New and old bridge abutted seam structure

By setting anchoring connection mother and daughter components between new and old bridges, combined with limiting groove components and shock-absorbing sponge, the problem of unstable bridge joint connection with joints larger than 70mm was solved, achieving stable bridge connection and improved fatigue resistance.

CN222065146UActive Publication Date: 2024-11-26ZHEJIANG UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420195110.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-11-26
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

There is a lack of clear solutions for the joint connection problem between existing bridges and newly built or widened bridges when the joint is larger than 70mm, especially when the settlement of the old and new bridges is uneven, which leads to unstable connection.

Method used

An anchoring connection is adopted, with the main and sub-components interlocked, combined with limiting slots and shock-absorbing sponge to form a bridge settlement buffer structure. The main bodies of the old and new bridges are connected by anchor bolts, and elastic concrete and asphalt concrete layers are set at the joints to accommodate uneven settlement.

Benefits of technology

It achieves a stable connection between the old and new bridges, reduces shear deformation at the joints, improves fatigue resistance, and solves the height difference problem caused by inconsistent settlement between the old and new bridges through detachable shock-absorbing foam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065146U_ABST
    Figure CN222065146U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge structures, and discloses a new and old bridge abutted seam structure which comprises a new and old bridge main body connecting structure used for splicing new and old bridge main bodies and a new and old bridge main body deck structure used for splicing the tops of the new and old bridge main bodies. The new and old bridge main body connecting structure comprises an anchoring connecting mother piece arranged on an old bridge main body in a penetrating mode and an anchoring connecting child piece arranged on a new bridge main body in a penetrating mode, and the anchoring connecting child piece is matched with the anchoring connecting mother piece in an inserted mode. The anchoring connection child part and the anchoring connection mother part are arranged on the new bridge body and the old bridge body respectively, the bridge settlement buffering structure is formed after the anchoring connection child part and the anchoring connection mother part are connected in an inserted mode, connection of two bridges is achieved, and the effect of differential settlement is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge structures, in particular to a joint structure of new and old bridges. Background Art

[0002] With the rapid development of today's society and the increasing traffic volume, the previously built bridges cannot meet people's growing transportation needs, and the idea of ​​expanding new and old bridges is becoming more and more popular.

[0003] There is no clear solution to the connection problem between the existing bridge and the newly built and widened bridge when the joint is larger than 70mm. In view of this phenomenon, the utility model proposes a new and old bridge joint structure for solving this problem. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a new-old bridge joint structure, which is suitable for the 70mm joint seams of new and old bridges.

[0005] In order to achieve the above-mentioned purpose, the utility model provides the following solutions:

[0006] A new-old bridge joint structure comprises a new-old bridge main body connection structure for splicing the new-old bridge main body and a new-old bridge main body deck structure for splicing the new-old bridge main body on the top; the new-old bridge main body connection structure comprises an anchor connection mother component penetrated on the old bridge main body and an anchor connection sub-component penetrated on the new bridge main body, and the anchor connection sub-component is plugged into and matched with the anchor connection mother component.

[0007] Furthermore, the anchor connection mother component includes an anchor screw A and a limiting notch component arranged at the bottom of the anchor screw A. The anchor screw A is passed through the bridge body of the old bridge, and the limiting notch component is located below the bridge body of the old bridge.

[0008] Furthermore, the anchoring connection sub-component includes an anchoring screw B and a limiting anchoring column arranged at the bottom of the anchoring screw B. The anchoring screw B is passed through the bridge body of the new bridge, and the limiting anchoring column is located below the bridge body of the new bridge. The limiting anchoring column is inserted and fitted in the limiting slot component.

[0009] Furthermore, the limiting notch member adopts a hollow cylindrical structure with one side open, and the limiting notch of the limiting notch member is filled with a shock-absorbing sponge.

[0010] Furthermore, the main bridge deck structure of the new and old bridges includes an elastic concrete layer arranged above the joint between the new bridge body and the old bridge body, an asphalt concrete layer arranged on the new bridge body and located on one side of the elastic concrete layer, and an asphalt concrete layer arranged on the old bridge body and located on the other side of the elastic concrete layer.

[0011] Furthermore, the anchoring screw A is provided with an annular protrusion structure at its top and above the position close to the limiting notch; the anchoring screw B is provided with an annular protrusion structure at its top and above the position close to the limiting anchoring column.

[0012] Furthermore, the elastic concrete layer is laid with the same thickness as the asphalt concrete layers on both sides thereof.

[0013] The beneficial effects of the utility model are as follows:

[0014] 1) The utility model provides an anchor connection sub-component and an anchor connection mother component on the main body of the new and old bridges respectively. The anchor connection mother component is plugged into the anchor connection sub-component to form a bridge settlement buffer structure, thereby achieving the effect of connecting the two bridges and meeting the uneven settlement.

[0015] 2) Compared with traditional rubber damping blocks, the shock-absorbing sponge installed on the anchor connection mother part can more effectively reduce the shear deformation at the joint and have better anti-fatigue performance; the shock-absorbing sponge can make the displacement settlement value within a safe range. The shock-absorbing sponge is used at the joint of the new and old bridges. By changing its own shape, it can solve the height difference problem caused by the inconsistent settlement of the new and old bridges.

[0016] 3) The bottom of the utility model structural anchor connection mother component and the anchor connection sub-component is set below the main body of the new and old bridges, and the shock-absorbing sponge is detachable, which is convenient for the later replacement of the shock-absorbing sponge. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the anchor connection mother component of the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the anchoring connection sub-component of the utility model;

[0020] In the figure: 1. The main body of the old bridge; 2. The main body of the new bridge; 3. The anchor connection mother component; 301. The anchor screw A; 302. The limiting notch component; 4. The anchor connection sub-component; 401. The anchor screw B; 402. The limiting anchor column; 5. The elastic concrete layer; 6. The asphalt concrete layer; 7. The annular raised structure. DETAILED DESCRIPTION

[0021] In order to more clearly illustrate the implementation of the utility model, a clearer and more complete description of the design scheme in the example of the utility model is given. Obviously, the description of the example is only a part of the example, not the entire content. For the description of this example, all other implementations obtained by ordinary people in this example without creative work are within the scope of protection of the utility model patent.

[0022] like Figure 1 As shown, this example provides a new-old bridge joint structure, which is composed of a new-old bridge main connecting structure and a new-old bridge main bridge deck structure.

[0023] The main connection structure of the new and old bridges is composed of an anchor connection mother component 3, an anchor connection sub-component 4 and a shock-absorbing sponge;

[0024] The anchoring connection mother component 3 includes an anchoring screw A301 and a limiting slot component 302 arranged at the bottom of the anchoring screw A301. The anchoring screw A301 is passed through the old bridge body 1. The limiting slot component 302 is located below the old bridge body 1, and the limiting slot component 302 is exposed from the old bridge body 1.

[0025] The anchoring screw A301 is provided with an annular protrusion structure 7 at its top and above the position close to the limiting notch 302.

[0026] The limiting notch 302 is a hollow cylindrical structure with one side open, and the limiting notch 302 is filled with a shock-absorbing sponge.

[0027] The anchoring connection component 4 includes an anchoring screw B401 and a limiting anchoring column 402 arranged at the bottom of the anchoring screw B401. The anchoring screw B401 is passed through the new bridge body 2, and the limiting anchoring column 402 is located below the new bridge body 2. The limiting anchoring column 402 is inserted and fitted in the limiting groove component 302, and the limiting anchoring column 402 is also exposed from the new bridge body 2.

[0028] The anchoring screw B401 is provided with an annular protruding structure 7 at its top and above the position close to the limiting anchoring column 402.

[0029] The utility model uses a high-strength screw or a high-strength steel bar, and the upper end is welded with a ring-shaped protrusion structure 7 through a hole for installation and limiting. The middle part crosses between the new and old concrete bridge bodies, and the bottom is also welded with a ring-shaped protrusion structure 7 through a hole.

[0030] The cooperation between the limit slot and the limit anchor column can effectively control the displacement and settlement of the bridge; the notch of the limit slot is buffered by the shock-absorbing sponge to meet the uneven settlement between the new and old bridges. The use of the shock-absorbing sponge adopts a full arrangement method, that is, the sponge fills the entire limit slot, and the limit anchor column is inserted into the limit slot, that is, the shrinkage of the sponge in the later period is the settlement displacement of the bridge. During the use, the shrinkage displacement of the shock-absorbing sponge shall not exceed six years at most, because the fatigue performance of the sponge must be guaranteed to ensure that the uneven settlement between the new and old bridges can be effectively controlled by the limit device.

[0031] When the settlement difference between the new and old bridges exceeds 20mm, it is necessary to replace the shock-absorbing sponge filling blocks, because when the settlement difference exceeds 20mm, the sponge blocks' ability to adapt to the settlement deformation of the new and old bridges will decrease, and replacement can keep the shear resistance stable. Or even if the settlement difference exceeds 20mm and the service life exceeds ten years, the sponge filling blocks also need to be replaced, because due to long-term deformation, their fatigue resistance will be reduced.

[0032] When replacing the sponge block, it is necessary to pay attention to replacing the limit slot piece and the limit anchor column at the same time; first cut off the limit anchor column, take out the limit anchor column, then cut off the limit slot piece, replace both sides with new ones, and then weld them to the corresponding anchor screws after replacement.

[0033] The main bridge deck structures of the new and old bridges include an elastic concrete layer 5 and an asphalt concrete layer 6; the elastic concrete layer 5 is arranged above the joint between the new bridge body 2 and the old bridge body 1, the asphalt concrete layer 6 is arranged on the new bridge body 2 and located on one side of the elastic concrete layer 5, and the asphalt concrete layer 6 is also arranged on the old bridge body 1 and located on the other side of the elastic concrete layer 5.

[0034] Construction principle:

[0035] The old bridge is demolished or widened, a set of anchor connection mother parts are inserted into the steel layer of the old bridge and tied to the steel layer, and then a set of anchor connection sub-parts are inserted into the steel layer of the new bridge, and then connected with the anchor connection mother parts and tied to the steel layer. The main bodies of the new and old bridges are formworked and concrete is poured. After completion, the annular protrusion structure on the anchor steel bar is stuck between the main bodies of the new and old bridges.

[0036] The specific examples used in this specification illustrate the principles and implementation schemes of the present invention, and the description of the above embodiments is only to help understand the present invention. For those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scopes, and the contents of the description should not be a limitation of the present invention.

Claims

1. A new and old bridge joint structure, characterized in that: It comprises a new and old bridge body connection structure for splicing the new and old bridge bodies and a new and old bridge body deck structure for splicing the new and old bridge bodies at the top; the new and old bridge body connection structure comprises an anchor connection mother component (3) inserted through the old bridge body (1) and an anchor connection sub-component (4) inserted through the new bridge body (2); the anchor connection sub-component (4) is plugged into and matched with the anchor connection mother component (3); The anchor connection mother component (3) comprises an anchor screw rod A (301) and a limiting notch component (302) arranged at the bottom of the anchor screw rod A (301), wherein the anchor screw rod A (301) is passed through the bridge body (1) of the old bridge, and the limiting notch component (302) is located below the bridge body (1) of the old bridge; The anchor connection sub-component (4) comprises an anchor screw rod B (401) and a position-limiting anchor column (402) arranged at the bottom of the anchor screw rod B (401), the anchor screw rod B (401) is passed through the new bridge body (2), and the position-limiting anchor column (402) is located below the new bridge body (2), and the position-limiting anchor column (402) is plugged into and fitted in the position-limiting notch component (302); The limiting notch member (302) adopts a hollow cylindrical structure with one side open, and the limiting notch member (302) is filled with a shock-absorbing sponge.

2. The new-old bridge joint structure according to claim 1 is characterized in that: The main bridge deck structure of the new and old bridges comprises an elastic concrete layer (5) arranged above a joint between a new bridge main body (2) and an old bridge main body (1), an asphalt concrete layer (6) arranged on the new bridge main body (2) and located on one side of the elastic concrete layer (5), and an asphalt concrete layer (6) arranged on the old bridge main body (1) and located on the other side of the elastic concrete layer (5).

3. The new-old bridge joint structure according to claim 1 is characterized in that: The anchoring screw A (301) is provided with an annular protrusion structure (7) at its top and above a position close to the limiting notch (302); the anchoring screw B (401) is provided with an annular protrusion structure (7) at its top and above a position close to the limiting anchoring column (402).

4. The new-old bridge joint structure according to claim 2 is characterized in that: The elastic concrete layer (5) and the asphalt concrete layers (6) on both sides thereof have the same laying thickness.