Annular hoisting structure for overhauling in furnace

By using the embedded hoisting method of the ring hoisting structure for in-furnace maintenance, the problems of complex operation, high cost and poor safety in the existing technology have been solved, and the safe and efficient hoisting of the blast furnace shell and cooling wall has been achieved.

CN222063828UActive Publication Date: 2024-11-26PANGANG GRP ENG TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420191037.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-11-26
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

The existing method of drilling holes in the blast furnace shell to install the ring beam is difficult to operate, affects the operation of the lifting platform, is harmful to the life of the furnace shell, and is complex, costly and unsafe.

Method used

An in-furnace maintenance ring hoisting structure is adopted, including a ring hoisting beam, a hoisting bracket and connecting bolts. The existing cooling wall bolt holes are used for embedded hoisting to form a ring hoisting system, which is combined with electric hoists arranged in a ring along the inside of the furnace shell.

Benefits of technology

It simplifies the hoisting operation, protects the integrity of the furnace shell, improves construction safety and efficiency, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222063828U_ABST
    Figure CN222063828U_ABST
Patent Text Reader

Abstract

The utility model relates to an annular hoisting structure for in-furnace maintenance, and belongs to the technical field of maintenance equipment. The device comprises an annular hanging beam (2), a hanging bracket seat (3) and a connecting bolt (5), the hanging bracket seat (3) comprises a fixing plate (33) and a connecting plate (31), the two ends of the connecting plate (31) are connected with the annular hanging beam (2) and the fixing plate (33) respectively, and the connecting end of the connecting plate (31) and the fixing plate (33) is an inclined plane; and the fixed plate (33) is provided with a connecting hole, so that the fixed plate (33) is arranged on the cooling wall (1) in a penetrating manner through a connecting bolt (5). According to the device, the equally-divided hanging bracket seats (3) and the annular hanging beam (2) are connected together through bolt holes of an existing cooling wall (1) and are matched with an electric hoist to form an annular hanging system, the annular hanging system is annularly arranged along the interior of a furnace shell, and the hanging requirements of the furnace shell and the cooling wall (1) are met. The problems that in the prior art, the operation difficulty is large and the influence on the service life of the furnace shell is large by directly forming a hole in the furnace shell, penetrating through a cross beam and then installing an annular beam are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to an annular hoisting structure for maintenance in a furnace, belonging to the technical field of maintenance equipment. Background Art

[0002] As part of the hidden danger rectification project of the new No. 3 blast furnace in the ironmaking plant, it is necessary to replace cooling wall sections 5 to 13 and furnace shell sections 7 to 12, and furnace shell sections 13 and above and cooling wall sections 12 and above will not be removed. The middle section of the existing blast furnace shell adopts a new 1 / 6 area replacement technology, and each furnace shell and cooling wall can only be hoisted using the embedded method. However, since each furnace shell adopts an embedded local excavation installation method, it is actually necessary to set up a ring crane according to the actual situation on site to implement the replacement of furnace shell sections 7 to 12 and cooling wall sections 6 to 12, in order to meet the hoisting space and lifting height requirements. Therefore, the existing ring-type hanging is set at a suitable position where the cooling wall needs to be replaced but the furnace shell does not need to be replaced in the previous generation. Under normal circumstances, the installation of the furnace shell replaced in the middle section of the blast furnace shell is to symmetrically open 4 600mm*800mm rectangular holes on the upper opening of the upper furnace shell for passing 2 12-meter 56#C I-beams (main hanging beams), and then lay 7 12-meter HM244*175*7*11 (secondary hanging beams) on the main hanging beams to form an overall hanging frame. After the overall hanging frame is formed, double-back 14# channel steel (hanging beam) and ring-type hanging beams are set on the main and secondary hanging beams for hanging the furnace shell and cooling wall. This method is to directly open a hole in the furnace shell to pass the crossbeam and then install the ring beam. It is not only difficult to operate, but also affects the operation of the hanging plate in the furnace, and has a greater impact on the long life of the furnace shell. At the same time, the ring-type hanging setting process of the existing technology is complicated and costly, and its construction safety is difficult to ensure and the construction time is long. Utility Model Content

[0003] The technical problem to be solved by the utility model is that the method of directly drilling holes in the furnace shell and then installing the annular beam in the prior art is not only difficult to operate, affects the operation of the hanging plate in the furnace, but also has a great impact on the life of the furnace shell.

[0004] The technical solution adopted by the utility model to solve its technical problems is: an annular hanging structure for furnace maintenance, including an annular hanging beam, and also including a plurality of hanger seats and connecting bolts. The hanger seat includes a fixed plate and a connecting plate. The connecting plate is an arc structure, and one end is connected to the upper end of the annular hanging beam, and the other end is connected to the fixed plate. The connecting end of the connecting plate and the fixed plate is an inclined surface; a connecting hole is provided in the middle of the fixed plate, so that the fixed plate can be passed through the connecting bolts on the cooling wall.

[0005] Wherein, the number of the hanger seats in the above device is 13 to 15, and they are arranged on the cooling wall at circumferential intervals.

[0006] Furthermore, in the above device, the connecting plates of each of the hanger seats are two pieces arranged at intervals, and a supporting plate is horizontally arranged away from the fixed plate end, and the lower end of the supporting plate is connected to the upper end of the annular hanging beam.

[0007] Furthermore, the above device also includes a stiffening plate, which is obliquely arranged between the two connecting plates, and the two sides of the stiffening plate are connected to the side walls of the corresponding side connecting plates.

[0008] Wherein, the connecting plate in the above device is in the shape of an inverted Big Dipper.

[0009] Furthermore, when the support plate in the above device is arranged horizontally, the inclined surface of the connecting end of the connecting plate and the fixing plate matches the side wall of the cooling wall 1.

[0010] Furthermore, when the support plate in the above device is arranged horizontally, the distance between the upper end connecting the connecting plate and the fixing plate and the vertical line passing through the lower end connecting the connecting plate is 28 to 30 mm.

[0011] Furthermore, the annular suspension beam in the above device is rolled from 36# I-beam.

[0012] The beneficial effects of the utility model are as follows: the device has a simple structure and is easy to use. The device uses an embedded hoisting method to set up a ring-shaped hanger using the existing cooling wall bolt holes. Specifically, the existing cooling wall bolt holes are used to connect the equally divided hanger seat with the ring-shaped hanger beam, and the electric hoist is used to form a ring-shaped hanger system, which is arranged in a ring along the inside of the furnace shell. This structure can reduce the upper load and avoid damaging the integrity of the furnace shell, meeting the requirements for hoisting the furnace shell and cooling wall. At the same time, it realizes the safe and efficient installation of the blast furnace shell and cooling wall, and can be widely promoted and used in the maintenance of domestic blast furnaces. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 This is a schematic diagram of the installation structure of the utility model.

[0014] Figure 2 For this utility model Figure 1 Schematic diagram of the AA section structure.

[0015] Figure 3 For this utility model Figure 1 A magnified schematic diagram of the structure at point I in the middle.

[0016] Figure 4 It is a schematic diagram of the connection structure between the hanger seat and the cooling wall of the utility model.

[0017] Figure 5 The utility model is a schematic diagram of the connection structure between the hanger seat and the annular hanging beam.

[0018] Figure numerals: 1 is a cooling wall, 2 is an annular hanging beam, 3 is a hanger seat, 31 is a connecting plate, 32 is a stiffening plate, 33 is a fixing plate, 34 is a supporting plate, and 5 is a connecting bolt. DETAILED DESCRIPTION

[0019] The utility model is further described below in conjunction with the accompanying drawings.

[0020] like Figures 1 to 5 As shown, the annular hoisting structure for furnace maintenance of the utility model includes an annular hanging beam 2, and also includes a plurality of hanger seats 3 and connecting bolts 5. The hanger seat 3 includes a fixing plate 33 and a connecting plate 31. The connecting plate 31 is an arc-shaped structure, and one end is connected to the upper end of the annular hanging beam 2, and the other end is connected to the fixing plate 33. The connecting end of the connecting plate 31 and the fixing plate 33 is an inclined surface; a connecting hole is provided in the middle of the fixing plate 33, so that the fixing plate 33 can be passed through the connecting bolts 5 on the cooling wall 1. It can be understood by those skilled in the art that the present device uses the embedded hoisting method of setting the annular hanger by the bolt holes of the existing cooling wall 1, specifically, the existing bolt holes of the cooling wall 1 connect the equally divided hanger seats 3 and the annular hanging beam 2 together with the electric hoist to form an annular hanging system, and are arranged in a ring along the inside of the furnace shell. The actual preferred structure includes an annular hanger beam 2, a plurality of hanger seats 3 and connecting bolts 5. The hanger seat 3 is mainly used to fix the annular hanger beam 2 on the cooling wall 1. Therefore, the hanger seat 3 preferably includes a fixing plate 33 and a connecting plate 31. Since one end is connected to the upper end of the annular hanger beam 2 and the other end is connected to the fixing plate 33, and the annular hanger beam 2 needs to be kept horizontal, the connecting plate 31 is preferably an arc structure, and the connecting end of the connecting plate 31 and the fixing plate 33 is an inclined surface, and the inclination angle should be compatible with the inclination angle of the inner wall of the cooling wall 1, so that the fixing plate 33 can fit tightly with the inside of the cooling wall 1 to keep the structure of the connection firm. The device preferably has a connecting hole in the middle of the fixing plate 33, so that the fixing plate 33 can be passed through the cooling wall 1 by the connecting bolt 5. Specifically, the fixing plate 33 is placed close to the cooling wall 1, and the screw is passed through the fixing plate 33 and the cooling wall 1 from the inside to the outside in turn and then fixed with the nut thread. The hanger seat 3 should be set on the same diameter, and the number of the hanger seat 3 can actually be reasonably designed according to the lifting weight. The connecting bolt 5 can be an M36 bolt, and a ring-shaped hanging beam 2 reinforcement measure is provided outside the blast furnace to ensure the overall lifting structure strength.

[0021] Preferably, the number of the hanger seats 3 in the above device is 13 to 15, and they are arranged on the cooling wall 1 at circumferential intervals. It can be understood by those skilled in the art that the preferred number of the hanger seats 3 in this device is 13 to 15, and they are arranged on the cooling wall 1 at circumferential intervals. Specifically, the preferred number of the hanger seats 3 is 15, so that the device actually connects the annular hanger beam 2 and the blast furnace shell into a whole through 15 sets of annular beam hanger seats 3, and is arranged in an annular manner along the inside of the furnace shell. And the hanger seats 3 are arranged on the cross section of the same diameter of the cooling wall 1 at circumferential intervals.

[0022] Preferably, in the above device, the connecting plates 31 of each of the hanger seats 3 are two spaced apart, and a support plate 34 is horizontally arranged away from the end of the fixed plate 33, and the lower end of the support plate 34 is connected to the upper end of the annular hanger beam 2. It can be understood by those skilled in the art that, since there are multiple hanger seats 3, and each hanger seat 3 includes a support plate 34, two spaced apart connecting plates 31 and a fixed plate 33, and the connection can be fixed by welding. The support plate 34 and the fixed plate 33 are respectively arranged at the two ends of the connecting plate 31, the support plate 34 is horizontally arranged to match the annular hanger beam 2, and the fixed plate 33 is inclined to match the cooling wall 1.

[0023] Preferably, the device further comprises a stiffening plate 32, which is obliquely arranged between the two connecting plates 31, and the two sides of the stiffening plate 32 are connected to the side walls of the corresponding side connecting plates 31. It can be understood by those skilled in the art that, in order to ensure the structural strength of the hanger seat 3, it is preferred to arrange a stiffening plate 32 between the two spaced connecting plates 31, and the two sides of the stiffening plate 32 are connected to the side walls of the corresponding side connecting plates 31, and can be fixed by welding.

[0024] Preferably, the connecting plate 31 in the above device is in the shape of an inverted Big Dipper. It can be understood by those skilled in the art that, since the annular suspension beam 2 should be arranged horizontally in the blast furnace when working, the support plate 34 should be kept horizontally arranged during actual installation, and the interior of the cooling wall 1 is an inclined surface structure, so the fixing plate 33 should be arranged at an angle. In order to ensure that the support plate 34 is arranged horizontally at one end of the connecting plate 31 and the fixing plate 33 is arranged at an angle at the other end, and to ensure the structural strength of the connecting plate 31, the connecting plate 31 of the device is preferably in the shape of an inverted Big Dipper.

[0025] Preferably, when the support plate 34 in the above device is horizontally arranged, the inclined surface of the connection end of the connection plate 31 and the fixed plate 33 matches the side wall of the cooling wall 1. It can be understood by those skilled in the art that in order to ensure that the fixed plate 33 and the cooling wall 1 are tightly fitted after the annular suspension beam 2 is horizontally arranged, the device preferably supports the support plate 34 when it is horizontally arranged, and the inclined surface of the connection end of the connection plate 31 and the fixed plate 33 matches the side wall of the cooling wall 1, so as to ensure that the pre-tightening force of the connecting bolt 5 presses the fixed plate 33 against the cooling wall 1, thereby ensuring the structural strength of the connection.

[0026] Preferably, when the support plate 34 in the above device is horizontally arranged, the spacing between the upper end of the connection between the connecting plate 31 and the fixing plate 33 and the vertical line passing through the lower end of the connection is 28 to 30 mm. It can be understood by those skilled in the art that in order to ensure that the fixing plate 33 is tightly fitted with the cooling wall 1 after the annular suspension beam 2 is horizontally arranged, the preferred support plate 34 of the device is horizontally arranged, and the spacing between the upper end of the connection between the connecting plate 31 and the fixing plate 33 and the vertical line passing through the lower end of the connection is 28 to 30 mm. In fact, it can be known through calculation that the spacing is 30 mm, which ensures that the pre-tightening force of the connecting bolt 5 presses the fixing plate 33 tightly against the cooling wall 1, thereby ensuring the structural strength of the connection.

[0027] Preferably, the annular suspension beam 2 in the above device is made of 36# I-beam. Those skilled in the art can understand that the preferred material of the annular suspension beam 2 of this device is made of 36# I-beam to ensure the stability of the hoisting.

Claims

1. A furnace maintenance annular hoisting structure, comprising an annular hanging beam (2), characterized in that: It also includes a plurality of hanger seats (3) and connecting bolts (5), wherein the hanger seat (3) includes a fixing plate (33) and a connecting plate (31), wherein the connecting plate (31) is an arc-shaped structure, and one end is connected to the upper end of the annular hanger beam (2), and the other end is connected to the fixing plate (33), and the connecting end of the connecting plate (31) and the fixing plate (33) is an inclined surface; a connecting hole is provided in the middle of the fixing plate (33), so that the fixing plate (33) can be passed through the connecting bolts (5) and installed on the cooling wall (1).

2. The annular hoisting structure for furnace maintenance as claimed in claim 1, characterized in that: The number of the hanger seats (3) is 13 to 15, and they are arranged on the cooling wall (1) at circumferential intervals.

3. The annular hoisting structure for furnace maintenance as claimed in claim 2, characterized in that: The connecting plates (31) of each of the hanger seats (3) are two pieces arranged at intervals, and a support plate (34) is horizontally arranged away from the end of the fixed plate (33), and the lower end of the support plate (34) is connected to the upper end of the annular hanging beam (2).

4. The annular hoisting structure for furnace maintenance as claimed in claim 3, characterized in that: It also includes a stiffening plate (32), which is obliquely arranged between the two connecting plates (31) and has two sides connected to the side walls of the corresponding side connecting plates (31).

5. The annular hoisting structure for furnace maintenance according to claim 1, characterized in that: The connecting plate (31) is in the shape of an inverted Big Dipper.

6. The annular hoisting structure for furnace maintenance as claimed in claim 3, characterized in that: When the support plate (34) is arranged horizontally, the inclined surface of the connection end of the connection plate (31) and the fixing plate (33) matches the side wall of the cooling wall (1).

7. The annular hoisting structure for furnace maintenance as claimed in claim 3, characterized in that: When the support plate (34) is arranged horizontally, the distance between the upper end connecting the connecting plate (31) and the fixing plate (33) and the vertical line passing through the lower end connecting is 28 to 30 mm.

8. The annular hoisting structure for furnace maintenance as claimed in claim 1, characterized in that: The annular suspension beam (2) is formed by rolling 36# I-beam.