Partition and grading paste filling treatment and construction structure of open pit connecting underground goaf
The application of a three-stage filling structure and a Y-shaped diversion device has solved the problems of unreasonable load-bearing capacity and low solid waste utilization rate in open-pit to underground mining, achieving safe, economical and efficient management and ecological restoration of the goaf, and improving resource recovery rate and mining safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- CHIFENG CNMC BAIYIN NUOER MINING CO LTD
- Filing Date
- 2026-04-30
- Publication Date
- 2026-06-16
AI Technical Summary
Existing technologies cannot effectively solve the problems of unreasonable bearing structure, high filling cost, uneven diversion, disconnect between underground and open-pit management, low solid waste utilization rate and insufficient ecological restoration in complex goaf areas during the conversion from open-pit to underground mining. This results in poor safety and economic efficiency, making it difficult to meet the needs of deep mining.
By adopting a three-stage filling structure (high-strength rigid isolation, medium-strength flexible buffer, and low-strength high-efficiency compaction) and a Y-shaped multi-path independent diversion device, synchronous, zoned, precise, and efficient filling of underground voids and open pits is achieved, constructing a stable load-bearing system. Solid waste is used as a low-strength filling material, combined with surface transportation and underground graded filling processes, forming a complete process management system from surface preparation, pipeline transportation, precise diversion, to underground graded filling.
It has achieved safe, reliable, economical and efficient management of goaf areas, reduced backfilling costs, improved resource recovery and solid waste utilization rates, protected the safety of the underlying ore body, improved mining conditions, and achieved the integrated goal of ecological restoration and safety management.
Smart Images

Figure CN122215849A_ABST