Construction site yellow mud water circulation scheduling device
By designing the yellow mud water circulation scheduling device on the construction site, the extrusion and sliding structure of the filter plate and the elastic ring are used to achieve separation of yellow mud and water, and the design of conveyor belt and cleaning components is solved, the problem of yellow mud residue and separation efficiency is solved. The efficient treatment and recycling of yellow mud water is achieved.
Patent Information
- Application Number
- CN202420399146.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-03-01
AI Technical Summary
If the existing yellow mud water treatment device is not cleaned in time after treatment, it will cause the yellow mud residue to affect the next treatment work, and it will not be possible to effectively separate the water from the yellow mud.
A construction site yellow mud water circulation scheduling device is designed, including a water storage tank, a conveyor belt, a separation assembly and a cleaning assembly. The separation of yellow mud and water is achieved through the extrusion and sliding structure of the filter plate and the elastic ring, and the conveyor belt and drainage port are used for separation. For the discharge of mud cakes and the use of water, the cleaning assembly is rinsed through the spray head to avoid residue.
Effective separation and treatment of yellow mud water is achieved, the impact of yellow mud residue on the next treatment is avoided, and the separation efficiency between water and yellow mud is ensured, and the recycling of yellow mud water on the construction site is ensured.
Smart Images

Figure CN222075973U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of yellow mud water treatment, in particular to a yellow mud water circulation scheduling device at a construction site. Background Art
[0002] During construction at a construction site, in order to ensure the stability of the building's construction and ensure the quality of the building's engineering, a pile driver is needed to drive piles to lay the foundation of the building, thereby ensuring the quality and safety of the building's engineering. When the pile driver is working, a large amount of yellow mud water will be generated, which needs to be collected and discharged in time to ensure the normal operation of the pile driver.
[0003] The existing application number is CN216639245U, which is a device for treating yellow mud water in urban underground construction. Two extension components are arranged inside the mounting frame and used in conjunction with the movable frame to adjust the length of the plate and frame filter press. A splicing component is arranged on the surface of the mounting frame to facilitate the extension of the length of the fixed rod. A fixing ring is arranged on the surface of the fixed rod and used in conjunction with the extrusion piece to drive the extrusion piece to move its position, and the fixing piece can be disassembled on the surface of the fixed rod, thereby realizing the use of various amounts of yellow mud.
[0004] The existing yellow mud water treatment device only adjusts its work by adjusting the length of the filter press, thereby achieving the treatment of various amounts of yellow mud water. However, after the device treats the yellow mud water, part of the yellow mud in the yellow mud water will remain inside the device. If it is not cleaned in time, it will affect the next treatment of the yellow mud water. Utility Model Content
[0005] The utility model aims to provide a construction site yellow mud water circulation scheduling device to solve the above-mentioned background problems.
[0006] The purpose of the utility model can be achieved through the following technical solutions:
[0007] A construction site yellow mud water circulation scheduling device includes a discharge component, the discharge component includes a water storage tank, and drainage pipes are symmetrically arranged on both sides of the water storage tank, a conveyor belt is arranged below the water storage tank, and a storage box is arranged below the conveyor belt, and the storage box is fixedly connected to the end of the drainage pipe;
[0008] A separation assembly is fixedly arranged on the top of the discharge assembly, and the separation assembly includes a mounting plate, and two mounting plates are symmetrically arranged on the top of the discharge assembly;
[0009] A cleaning component is arranged on the top of the separation component. The cleaning component includes a nozzle, and a plurality of the nozzles are located above the separation component.
[0010] As a further solution of the utility model: a plurality of filter plates are arranged between the two mounting plates, and a pressure plate is arranged on one side of the filter plate.
[0011] As a further solution of the utility model: a feed port is fixedly provided on one side of the mounting plate.
[0012] As a further solution of the utility model: a guide rod is fixedly arranged between the mounting plates, a plurality of elastic rings are sleeved on the outside of the guide rod, and one side of the elastic ring is fixedly connected to the filter plate.
[0013] As a further solution of the utility model: the two guide rods are symmetrically arranged on one side of the filter plate, and the filter plate and the guide rods form a sliding structure through an elastic ring.
[0014] As a further solution of the utility model: a drain outlet is fixedly connected to one side of the exterior of the storage box, and a mud discharge outlet is arranged above the drain outlet, and the conveyor belt is located inside the mud discharge outlet.
[0015] As a further solution of the utility model: the ends of the plurality of nozzles are fixedly connected to the bottom end of the water tank, a connecting pipe is fixedly connected to one side of the water tank, and the end of the connecting pipe is connected to the storage box.
[0016] As a further solution of the utility model: baffles are symmetrically arranged on the top of the conveyor belt, and the two baffles are located below the separation assembly.
[0017] Beneficial effects of the utility model:
[0018] (1) The utility model transports the yellow mud water into the separation component through the feed port on the mounting plate, and then uses a power rod to drive a pressure plate to squeeze a plurality of filter plates. Under the action of mutual squeezing of the plurality of filter plates, the yellow mud between the yellow mud water is squeezed into a mud cake shape, and the water enters the water storage tank under the action of gravity. When the amount of mud cake between the filter plates reaches a certain amount, the power rod is used to drive the pressure plate to reset. Due to the elasticity of the elastic ring, the plurality of filter plates are separated from each other, so that the mud cake between the two filter plates will fall onto the conveyor belt under the action of gravity, and the mud cake is transported out through the conveyor belt, thereby realizing the separation of water and yellow mud in the yellow mud water on the construction site;
[0019] (2) When the utility model needs to use the separated water, the water in the storage box can be used through the drain port. At the same time, the separated yellow mud cake can be discharged out of the separation component through the mud discharge port by using a conveyor belt. The yellow mud cake can be discharged while ensuring that the yellow mud water on the construction site is separated from the yellow mud. When the separated water is not needed, the water in the storage box can be transported to the water tank by using a water pump. After that, the separation component under the cleaning component can be flushed through a nozzle connected to the bottom of the water tank to prevent the residual yellow mud from affecting the next separation work. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The utility model is further described below in conjunction with the accompanying drawings.
[0021] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0022] Figure 2 This is a schematic diagram of the connection structure between the filter plate and the guide rod in the utility model;
[0023] Figure 3 This utility model Figure 2 The enlarged structural diagram at A in the middle;
[0024] Figure 4 It is a structural sectional view of the utility model.
[0025] In the figure: 1. Discharge assembly; 101. Drain pipe; 102. Storage box; 103. Conveyor belt; 104. Baffle; 105. Mud discharge port; 106. Drain port; 107. Water storage tank; 2. Separation assembly; 201. Mounting plate; 202. Feed port; 203. Filter plate; 204. Guide rod; 205. Elastic ring; 206. Press plate; 3. Cleaning assembly; 301. Water tank; 302. Nozzle; 303. Connecting pipe. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Embodiment 1
[0028] See also Figure 1-Figure 4As shown, the utility model is a construction site yellow mud water circulation scheduling device, in order to separate water and yellow mud in the construction site yellow mud water, comprising a discharge assembly 1, the discharge assembly 1 comprising a water storage tank, drainage pipes 101 are symmetrically arranged on both sides of the water storage tank, a conveyor belt 103 is arranged below the water storage tank, a storage box 102 is arranged below the conveyor belt 103, and the storage box 102 is fixedly connected to the end of the drainage pipe 101;
[0029] A separation component 2 is fixedly arranged on the top of the discharge component 1. The separation component 2 includes a mounting plate 201. Two mounting plates 201 are symmetrically arranged on the top of the discharge component 1.
[0030] A cleaning component 3 is disposed at the top of the separation component 2 . The cleaning component 3 includes a nozzle 302 . A plurality of nozzles 302 are located above the separation component 2 .
[0031] Specifically, a plurality of filter plates 203 are arranged between the two mounting plates 201, a pressure plate 206 is arranged on one side of the filter plate 203, and one side of the pressure plate 206 is fixedly connected to the end of the power rod. When the yellow mud water on the construction site needs to be separated and processed, the yellow mud water is transported to the inside of the separation component 2 through the feed port 202 on the mounting plate 201, and then the power rod is used to drive the pressure plate 206 to squeeze the plurality of filter plates 203. Under the action of mutual squeezing of the plurality of filter plates 203, the yellow mud between the yellow mud water is squeezed into a mud cake shape, and the water will enter the water storage tank under the action of gravity.
[0032] More specifically, a feed port 202 is fixedly provided on one side of the mounting plate 201, and a guide rod 204 is fixedly provided between the mounting plates 201. A plurality of elastic rings 205 are sleeved on the outside of the guide rod 204, and one side of the elastic ring 205 is fixedly connected to the filter plate 203. In the process of using the plurality of filter plates 203 to squeeze each other, the elastic rings 205 connected on one side of the plurality of filter plates 203 will also be driven to slide on the guide rod 204. Under the action of the guide rod 204 and the elastic ring 205, it is ensured that the plurality of filter plates 203 will not deviate during the squeezing process. When the amount of mud cake between the filter plates 203 reaches a certain amount, the power rod is used to drive the pressure plate 206 to reset. Since the elastic ring 205 is elastic, the plurality of filter plates 203 will separate from each other, so that the mud cake between the two filter plates 203 will fall onto the conveyor belt 103 under the action of gravity, and the mud cake will be transported out through the conveyor belt 103, thereby realizing the separation of water and yellow mud in the yellow mud water on the construction site.
[0033] Specific implementation method of this practical embodiment: when it is necessary to separate and treat the yellow mud water on the construction site, the yellow mud water is transported to the inside of the separation component 2 through the feed port 202 on the mounting plate 201, and then the power rod is used to drive the pressure plate 206 to squeeze the multiple filter plates 203. Under the action of the mutual squeezing of the multiple filter plates 203, the yellow mud between the yellow mud water is squeezed into a mud cake shape, and the water will enter the water storage tank under the action of gravity. When the amount of mud cake between the filter plates 203 reaches a certain amount, the power rod is used to drive the pressure plate 206 to reset. Since the elastic ring 205 is elastic, the multiple filter plates 203 will be separated from each other, so that the mud cake between the two filter plates 203 will fall onto the conveyor belt 103 under the action of gravity, and the mud cake will be transported out through the conveyor belt 103, thereby realizing the separation of water and yellow mud in the yellow mud water on the construction site.
[0034] Embodiment 2
[0035] Based on the above embodiment 1, please refer to Figure 1 and Figure 4 A drain port 106 is fixedly connected to one side of the outside of the storage box 102, and a mud discharge port 105 is arranged above the drain port 106. The conveyor belt 103 is located inside the mud discharge port 105. When the separation work of the yellow mud water on the construction site is completed through the separation component 2, when the separated water is needed, the water in the storage box 102 can be used by using the drain port 106. At the same time, the conveyor belt 103 can also be used to discharge the separated yellow mud cake out of the separation component 2 through the mud discharge port 105. While ensuring that the yellow mud water on the construction site is separated from the yellow mud, the yellow mud cake is discharged to avoid the yellow mud cake that is not discharged in time affecting it during the next separation work.
[0036] Specifically, several nozzles 302 are located below the top plate on the cleaning component 3, and the ends of several nozzles 302 are fixedly connected to the bottom of the water tank 301. A connecting pipe 303 is fixedly connected to one side of the water tank 301, and the end of the connecting pipe 303 is connected to the storage box 102. A water pump is provided at the end of the connecting pipe 303 located in the storage box 102. When the separated water is not needed, the water in the storage box 102 can be transported to the water tank 301 by using the water pump. Thereafter, the separation component 2 below the cleaning component 3 is flushed through the nozzles 302 connected to the bottom of the water tank 301. Therefore, after the yellow mud cake is discharged from the mud discharge port 105, the inside of the separation component 2 is cleaned again, and the residual yellow mud attached to the inner wall of the separation component 2 is flushed to avoid the residual yellow mud from affecting the next separation work.
[0037] More specifically, baffles 104 are symmetrically arranged on the top of the conveyor belt 103, and the baffles 104 are located below the separation assembly 2. When the pressure plate 206 is driven by the power rod to reset, the filter plates 203 will separate from each other, and the yellow mud cakes between the filter plates 203 will fall onto the conveyor belt 103 under the action of gravity. The baffles 104 on both sides of the conveyor belt 103 prevent the yellow mud cakes from not falling on the conveyor belt 103 during the falling process.
[0038] Specific implementation method of this practical embodiment: When the separation of water and yellow mud in the yellow mud water on the construction site is completed by the separation component 2, when the separated water is needed, the water in the storage box 102 can be used through the drain port 106. At the same time, the conveyor belt 103 can be used to discharge the separated yellow mud cake out of the separation component 2 through the mud discharge port 105. While ensuring that the yellow mud water on the construction site is separated from the yellow mud, the yellow mud cake is discharged. When the separated water is not needed, the water in the storage box 102 can be transported to the water tank 301 by using a water pump. Thereafter, the separation component 2 below the cleaning component 3 is flushed through the nozzle 302 connected to the bottom end of the water tank 301. Therefore, after the yellow mud cake is discharged from the mud discharge port 105, the inside of the separation component 2 is cleaned again to flush the residual yellow mud attached to the inner wall of the separation component 2 to prevent the residual yellow mud from affecting the next separation work.
[0039] The working principle of the utility model is as follows: when it is necessary to separate and treat the yellow mud water on the construction site, the yellow mud water is transported to the interior of the separation component 2 through the feed port 202 on the mounting plate 201, and then the power rod is used to drive the pressure plate 206 to squeeze the plurality of filter plates 203. Under the action of the mutual squeezing of the plurality of filter plates 203, the yellow mud between the yellow mud water is squeezed into a mud cake shape, and the water will enter the water storage tank under the action of gravity. When the amount of mud cake between the filter plates 203 reaches a certain amount, the power rod is used to drive the pressure plate 206 to reset. Since the elastic ring 205 is elastic, the plurality of filter plates 203 will be separated from each other, so that the mud cake between the two filter plates 203 will fall onto the conveyor belt 103 under the action of gravity, and the mud cake will be transported out through the conveyor belt 103, thereby realizing the separation of water and yellow mud in the yellow mud water on the construction site.
[0040] The above is a detailed description of an embodiment of the utility model, but the content is only a preferred embodiment of the utility model and cannot be considered to limit the scope of implementation of the utility model. All equivalent changes and improvements made within the scope of application of the utility model should still fall within the scope of the patent coverage of the utility model.
Claims
1. Construction site yellow mud water circulation scheduling device, characterized in that: The discharge assembly (1) comprises a water storage tank (107), and drainage pipes (101) are symmetrically arranged on both sides of the water storage tank (107), a conveyor belt (103) is arranged below the water storage tank, and a storage box (102) is arranged below the conveyor belt (103), and the storage box (102) is fixedly connected to the end of the drainage pipe (101); A separation component (2) is fixedly arranged at the top of the discharge component (1), and the separation component (2) comprises a mounting plate (201), and two mounting plates (201) are symmetrically arranged at the top of the discharge component (1); A cleaning component (3) is arranged at the top of the separation component (2), and the cleaning component (3) comprises a nozzle (302). A plurality of the nozzles (302) are located above the separation component (2).
2. The construction site yellow mud water circulation scheduling device according to claim 1, characterized in that: A plurality of filter plates (203) are arranged between the two mounting plates (201), and a pressing plate (206) is arranged on one side of the filter plate (203).
3. The construction site yellow mud water circulation scheduling device according to claim 1, characterized in that: A feed port (202) is fixedly provided on one side of the mounting plate (201).
4. The construction site yellow mud water circulation scheduling device according to claim 1, characterized in that: A guide rod (204) is fixedly arranged between the mounting plates (201), a plurality of elastic rings (205) are sleeved on the outside of the guide rod (204), and one side of the elastic ring (205) is fixedly connected to the filter plate (203).
5. The construction site yellow mud water circulation scheduling device according to claim 4, characterized in that: The two guide rods (204) are symmetrically arranged on one side of the filter plate (203), and the filter plate (203) forms a sliding structure with the guide rods (204) via an elastic ring (205).
6. The construction site yellow mud water circulation scheduling device according to claim 1, characterized in that: A drainage port (106) is fixedly connected to one side of the exterior of the storage box (102), and a mud discharge port (105) is arranged above the drainage port (106), and the conveyor belt (103) is located inside the mud discharge port (105).
7. The construction site yellow mud water circulation scheduling device according to claim 1, characterized in that: The ends of the plurality of spray heads (302) are fixedly connected to the bottom end of the water tank (301), a connecting pipe (303) is fixedly connected to one side of the water tank (301), and the end of the connecting pipe (303) is connected to the storage box (102).
8. The construction site yellow mud water circulation scheduling device according to claim 1, characterized in that: Baffles (104) are symmetrically arranged on the top of the conveyor belt (103), and the two baffles (104) are located below the separation assembly (2).
