of tailings, marking high-variable areas, constructing input vectors, generating control commands using proportional-integral-derivative controllers, and providing feedback correction when deviations exceed limits, the system combines vibration spectrum and load torque criteria to trigger working condition reconstruction, updates the interpolation function, generates a local optimal parameter set, reallocates the working area based on working efficiency and generates conflict-free paths, and trains parameter mapping strategies for gray-scale release.

Benefits of technology

It effectively suppresses execution deviations, avoids interference between multiple machine trajectories, ensures stable and coordinated operation of the system under complex working conditions, and improves the continuity of operations and the overall control robustness.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

This invention belongs to the field of tailings mining technology, specifically relating to a tailings mining control method and system. By constructing a multi-dimensional over-limit criterion based on deviation, vibration spectrum, and load torque, a working condition reconfiguration mechanism is actively triggered. During the freeze period, a response matrix is ​​constructed using steady-state data, and parameter corrections are solved to achieve online updates of interpolation function nodes and slopes. Furthermore, based on the updated mapping relationship, a locally optimal parameter set is generated for multiple devices, and interference risk is dynamically calculated according to the predicted trajectory. If conflicts exist, the area is redistributed according to operational efficiency, and conflict-free paths are generated. This effectively suppresses execution deviations caused by parameter mismatch, avoids multi-machine trajectory interference, ensures stable and coordinated operation of the system under complex disturbance conditions, and significantly improves operational continuity and overall control robustness.