Test device for simulating foundation subsidence

By designing a test device to simulate foundation subsidence, including foundation carriers, soil transportation, humidification and heating and dehumidification systems, the shortcomings of foundation subsidence research in wet loess areas were solved, and the real simulation of the catastrophe mechanism of high-speed railway subsidence was realized and Dynamic stability research has improved the systematicity and accuracy of the experiment.

CN222120331UActive Publication Date: 2024-12-06CHANGAN UNIV +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420824182.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-12-06
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

In the wet loess area, it is difficult for the existing technology to effectively simulate and study the catastrophic mechanism and long-term dynamic stability of high-speed railway subgrades, resulting in insufficient field tests and small-scale model tests, which affects the authenticity and accuracy of foundation subsidence.

Method used

A test device that simulates foundation subsidence is designed, including foundation carrier system, soil transportation system, two-way humidification system, heating and dehumidification system and foundation settlement system. Through these systems, the on-site construction process is simulated to achieve soil humidification. Heating, dehumidification and settlement simulates foundation settlement and provides a systematic, stable and accurate indoor testing environment.

Benefits of technology

The device can truly simulate the on-site construction process, improve the accuracy of foundation settlement deformation measurement, and conduct soil transportation and water level control in a simple and efficient manner, realize accurate adjustment of temperature and moisture content, and facilitate the study of water-force of soil characteristics. Thermal coupling effect provides reliable large-scale model experimental conclusions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222120331U_ABST
    Figure CN222120331U_ABST
Patent Text Reader

Abstract

The utility model discloses a test device for simulating foundation subsidence, which comprises a foundation carrier system used for bearing a soil body; the soil body transportation system is used for transporting soil bodies to the foundation carrier system; the two-way humidifying system is used for humidifying the soil body borne by the foundation carrier system; the heating and dehumidifying system is used for heating and dehumidifying the soil body borne by the foundation carrier system; and the foundation settlement system is used for simulating foundation settlement. According to the utility model, the on-site construction process can be truly simulated, the test intuition under the prototype condition can be exerted, and the systematicness, stability and accuracy of indoor test determination can be fully exerted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of roadbed, tunnel and building foundation construction, in particular to a test device for simulating foundation subsidence. Background Art

[0002] Collapsible loess refers to soil that is soaked by water under a certain pressure, the soil structure is quickly destroyed, and there is a significant additional subsidence, which particularly affects the safety of building structures. When building high-speed railways in large areas of collapsible loess, due to the loose structure of the loess, coupled with the influence of locomotive vibration and rainfall, it is easy to cause problems such as subsidence of the roadbed and slope collapse, thus threatening the safety of train operation. Therefore, the problem of high-speed railway subgrade humidification disasters in collapsible loess areas urgently needs to be explored in depth, in order to solve the key scientific problems behind the technical bottlenecks of such geological disaster prevention and control.

[0003] In order to better and more realistically study and analyze the mechanism of moisture increase and disaster-pregnancy of high-speed railway subgrade in collapsible loess areas and its long-term dynamic stability, a test device and method for simulating foundation subsidence were proposed to overcome the shortcomings of field tests and small-scale model tests. The device and method can not only simulate the on-site construction process more realistically and give full play to the intuitiveness of the test under prototype conditions, but also give full play to the systematicness, stability and accuracy of indoor test determination, so as to draw reliable large-scale model test conclusions. Utility Model Content

[0004] The utility model aims to provide a test device for simulating foundation settlement, which is used to overcome the shortcomings of on-site tests and small-scale model tests.

[0005] In order to achieve the above object, the utility model provides a test device for simulating foundation subsidence, and the technical solution adopted is as follows:

[0006] A test device for simulating foundation subsidence, comprising:

[0007] Foundation carrier system, used to support the soil;

[0008] A soil transport system, used for transporting soil to the foundation carrier system;

[0009] A two-way humidification system, used for humidifying the soil carried by the foundation carrier system;

[0010] A heating and dehumidification system, used for heating and dehumidifying the soil carried by the foundation carrier system;

[0011] Foundation settlement system, used to simulate foundation settlement.

[0012] Furthermore, the foundation carrier system includes a movable steel plate and a steel structure support, the steel structure support is provided with a fixed vertical plate and a glass vertical plate, and the movable steel plate is hingedly connected to the steel structure support through an edge movable plate.

[0013] Furthermore, the soil transportation system includes a gantry, an I-beam runway, an electric hoist elevator, a motor traction device and a transport vehicle, the I-beam runway is fixed to the gantry, the electric hoist elevator is connected to the transport vehicle, and the electric hoist elevator is movably arranged on the I-beam runway through the motor traction device.

[0014] Furthermore, the bidirectional humidification system includes a seepage pipe, a water tank and a flow meter. The seepage pipe is connected to the water tank, and the flow meter is arranged on the seepage pipe.

[0015] Furthermore, the heating and dehumidification system includes a temperature controller and an electric heater. The electric heater is arranged on the inner side of the fixed vertical plate. The signal output end of the temperature controller is connected to the electric heater.

[0016] Furthermore, the foundation settlement system includes a longitudinal lifting system, a mechanical jack, a transverse lifting system, a lifting beam displacement limiting groove, a hand-locking crank plate, an intermediate movable plate hinge, a steel strand, an edge movable plate hinge, a pulley and an intermediate movable plate moving roller.

[0017] Furthermore, the edge movable steel plate is connected to the steel structure support through the edge movable plate hinge, and two middle movable plate moving rollers are arranged on the edge movable plate in the direction parallel to the long side, two rollers are arranged on the edge of the second movable plate close to the edge movable plate, a channel steel lifting beam is arranged under the middle movable plate moving roller, and lifting beam displacement limiting grooves are arranged at both ends of the channel steel.

[0018] Furthermore, the third and second movable plates are hingedly connected via an intermediate movable plate, and a channel steel lifting beam is arranged below and hingedly connected to the intermediate movable plate.

[0019] Furthermore, the moving roller of the middle movable plate is made of rigid material.

[0020] Furthermore, one seepage pipe is laid every 30 cm of soil layer.

[0021] The beneficial effects of the utility model are:

[0022] 1. The utility model can not only simulate the on-site construction process more realistically, give full play to the intuitiveness of the test under the prototype conditions, but also give full play to the systematicness, stability and accuracy of indoor test determination;

[0023] 2. The foundation carrier system of the utility model is made of steel structure, so it has high stability and reduces the influence of boundary conditions, so that the foundation settlement deformation can be accurately measured;

[0024] 3. The soil transportation system of the utility model is made of two-way automatic transportation equipment, so that soil transportation can be carried out in a time-saving, simple and efficient manner;

[0025] 4. The utility model bidirectional humidification system uses a water pump to stably supply water to the pipe network, which can achieve stable and uniform rise and fall of the water level. The flow rate is measured by an electronic flow meter, which can conveniently and accurately measure the water seepage;

[0026] 5. The heating and dehumidification system of the utility model is composed of 12 groups of electric heaters, which are attached to the inner surface of the vertical plate, and can realize accurate temperature setting and heating uniformity, and can quickly reduce the moisture content of the foundation, achieve the effect of rapid dehumidification, and realize the study of soil characteristics under the dry-wet cycle and water-mechanical-thermal coupling;

[0027] 6. The foundation settlement system of the utility model is made of 144 0.3-meter movable steel plates, 25 5-ton mechanical jacks, 56 pulley lifting frames, 5 8-meter square steel pipes, 23 2-meter square steel pipes and displacement sensors. Each component can be increased or reduced according to actual needs, so that different longitudinal settlement modes and different lateral local settlement modes can be conveniently and accurately achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the specific implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the specific implementation or the prior art description. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.

[0029] Figure 1 The figure shows the overall structure of a test device for simulating foundation subsidence according to an embodiment of the utility model.

[0030] Figure 2 The structure diagram of a foundation carrier system of a test device for simulating foundation subsidence according to an embodiment of the utility model is shown.

[0031] Figure 3 The structure diagram of the soil transportation system of a test device for simulating foundation settlement according to an embodiment of the utility model is shown.

[0032] Figure 4 The structure diagram of a bidirectional humidification system of a test device for simulating foundation subsidence according to an embodiment of the utility model is shown.

[0033] Figure 5 The structure diagram of a heating and dehumidification system of a test device for simulating foundation subsidence according to an embodiment of the utility model is shown.

[0034] Figure 6 An overall schematic diagram of a foundation settlement system of a test device for simulating foundation settlement according to an embodiment of the utility model is shown.

[0035] Figure 7 A schematic diagram of a cable hoisting system of a test device for simulating foundation subsidence according to an embodiment of the utility model is shown.

[0036] Figure 8 A detailed view of the hinge connection of an edge movable plate of a test device for simulating foundation settlement according to an embodiment of the utility model is shown.

[0037] Fig. 9 A detailed diagram of the lifting rope of a test device for simulating foundation settlement according to an embodiment of the utility model is shown.

[0038] Fig.10 A detailed view of the hinge connection of the middle movable plate of a test device for simulating foundation settlement according to an embodiment of the utility model is shown.

[0039] Reference numerals:

[0040] A. Foundation carrier system; B. Soil transportation system; C. Bidirectional humidification system; D. Heating and dehumidification system; E. Foundation settlement system; 1. Movable steel plate; 2. Fixed vertical plate; 3. Steel structure support; 4. Glass vertical plate; 5. Gantry; 6. I-beam runway; 7. Electric hoist; 8. Transport vehicle; 9. Seepage pipe; 10. Water tank; 11. Flow meter; 12. Temperature controller; 13. Electric heater; 14. Longitudinal lifting beam; 15. Mechanical jack; 16. Horizontal lifting beam; 17. Lifting beam displacement limiting groove; 18. Locking hand winch; 19. Intermediate movable plate hinge; 20. Steel strand; 21. Edge movable plate hinge; 22. Motor traction device. DETAILED DESCRIPTION

[0041] The following describes the implementation of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific implementations, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict.

[0042] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0043] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0044] The specific implementation of the utility model is further described in detail below in conjunction with the drawings and embodiments.

[0045] The present invention provides a test device for simulating foundation subsidence, comprising:

[0046] Foundation carrier system A, used to carry the soil;

[0047] A soil transport system B, used for transporting soil to the foundation carrier system;

[0048] A two-way humidification system C, used for humidifying the soil carried by the foundation carrier system;

[0049] A heating and dehumidification system D, used for heating and dehumidifying the soil carried by the foundation carrier system;

[0050] Foundation settlement system E is used to simulate foundation settlement.

[0051] Specifically, Figure 2 As shown, the foundation carrier system A includes a movable steel plate 1 and a steel structure support 3, on which a fixed vertical plate 2 and a glass vertical plate 4 are attached. Meanwhile, the movable steel plate 1 is part of the foundation settlement system, and the movable steel plate 1 is connected to the steel structure support 3 via a movable hinge 21.

[0052] like Figure 3 As shown, the soil transportation system B includes a steel structure truss 5, a gantry crane 6, a motor 7 and a transport vehicle 8.

[0053] The soil transportation system B includes a gantry 5, an I-beam runway 6, an electric hoist lift 7, a motor tractor 22 and a transport vehicle 8, wherein the I-beam runway 6 is fixed to the gantry 5, the electric hoist lift 7 is connected to the transport vehicle 8, and the electric hoist lift 7 is movably arranged on the I-beam runway 6 through the motor tractor 22. The gantry 5 and the I-beam runway 6 provide a stable transportation track, the electric hoist lift 7 realizes lifting, and the motor tractor 22 realizes linear motion on the I-beam runway 6, so that the soil can be transported by the transport vehicle 8.

[0054] like Figure 4 As shown, the bidirectional humidification system C includes a water seepage pipe 9, a water tank 10 and a flow meter 11, and the humidification system is arranged on both sides of the model box.

[0055] like Figure 5 As shown, the heating and dehumidification system D includes a temperature controller 12 and an electric heater 13 , and the electric heater 13 is arranged on the inner side of the vertical plate 2 .

[0056] like Figure 6 As shown, the foundation settlement system E includes a longitudinal lifting system 14, a mechanical jack 15, a transverse lifting system 16, a lifting beam displacement limiting groove 17, a hand-locking crank plate 18, an intermediate movable plate hinge 19, a steel strand 20, an edge movable plate hinge 21, a pulley 22 and an intermediate movable plate moving roller 23.

[0057] The following will take the cross-section settlement in the short side direction as an example to introduce in detail the internal working principles of each system, the connection method of each system in cooperation with each other, and its operating principle.

[0058] Please combine Figure 7-10 As shown, after the test device simulating foundation settlement is processed, the longitudinal lifting system 14 is lifted by shaking the self-locking winch 18 to make all the movable steel plates 1 in the same horizontal plane, wherein the edge movable steel plate is connected to the steel structure support 3 through the edge movable plate hinge 21, and the edge movable plate is provided with two rollers 23 in the direction parallel to the long side, and the rollers are made of rigid materials to prevent the rollers from deforming themselves and causing secondary deformation of the foundation, two rollers 23 are provided on the edge of the second movable plate close to the edge movable plate, a channel steel lifting beam 14 is provided below the four rollers, and lifting beam displacement limiting grooves 17 are provided at both ends of the channel steel to ensure that the lifting beam does not produce horizontal displacement, the third and second movable plates are connected through the middle movable plate hinge 19, and a channel steel lifting beam 14 is also provided below and connected to the middle movable plate hinge 19, as shown Fig.10 As shown in the detailed drawing, its purpose is to ensure that all movable plates do not move during the lifting process, that is, the movable plates are evenly spaced to achieve continuity of foundation settlement.

[0059] After the movable steel plate 1 is adjusted to be level, its plane height is recorded by a level meter, and a geotextile is laid on the platform to prevent soil particles from leaking down. Then, soil is spread to the lifting platform through the soil transportation system, and a seepage pipe 9 is laid every 30 cm of soil layer. By analogy, the model box is filled with soil, and a scaled-down building is built on the foundation in proportion.

[0060] The high-level water tank 10 infiltrates water into the soil to achieve the original settlement simulation of the soil under different moisture contents. At the same time, the heating and dehumidification system on the fixed vertical plate 2 can be used to achieve rapid evaporation of water, thereby achieving dry-wet cycle simulation of different moisture contents.

[0061] After the original settlement is achieved and the foundation settlement law is found, the self-locking winches 18 at both ends of the longitudinal settlement beam 14 can be simultaneously shaken to set the longitudinal settlement beam 14's sinking distance from the edge in sequence. After a certain settlement beam is set, the mechanical jack 15 is supported every 2 meters to ensure that the entire settlement beam is in the same horizontal position, thereby achieving different ways of foundation settlement. The settlement in the long side direction is achieved in the same way.

[0062] The above implementation modes are only used to illustrate the present invention, but not to limit the present invention. Ordinary technicians in the relevant technical field can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions also belong to the scope of the present invention. The scope of patent protection of the present invention should be limited by the claims.

Claims

1. A test device for simulating foundation subsidence, characterized in that: include: Foundation carrier system, used to support the soil; A soil transport system, used for transporting soil to the foundation carrier system; A two-way humidification system, used for humidifying the soil carried by the foundation carrier system; A heating and dehumidification system, used for heating and dehumidifying the soil carried by the foundation carrier system; Foundation settlement system, used to simulate foundation settlement.

2. The test device for simulating foundation subsidence according to claim 1, characterized in that: The foundation carrier system comprises a movable steel plate and a steel structure support, the steel structure support is provided with a fixed vertical plate and a glass vertical plate, and the movable steel plate is hingedly connected to the steel structure support through an edge movable plate.

3. The test device for simulating foundation subsidence according to claim 1, characterized in that: The soil transportation system includes a gantry, an I-beam runway, an electric hoist, a motor traction device and a transport vehicle. The I-beam runway is fixed to the gantry, the electric hoist is connected to the transport vehicle, and the electric hoist is movably arranged on the I-beam runway through the motor traction device.

4. The test device for simulating foundation subsidence according to claim 1, characterized in that: The bidirectional humidification system comprises a water seepage pipe, a water tank and a flow meter. The water seepage pipe is connected to the water tank, and the flow meter is arranged on the water seepage pipe.

5. The test device for simulating foundation subsidence according to claim 2, characterized in that: The heating and dehumidification system comprises a temperature controller and an electric heater. The electric heater is arranged on the inner side of the fixed vertical plate. The signal output end of the temperature controller is connected to the electric heater.

6. The test device for simulating foundation subsidence according to claim 2, characterized in that: The foundation settlement system comprises a longitudinal lifting system, a mechanical jack, a transverse lifting system, a lifting beam displacement limiting groove, a locking hand cranking plate, an intermediate movable plate hinge, a steel strand, an edge movable plate hinge, a pulley and an intermediate movable plate moving roller.

7. The test device for simulating foundation subsidence according to claim 6, characterized in that: The edge movable steel plate is connected to the steel structure support through the edge movable plate hinge, and two middle movable plate moving rollers are arranged on the edge movable plate in the direction parallel to the long side, two rollers are arranged on the edge of the second movable plate close to the edge movable plate, a channel steel lifting beam is arranged under the middle movable plate moving roller, and lifting beam displacement limiting grooves are arranged at both ends of the channel steel.

8. The test device for simulating foundation subsidence according to claim 7, characterized in that: The third and second movable plates are hingedly connected through the middle movable plate, and a channel steel lifting beam is arranged below and hingedly connected with the middle movable plate.

9. The test device for simulating foundation subsidence according to claim 7, characterized in that: The moving roller of the middle movable plate is made of rigid material.

10. The test device for simulating foundation subsidence according to claim 4, characterized in that: One seepage pipe is laid every 30 cm of soil layer.