Municipal road green belt structure with sponge city effect

By designing ecological green spaces and sunken green spaces on municipal roads, combined with perforated drainage pipes and overflow wells, the problems of rainwater treatment and green space water use in extreme climates are solved, the design concept of sponge cities is realized, and road safety and green spaces are improved. long-term operation.

CN221798629UActive Publication Date: 2024-10-01POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202323466820.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-01
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

The existing green belt design of municipal roads cannot effectively handle excessive rainstorms and droughts when faced with extreme climatic conditions, resulting in road water accumulation, soil loss and poor rainwater storage effects, affecting road safety and environmental and water protection issues.

Method used

Design a municipal road green belt structure that has the function of a sponge city, including ecological green space and sunken green space. Perforated drainage pipes are arranged between the two, using anti-seepage geotextiles, permeable geotextiles and planting soil layers, combined with overflow wells and The integrated inspection well realizes the collection, penetration and purification of rainwater to ensure the effective use of water.

Benefits of technology

It effectively absorbs excessive heavy rains, meets the water demand of green spaces, avoids soil erosion, improves road safety, and improves the practicality and efficiency of the structure by simplifying the construction process and reducing investment costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798629U_ABST
    Figure CN221798629U_ABST
Patent Text Reader

Abstract

The utility model relates to a municipal road green belt structure with a sponge city effect, the municipal road green belt structure is arranged between a motor vehicle lane and a sidewalk, the municipal road green belt structure comprises an ecological green land and a concave green land, the ecological green land comprises curb stone, a gravel belt, a first planting layer and a water passing groove which are sequentially arranged in the first direction, the first direction is the direction from the motorway to the sidewalk; the concave greenbelt comprises a perforated curb, a gravel belt and a second planting layer which are sequentially arranged in the first direction, the height of the second planting layer on the horizontal plane is lower than that of the motor vehicle lane and the sidewalk, and an overflow well is vertically arranged in the second planting layer; the ecological green land and the concave green land are arranged at intervals in the length direction of the motor vehicle lane, and perforated drainage pipes are arranged in the first planting layer and the second planting layer in the length direction. According to the municipal road green belt structure, on one hand, part of catchment when over-standard rainstorm comes can be absorbed; and on the other hand, rainfall can be regulated and stored, and the water demand of the green land can be met in the long drought period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of municipal water supply and drainage technology, and in particular to a municipal road green belt structure having the function of a sponge city. Background Art

[0002] In recent years, most cities in my country have been affected by extreme climatic conditions, and urban flooding has occurred from time to time. For this reason, the country has creatively proposed the concept of "sponge city", striving to achieve the goals of "infiltration, retention, storage, purification, use, and drainage" through various engineering measures in urban construction. "Municipal road green belts" are the carriers for realizing sponge cities.

[0003] In conventional design, municipal road green belts mostly consider reserving a certain area and directly planting green crops, and rarely consider connecting with the municipal drainage network system. If there is excessive rainstorm or blockage of some drainage channels, the road may accumulate too much water, which may cause soil loss in the green belt and cause environmental and water conservation problems. At the same time, the sustainable use of daily rainfall is not considered; in case of long-term drought, regular watering is required to ensure the survival of plants in the green belt. Under the current sponge city design concept, "sunken green space" has gradually become popular. However, in its design and use process, there are more or less flaws in the collection, infiltration and purification of rainwater, which may cause poor rainwater accumulation effect, affect the safe operation of roads, cause soil loss, and cannot be effectively used for a long time. On the other hand, in terms of the current municipal road drainage method, the road is connected to the municipal pipeline through a simple rainwater grate or water collection well. If there is excessive rainstorm or blockage of some drainage channels, it will cause road waterlogging or waterlogging to a certain extent, thereby restricting traffic safety. Utility Model Content

[0004] The embodiment of the present application provides a municipal road green belt structure that has the function of a sponge city. The stormwater storage function of the green space is enhanced during the upgrading and transformation. On the one hand, it can absorb part of the runoff when super-standard rainstorms occur; on the other hand, it can implement the regulation and storage function of rainfall to meet the water demand of the green space during long droughts.

[0005] The municipal road green belt structure provided in the embodiment of the present application is arranged between the motor vehicle lane and the sidewalk, and includes:

[0006] An ecological green space, the ecological green space comprising a curbstone, a gravel belt, a first planting layer and a water groove arranged in sequence along a first direction, the first direction being a direction from the motor vehicle lane to the sidewalk;

[0007] A sunken green space, the sunken green space comprising an open-hole curbstone, a gravel belt and a second planting layer arranged in sequence along the first direction, the height of the second planting layer on a horizontal plane is lower than the motor vehicle lane and the sidewalk, and an overflow well is vertically arranged in the second planting layer;

[0008] The ecological green space and the sunken green space are arranged at intervals along the length direction of the motor vehicle lane, and perforated drainage pipes are arranged in the first planting layer and the second planting layer along the length direction.

[0009] In addition, the municipal road green belt structure provided in the embodiment of the present application may also have the following additional technical features:

[0010] In an optional solution, the first planting layer includes an impermeable geotextile, a gravel layer, a permeable geotextile and a planting soil layer arranged in sequence from bottom to top;

[0011] The anti-seepage geotextile is coated on the wall between the motor vehicle lane and the sidewalk, the permeable geotextile is laid between the gravel layer and the planting soil layer, and the perforated drainage pipe is located in the gravel layer.

[0012] In an optional solution, the second planting layer includes an impermeable geotextile, a gravel layer, a permeable geotextile and a planting soil layer arranged in sequence from bottom to top;

[0013] The anti-seepage geotextile is coated on the wall between the motor vehicle lane and the sidewalk, the permeable geotextile is laid between the gravel layer and the planting soil layer, the planting soil layer of the second planting layer is planted with green plants, and the perforated drainage pipe is located in the gravel layer.

[0014] In an optional solution, the second planting layer includes a rammed soil layer, an impermeable geotextile, a gravel drainage layer, a permeable geotextile and improved planting soil arranged in sequence from bottom to top;

[0015] The anti-seepage geotextile is coated on the wall between the motor vehicle lane and the sidewalk, the permeable geotextile is laid between the gravel drainage layer and the improved planting soil, and the perforated drainage pipe is located in the gravel drainage layer.

[0016] In an optional scheme, the overflow well includes a concrete well seat, an integral inspection well, a sewage interception basket and a turbine rainwater grate arranged in sequence from bottom to top; the integral inspection well is arranged at the top of the concrete well seat, the sewage interception basket and the turbine rainwater grate are arranged at the entrance of the integral inspection well, and the perforated drainage pipe is connected to the integral inspection well.

[0017] In an optional solution, a granite-burnt curbstone is provided on one side of the sidewalk close to the ecological green space and / or the sunken green space, and the outer edge of the gravel belt is covered with a permeable geotextile.

[0018] In an optional solution, at least a portion of the outer wall of the perforated drainage pipe is wrapped with a permeable geotextile, and the water outlet end of the perforated drainage pipe is connected to the municipal rainwater pipe network.

[0019] In an optional solution, the perforated drainage pipe has an opening rate of 2.7%, the gravel particle size of the gravel belt is 8 to 16 mm, and the porosity is 35% to 45%.

[0020] The beneficial effects of the embodiments of the present application are:

[0021] The municipal road green belt structure in the embodiment of the present application is consistent with the design concept of the sponge city, effectively realizing water absorption, water demand, water infiltration, and water purification when it rains, and "releasing" and utilizing the stored water when needed; it can not only better connect with the municipal road and avoid hollowing out and scouring of the road foundation, but also effectively avoid soil loss and achieve long-term operation; in addition, by adopting an integral finished plastic inspection well and setting a sewage interception hanging basket at the inspection well mouth, the efficiency of the use of the structure can be further improved, and efficient maintenance and treatment work can also be achieved during the operation period. In general, the municipal road green belt structure has a simple construction process, low investment cost, and strong practicality, and can be promoted to similar projects.

[0022] It should be understood that the foregoing general description and the following detailed description are exemplary only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A schematic diagram of the structure of a municipal road green belt provided in this application in a specific embodiment;

[0024] Figure 2 for Figure 1 AA cross-sectional structural diagram of the green belt structure of the municipal road in the middle;

[0025] Figure 3 for Figure 1 BB section structure diagram of the green belt structure of the municipal road in the middle;

[0026] Figure 4 for Figure 1 Schematic diagram of the cross-sectional structure of the green belt structure of the municipal road in the overflow well;

[0027] Figure 5 A schematic diagram of the cross-sectional structure of the sunken green space provided in the present application in another embodiment.

[0028] Figure numerals: motor vehicle lane 1, sidewalk 2, ecological green space 3, sunken green space 4, curb 5, gravel belt 6, first planting layer 7, water-passing groove 8, perforated curb 9, second planting layer 10, overflow well 11, perforated drainage pipe 12, anti-seepage geotextile 13, gravel layer 14, permeable geotextile 15, planting soil layer 16, rammed soil layer 17, gravel drainage layer 18, improved planting soil 19, concrete well base 20, integral inspection well 21, sewage interception basket 22, turbine rainwater grate 23, granite burned curb 24, green plants 25.

[0029] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application. DETAILED DESCRIPTION

[0030] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.

[0031] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0032] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.

[0033] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0034] It should be noted that the directional words such as "upper", "lower", "left", and "right" described in the embodiments of the present application are described at the angles shown in the accompanying drawings and should not be understood as limiting the embodiments of the present application. In addition, in the context, it is also necessary to understand that when it is mentioned that an element is connected to another element "upper" or "lower", it can not only be directly connected to another element "upper" or "lower", but also indirectly connected to another element "upper" or "lower" through an intermediate element.

[0035] like Figure 1-5As shown, an embodiment of the present application provides a municipal road green belt structure with the function of a sponge city, which is arranged between a motor vehicle lane 1 and a sidewalk 2, and specifically includes an ecological green space 3 and a sunken green space 4, wherein the ecological green space 3 includes a curb 5, a gravel belt 6, a first planting layer 7 and a water groove 8 arranged in sequence along a first direction, and the first direction is the direction from the motor vehicle lane 1 to the sidewalk 2; the sunken green space 4 includes an open curb 9, a gravel belt 6 and a second planting layer 10 arranged in sequence along the first direction, the height of the second planting layer 10 on the horizontal plane is lower than that of the motor vehicle lane 1 and the sidewalk 2, and an overflow well 11 is vertically arranged in the second planting layer 10; the ecological green space 3 and the sunken green space 4 are arranged at intervals along the length direction of the motor vehicle lane 1, and perforated drainage pipes 12 are arranged in the first planting layer 7 and the second planting layer 10 along the length direction.

[0036] The embodiment of the present application meets the requirements of a sponge city through an interval matching system of "ecological green space 3 + sunken green space 4". Rainwater from the driving road flows along the cross slope of the road into the side-zoned sunken green space for infiltration. Rainwater from the non-motorized vehicle lane 1 and the sidewalk 2 flows along the cross slope into the connected tree pool for infiltration. Excess rainwater is discharged into the municipal pipeline through the overflow rainwater outlet in the sunken green space.

[0037] like Figure 3 As shown, in a specific embodiment, the first planting layer 7 includes an impermeable geotextile 13, a gravel layer 14, a permeable geotextile 15 and a planting soil layer 16 arranged in sequence from bottom to top; the impermeable geotextile 13 covers the wall surface between the motor vehicle lane 1 and the sidewalk 2, the permeable geotextile 15 is laid between the gravel layer 14 and the planting soil layer 16, and the perforated drainage pipe 12 is located in the gravel layer 14.

[0038] like Figure 2 As shown, in a specific embodiment, the second planting layer 10 includes an impermeable geotextile 13, a gravel layer 14, a permeable geotextile 15 and a planting soil layer 16 arranged in sequence from bottom to top; the impermeable geotextile 13 covers the wall surface between the motor vehicle lane 1 and the sidewalk 2, the permeable geotextile 15 is laid between the gravel layer 14 and the planting soil layer 16, the planting soil layer 16 of the second planting layer 10 is planted with green plants 25, and the perforated drainage pipe 12 is located in the gravel layer 14. Plants in the second planting layer 10 should be selected according to the vertical arrangement of the green space, water conditions, runoff rainwater quality, etc., and local plants with strong cold resistance, heat resistance, salt resistance, pollution resistance, etc. should be selected according to the area where the project is located to ensure the survival of the plants and the landscape effect.

[0039] During the construction of the municipal road green belt structure, the road base and cushion layer near the tree pit can be covered with an anti-seepage membrane (two-cloth-one-membrane structure) to prevent rainwater from penetrating and eroding the road foundation, reducing the foundation bearing capacity, and thus affecting traffic safety. The gravel belt 6 and the permeable sidewalk 2 are covered with a 300g / m2 permeable geotextile 15 at the junction with the tree pit to prevent the soil from clogging the gravel and affecting its permeability. The overlap width of the geotextile is not less than 10cm. The perforated de110 pipe adopts a PE pipe with a nominal pressure of 0.6MPa and an opening rate of 2.7%. The pipe connection method adopts bonding and is covered with a permeable geotextile 15.

[0040] like Figure 5 As shown, in a specific embodiment, the second planting layer 10 includes a rammed soil layer 17, an impermeable geotextile 13, a gravel drainage layer 18, a permeable geotextile 15 and improved planting soil 19 arranged in sequence from bottom to top; the impermeable geotextile 13 covers the wall between the motor vehicle lane 1 and the sidewalk 2, the permeable geotextile 15 is laid between the gravel drainage layer 18 and the improved planting soil 19, and the perforated drainage pipe 12 is located in the gravel drainage layer 18.

[0041] like Figure 4 As shown, in a specific embodiment, the overflow well 11 includes a concrete well seat 20, an integral inspection well 21, a sewage interception basket 22 and a turbine rainwater grate 23 arranged in sequence from bottom to top; the integral inspection well 21 is arranged on the top of the concrete well seat 20, the sewage interception basket 22 and the turbine rainwater grate 23 are arranged at the entrance of the integral inspection well 21, and the perforated drain pipe 12 is connected to the integral inspection well 21. The overflow well 11 in the green belt structure can adopt an integral finished plastic inspection well, and the bottom should be implemented with a concrete well seat 20 first. A sewage interception basket 22 is set at the wellhead of the overflow well 11 to meet the filtration of rainwater containing impurities, thereby ensuring the long-term operation of the overflow well 11; the interception well adopts a turbine rainwater grate 23 to ensure the water inlet efficiency. The overflow well 11 mouth is 100mm higher than the greening bottom, which can be adjusted according to the actual overflow water level elevation; the effective growth space of the plant root system in the ecological tree pool is 120cm×100cm.

[0042] In addition, a granite burnt curb 245 is provided on one side of the sidewalk 2 close to the ecological green space 3 and / or the sunken green space 4, and a permeable geotextile 15 is provided on the outer edge of the gravel belt 6. At least part of the outer wall of the perforated drainage pipe 12 is wrapped with a permeable geotextile, and the outlet end of the perforated drainage pipe 12 is connected to the municipal rainwater pipe network. The granite burnt curb 245 is in the form of sesame gray granite burnt surface, with a size of 150mm×400mm×1000mm. Its bottom is made of 30mm thick M7.5 cement mortar cushion layer and is located on the C15 concrete backrest. The flow channel behind the hole of the perforated curb 9 is arranged with 5cm pebble veneer, which can achieve the energy dissipation effect of large-flow rainwater and reduce the scouring of the soil of the rear green belt. Considering safety, the inner side line of the sidewalk 2 needs to adopt fences, plants and other protective measures on both sides of the bioretention. The layout and elevation of the municipal pipe network should be reviewed before construction to ensure that the green belt overflow well 11 is effectively connected to the municipal pipe network.

[0043] The rainwater from the road is discharged into the ecological green space 3 through the perforated curbstone 9, and is first filtered by the gravel belt 6. The gravel belt 6 is provided with a perforated drainage pipe 12 with an opening rate of 2.7%, which is connected to the nearest rainwater pipe. The gravel particle size is 8-16mm, the porosity is 35%-45%, and the de110PE perforated pipe is wrapped with a permeable geotextile and placed in the gravel layer 14. The curbstone 5 is perforated every 10 meters, and a ductile iron rainwater grate with a specification of 500×200 is used.

[0044] The working principle of the municipal road green belt structure is: by creating different ways of collecting water and rainwater, it meets the drainage requirements of different areas of the municipal road motorway 1, green belt and sidewalk 2, which greatly conforms to the design concept of the sponge city, effectively realizes water absorption, water demand, water infiltration and water purification when it rains, and "releases" and utilizes the stored water when needed, which can meet the requirements of a certain degree of absorption of road rainwater under super-standard rain and waterlogging conditions, and maximize the driving safety of traffic roads. At the same time, the integral finished plastic inspection well and the sewage interception hanging basket 22 arranged at the inspection well mouth adopted by the utility model can further improve the use efficiency of the structure and realize efficient maintenance during the operation period.

[0045] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A municipal road green belt structure with the function of a sponge city, wherein the municipal road green belt structure is arranged between a motor vehicle lane and a sidewalk, and is characterized in that: include: An ecological green space, the ecological green space comprising a curbstone, a gravel belt, a first planting layer and a water groove arranged in sequence along a first direction, the first direction being a direction from the motor vehicle lane to the sidewalk; A sunken green space, the sunken green space comprising an open-hole curbstone, a gravel belt and a second planting layer arranged in sequence along the first direction, the height of the second planting layer on a horizontal plane is lower than the motor vehicle lane and the sidewalk, and an overflow well is vertically arranged in the second planting layer; The ecological green space and the sunken green space are arranged at intervals along the length direction of the motor vehicle lane, and perforated drainage pipes are arranged in the first planting layer and the second planting layer along the length direction.

2. The municipal road green belt structure with sponge city function according to claim 1 is characterized in that: The first planting layer includes an impermeable geotextile, a gravel layer, a permeable geotextile and a planting soil layer arranged in sequence from bottom to top; The anti-seepage geotextile is coated on the wall between the motor vehicle lane and the sidewalk, the permeable geotextile is laid between the gravel layer and the planting soil layer, and the perforated drainage pipe is located in the gravel layer.

3. The municipal road green belt structure with sponge city function according to claim 1 is characterized in that: The second planting layer includes an impermeable geotextile, a gravel layer, a permeable geotextile and a planting soil layer arranged in sequence from bottom to top; The anti-seepage geotextile is coated on the wall between the motor vehicle lane and the sidewalk, the permeable geotextile is laid between the gravel layer and the planting soil layer, the planting soil layer of the second planting layer is planted with green plants, and the perforated drainage pipe is located in the gravel layer.

4. The municipal road green belt structure with sponge city function according to claim 1 is characterized in that: The second planting layer includes a rammed soil layer, an impermeable geotextile, a gravel drainage layer, a permeable geotextile and improved planting soil arranged in sequence from bottom to top; The anti-seepage geotextile is coated on the wall between the motor vehicle lane and the sidewalk, the permeable geotextile is laid between the gravel drainage layer and the improved planting soil, and the perforated drainage pipe is located in the gravel drainage layer.

5. The municipal road green belt structure with sponge city function according to any one of claims 1 to 4, characterized in that: The overflow well includes a concrete well seat, an integral inspection well, a sewage interception basket and a turbine rainwater grate which are arranged in sequence from bottom to top; the integral inspection well is arranged at the top of the concrete well seat, the sewage interception basket and the turbine rainwater grate are arranged at the entrance of the integral inspection well, and the perforated drainage pipe is connected to the integral inspection well.

6. The municipal road green belt structure with sponge city function according to claim 5 is characterized in that: A granite burnt curb is arranged on one side of the sidewalk close to the ecological green space and / or the sunken green space, and a permeable geotextile is covered on the outer edge of the gravel belt.

7. The municipal road green belt structure with sponge city function according to claim 5 is characterized in that: At least part of the outer wall of the perforated drainage pipe is wrapped with a permeable geotextile, and the water outlet end of the perforated drainage pipe is connected to the municipal rainwater pipe network.

8. The municipal road green belt structure with sponge city function according to claim 5 is characterized in that: The perforated drainage pipe has an opening rate of 2.7%, the gravel particle size of the gravel belt is 8 to 16 mm, and the porosity is 35% to 45%.

Citation Information

Cited By

  • Deep root system plant planting pool for intercepting road soil pollution

    CN120476898A